26 Weeks RBP From 16-06-2025 To 14-12-2025 (West) GNT DIV

The document outlines the Rolling Block Programme scheduled from June 16, 2025, to December 14, 2025, detailing various engineering works across different sections. Each entry specifies the date, division, section, type of work, planned block duration, and required resources. The program includes maintenance activities such as rail renewal, welding, and inspections, with specific timings and personnel assignments noted for each task.

Uploaded by

Krishna Mohan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views32 pages

26 Weeks RBP From 16-06-2025 To 14-12-2025 (West) GNT DIV

The document outlines the Rolling Block Programme scheduled from June 16, 2025, to December 14, 2025, detailing various engineering works across different sections. Each entry specifies the date, division, section, type of work, planned block duration, and required resources. The program includes maintenance activities such as rail renewal, welding, and inspections, with specific timings and personnel assignments noted for each task.

Uploaded by

Krishna Mohan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 32

Rolling Block Programme from 16-06-2025 to 14-12-2025 - WEST

Block Planned Demanded On Date


Sub KM Planned block Timings Train
Major Station/Station Main or Planned Block Duration Output Supervisor Block Timings Remarks (S&T, Caution Order
S.No Date Div Secti Direction Dept Type of Work Repercu (HH:MM) OHE, Tower Car,
Section Shadow (in mins) From To Deputed Impositions/
on From To From To Unit Quantity sions Power block, etc)
(HH:MM) (HH:MM) From To Alterations

16-06-2025 (Monday)

13:00- OHE staff


1 16-06-2025 GNT GNT-NDL NDL YARD RD-4 ENGG Rail renewal MAIN 2 blocks of 90 min each 8:30-10:00 SSE/P.Way/NDL(G)
14:30 required

13:00- OHE staff


2 16-06-2025 GNT GNT-NDL NDL YARD RD-1 ENGG Welding MAIN 2 blocks of 90 min each 8:30-10:00 no 4 SSE/P.Way/NDL(G)
14:30 required

3 16-06-2025 GNT GNT-NDL NDL YARD SL 1 2 TRD UIOL MAINTENANCE Shadow 60+60 MINS SSE/TRD/NDL

4 16-06-2025 GNT GNT-NDL NDL YARD ST B/I Maintenance Shadow 2 Blocks of 30mins each ESM/NDL Assistant

2 Disconnection of each
5 16-06-2025 GNT GNT-NDL NDL YARD ST CH Maintenance Shadow ESM/NDL Assistant
30 min

execavation,Breaking drilling
6 16-06-2025 GNT GNT-NDL CMZ GZL UP/DN 232/650 233/400 Engg-Con Shadow 1 block of 90 mins 11:30-13:00 AXEN/C/MRK 09:00 17:00
blasting of rock

execavation,Breaking drilling
7 16-06-2025 GNT GNT-NDL DMT CMZ UP/DN 219/700 223/200 Engg-Con Shadow 2 blocks of 60 min each AXEN/C/MRK 09:00 17:00
blasting of rock

11:30-
8 16-06-2025 GNT GNT-NDL DMT CMZ SL ENGG UTV MAIN 2 blocks of 90 min each 9:30-11:00 no 40 JE/P.Way/GID(G)
13:00

9 16-06-2025 GNT GNT-NDL GID YARD ST B/I Maintenance Shadow 2 Blocks of 30mins each ESM/GID Assistant

2 Disconnection of each
10 16-06-2025 GNT GNT-NDL GID YARD ST CH Maintenance MAIN ESM/GID Assistant
30 min

S&T and OHE


11 16-06-2025 GNT GNT-NDL GID YARD DN ENGG BCM+TAMPING MAIN 1 block of 180 mins 11:00-14:00 km 0.25 SSE/P.Way/GID staff with Tower SR 30KMPH
car required

12 16-06-2025 GNT GNT-NDL JBK YARD ST Both B/I QTY/Inspection Shadow 2 Blocks of each 30min SSE/S/MRK ESM

LC- 217 EKT & S/BOOM EKT 2 Disconnection of each


13 16-06-2025 GNT GNT-NDL JBK YARD ST shadow ESM/CBM Assistant
MAINTENANCE 30 min

14:00- OHE staff


14 16-06-2025 GNT GNT-NDL JBK YARD UP ENGG TAMPING MAIN 2 block of 90 mins 10:30-12:00 km 1.6 SSE/P.Way/CBM
15:30 required

14:00-
15 16-06-2025 GNT GNT-NDL CBM TLU UP/DN 164 169 TRD PTFE MANTENANCE MAIN 2 Blocks of 90 min each 10:30-12:00 SSE/TRD/GID TOWER CAR
15:30

16 16-06-2025 GNT GNT-NDL MRK YARD ST Both B/I M/I INSPECTION MAIN 2 Blocks of each 30min JE/S/CBM ESM

2 disconnection of each
17 16-06-2025 GNT GNT-NDL MRK YARD ST CH M/I INSPECTION Shadow JE/S/CBM ESM
30min

ENGG Staff
18 16-06-2025 GNT GNT-NDL KCD YARD ENGG & ST SSD Maintenance MAIN 2 Blocks of each 60min ESM/KCD
required.

19 16-06-2025 GNT GNT-NDL GKM KCD UP/DN 97 106 TRD PTFE MANTENANCE MAIN 120+120 MINUTES flexible slot SSE/TRD/MRK TOWER CAR

2 BLOCK OF 30MINS
20 16-06-2025 GNT GNT-NDL CEM YARD ST BOTH B/I Q.I Shadow SSE/S/VKN ESM
EACH
Block Planned Demanded On Date
Sub KM Planned block Timings Train
Major Station/Station Main or Planned Block Duration Output Supervisor Block Timings Remarks (S&T, Caution Order
S.No Date Div Secti Direction Dept Type of Work Repercu (HH:MM) OHE, Tower Car,
Section Shadow (in mins) From To Deputed Impositions/
on From To From To Unit Quantity sions Power block, etc)
(HH:MM) (HH:MM) From To Alterations

2 disconnection of each
21 16-06-2025 GNT GNT-NDL CEM YARD ST CH Q.I Shadow SSE/S/VKN ESM
30min

4 BLOCKS OF 90MIN 14:00- OHE Staff


22 16-06-2025 GNT GNT-NDL NRT STUR UP/DN ENGG BRM MAIN 8:00-9:30 km 4 SSE/P.WAY/NRT
EACH 15:30 Required

2 BLOCK OF 30MINS
23 16-06-2025 GNT GNT-NDL STUR YARD ST BOTH B/I MAINTENANCE MAIN ESM/STUR ASSISTANT
EACH

2 disconnection of each
24 16-06-2025 GNT GNT-NDL STUR YARD ST CH MAINTENANCE Shadow ESM/STUR ASSISTANT
30min

S&T and OHE


1 BLOCK OF 180MIN
25 16-06-2025 GNT GNT-NDL NDPU YARD UP/DN ENGG BCM+TAMPING MAIN 13:00-16:00 km 0.2 SSE/P.WAY/NLPD staff with Tower
EACH
car required

2 BLOCKS OF 120MIN 14:00- OHE Staff


26 16-06-2025 GNT GNT-NDL PRCA PPM UP/DN ENGG 3X DYNAMIC MAIN 8:00-9:30 km 3 SSE/P.WAY/NLPD
EACH 15:30 Required

2 BLOCKS OF EACH 2 flexible OHE Staff


27 16-06-2025 GNT GNT-KCC NBR YARD UP/DN ENGG PCTM TAMPING MAIN 6:30-8:30 pt 1 SSE/P.WAY/GNT
HOURS slot Required

2 BLOCKS OF EACH 2
28 16-06-2025 GNT GNT-KCC NBR MAG UP ENGG WELDING OF RAIL JOINTS MAIN flexible slot no 4 SSE/P.WAY/GNT -
HOURS

S&T, OHE Staff,


29 16-06-2025 GNT GNT-KCC NBR MAG DN ENGG TFTR WORK MAIN 1 BLOCKS OF 4 HOURS 6:30-9:30 km 0.2 SSE/P.WAY/GNT POWER BLOCK
Required

17-06-2025 (Tuesday)

1 17-06-2025 GNT GNT-NDL NDL YA SL 1 2 TRD AOH OF ATD Shadow 60+60 MINS SSE/TRD/NDL

13:00- OHE staff


2 17-06-2025 GNT GNT-NDL NDL YARD RD-4 ENGG Rail renewal Shadow 2 blocks of 90 min each 8:30-10:00 SSE/P.Way/NDL(G)
14:30 required

13:00- OHE staff


3 17-06-2025 GNT GNT-NDL NDL YARD RD-1 ENGG Welding MAIN 2 blocks of 90 min each 8:30-10:00 no 4 SSE/P.Way/NDL(G)
14:30 required

execavation,Breaking drilling
4 17-06-2025 GNT GNT-NDL CMZ GZL UP/DN 232/650 233/400 Engg-Con Shadow 1 block of 90 mins 11:30-13:00 AXEN/C/MRK 09:00 17:00
blasting of rock

5 17-06-2025 GNT GNT-NDL CMZ YARD ST B/I M.I Shadow 2 Blocks of 30mins each JE/S/NDL ESM

11:30-
6 17-06-2025 GNT GNT-NDL DMT CMZ SL ENGG UTV MAIN 2 blocks of 90 min each 9:30-11:00 no 40 JE/P.Way/GID(G)
13:00

execavation,Breaking drilling
7 17-06-2025 GNT GNT-NDL DMT CMZ UP/DN 219/700 223/200 Engg-Con Shadow 2 blocks of 60 min each AXEN/C/MRK 09:00 17:00
blasting of rock

Tower car, Rail


Pending works/ Remarks block may be planed as 9.00 17.00h
8 17-06-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
S&T and OHE
9 17-06-2025 GNT GNT-NDL GID YARD DN ENGG BCM+TAMPING MAIN 1 block of 180 mins 11:00-14:00 km 0.25 SSE/P.Way/GID staff with Tower SR 30KMPH
car required

OHE staff
10 17-06-2025 GNT GNT-NDL JBK SDV UP/DN ENGG TAMPING Shadow 2 block of 90 mins 11:00-14:00 km 1.6 SSE/P.Way/CBM
required

11 17-06-2025 GNT GNT-NDL JBK YARD ST Both B/I M.I Shadow 2 Blocks of each 30min JE/S/CBM ESM

2 disconnections of each
12 17-06-2025 GNT GNT-NDL JBK YARD ST CH TECH, M.I Shadow JE/S/CBM ESM
30min
Block Planned Demanded On Date
Sub KM Planned block Timings Train
Major Station/Station Main or Planned Block Duration Output Supervisor Block Timings Remarks (S&T, Caution Order
S.No Date Div Secti Direction Dept Type of Work Repercu (HH:MM) OHE, Tower Car,
Section Shadow (in mins) From To Deputed Impositions/
on From To From To Unit Quantity sions Power block, etc)
(HH:MM) (HH:MM) From To Alterations

14:00-
13 17-06-2025 GNT GNT-NDL CBM yard UP&DN 168 170 TRD CROSSOVERS MAINTENANCE MAIN 2 Blocks of 90 min each 10:30-12:00 SSE/TRD/GID TOWER CAR
15:30

Tower car, Rail


Pending works/ Remarks block may be planed as 9.00 17.00h
14 17-06-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff

Tower car & OHE


15 17-06-2025 GNT GNT-NDL GKM KCD UP/DN 97 106 TRD AOH OF ATD Shadow 120+120 MINUTES flexible slot SSE/TRD/MRK
staff

16 17-06-2025 GNT GNT-NDL GKM YARD ST Cable meggering at GNT side MAIN 1 Disconection of 240mins NI wkg SSE/S/VKN ESMs & assistant

