0% found this document useful (0 votes)
27 views3 pages

Dfccil Knowlege Book B

The document outlines three proposed future corridors by the Dedicated Freight Corridor Corporation of India Limited: the East Coast Corridor (1080 km), East-West Corridor (1738 RKM), and North-South Corridor (890 RKM). Each corridor passes through multiple states and is expected to generate significant freight traffic from various industries such as coal, iron ore, and thermal power plants. The completion dates for the Detailed Project Reports (DPR) for these corridors are set for December 2022, March 2023, and February 2023, respectively.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views3 pages

Dfccil Knowlege Book B

The document outlines three proposed future corridors by the Dedicated Freight Corridor Corporation of India Limited: the East Coast Corridor (1080 km), East-West Corridor (1738 RKM), and North-South Corridor (890 RKM). Each corridor passes through multiple states and is expected to generate significant freight traffic from various industries such as coal, iron ore, and thermal power plants. The completion dates for the Detailed Project Reports (DPR) for these corridors are set for December 2022, March 2023, and February 2023, respectively.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

6/28/25, 5:26 AM DFCCIL

E-Tender/IREPS Freight Business Portal CVC Link for E-Pledge


Skip to Main Content Screen Reader Access A +
A A- A A English | हिंदी

Dedicated Freight Corridor Corporation of India Limited


A Govt. of India (Ministry of Railways) Enterprise

Contact Us Login

https://dfccil.com/Home/DynemicPages?MenuId=325 1/3
6/28/25, 5:26 AM DFCCIL

New Corridor Last Updated On:23/12/2022

Future DFC Corridors


The following three future corridors have been proposed:-

1. East Coast Corridor :-

The proposed corridor stretching 1080 km traverses through three states of India, namely West Bengal, Orissa, and Andhra Pradesh. Mostly
runs parallel to the existing Kharagpur-Vijayawada coastal railway line. It also passes over three zonal railways, namely South Eastern, East
Coast and South-Central Railway. The DPR for this corridor is likely to be completed by Dec’22.

Traffic Potential:
The major traffic generators which will be contributing to East Coast Corridor in PIA are mines of Coal, Iron ore, Thermal Power Plants, Ports,
Fertilizers, POL, CONCOR ICDs, FCI godowns, etc.

2. East West Corridor :-

https://dfccil.com/Home/DynemicPages?MenuId=325 2/3
6/28/25, 5:26 AM DFCCIL

The proposed East-West DFC (EWDFC) from Bhusaval to Dankuni including spur line from Rajkharswan to Andal passes through five states
namely West Bangal, Jharkhand, Odisha, Chhattisgarh, and Maharashtra. The length of the mainline is 1551 RKM and the length of the spur
line is 187 RKM (Total: 1738 RKM). This corridor has further been extended from Bhusaval to Palghar. The DPR for this corridor is planned to
be completed by Mar’23.

Traffic Potential:
The major traffic generators which will be contributing to East-West Corridor in project influence area (PIA) are Mines of Coal, Iron ore,
bauxite, Manganese, Ferro Alloys, Steel Pants, Ports – major and minor, Fertilizers, Thermal Power Plants, Petroleum Oil Lubricants (POL),
Cement plants, Container Corporation (CONCOR) Inland Container Deports (ICDs), Food Corporation of India (FCI) godowns etc.

3.North-South Corridor :-

The proposed North-South DFC (NSDFC) from Itarsi-Nagpur-Vijayawada passes through four states namely Madhya Pradesh,
Maharashtra, Telangana, and Andhra Pradesh. The length of this route is 890 RKM. Railway Board has further extended this corridor from
Vijayawada to Nidubrolu. The DPR for this corridor is targeted for completion by Feb’23.
These areas surrounding the route are endowed with natural resources such as coal and other minerals, steel plants in adjoining areas,
Industrial hubs like Cement Plants, Thermal Power Stations, Logistic Parks which generate heavy freight along the North-South Sub corridor
route.

Traffic Potential:
The major traffic generators which will be contributing to North-South Corridor in Project influence area (PIA) are Mines of Coal, Cement
plants, Thermal Power Plants (TPP), Petroleum Oil Lubricants (POL), Container Corporation (CONCOR) Inland Container Deports (ICDs),
Food Corporation of India (FCI) godowns, Fertilizers etc.

Copyright Policy Disclaimer Hyperlinking Policy Privacy Policy Terms & Conditions Site Map
Visitor Counter:0006537103
Last Updated On:27/06/2025

Copyright & copy 2025 DFCCIL, Government of India, All Rights Reserved

https://dfccil.com/Home/DynemicPages?MenuId=325 3/3

You might also like