4 BLOCKS OF 90MIN 14:00- OHE Staff


17 17-06-2025 GNT GNT-NDL NRT STUR UP/DN ENGG BRM MAIN 8:00-9:30 km 4 SSE/P.WAY/NRT
EACH 15:30 Required

S&T and OHE


1 BLOCK OF 180MIN
18 17-06-2025 GNT GNT-NDL NDPU YARD UP/DN ENGG BCM+TAMPING MAIN 13:00-16:00 km 0.25 SSE/P.WAY/NLPD staff with Tower
EACH
car required

2 BLOCKS OF 120MIN OHE Staff


19 17-06-2025 GNT GNT-NDL NDPU PPM UP/DN ENGG 3X DYNAMIC Shadow 13:00-16:00 km 3 SSE/P.WAY/NLPD
EACH Required

ESMs &
20 17-06-2025 GNT GNT-NDL GNT/S YARD ST 1 B/I M.I MAIN 1Blocks of 30min JE/S/GNT
assistants

ESMs &
21 17-06-2025 GNT GNT-NDL GNT/S YARD ST CH1-4 M.I Shadow 2 Disconection of 30mins JE/S/GNT
assistants

2 BLOCKS OF EACH 2 flexible OHE Staff


22 17-06-2025 GNT GNT-KCC NBR YARD UP/DN ENGG PCTM TAMPING MAIN 6:30-8:30 pt 1 SSE/P.WAY/GNT
HOURS slot Required

2 BLOCKS OF EACH 2
23 17-06-2025 GNT GNT-KCC NBR MAG UP ENGG WELDING OF RAIL JOINTS MAIN flexible slot no 4 SSE/P.WAY/GNT -
HOURS

S&T, OHE Staff,


24 17-06-2025 GNT GNT-KCC NBR MAG DN ENGG TFTR WORK MAIN 1 BLOCKS OF 4 HOURS 6:30-9:30 km 0.2 SSE/P.WAY/GNT POWER BLOCK
Required

Point No. 19A Machine ESMs &


25 17-06-2025 GNT GNT-KCC MAG YARD ST MAIN 1 Block of 90 min 6:30-8:00 SSE/S/GNT
replacement work assistants

18-06-2025 (Wednesday)

13:00- OHE staff


1 18-06-2025 GNT GNT-NDL NDL YARD RD-1 ENGG Welding MAIN 2 blocks of 90 min each 8:30-10:00 no 4 SSE/P.Way/NDL(G)
14:30 required

2 18-06-2025 GNT GNT-NDL GZL YARD SL 242 243 TRD T/O & SI MAINTENANCE MAIN 60+60 MINS SSE/TRD/NDL

execavation,Breaking drilling
3 18-06-2025 GNT GNT-NDL CMZ GZL UP/DN 232/650 233/400 Engg-Con Shadow 1 block of 90 mins 11:30-13:00 AXEN/C/MRK 09:00 17:00
blasting of rock

Tower car, Rail


Pending works/ Remarks block may be planed as 9.00 17.00h
4 18-06-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff

execavation,Breaking drilling
5 18-06-2025 GNT GNT-NDL DMT CMZ UP/DN 219/700 223/200 Engg-Con Shadow 2 blocks of 60 min each AXEN/C/MRK 09:00 17:00
blasting of rock

11:30-
6 18-06-2025 GNT GNT-NDL DMT CMZ SL ENGG UTV MAIN 2 blocks of 90 min each 9:30-11:00 no 4 JE/P.Way/GID(G)
13:00

S&T and OHE


7 18-06-2025 GNT GNT-NDL GID YARD DN ENGG BCM+TAMPING MAIN 1 block of 180 mins 11:00-14:00 km 0.2 SSE/P.Way/GID staff with Tower SR 30KMPH
car required

OHE staff
8 18-06-2025 GNT GNT-NDL JBK SDV UP/DN ENGG TAMPING Shadow 2 block of 90 mins 11:00-14:00 km 1.6 SSE/P.Way/CBM
required
Block Planned Demanded On Date
Sub KM Planned block Timings Train
Major Station/Station Main or Planned Block Duration Output Supervisor Block Timings Remarks (S&T, Caution Order
S.No Date Div Secti Direction Dept Type of Work Repercu (HH:MM) OHE, Tower Car,
Section Shadow (in mins) From To Deputed Impositions/
on From To From To Unit Quantity sions Power block, etc)
(HH:MM) (HH:MM) From To Alterations

14:00-
9 18-06-2025 GNT GNT-NDL CBM yard UP&DN 168 170 TRD CROSSOVERS MAINTENANCE MAIN 2 Blocks of 90 min each 10:30-12:00 SSE/TRD/GID TOWER CAR
15:30

Tower car & OHE


10 18-06-2025 GNT GNT-NDL TLU YARD UP/DN 155 157 TRD AOH OF ATD MAIN 120+120 MINUTES flexible slot SSE/TRD/MRK
staff

11 18-06-2025 GNT GNT-NDL TLU YARD ST Both B/I MAINTENCE Shadow 2 Blocks of each 30min TECH/MRK ESM

2 disconnections of each
12 18-06-2025 GNT GNT-NDL TLU YARD ST CH TECH, MAINTENCE Shadow TECH/MRK ESM
30min

Tower car, Rail


Pending works/ Remarks block may be planed as 9.00 17.00h
13 18-06-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff

2 BLOCK OF 30MINS
14 18-06-2025 GNT GNT-NDL GKM YARD ST BOTH B/I M.I MAIN JE/S/KCD ESM
EACH

2 disconnection of each
15 18-06-2025 GNT GNT-NDL GKM YARD ST CH M.I Shadow JE/S/KCD ESM
30min

2 BLOCK OF 30MINS
16 18-06-2025 GNT GNT-NDL SAB YARD ST BOTH B/I Q.I Shadow SSE/S/VKN ESM
EACH

2 disconnection of each
17 18-06-2025 GNT GNT-NDL SAB YARD ST CH Q.I Shadow SSE/S/VKN ESM
30min

2 BLOCKS OF 120MIN 14:00- OHE Staff


18 18-06-2025 GNT GNT-NDL STUR NDPU UP/DN ENGG 3X DYNAMIC MAIN 8:00-9:30 km 3 SSE/P.WAY/NLPD
EACH 15:30 Required

2 Disconnections of 30
19 18-06-2025 GNT GNT-NDL NDPU YARD ST ch 3,4 ekt maintenance Shadow ESM/PRCA assistant
mins each

S&T and OHE


1 BLOCK OF 180MIN
20 18-06-2025 GNT GNT-NDL NDPU YARD UP/DN ENGG BCM+TAMPING MAIN 13:00-16:00 km 0.2 SSE/P.WAY/NLPD staff with Tower
EACH
car required

4 BLOCKS OF 90MIN 14:00- OHE Staff


21 18-06-2025 GNT GNT-NDL PPM NLPD UP/DN ENGG BRM MAIN 8:00-9:30 km 4 SSE/P.WAY/NRT
EACH 15:30 Required

2 BLOCKS OF EACH 2 flexible OHE Staff


22 18-06-2025 GNT GNT-KCC NBR YARD UP/DN ENGG PCTM TAMPING MAIN 6:30-8:30 pt 1 SSE/P.WAY/GNT
HOURS slot Required

DESTRESSING AND WELDING 2 BLOCKS OF EACH 2


23 18-06-2025 GNT GNT-KCC NBR MAG UP ENGG MAIN flexible slot km 0.5 SSE/P.WAY/GNT -
OF RAIL JOINTS HOURS

S&T, OHE Staff,


24 18-06-2025 GNT GNT-KCC NBR MAG DN ENGG TFTR WORK MAIN 1 BLOCKS OF 4 HOURS 6:30-9:30 km 0.2 SSE/P.WAY/GNT POWER BLOCK
Required

19-06-2025 (Thursday)

13:00- OHE staff


1 19-06-2025 GNT GNT-NDL NDL YARD RD-1 ENGG Welding MAIN 2 blocks of 90 min each 8:30-10:00 no 4 SSE/P.Way/NDL(G)
14:30 required

2 19-06-2025 GNT GNT-NDL NDPL YARD ST B/I M.I Shadow 2 Blocks of 30mins each JE/S/NDL ESM

execavation,Breaking drilling
3 19-06-2025 GNT GNT-NDL CMZ GZL UP/DN 232/650 233/400 Engg-Con Shadow 1 block of 90 mins 11:30-13:00 AXEN/C/MRK 09:00 17:00
blasting of rock

Tower car, Rail


Pending works/ Remarks block may be planed as 9.00 17.00h
4 19-06-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff

5 19-06-2025 GNT GNT-NDL SDV YARD ST B/I M.I Shadow 2 Blocks of 30mins each SE/S/GID ESM
Block Planned Demanded On Date
Sub KM Planned block Timings Train
Major Station/Station Main or Planned Block Duration Output Supervisor Block Timings Remarks (S&T, Caution Order
S.No Date Div Secti Direction Dept Type of Work Repercu (HH:MM) OHE, Tower Car,
Section Shadow (in mins) From To Deputed Impositions/
on From To From To Unit Quantity sions Power block, etc)
(HH:MM) (HH:MM) From To Alterations

11:30-
6 19-06-2025 GNT GNT-NDL DMT CMZ SL ENGG UTV MAIN 2 blocks of 90 min each 9:30-11:00 no 40 JE/P.Way/GID(G)
13:00

execavation,Breaking drilling
7 19-06-2025 GNT GNT-NDL DMT CMZ UP/DN 219/700 223/200 Engg-Con Shadow 2 blocks of 60 min each AXEN/C/MRK 09:00 17:00
blasting of rock

8 19-06-2025 GNT GNT-NDL JBK YARD ST Both B/I M/I INSPECTION Shadow 2 Blocks of each 30min JE/S/CBM ESM

2 Disconnections of each
9 19-06-2025 GNT GNT-NDL JBK YARD ST CH , M/I INSPECTION Shadow JE/S/CBM ESM
30min

14:00-
10 19-06-2025 GNT GNT-NDL JBK yard UP&DN 175 177 TRD CROSSOVERS MAINTENANCE MAIN 2 Blocks of 90 min each 11:00-12:30 SSE/TRD/GID TOWER CAR
15:30

S&T and OHE


11 19-06-2025 GNT GNT-NDL CBM YARD Rd-01 ENGG BCM+TAMPING MAIN 1 block of 180 mins 10:30-13:30 km 0.25 SSE/P.Way/GID SR 30KMPH
staff required

OHE staff with


12 19-06-2025 GNT GNT-NDL CBM YARD UP ENGG TAMPING Shadow 2 block of 90 mins 10:30-13:30 km 1.6 SSE/P.Way/CBM Tower car
required

Tower car & OHE


13 19-06-2025 GNT GNT-NDL MRK TLU UP/DN 143 155 TRD AOH OF ATD Main 120+120 MINUTES flexible slot SSE/TRD/MRK
staff

Tower car, Rail


Pending works/ Remarks block may be planed as 9.00 17.00h
14 19-06-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff

Jt. Inspection of Pt. & Cr with PWI & ENGG


15 19-06-2025 GNT GNT-NDL KCD YARD ENGG & ST SSE/S/MRK
Engg staff Staff required.

1 Disconection of 240 ESMs &


16 19-06-2025 GNT GNT-NDL GKM YARD ST Cable meggering at NDL side MAIN NI wkg SSE/S/VKN
mins Assistants

2 BLOCKS OF 120MIN 14:00- OHE Staff


17 19-06-2025 GNT GNT-NDL NRT STUR UP/DN ENGG 3X DYNAMIC MAIN 8:00-9:30 km 3 SSE/P.WAY/NLPD
EACH 15:30 Required

OHE staff with


1 BLOCK OF 180MIN
18 19-06-2025 GNT GNT-NDL NDPU PPM UP/DN ENGG BCM+TAMPING MAIN 13:00-16:00 km 0.25 SSE/P.WAY/NLPD Tower car
EACH
required

19 19-06-2025 GNT GNT-NDL PPM YARD ST Both ufsbi monthly inspection Shadow 2 block 30 mins each JE/S/NLPD ESM

2 Disconnection 30 mins
20 19-06-2025 GNT GNT-NDL PPM YARD ST ch 1,2,3,4, monthly inspection Shadow JE/S/NLPD ESM
each

4 BLOCKS OF 90MIN 14:00- OHE Staff


21 19-06-2025 GNT GNT-NDL PPM NLPD UP/DN ENGG BRM MAIN 8:00-9:30 km 4 SSE/P.WAY/NRT
EACH 15:30 Required

ESMs &
22 19-06-2025 GNT GNT-KCC NBR YARD ST BOTH B/I Qrtly inspection Shadow 2 block of 30mins SSE/S/GNT
Assistants

3 Disconection of 30 mins ESMs &


23 19-06-2025 GNT GNT-KCC NBR YARD ST CH Q.I Shadow SSE/S/GNT
each Assistants

OHE Staff,
24 19-06-2025 GNT GNT-KCC NBR MAG DN ENGG TFTR WORK MAIN 1 BLOCKS OF 4 HOURS 6:30-9:30 km 0.2 SSE/P.WAY/GNT POWER BLOCK
Required

2 BLOCKS OF EACH 2 10:00- OHE Staff


25 19-06-2025 GNT GNT-KCC MAG YARD UP/DN ENGG PCTM TAMPING MAIN 7:15-8:45 pt 1 SSE/P.WAY/GNT
HOURS 11:30 Required

20-06-2025 (Friday)

1 20-06-2025 GNT GNT-NDL NDPL YARD SL 250 251 TRD UIOL MAINTENANCE Shadow 60+60 MINS SSE/TRD/NDL
Block Planned Demanded On Date
Sub KM Planned block Timings Train
Major Station/Station Main or Planned Block Duration Output Supervisor Block Timings Remarks (S&T, Caution Order
S.No Date Div Secti Direction Dept Type of Work Repercu (HH:MM) OHE, Tower Car,
Section Shadow (in mins) From To Deputed Impositions/
on From To From To Unit Quantity sions Power block, etc)
(HH:MM) (HH:MM) From To Alterations

execavation,Breaking drilling
2 20-06-2025 GNT GNT-NDL CMZ GZL UP/DN 232/650 233/400 Engg-Con Shadow 1 block of 90 mins 11:30-13:00 AXEN/C/MRK 09:00 17:00
blasting of rock

Tower car, Rail


Pending works/ Remarks block may be planed as 9.00 17.00h
3 20-06-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff

11:30-
4 20-06-2025 GNT GNT-NDL DMT CMZ SL ENGG UTV MAIN 2 blocks of 90 min each 9:30-11:00 no 40 JE/P.Way/GID(G)
13:00

execavation,Breaking drilling
5 20-06-2025 GNT GNT-NDL DMT CMZ UP/DN 219/700 223/200 Engg-Con Shadow 2 blocks of 60 min each AXEN/C/MRK 09:00 17:00
blasting of rock

OHE staff with


14:00-
6 20-06-2025 GNT GNT-NDL JBK SDV DN ENGG TAMPING MAIN 2 block of 90 mins 11:00-12:30 km 1.6 SSE/P.Way/CBM tower car
15:30
required

14:00-
7 20-06-2025 GNT GNT-NDL JBK yard UP&DN 175 177 TRD CROSSOVERS MAINTENANCE Shadow 2 Blocks of 90 min each 11:00-12:30 SSE/TRD/GID TOWER CAR
15:30

S&T and OHE


8 20-06-2025 GNT GNT-NDL CBM YARD Rd-01 ENGG BCM+TAMPING MAIN 1 block of 180 mins 10:30-13:30 km 0.25 SSE/P.Way/GID SR 30KMPH
staff required

Tower car & OHE


9 20-06-2025 GNT GNT-NDL MRK GJJ UP/DN 143 129 TRD AOH OF ATD Shadow 120+120 MINUTES flexible slot SSE/TRD/MRK
staff

Tower car, Rail


Pending works/ Remarks block may be planed as 9.00 17.00h
10 20-06-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff

14:30- 9.00 17.00h


11 20-06-2025 GNT GNT-NDL TLU YARD DN ENGG BEND RAIL RENWAL Main 1 blcok of 180 min 10:00-11:30 JE.P.MRK OHE staff 30KMPH
16:00 hrs rs

12 20-06-2025 GNT GNT-NDL POO KCD UD ENGG Bri.413A Block Main 1 Block of 210 min SSE/Bri/GNT OHE with T/c

2 BLOCK OF 30MINS
13 20-06-2025 GNT GNT-NDL MUK YARD ST BOTH B/I Q.I Shadow SSE/S/VKN ESM
EACH

2 disconnection of each
14 20-06-2025 GNT GNT-NDL MUK YARD ST CH Q.I Shadow SSE/S/VKN ESM
30min

2 BLOCKS OF EACH 2 14:30- S&T and OHE


15 20-06-2025 GNT GNT-NDL MUK YARD UP&DN ENGG TAMPING MACHINE WORK MAIN 9:00-10:30 km 1.6 SSE/P.WAY/VKN
HOURS 16:00 staff required

OHE staff with


1 BLOCK OF 180MIN
16 20-06-2025 GNT GNT-NDL NDPU PPM UP/DN ENGG BCM+TAMPING MAIN 13:00-16:00 km 0.25 SSE/P.WAY/NLPD Tower car
EACH
required

4 BLOCKS OF 90MIN 14:00- OHE Staff


17 20-06-2025 GNT GNT-NDL PPM NLPD UP/DN ENGG BRM MAIN 8:00-9:30 km 4 SSE/P.WAY/NRT
EACH 15:30 Required

LC 304 and LC 307 ekt 2 disconnection of each


18 20-06-2025 GNT GNT-NDL PRCA YARD ST Shadow ESM/PRCA ASSISTANT
maintenance. 30min

2 disconnection of each
19 20-06-2025 GNT GNT-NDL PRCA YARD ST ch 3,4 ekt maintenance. Shadow ESM/PRCA ASSISTANT
30min

S&T, OHE Staff,


20 20-06-2025 GNT GNT-KCC NBR MAG DN ENGG TFTR WORK MAIN 1 BLOCKS OF 4 HOURS 6:30-9:30 km 0.2 SSE/P.WAY/GNT POWER BLOCK
Required

2 BLOCKS OF EACH 2 10:00- OHE Staff


21 20-06-2025 GNT GNT-KCC MAG YARD UP/DN ENGG PCTM TAMPING MAIN 7:15-8:45 pt 1 SSE/P.WAY/GNT
HOURS 11:30 Required

21-06-2025 (Saturday)

1 Disconection of 180 ESMs &


1 21-06-2025 GNT GNT-NDL NDPL YARD ST Cable meggering at GNT side MAIN NI wkg SSE/S/NDL
mins Assistants
Block Planned Demanded On Date
Sub KM Planned block Timings Train
Major Station/Station Main or Planned Block Duration Output Supervisor Block Timings Remarks (S&T, Caution Order
S.No Date Div Secti Direction Dept Type of Work Repercu (HH:MM) OHE, Tower Car,
Section Shadow (in mins) From To Deputed Impositions/
on From To From To Unit Quantity sions Power block, etc)
(HH:MM) (HH:MM) From To Alterations

execavation,Breaking drilling
2 21-06-2025 GNT GNT-NDL CMZ GZL UP/DN 232/650 233/400 Engg-Con Shadow 1 block of 90 mins 11:30-13:00 SSE/S/NDL 09:00 17:00
blasting of rock

Tower car, Rail


Pending works/ Remarks block may be planed as 9.00 17.00h
3 21-06-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff

11:30-
4 21-06-2025 GNT GNT-NDL DMT CMZ SL ENGG UTV MAIN 2 blocks of 90 min each 9:30-11:00 no 40 JE/P.Way/GID(G)
13:00

execavation,Breaking drilling
5 21-06-2025 GNT GNT-NDL DMT CMZ UP/DN 219/700 223/200 Engg-Con Shadow 2 blocks of 60 min each AXEN/C/MRK 09:00 17:00
blasting of rock

11:30- OHE staff


6 21-06-2025 GNT GNT-NDL DMT YARD UP ENGG TAMPING MAIN 2 block of 90 mins 9:30-11:00 km 1.6 SSE/P.Way/CBM
13:00 required

7 21-06-2025 GNT GNT-NDL JBK yard UP/DN 175 177 TRD ATD & Isolators maintenance Shadow 3 Blocks of 60 min each SSE/TRD/GID

S&T and OHE


8 21-06-2025 GNT GNT-NDL CBM YARD Rd-01 ENGG BCM+TAMPING MAIN 1 block of 180 mins 10:30-13:30 km 0.25 SSE/P.Way/GID SR 30KMPH
staff required

Tower car & OHE


9 21-06-2025 GNT GNT-NDL MRK GJJ UP/DN 143 129 TRD AOH OF ATD MAIN 120+120 MINUTES flexible slot SSE/TRD/MRK
staff

Tower car, Rail


Pending works/ Remarks block may be planed as 9.00 17.00h
10 21-06-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff

Jt. Inspection of Pt. & Cr with ENGG Staff


11 21-06-2025 GNT GNT-NDL POO YARD ENGG & ST ESM/MRK
Engg staff required.

12 21-06-2025 GNT GNT-NDL POO KCD UD ENGG Bri.413A Block Main 1 Block of 180 min SSE/Bri/GNT OHE with T/c

13 21-06-2025 GNT GNT-NDL GKM CEM UP 89 95 TRD AOH of CLs Shadow 75+75 flexible slot 10

2 BLOCK OF 30MINS
14 21-06-2025 GNT GNT-NDL VKN YARD ST BOTH B/I M.I Shadow JE/S/VKN ESM
EACH

2 BLOCKS OF EACH 2 14:00- S&T and OHE


15 21-06-2025 GNT GNT-NDL SAB YARD UP&DN ENGG TAMPING MACHINE WORK MAIN 9:00-10:30 km 3 SSE/PWAY/VKN
HOURS 15:30 staff required

Tower car, Rail


9.00 17.00h
16 21-06-2025 GNT GNT-NDL NRT STUR ENGG LC 287 Block Main 1 blcok of 180 min -- SSE/PWAY/NLPD crane & OHE
hrs rs
staff
OHE staff with
1 BLOCK OF 180MIN
17 21-06-2025 GNT GNT-NDL NDPU PPM UP/DN ENGG BCM+TAMPING MAIN 13:00-16:00 km 0.25 SSE/P.WAY/NLPD Tower car
EACH
required

18 21-06-2025 GNT GNT-NDL PPM YARD ST LC 298 ekt maintenance Shadow 1 block of 30mins ESM/PRCA ASSISTANT

2 disconnections of each
19 21-06-2025 GNT GNT-NDL PPM YARD ST ch 3,4 ekt maintenance Shadow ESM/PRCA ASSISTANT
30min

4 BLOCKS OF 90MIN 14:00- OHE Staff


20 21-06-2025 GNT GNT-NDL PPM NLPD UP/DN ENGG BRM MAIN 8:00-9:30 km 4 SSE/P.WAY/NRT
EACH 15:30 Required

S&T, OHE Staff,


21 21-06-2025 GNT GNT-KCC NBR MAG DN ENGG TFTR WORK MAIN 1 BLOCKS OF 4 HOURS 6:30-9:30 km 0.2 SSE/P.WAY/GNT POWER BLOCK
Required

2 BLOCKS OF EACH 2 10:00- OHE Staff


22 21-06-2025 GNT GNT-KCC MAG YARD UP/DN ENGG PCTM TAMPING MAIN 7:15-8:45 pt 1 SSE/P.WAY/GNT
HOURS 11:30 Required

22-06-2025 (Sunday)
Block Planned Demanded On Date
Sub KM Planned block Timings Train
Major Station/Station Main or Planned Block Duration Output Supervisor Block Timings Remarks (S&T, Caution Order
S.No Date Div Secti Direction Dept Type of Work Repercu (HH:MM) OHE, Tower Car,
Section Shadow (in mins) From To Deputed Impositions/
on From To From To Unit Quantity sions Power block, etc)
(HH:MM) (HH:MM) From To Alterations

execavation,Breaking drilling
1 22-06-2025 GNT GNT-NDL CMZ GZL UP/DN 232/650 233/400 Engg-Con Shadow 1 block of 90 mins 11:30-13:00 AXEN/C/MRK 09:00 17:00
blasting of rock

11:30-
2 22-06-2025 GNT GNT-NDL DMT CMZ SL ENGG UTV MAIN 2 blocks of 90 min each 9:30-11:00 no 40 JE/P.Way/GID(G)
13:00

execavation,Breaking drilling
3 22-06-2025 GNT GNT-NDL DMT CMZ UP/DN 219/700 223/200 Engg-Con Shadow 2 blocks of 60 min each AXEN/C/MRK 09:00 17:00
blasting of rock

OHE staff with


14:00-
4 22-06-2025 GNT GNT-NDL JBK SDV UP ENGG TAMPING MAIN 2 block of 90 mins 11:00-12:30 km 1.6 SSE/P.Way/CBM tower car
15:30
required

14:00- OHE staff


5 22-06-2025 GNT GNT-NDL CBM YARD Rd-01 ENGG TAMPING MAIN 2 Blocks of 120 min each 10:30-12:00 km 0.25 SSE/P.Way/GID SR 30KMPH
15:30 required

TAMPING MACHINE WORK AT 2 BLOCKS OF EACH 2 14:00- S&T and OHE


6 22-06-2025 GNT GNT-NDL SAB SYM UP&DN ENGG MAIN 9:00-10:30 km 3 SSE/PWAY/VKN
IB HOURS 15:30 staff required

1 Disconnections of
7 22-06-2025 GNT GNT-NDL STUR YARD ST LC 291 EKT NM Shadow ESM/STUR Assistant
30mins

2 BLOCKS OF 120MIN OHE staff


8 22-06-2025 GNT GNT-NDL NDPU PPM UP/DN ENGG TAMPING Shadow 13:00-16:00 km 0.25 SSE/P.WAY/NLPD
EACH required

4 BLOCKS OF 90MIN 14:00- OHE Staff


9 22-06-2025 GNT GNT-NDL PPM NLPD UP/DN ENGG BRM MAIN 8:00-9:30 km 4 SSE/P.WAY/NRT
EACH 15:30 Required

2 BLOCKS OF EACH 2 10:00- OHE Staff


10 22-06-2025 GNT GNT-KCC MAG YARD UP/DN ENGG PCTM TAMPING MAIN 7:15-8:45 pt 1 SSE/P.WAY/GNT
HOURS 11:30 Required

23-06-2025 (Monday)

1 23-06-2025 GNT GNT-NDL CEM VKN UP 82 88 TRD AOH of ATDs Shadow 60+60 4

2 23-06-2025 GNT GNT-NDL CMZ DMT SL 223 224 TRD PTFE MAINTENANCE MAIN 60+60 MINS SSE/TRD/NDL

3 23-06-2025 GNT GNT-NDL GZL YARD ST LC-192 EKT MAINTENANCE Shadow 1 BLCOK 30 MIN ESM/NDL

execavation,Breaking drilling
4 23-06-2025 GNT GNT-NDL DMT CMZ UP/DN 219/700 223/200 Engg-Con Shadow 2 blocks of 60 min each AXEN/C/MRK 09:00 17:00
blasting of rock
execavation,Breaking drilling
5 23-06-2025 GNT GNT-NDL CMZ GZL UP/DN 232/650 233/400 Engg-Con Shadow 1 block of 90 mins 11:30-13:00 AXEN/C/MRK 09:00 17:00
blasting of rock
2 BLOCKS OF EACH 2 10:00- S&T, OHE Staff
6 23-06-2025 GNT GNT-KCC REP YARD UP/DN ENGG PCTM POINTS TAMPING MAIN 8:00-9:30 pt 1 SSE/P.WAY/GNT
HOURS 11:30 Required
S&T Staff
7 23-06-2025 GNT GNT-KCC GNT YARD UP/DN ENGG SSD MAINTENANCE MAIN 1 BLOCKS OF 60MIN SSE/P.WAY/GNT
Required

24-06-2025 (Tuesday)

1 24-06-2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER Shadow 1 BLOCK 30 MIN JE/SIG/NDL

2 24-06-2025 GNT GNT-NDL NDPL YARD SL 249 250 TRD ISOLATOR MAINTENANCE Shadow 60+60 MINS SSE/TRD/NDL TOWERCAR

S&T ,OHE
3 24-06-2025 GNT GNT-NDL GNT YARD SL ENGG Tamping MAIN 2 blocks of 120+120 min flexible slot km 1.6 SSE/PWAY/GNT
Required
required HQ s S&T,OHE with
4 24-06-2025 GNT GNT-NDL MRK GJJ UD ENGG Bri.387 Block Main 1 Block of 210 min SSE/Bri/GNT
permission T/c
execavation,Breaking drilling
5 24-06-2025 GNT GNT-NDL DMT CMZ UP/DN 219/700 223/200 Engg-Con Shadow 2 blocks of 60 min each AXEN/C/MRK 09:00 17:00
blasting of rock
execavation,Breaking drilling
6 24-06-2025 GNT GNT-NDL CMZ GZL UP/DN 232/650 233/400 Engg-Con Shadow 1 block of 90 mins 11:30-13:00 AXEN/C/MRK 09:00 17:00
blasting of rock
S&T Staff
7 24-06-2025 GNT GNT-KCC REP YARD UP/DN ENGG SSD MAINTENANCE MAIN 1 BLOCKS OF 60MIN SSE/P.WAY/GNT
Required

25-06-2025 (Wednesday)
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
1 25-06-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
Block Planned Demanded On Date
Sub KM Planned block Timings Train
Major Station/Station Main or Planned Block Duration Output Supervisor Block Timings Remarks (S&T, Caution Order
S.No Date Div Secti Direction Dept Type of Work Repercu (HH:MM) OHE, Tower Car,
Section Shadow (in mins) From To Deputed Impositions/
on From To From To Unit Quantity sions Power block, etc)
(HH:MM) (HH:MM) From To Alterations
S&T ,OHE
2 25-06-2025 GNT GNT-NDL GNT YARD SL ENGG Tamping MAIN 2 blocks of 120+120 min flexible slot km 3 SSE/PWAY/GNT
Required
execavation,Breaking drilling
3 25-06-2025 GNT GNT-NDL DMT CMZ UP/DN 219/700 223/200 Engg-Con Shadow 2 blocks of 60 min each AXEN/C/MRK 09:00 17:00
blasting of rock
execavation,Breaking drilling
4 25-06-2025 GNT GNT-NDL CMZ GZL UP/DN 232/650 233/400 Engg-Con Shadow 1 block of 90 mins 11:30-13:00 AXEN/C/MRK 09:00 17:00
blasting of rock
2 BLOCKS OF 60MIN S&T Staff
5 25-06-2025 GNT GNT-KCC NBR YARD UP/DN ENGG SSD MAINTENANCE MAIN SSE/P.WAY/GNT
EACH Required

26-06-2025 (Thursday)

1 26-06-2025 GNT GNT-NDL NDL NDPL ST LC-186 EKT MAINTENANCE Shadow 1 BLOCK 30 MIN ESM/NDL

2 26-06-2025 GNT GNT-NDL GZL YARD SL 241 243 TRD ISOLATOR MAINTENANCE MAIN 60+60 MINS SSE/TRD/NDL TOWER CAR

S&T ,OHE
3 26-06-2025 GNT GNT-NDL GNT YARD SL ENGG Tamping MAIN 2 blocks of 120+120 min flexible slot SSE/PWAY/GNT
Required
execavation,Breaking drilling
4 26-06-2025 GNT GNT-NDL DMT CMZ UP/DN 219/700 223/200 Engg-Con Shadow 2 blocks of 60 min each AXEN/C/MRK 09:00 17:00
blasting of rock
execavation,Breaking drilling
5 26-06-2025 GNT GNT-NDL CMZ GZL UP/DN 232/650 233/400 Engg-Con Shadow 1 block of 90 mins 11:30-13:00 AXEN/C/MRK 09:00 17:00
blasting of rock
2 BLOCKS OF 60MIN S&T Staff
6 26-06-2025 GNT GNT-KCC MAG YARD UP/DN ENGG SSD MAINTENANCE MAIN SSE/P.WAY/GNT
EACH Required
GNT SOUTH S&T JOINT INSPECTION NOTES 2 BLOCKS OF 90MIN S&T Staff
7 26-06-2025 GNT GNT-NDL UP/DN ENGG MAIN SSE/P.WAY/GNT
YARD END ATTENTION EACH Required

27-06-2025 (Friday)

1 27-06-2025 GNT GNT-NDL CMZ YARD SL 230 2312 TRD T/O MAINTENANCE MAIN 60+60 MINS SSE/TRD/NDL TOWER CAR

14:45-
2 27-06-2025 GNT GNT-NDL VKN SYM DN 72 82 TRD AOH of CLs Main 75+75 12:30-13:45 10
16:00

3 27-06-2025 GNT GNT-NDL NDPU YARD ST Both B/I Monthly Inspection Shadow 2 Blocks of each 30" JE/S/PPM ESM

required HQ s S&T,OHE with


4 27-06-2025 GNT GNT-NDL SYM VKN UD ENGG Bri.438A Block Main 1 Block of 210 min SSE/Bri/GNT
permission T/c
S&T ,OHE
5 27-06-2025 GNT GNT-NDL GNT YARD SL ENGG Tamping MAIN 2 blocks of 120+120 min flexible slot SSE/PWAY/GNT
Required
execavation,Breaking drilling
6 27-06-2025 GNT GNT-NDL DMT CMZ UP/DN 219/700 223/200 Engg-Con Shadow 2 blocks of 60 min each AXEN/C/MRK 09:00 17:00
blasting of rock
execavation,Breaking drilling
7 27-06-2025 GNT GNT-NDL CMZ GZL UP/DN 232/650 233/400 Engg-Con Shadow 1 block of 90 mins 11:30-13:00 AXEN/C/MRK 09:00 17:00
blasting of rock
GNT SOUTH S&T JOINT INSPECTION NOTES 2 BLOCKS OF 90MIN S&T Staff
8 27-06-2025 GNT GNT-NDL UP/DN ENGG MAIN SSE/P.WAY/GNT
YARD END ATTENTION EACH Required

28-06-2025 (Saturday)

1 28-06-2025 GNT GNT-NDL GJJ YARD ST Both B/I Monthly Inspection Shadow 2 Blocks of each 30MIN. JE/S/KCD ESM

S&T, OHE staff


2 28-06-2025 GNT GNT-NDL PRCA YARD ENGG & ST Rail Renewal Main 2 Blocks of 90 min each flexible slot SSE/SW/NLPD
required
Crank handle 5,6,7&8 No
3 28-06-2025 GNT GNT-NDL NLPD Yard ST Shadow 4 blocks each 30 minutes JE /SIGNAL /NLPD ESM
M/Inspection Train
execavation,Breaking drilling
4 28-06-2025 GNT GNT-NDL DMT CMZ UP/DN 219/700 223/200 Engg-Con Shadow 2 blocks of 60 min each AXEN/C/MRK 09:00 17:00
blasting of rock
execavation,Breaking drilling
5 28-06-2025 GNT GNT-NDL CMZ GZL UP/DN 232/650 233/400 Engg-Con Shadow 1 block of 90 mins 11:30-13:00 AXEN/C/MRK 09:00 17:00
blasting of rock

6 28-06-2025 GNT GNT-NDL NDL YARD SL 256 257 TRD ISOLATOR MAINTENANCE MAIN 60+60 MINS

GNT SOUTH S&T JOINT INSPECTION NOTES 2 BLOCKS OF 90MIN S&T Staff
7 28-06-2025 GNT GNT-NDL UP/DN ENGG MAIN SSE/P.WAY/GNT
YARD END ATTENTION EACH Required

29-06-2025 (Sunday)

1 29-06-2025 GNT GNT-NDL CMZ DMT SL 218 219 TRD CL'S MAINTENANCE Shadow 60+60+60 MINS SSE/TRD/NDL TOWERCAR
CLS=
2 29-06-2025 GNT GNT-NDL CEM YARD UP&DN 88 90 TRD T/OS MAINTENANCE Shadow 60+60 No. 10, SSE/TRD/VKN
T/O=2
30-06-2025 (Monday)

1 30-06-2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER Shadow 1 BLOCK 30 MIN JE/SIG/NDL
Block Planned Demanded On Date
Sub KM Planned block Timings Train
Major Station/Station Main or Planned Block Duration Output Supervisor Block Timings Remarks (S&T, Caution Order
S.No Date Div Secti Direction Dept Type of Work Repercu (HH:MM) OHE, Tower Car,
Section Shadow (in mins) From To Deputed Impositions/
on From To From To Unit Quantity sions Power block, etc)
(HH:MM) (HH:MM) From To Alterations
CLS=
2 30-06-2025 GNT GNT-NDL CEM YARD UP&DN 88 90 TRD T/OS MAINTENANCE Shadow 60+60 No. 10, SSE/TRD/VKN
T/O=2
Crank handle 1,2,3&4 No
3 30-06-2025 GNT GNT-NDL NLPD Yard ST Shadow 4 block each 30 minutes JE /SIGNAL /NLPD ESM
M/Inspection Train
execavation,Breaking drilling
4 30-06-2025 GNT GNT-NDL DMT CMZ UP/DN 219/700 223/200 Engg-Con Shadow 2 blocks of 60 min each 10:00 12:00 AXEN/C/MRK 09:00 17:00
blasting of rock
execavation,Breaking drilling
5 30-06-2025 GNT GNT-NDL CMZ GZL UP/DN 232/650 233/400 Engg-Con Shadow 1 block of 90 mins 11:30-13:00 AXEN/C/MRK 09:00 17:00
blasting of rock
GNT NORTH S&T JOINT INSPECTION NOTES 2 BLOCKS OF 90MIN S&T Staff
6 30-06-2025 GNT GNT-KCC UP/DN ENGG MAIN SSE/P.WAY/GNT
YARD END ATTENTION EACH Required

01-07-2025 (Tuesday)
CLS=
1 01-07-2025 GNT GNT-NDL CEM YARD UP&DN 88 90 TRD T/OS MAINTENANCE Shadow 60+60 No. 10, SSE/TRD/VKN
T/O=2
Crank handle 1,2,3&4 No
2 01-07-2025 GNT GNT-NDL NLPD Yard ST Shadow 4 block each 30 minutes JE /SIGNAL /NLPD ESM
M/Inspection Train
GNT NORTH S&T JOINT INSPECTION NOTES 2 BLOCKS OF 90MIN S&T Staff
3 01-07-2025 GNT GNT-KCC UP/DN ENGG MAIN SSE/P.WAY/GNT
YARD END ATTENTION EACH Required

02-07-2025 (Wednesday)

1 02-07-2025 GNT GNT-NDL CMZ DMT SL 221 223 TRD TUNNEL SCL MAINTENANCE Shadow 60+60 SSE/TRD/NDL TOWERCAR
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 02-07-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
Towerstaff
car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
3 02-07-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
GNT NORTH S&T JOINT INSPECTION NOTES 2 BLOCKS OF 90MIN S&T Staff
4 02-07-2025 GNT GNT-KCC UP/DN ENGG MAIN SSE/P.WAY/GNT
YARD END ATTENTION EACH Required

03-07-2025 (Thursday)

1 03-07-2025 GNT GNT-NDL DMT CMZ SL 220 221 TRD AOH of ATD Shadow 60+60 MINS SSE/TRD/NDL

2 03-07-2025 GNT GNT-NDL CEM VKN UP 82 88 TRD AOH of ATDs Shadow 60+60 No. 4

UP and
3 03-07-2025 GNT GNT-KCC NBR YARD ST NBR-MAG,NBR-REP B/I M/I shadow 2 blocks of 30 min each JE/S/GNT ESM
DN
S&T JOINT INSPECTION NOTES 2 BLOCKS OF 90MIN S&T Staff
4 03-07-2025 GNT GNT-KCC MAG YARD UP/DN ENGG MAIN SSE/P.WAY/GNT
ATTENTION EACH Required

04-07-2025 (Friday)

1 04-07-2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER Shadow 1 BLOCK 60 MIN JE/SIG/NDL

2 04-07-2025 GNT GNT-NDL GZL CMZ SL 233 234 TRD UIOL MAINTENANCE Shadow 60+60 MINS SSE/TRD/NDL

S&T JOINT INSPECTION NOTES 2 BLOCKS OF 90MIN S&T Staff


3 04-07-2025 GNT GNT-KCC MAG YARD UP/DN ENGG MAIN SSE/P.WAY/GNT
ATTENTION EACH Required

05-07-2025 (Saturday)

1 05-07-2025 GNT GNT-NDL GZL CMZ SL 238 239 TRD AOH OF ATD Shadow 60+60 MINS SSE/TRD/NDL
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 05-07-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
Towerstaff
car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
3 05-07-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
S&T JOINT INSPECTION NOTES 2 BLOCKS OF 90MIN S&T Staff
4 05-07-2025 GNT GNT-KCC NBR YARD UP/DN ENGG MAIN SSE/P.WAY/GNT
ATTENTION EACH Required

06-07-2025 (Sunday)

1 06-07-2025 GNT GNT-NDL CMZ YARD SL 230 232 TRD AOH OF ATD Shadow 60+60 MINS SSE/TRD/NDL
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 06-07-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
Towerstaff
car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
3 06-07-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
07-07-2025 (Monday)
TOWERCAR/PIC
1 07.07.2025 GNT GNT-NDL NDL YARD SL 256 257 TRD POH OF ATD Shadow 60+60 SSE/TRD/NDL
KUP
Block Planned Demanded On Date
Sub KM Planned block Timings Train
Major Station/Station Main or Planned Block Duration Output Supervisor Block Timings Remarks (S&T, Caution Order
S.No Date Div Secti Direction Dept Type of Work Repercu (HH:MM) OHE, Tower Car,
Section Shadow (in mins) From To Deputed Impositions/
on From To From To Unit Quantity sions Power block, etc)
(HH:MM) (HH:MM) From To Alterations

2 07.07.2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER Shadow 1 BLCOK 60 MIN JE/SIG/NDL

3 07.07.2025 GNT GNT-NDL GZL CMZ SL 240 242 TRD AOH OF ATD Shadow 60+60 MINS

4 07.07.2025 GNT GNT-NDL CEM VKN DN 88 82 TRD AOH of CLs Shadow 75+75 10

S&T JOINT INSPECTION NOTES 2 BLOCKS OF 90MIN S&T Staff


5 07.07.2025 GNT GNT-KCC NBR YARD UP/DN ENGG MAIN SSE/P.WAY/GNT
ATTENTION EACH Required

08-07-2025 (Tuesday)

1 08-07-2025 GNT GNT-NDL NDL YARD SL 256 257 TRD AOH OF ATD Shadow 90+90 MINS SSE/TRD/NDL

2 08-07-2025 GNT GNT-NDL GKM YARD ST Both B/I Monthly Inspection Shadow 2 Blocks of each 30MIN. JE/S/KCD ESM
C/o:1,
UP and AOH of T/os, Crossover and 14:45-
3 08-07-2025 GNT GNT-NDL VKN YARD 82 83 TRD Main 75+75 12:30-13:45 T/os:2
DN CLs. 16:00
,
14:00- S&T, OHE staff
4 08-07-2025 GNT GNT-NDL NDPU YARD ENGG & ST Redundant Glued Joint Renewal Main 2 Blocks of 90 min each 8:00-9:30 SSE/SW/NLPD
15:30 required
S&T JOINT INSPECTION NOTES 2 BLOCKS OF 90MIN S&T Staff
5 08-07-2025 GNT GNT-KCC NBR YARD UP/DN ENGG MAIN SSE/P.WAY/GNT
ATTENTION EACH Required

09-07-2025 (Wednesday)
TOWERCAR/PIC
1 09-07-2025 GNT GNT-NDL NDL YA LINE SL 1KM 2 KM TRD POH OF ATD Shadow 60+60 SSE/TRD/NDL
KUP

2 09-07-2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER Shadow 1 BLCOK 60 MIN JE/SIG/NDL

3 09-07-2025 GNT GNT-NDL GZL CMZ SL 240 242 TRD AOH OF ATD Shadow 60+60 MINS

4 09-07-2025 GNT GNT-NDL CEM VKN DN 88 82 TRD AOH of CLs Shadow 75+75 No. 10

10-07-2025 (Thursday)

1 10-07-2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER Shadow 1 BLOCK 30 MIN JE/SIG/NDL

2 10-07-2025 GNT GNT-NDL CMZ DMT SL 218 219 TRD CL'S MAINTENANCE Shadow 60+60+60 MINS SSE/TRD/NDL TOWERCAR
CLS=
3 10-07-2025 GNT GNT-NDL CEM YARD UP&DN 88 90 TRD T/OS MAINTENANCE Shadow 60+60 No. 10, SSE/TRD/VKN
T/O=2
Crank handle 1,2,3&4 No
4 10-07-2025 GNT GNT-NDL NLPD Yard ST Shadow 4 block each 30 minutes JE /SIGNAL /NLPD ESM
M/Inspection Train

11-07-2025 (Friday)
TOWERCAR/PIC
1 11-07-2025 GNT GNT-NDL NDL NDPL SL 256 257 TRD SCL MAINTENANCE WORK Shadow 60+60 SSE/TRD/NDL
KUP

2 11-07-2025 GNT GNT-NDL CMZ DMT SL 218 219 TRD CL'S MAINTENANCE Shadow 60+60+60 MINS SSE/TRD/NDL TOWERCAR
CLS=
3 11-07-2025 GNT GNT-NDL CEM YARD UP&DN 88 90 TRD T/OS MAINTENANCE Shadow 60+60 No. 10, SSE/TRD/VKN
T/O=2
Crank handle 1,2,3&4 No
4 11-07-2025 GNT GNT-NDL NLPD Yard ST Shadow 4 block each 30 minutes JE /SIGNAL /NLPD ESM
M/Inspection Train

12-07-2025 (Saturday)

1 12-07-2025 GNT GNT-NDL CMZ DMT SL 221 223 TRD TUNNEL SCL MAINTENANCE Shadow 60+60 SSE/TRD/NDL TOWERCAR
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 12-07-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
Towerstaff
car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
3 12-07-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
13-07-2025 (Sunday)

1 13-07-2025 GNT GNT-NDL DMT CMZ SL 220 221 TRD AOH of ATD Shadow 60+60 MINS SSE/TRD/NDL

2 13-07-2025 GNT GNT-NDL CEM VKN UP 82 88 TRD AOH of ATDs Shadow 60+60 No. 4

14:00- S&T, OHE staff


3 13-07-2025 GNT GNT-NDL NDPU YARD UP ENGG & ST Redundant Glued Joint Renewal Main 2 Blocks of 90 min each 8:00-9:30 No. 2 SSE/SW/NLPD
15:30 required
UP and
4 13-07-2025 GNT GNT-KCC NBR YARD ST NBR-MAG,NBR-REP B/I M/I shadow 2 blocks of 30 min each JE/S/GNT ESM
DN
Block Planned Demanded On Date
Sub KM Planned block Timings Train
Major Station/Station Main or Planned Block Duration Output Supervisor Block Timings Remarks (S&T, Caution Order
S.No Date Div Secti Direction Dept Type of Work Repercu (HH:MM) OHE, Tower Car,
Section Shadow (in mins) From To Deputed Impositions/
on From To From To Unit Quantity sions Power block, etc)
(HH:MM) (HH:MM) From To Alterations

14-07-2025 (Monday)
TOWERCAR/PIC
1 14-07-2025 GNT GNT-NDL NDL YARD SL 256 257 TRD POH OF ATD Shadow 60+60 SSE/TRD/NDL
KUP

2 14-07-2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER Shadow 1 BLCOK 60 MIN JE/SIG/NDL

3 14-07-2025 GNT GNT-NDL GZL CMZ SL 240 242 TRD AOH OF ATD Shadow 60+60 MINS

4 14-07-2025 GNT GNT-NDL CEM VKN DN 88 82 TRD AOH of CLs Shadow 75+75 10

15-07-2025 (Tuesday)

1 15-07-2025 GNT GNT-NDL NDL YARD SL 256 257 TRD AOH OF ATD Shadow 90+90 MINS SSE/TRD/NDL

2 15-07-2025 GNT GNT-NDL GKM YARD ST Both B/I Monthly Inspection Shadow 2 Blocks of each 30MIN. JE/S/KCD ESM
C/o:1,
UP and AOH of T/os, Crossover and 14:45-
3 15-07-2025 GNT GNT-NDL VKN YARD 82 83 TRD Main 75+75 12:30-13:45 T/os:2
DN CLs. 16:00
,
14:00- S&T, OHE staff
4 15-07-2025 GNT GNT-NDL NDPU YARD ENGG & ST Redundant Glued Joint Renewal Main 2 Blocks of 90 min each 8:00-9:30 SSE/SW/NLPD
15:30 required

16-07-2025 (Wednesday)
TOWERCAR/PIC
1 16-07-2025 GNT GNT-NDL NDL YA LINE SL 1KM 2 KM TRD POH OF ATD Shadow 60+60 SSE/TRD/NDL
KUP

2 16-07-2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER Shadow 1 BLCOK 60 MIN JE/SIG/NDL

3 16-07-2025 GNT GNT-NDL GZL CMZ SL 240 242 TRD AOH OF ATD Shadow 60+60 MINS

4 16-07-2025 GNT GNT-NDL CEM VKN DN 88 82 TRD AOH of CLs Shadow 75+75 No. 10

17-07-2025 (Thursday)

1 17-07-2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER Shadow 1 BLOCK 30 MIN JE/SIG/NDL

2 17-07-2025 GNT GNT-NDL CMZ DMT SL 218 219 TRD CL'S MAINTENANCE Shadow 60+60+60 MINS SSE/TRD/NDL TOWERCAR
CLS=
3 17-07-2025 GNT GNT-NDL CEM YARD UP&DN 88 90 TRD T/OS MAINTENANCE Shadow 60+60 No. 10, SSE/TRD/VKN
T/O=2
Crank handle 1,2,3&4 No
4 17-07-2025 GNT GNT-NDL NLPD Yard ST Shadow 4 block each 30 minutes JE /SIGNAL /NLPD ESM
M/Inspection Train

18-07-2025 (Friday)
TOWERCAR/PIC
1 18-07-2025 GNT GNT-NDL NDL NDPL SL 256 257 TRD SCL MAINTENANCE WORK Shadow 60+60 SSE/TRD/NDL
KUP

2 18-07-2025 GNT GNT-NDL CMZ DMT SL 218 219 TRD CL'S MAINTENANCE Shadow 60+60+60 MINS SSE/TRD/NDL TOWERCAR

3 18-07-2025 GNT GNT-NDL NLPD YARD ENGG TWS block Main 1 block of 180 min SSE/PWAY/NLPD
CLS=
4 18-07-2025 GNT GNT-NDL CEM YARD UP&DN 88 90 TRD T/OS MAINTENANCE Shadow 60+60 No. 10, SSE/TRD/VKN
T/O=2
5 18-07-2025 GNT GNT-NDL STUR NRT DN ENGG TRR block MAIN 1 block of 180 min -- -- SSE/PWAY/NLPD

Crank handle 1,2,3&4 No


6 18-07-2025 GNT GNT-NDL NLPD Yard ST Shadow 4 block each 30 minutes JE /SIGNAL /NLPD ESM
M/Inspection Train

19-07-2025 (Saturday)

1 19-07-2025 GNT GNT-NDL CMZ DMT SL 221 223 TRD TUNNEL SCL MAINTENANCE Shadow 60+60 SSE/TRD/NDL TOWERCAR
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 19-07-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
3 19-07-2025 GNT GNT-NDL STUR NRT DN ENGG TRR block MAIN 1 block of 180 min -- -- SSE/PWAY/NLPD
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
4 19-07-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
20-07-2025 (Sunday)

1 20-07-2025 GNT GNT-NDL DMT CMZ SL 220 221 TRD AOH of ATD Shadow 60+60 MINS SSE/TRD/NDL
Block Planned Demanded On Date
Sub KM Planned block Timings Train
Major Station/Station Main or Planned Block Duration Output Supervisor Block Timings Remarks (S&T, Caution Order
S.No Date Div Secti Direction Dept Type of Work Repercu (HH:MM) OHE, Tower Car,
Section Shadow (in mins) From To Deputed Impositions/
on From To From To Unit Quantity sions Power block, etc)
(HH:MM) (HH:MM) From To Alterations

2 20-07-2025 GNT GNT-NDL CEM VKN UP 82 88 TRD AOH of ATDs Shadow 60+60 No. 4

3 20-07-2025 GNT GNT-NDL STUR NRT DN ENGG TRR block MAIN 1 block of 180 min -- -- SSE/PWAY/NLPD

UP and
3 20-07-2025 GNT GNT-KCC NBR YARD ST NBR-MAG,NBR-REP B/I M/I shadow 2 blocks of 30 min each JE/S/GNT ESM
DN

21-07-2025 (Monday)

1 21-07-2025 GNT GNT-NDL NDL YARD SL 256 256 TRD ISOLATORMAINTENANCE Shadow 60 MINS SSE/TRD/NDL

3 21-07-2025 GNT GNT-NDL STUR NRT DN ENGG TRR block MAIN 1 block of 180 min -- -- SSE/PWAY/NLPD

S&T, OHE staff


3 21-07-2025 GNT GNT-NDL PRCA YARD ENGG & ST Redundant Glued Joint Renewal Main 2 Blocks of 90 min each flexible slot SSE/SW/NLPD
required

22-07-2025 (Tuesday)

1 22-07-2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER Shadow 1 BLOCK 60 MIN JE/SIG/NDL

2 22-07-2025 GNT GNT-NDL GZL CMZ SL 233 234 TRD UIOL MAINTENANCE Shadow 60+60 MINS SSE/TRD/NDL

3 22-07-2025 GNT GNT-NDL STUR NRT DN ENGG TRR block MAIN 1 block of 180 min -- -- SSE/PWAY/NLPD

3 22-07-2025 GNT GNT-NDL SYM YARD DN ENGG TWS block MAIN 1 block of 180 min -- -- SSE/PWAY/VKN

S&T, OHE staff


3 22-07-2025 GNT GNT-NDL PRCA YARD ENGG & ST Redundant Glued Joint Renewal Main 2 Blocks of 90 min each flexible slot SSE/SW/NLPD
required

23-07-2025 (Wednesday)

1 23-07-2025 GNT GNT-NDL GZL CMZ SL 238 239 TRD AOH OF ATD Shadow 60+60 MINS SSE/TRD/NDL
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 23-07-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
3 23-07-2025 GNT GNT-NDL STUR NRT DN ENGG TRR block MAIN 1 block of 180 min -- -- SSE/PWAY/NLPD

3 23-07-2025 GNT GNT-NDL VKN SYM UP ENGG LC 287 block MAIN 1 block of 180 min -- -- SSE/PWAY/VKN
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
3 23-07-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
3 22-07-2025 GNT GNT-NDL SYM YARD DN ENGG TWS block MAIN 1 block of 180 min -- -- SSE/PWAY/VKN

S&T, OHE staff


5 23-07-2025 GNT GNT-NDL PRCA YARD ENGG & ST Redundant Glued Joint Renewal Main 2 Blocks of 90 min each flexible slot SSE/SW/NLPD
required

24-07-2025 (Thursday)

1 24-07-2025 GNT GNT-NDL CMZ YARD SL 230 232 TRD AOH OF ATD Shadow 60+60 MINS SSE/TRD/NDL
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 24-07-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
3 24-07-2025 GNT GNT-NDL SYM YARD DN ENGG TWS block MAIN 1 block of 180 min -- -- SSE/PWAY/VKN
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
3 24-07-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
25-07-2025 (Friday)

1 25-07-2025 GNT GNT-NDL NDL YARD SL 256 256 TRD AOH OF ATD Shadow SSE/TRD/NDL

2 25-07-2025 GNT GNT-NDL GZL YARD ST LC-192 EKT MAINTENANCE Shadow 1 BLCOK 30 MIN ESM/NDL
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
3 25-07-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
Towerstaff
car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
4 25-07-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
5 25-07-2025 GNT GNT-NDL GJJ YARD ST Both B/I Monthly Inspection Shadow 2 Blocks of each 30MIN. JE/S/KCD ESM

26-07-2025 (Saturday)

1 26-07-2025 GNT GNT-NDL GZL CMZ SL 233 234 TRD AOH OF ATD Shadow 60+60 MINS SSE/TRD/NDL
Block Planned Demanded On Date
Sub KM Planned block Timings Train
Major Station/Station Main or Planned Block Duration Output Supervisor Block Timings Remarks (S&T, Caution Order
S.No Date Div Secti Direction Dept Type of Work Repercu (HH:MM) OHE, Tower Car,
Section Shadow (in mins) From To Deputed Impositions/
on From To From To Unit Quantity sions Power block, etc)
(HH:MM) (HH:MM) From To Alterations
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 26-07-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
3 26-07-2025 GNT GNT-NDL DMT YARD ST LC-197 EKT MANTENANCE Shadow 1 BLCOK 30 MIN ESM/GID
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
4 26-07-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
27-07-2025 (Sunday)
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
1 27-07-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
Towerstaff
car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 27-07-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
3 27-07-2025 GNT GNT-NDL GKM CEM UP 89 95 TRD AOH of CLs Shadow 75+75 flexible slot 10

28-07-2025 (Monday)
TOWERCAR/PIC
1 28-07-2025 GNT GNT-NDL NDL YARD SL 256 257 TRD POH OF ATD Shadow 60+60 SSE/TRD/NDL
KUP

2 28-07-2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER Shadow 1 BLCOK 60 MIN JE/SIG/NDL

3 28-07-2025 GNT GNT-NDL GZL CMZ SL 240 242 TRD AOH OF ATD Shadow 60+60 MINS

4 28-07-2025 GNT GNT-NDL CEM VKN DN 88 82 TRD AOH of CLs Shadow 75+75 10

29-07-2025 (Tuesday)

1 29-07-2025 GNT GNT-NDL NDL YARD SL 256 257 TRD AOH OF ATD Shadow 90+90 MINS SSE/TRD/NDL

2 29-07-2025 GNT GNT-NDL GKM YARD ST Both B/I Monthly Inspection Shadow 2 Blocks of each 30MIN. JE/S/KCD ESM

3 29-07-2025 GNT GNT-NDL SYM YARD DN ENGG TWS block MAIN 1 block of 180 min -- -- SSE/PWAY/VKN
C/o:1,
UP and AOH of T/os, Crossover and 14:45-
3 29-07-2025 GNT GNT-NDL VKN YARD 82 83 TRD Main 75+75 12:30-13:45 T/os:2
DN CLs. 16:00
,
30-07-2025 (Wednesday)
TOWERCAR/PIC
1 30-07-2025 GNT GNT-NDL NDL YA LINE SL 1KM 2 KM TRD POH OF ATD Shadow 60+60 SSE/TRD/NDL
KUP

2 30-07-2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER Shadow 1 BLCOK 60 MIN JE/SIG/NDL

3 30-07-2025 GNT GNT-NDL GZL CMZ SL 240 242 TRD AOH OF ATD Shadow 60+60 MINS

4 30-07-2025 GNT GNT-NDL CEM VKN DN 88 82 TRD AOH of CLs Shadow 75+75 No. 10

31-07-2025 (Thursday)

1 31-07-2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER Shadow 1 BLOCK 30 MIN JE/SIG/NDL

2 31-07-2025 GNT GNT-NDL CMZ DMT SL 218 219 TRD CL'S MAINTENANCE Shadow 60+60+60 MINS SSE/TRD/NDL TOWERCAR

3 31-07-2025 GNT GNT-NDL SYM YARD DN ENGG TWS block MAIN 1 block of 180 min -- -- SSE/PWAY/VKN
CLS=
3 31-07-2025 GNT GNT-NDL CEM YARD UP&DN 88 90 TRD T/OS MAINTENANCE Shadow 60+60 No. 10, SSE/TRD/VKN
T/O=2
Crank handle 1,2,3&4 No
4 31-07-2025 GNT GNT-NDL NLPD Yard ST Shadow 4 block each 30 minutes JE /SIGNAL /NLPD ESM
M/Inspection Train

01-08-2025 (Friday)
TOWERCAR/PIC
1 01-08-2025 GNT GNT-NDL NDL NDPL SL 256 257 TRD SCL MAINTENANCE WORK Shadow 60+60 SSE/TRD/NDL
KUP

2 01-08-2025 GNT GNT-NDL CMZ DMT SL 218 219 TRD CL'S MAINTENANCE Shadow 60+60+60 MINS SSE/TRD/NDL TOWERCAR
CLS=
3 01-08-2025 GNT GNT-NDL CEM YARD UP&DN 88 90 TRD T/OS MAINTENANCE Shadow 60+60 No. 10, SSE/TRD/VKN
T/O=2
Crank handle 1,2,3&4 No
4 01-08-2025 GNT GNT-NDL NLPD Yard ST Shadow 4 block each 30 minutes JE /SIGNAL /NLPD ESM
M/Inspection Train

02-08-2025 (Saturday)
Block Planned Demanded On Date
Sub KM Planned block Timings Train
Major Station/Station Main or Planned Block Duration Output Supervisor Block Timings Remarks (S&T, Caution Order
S.No Date Div Secti Direction Dept Type of Work Repercu (HH:MM) OHE, Tower Car,
Section Shadow (in mins) From To Deputed Impositions/
on From To From To Unit Quantity sions Power block, etc)
(HH:MM) (HH:MM) From To Alterations

1 02-08-2025 GNT GNT-NDL CMZ DMT SL 221 223 TRD TUNNEL SCL MAINTENANCE Shadow 60+60 SSE/TRD/NDL TOWERCAR
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 02-08-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
Towerstaff
car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
3 02-08-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
03-08-2025 (Sunday)

1 03-08-2025 GNT GNT-NDL DMT CMZ SL 220 221 TRD AOH of ATD Shadow 60+60 MINS SSE/TRD/NDL

2 03-08-2025 GNT GNT-NDL CEM VKN UP 82 88 TRD AOH of ATDs Shadow 60+60 No. 4

UP and
3 03-08-2025 GNT GNT-KCC NBR YARD ST NBR-MAG,NBR-REP B/I M/I shadow 2 blocks of 30 min each JE/S/GNT ESM
DN

04-08-2025 (Monday)

1 04-08-2025 GNT GNT-NDL NDL YARD SL 256 257 TRD ISOLATOR MAINTENANCE Shadow 60+60

S&T ,OHE
2 04-08-2025 GNT GNT-NDL NLPD YARD SL ENGG Tamping Shadow 2 blocks of 120+120 min SSE/PWAY/NLPD
Required

05-08-2025 (Tuesday)

1 05-08-2025 GNT GNT-NDL NDL YARD SL 257 256 TRD ISOLATOR MAINTENANCE Shadow 60+60 SSE/TRD/NDL
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 05-08-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
Towerstaff
car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
3 05-08-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
06-08-2025 (Wednesday)

1 06-08-2025 GNT GNT-NDL NDL YARD SL 256 257 TRD ISOLATOR MAINTENANCE Shadow 60 MINS
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 06-08-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
2 06-08-2025 GNT GNT-NDL NLPD YARD ENGG TWS block Main 1 block of 180 min SSE/PWAY/NLPD

3 06-08-2025 GNT GNT-NDL DMT YARD ST BOTH B/I & CH MAINTENANCE Shadow 4 BLOCKS 30 MIN ESM/GID
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
4 06-08-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
6 06-08-2025 GNT GNT-NDL PRCA YARD ST Both B/I Monthly Inspection Main 2 Blocks of each 30" JE/S/PPM ESM

07-08-2025 (Thursday)

1 07-08-2025 GNT GNT-NDL NDL YARD SL 256 257 TRD ISOLATOR MAINTENANCE Shadow 60 MINS

2 07-08-2025 GNT GNT-NDL GZL YARD SL ST BOTH B/I & CH MAINTENANCE Shadow 3 BLCOKS 30 MIN EACH ESM/NDL

3 07-08-2025 GNT GNT-NDL GID YARD ST BOTH B/I & CH MAINTENANCE Shadow 4 BLCOKS 30 MIN EACH ESM/GID

08-08-2025 (Friday)
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
1 08-08-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
Towerstaff
car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 08-08-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
3 08-08-2025 GNT GNT-NDL DKD YARD ST Both B/I Monthly Inspection Shadow 2 Blocks of each 30" JE/S/KCD ESM

UP and
4 08-08-2025 GNT GNT-NDL SYM YARD 72 73 TRD SYM TRANSFORMER mAIN 60+60 1
DN

09-08-2025 (Saturday)
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
1 09-08-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
Towerstaff
car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 09-08-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
3 09-08-2025 GNT GNT-NDL POO YARD UP ST Both B/I Monthly Inspection Shadow 2 Blocks of each 30" JE/S/KCD ESM
Block Planned Demanded On Date
Sub KM Planned block Timings Train
Major Station/Station Main or Planned Block Duration Output Supervisor Block Timings Remarks (S&T, Caution Order
S.No Date Div Secti Direction Dept Type of Work Repercu (HH:MM) OHE, Tower Car,
Section Shadow (in mins) From To Deputed Impositions/
on From To From To Unit Quantity sions Power block, etc)
(HH:MM) (HH:MM) From To Alterations

10-08-2025 (Sunday)
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
1 10-08-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
Towerstaff
car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 10-08-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
11-08-2025 (Monday)
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
1 11-08-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
Towerstaff
car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 11-08-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
12-08-2025 (Tuesday)

1 12-08-2025 GNT GNT-NDL NDL YARD SL 256 257 TRD ISOLATOR MAINTENANCE Shadow 60 MINS

2 12-08-2025 GNT GNT-NDL GZL YARD SL ST BOTH B/I & CH MAINTENANCE Shadow 3 BLCOKS 30 MIN EACH ESM/NDL

3 12-08-2025 GNT GNT-NDL GID YARD ST BOTH B/I & CH MAINTENANCE Shadow 4 BLCOKS 30 MIN EACH ESM/GID

13-08-2025 (Wednesday)

1 13-08-2025 GNT GNT-NDL CMZ DMT SL 221 223 TRD TUNNEL SCL MAINTENANCE Shadow 60+60 SSE/TRD/NDL TOWERCAR
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 13-08-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
Towerstaff
car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
3 13-08-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
14-08-2025 (Thursday)
TOWERCAR/PIC
1 14-08-2025 GNT GNT-NDL NDL NDPL SL 256 257 TRD SCL MAINTENANCE WORK Shadow 60+60 SSE/TRD/NDL
KUP

2 14-08-2025 GNT GNT-NDL CMZ DMT SL 218 219 TRD CL'S MAINTENANCE Shadow 60+60+60 MINS SSE/TRD/NDL TOWERCAR

2 14-08-2025 GNT GNT-NDL CMZ DMT SL 218 219 TRD CL'S MAINTENANCE Shadow 60+60+60 MINS SSE/TRD/NDL TOWERCAR
CLS=
3 14-08-2025 GNT GNT-NDL CEM YARD UP&DN 88 90 TRD T/OS MAINTENANCE Shadow 60+60 No. 10, SSE/TRD/VKN
T/O=2
Crank handle 1,2,3&4 No
4 14-08-2025 GNT GNT-NDL NLPD Yard ST Shadow 4 block each 30 minutes JE /SIGNAL /NLPD ESM
M/Inspection Train

15-08-2025 (Friday)

1 15-08-2025 GNT GNT-NDL NDL YARD SL 256 257 TRD ISOLATOR MAINTENANCE Shadow 60+60

S&T ,OHE
2 15-08-2025 GNT GNT-NDL NLPD YARD SL ENGG Tamping Shadow 2 blocks of 120+120 min SSE/PWAY/NLPD
Required

16-08-2025 (Saturday)
TOWERCAR/PIC
1 16-08-2025 GNT GNT-NDL NDL NDPL SL 256 257 TRD SCL MAINTENANCE WORK Shadow 60+60 SSE/TRD/NDL
KUP

2 16-08-2025 GNT GNT-NDL CMZ DMT SL 218 219 TRD CL'S MAINTENANCE Shadow 60+60+60 MINS SSE/TRD/NDL TOWERCAR
CLS=
3 16-08-2025 GNT GNT-NDL CEM YARD UP&DN 88 90 TRD T/OS MAINTENANCE Shadow 60+60 No. 10, SSE/TRD/VKN
T/O=2
Crank handle 1,2,3&4 No
4 16-08-2025 GNT GNT-NDL NLPD Yard ST Shadow 4 block each 30 minutes JE /SIGNAL /NLPD ESM
M/Inspection Train

17-08-2025 (Sunday)
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
1 17-08-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
Towerstaff
car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 17-08-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
3 17-08-2025 GNT GNT-NDL DKD YARD ST Both B/I Monthly Inspection Shadow 2 Blocks of each 30" JE/S/KCD ESM

UP and
4 17-08-2025 GNT GNT-NDL SYM YARD 72 73 TRD SYM TRANSFORMER mAIN 60+60 1
DN

18-08-2025 (Monday)
Block Planned Demanded On Date
Sub KM Planned block Timings Train
Major Station/Station Main or Planned Block Duration Output Supervisor Block Timings Remarks (S&T, Caution Order
S.No Date Div Secti Direction Dept Type of Work Repercu (HH:MM) OHE, Tower Car,
Section Shadow (in mins) From To Deputed Impositions/
on From To From To Unit Quantity sions Power block, etc)
(HH:MM) (HH:MM) From To Alterations
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
1 18-08-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
Towerstaff
car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 18-08-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
3 18-08-2025 GNT GNT-NDL DKD YARD ST Both B/I Monthly Inspection Shadow 2 Blocks of each 30" JE/S/KCD ESM

UP and
4 18-08-2025 GNT GNT-NDL SYM YARD 72 73 TRD SYM TRANSFORMER mAIN 60+60 1
DN

19-08-2025 (Tuesday)
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
1 19-08-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
Towerstaff
car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 19-08-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
20-08-2025 (Wednesday)

1 20-08-2025 GNT GNT-NDL CMZ DMT SL 221 223 TRD TUNNEL SCL MAINTENANCE Shadow 60+60 SSE/TRD/NDL TOWERCAR
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 20-08-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
Towerstaff
car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
3 20-08-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
21-08-2025 (Thursday)

1 21-08-2025 GNT GNT-NDL NDL YARD SL 256 257 TRD ISOLATOR MAINTENANCE Shadow 60 MINS

2 21-08-2025 GNT GNT-NDL GZL YARD SL ST BOTH B/I & CH MAINTENANCE Shadow 3 BLCOKS 30 MIN EACH ESM/NDL

3 21-08-2025 GNT GNT-NDL GID YARD ST BOTH B/I & CH MAINTENANCE Shadow 4 BLCOKS 30 MIN EACH ESM/GID

22-08-2025 (Friday)

1 22-08-2025 GNT GNT-NDL NDL YARD SL 256 257 TRD ISOLATOR MAINTENANCE Shadow 60 MINS

2 22-08-2025 GNT GNT-NDL GZL YARD SL ST BOTH B/I & CH MAINTENANCE Shadow 3 BLCOKS 30 MIN EACH ESM/NDL

3 22-08-2025 GNT GNT-NDL GID YARD ST BOTH B/I & CH MAINTENANCE Shadow 4 BLCOKS 30 MIN EACH ESM/GID

23-08-2025 (Saturday)

1 23-08-2025 GNT GNT-NDL CMZ DMT SL 221 223 TRD TUNNEL SCL MAINTENANCE Shadow 60+60 SSE/TRD/NDL TOWERCAR
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 23-08-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
Towerstaff
car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
3 23-08-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
24-08-2025 (Sunday)
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
1 24-08-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
Towerstaff
car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 24-08-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
25-08-2025 (Monday)
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
1 25-08-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
Towerstaff
car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 25-08-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
3 25-08-2025 GNT GNT-NDL GKM CEM UP 89 95 TRD AOH of CLs Shadow 75+75 flexible slot 10

26-08-2025 (Tuesday)
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
1 26-08-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
Towerstaff
car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 26-08-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
3 26-08-2025 GNT GNT-NDL GKM CEM UP 89 95 TRD AOH of CLs Shadow 75+75 flexible slot 10
Block Planned Demanded On Date
Sub KM Planned block Timings Train
Major Station/Station Main or Planned Block Duration Output Supervisor Block Timings Remarks (S&T, Caution Order
S.No Date Div Secti Direction Dept Type of Work Repercu (HH:MM) OHE, Tower Car,
Section Shadow (in mins) From To Deputed Impositions/
on From To From To Unit Quantity sions Power block, etc)
(HH:MM) (HH:MM) From To Alterations
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
4 26-08-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
27-08-2025 (Wednesday)
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
1 27-08-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
Towerstaff
car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
1 27-08-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
Towerstaff
car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 27-08-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
3 27-08-2025 GNT GNT-NDL GKM CEM UP 89 95 TRD AOH of CLs Shadow 75+75 flexible slot 10
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
4 27-08-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
28-08-2025 (Thursday)
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
1 28-08-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
Towerstaff
car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 28-08-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
3 28-08-2025 GNT GNT-NDL GKM CEM UP 89 95 TRD AOH of CLs Shadow 75+75 flexible slot 10
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
4 28-08-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
29-08-2025 (Friday)
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
1 29-08-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
Towerstaff
car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 29-08-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
3 29-08-2025 GNT GNT-NDL GKM CEM UP 89 95 TRD AOH of CLs Shadow 75+75 flexible slot 10
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
4 29-08-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
30-08-2025 (Saturday)
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
1 30-08-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
Towerstaff
car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 30-08-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
3 30-08-2025 GNT GNT-NDL GKM CEM UP 89 95 TRD AOH of CLs Shadow 75+75 flexible slot 10
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
4 30-08-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
31-08-2025 (Sunday)
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
1 31-08-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
Towerstaff
car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 31-08-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
3 31-08-2025 GNT GNT-NDL GKM CEM UP 89 95 TRD AOH of CLs Shadow 75+75 flexible slot 10
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
4 31-08-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
01-09-2025 (Monday)

1 01-09-2025 GNT GNT-NDL CEM VKN UP 82 88 TRD AOH of ATDs Shadow 60+60 4

2 01-09-2025 GNT GNT-NDL NDL YARD SL 256 256 TRD AOH OF ATD Shadow SSE/TRD/NDL

3 01-09-2025 GNT GNT-NDL GZL YARD ST LC-192 EKT MAINTENANCE Shadow 1 BLCOK 30 MIN ESM/NDL

02-09-2025 (Tuesday)

1 02-09-2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER Shadow 1 BLOCK 30 MIN JE/SIG/NDL

2 02-09-2025 GNT GNT-NDL CMZ DMT SL 218 219 TRD CL'S MAINTENANCE Shadow 60+60+60 MINS SSE/TRD/NDL TOWERCAR
Block Planned Demanded On Date
Sub KM Planned block Timings Train
Major Station/Station Main or Planned Block Duration Output Supervisor Block Timings Remarks (S&T, Caution Order
S.No Date Div Secti Direction Dept Type of Work Repercu (HH:MM) OHE, Tower Car,
Section Shadow (in mins) From To Deputed Impositions/
on From To From To Unit Quantity sions Power block, etc)
(HH:MM) (HH:MM) From To Alterations

03-09-2025 (Wednesday)

1 03-09-2025 GNT GNT-NDL CMZ GZL SL 238 239 TRD CL'S MAINTENANCE Shadow 60+60 MINS SSE/TRD/NDL TOWER CAR
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 03-09-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
04-09-2025 (Thursday)

1 04-09-2025 GNT GNT-NDL NDL NDPL ST LC-186 EKT MAINTENANCE Shadow 1 BLOCK 30 MIN ESM/NDL

2 04-09-2025 GNT GNT-NDL NDPL YARD SL 253 255 TRD UIOL MAINTENANCE Shadow 60+60 MINS SSE/TRD/NDL TOWER CAR

05-09-2025 (Friday)

1 05-09-2025 GNT GNT-NDL GZL NDPL SL 246 247 TRD CLS MAINTENACE Shadow 60+60 MINS SSE/TRD/NDL TOWER CAR

14:45-
2 05-09-2025 GNT GNT-NDL VKN SYM DN 72 82 TRD AOH of CLs Main 75+75 12:30-13:45 10
16:00

3 05-09-2025 GNT GNT-NDL NDPU YARD ST Both B/I Monthly Inspection Shadow 2 Blocks of each 30" JE/S/PPM ESM

06-09-2025 (Saturday)

1 06-09-2025 GNT GNT-NDL GJJ YARD ST Both B/I Monthly Inspection Shadow 2 Blocks of each 30MIN. JE/S/KCD ESM

S&T, OHE staff


2 06-09-2025 GNT GNT-NDL PRCA YARD ENGG & ST Rail Renewal Main 2 Blocks of 90 min each flexible slot SSE/SW/NLPD
required
Crank handle 5,6,7&8 No
3 06-09-2025 GNT GNT-NDL NLPD Yard ST Shadow 4 blocks each 30 minutes JE /SIGNAL /NLPD ESM
M/Inspection Train

07-09-2025 (Sunday)

2 07-09-2025 GNT GNT-NDL KCD YARD UP 106 108 TRD AOH of Turnouts and Crossoves Shadow 2 blocks of 75 min each flexible slot

08-09-2025 (Monday)
TOWERCAR/PIC
1 08-09-2025 GNT GNT-NDL NDL YARD SL 256 257 TRD POH OF ATD Shadow 60+60 SSE/TRD/NDL
KUP

2 08-09-2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER Shadow 1 BLCOK 60 MIN JE/SIG/NDL

3 08-09-2025 GNT GNT-NDL GZL CMZ SL 240 242 TRD AOH OF ATD Shadow 60+60 MINS

4 08-09-2025 GNT GNT-NDL CEM VKN DN 88 82 TRD AOH of CLs Shadow 75+75 10

09-09-2025 (Tuesday)

1 09-09-2025 GNT GNT-NDL NDL YARD SL 256 257 TRD AOH OF ATD Shadow 90+90 MINS SSE/TRD/NDL

2 09-09-2025 GNT GNT-NDL GKM YARD ST Both B/I Monthly Inspection Shadow 2 Blocks of each 30MIN. JE/S/KCD ESM

2 09-09-2025 GNT GNT-NDL CMZ DMT SL 218 219 TRD CL'S MAINTENANCE Shadow 60+60+60 MINS SSE/TRD/NDL TOWERCAR

2 09-09-2025 GNT GNT-NDL NLPD YARD SL ENGG TWS block Main 1 block of 180 min SSE/PWAY/NLPD TOWERCAR
C/o:1,
UP and AOH of T/os, Crossover and 14:45-
3 09-09-2025 GNT GNT-NDL VKN YARD 82 83 TRD Main 75+75 12:30-13:45 T/os:2
DN CLs. 16:00
,
14:00- S&T, OHE staff
4 09-09-2025 GNT GNT-NDL NDPU YARD ENGG & ST Redundant Glued Joint Renewal Main 2 Blocks of 90 min each 8:00-9:30 SSE/SW/NLPD
15:30 required

10-09-2025 (Wednesday)
TOWERCAR/PIC
1 10-09-2025 GNT GNT-NDL NDL YA LINE SL 1KM 2 KM TRD POH OF ATD Shadow 60+60 SSE/TRD/NDL
KUP

2 10-09-2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER Shadow 1 BLCOK 60 MIN JE/SIG/NDL

3 10-09-2025 GNT GNT-NDL GZL CMZ SL 240 242 TRD AOH OF ATD Shadow 60+60 MINS

4 10-09-2025 GNT GNT-NDL CEM VKN DN 88 82 TRD AOH of CLs Shadow 75+75 No. 10

11-09-2025 (Thursday)
Block Planned Demanded On Date
Sub KM Planned block Timings Train
Major Station/Station Main or Planned Block Duration Output Supervisor Block Timings Remarks (S&T, Caution Order
S.No Date Div Secti Direction Dept Type of Work Repercu (HH:MM) OHE, Tower Car,
Section Shadow (in mins) From To Deputed Impositions/
on From To From To Unit Quantity sions Power block, etc)
(HH:MM) (HH:MM) From To Alterations

1 11-09-2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER Shadow 1 BLOCK 30 MIN JE/SIG/NDL

2 11-09-2025 GNT GNT-NDL CMZ DMT SL 218 219 TRD CL'S MAINTENANCE Shadow 60+60+60 MINS SSE/TRD/NDL TOWERCAR
CLS=
3 11-09-2025 GNT GNT-NDL CEM YARD UP&DN 88 90 TRD T/OS MAINTENANCE Shadow 60+60 No. 10, SSE/TRD/VKN
T/O=2
Crank handle 1,2,3&4 No
4 11-09-2025 GNT GNT-NDL NLPD Yard ST Shadow 4 block each 30 minutes JE /SIGNAL /NLPD ESM
M/Inspection Train

12-09-2025 (Friday)
TOWERCAR/PIC
1 12-09-2025 GNT GNT-NDL NDL NDPL SL 256 257 TRD SCL MAINTENANCE WORK Shadow 60+60 SSE/TRD/NDL
KUP

2 12-09-2025 GNT GNT-NDL CMZ DMT SL 218 219 TRD CL'S MAINTENANCE Shadow 60+60+60 MINS SSE/TRD/NDL TOWERCAR
CLS=
3 12-09-2025 GNT GNT-NDL CEM YARD UP&DN 88 90 TRD T/OS MAINTENANCE Shadow 60+60 No. 10, SSE/TRD/VKN
T/O=2
Crank handle 1,2,3&4 No
4 12-09-2025 GNT GNT-NDL NLPD Yard ST Shadow 4 block each 30 minutes JE /SIGNAL /NLPD ESM
M/Inspection Train

13-09-2025 (Saturday)

1 13-09-2025 GNT GNT-NDL CMZ DMT SL 221 223 TRD TUNNEL SCL MAINTENANCE Shadow 60+60 SSE/TRD/NDL TOWERCAR
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 13-09-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
Towerstaff
car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
3 13-09-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
14-09-2025 (Sunday)

1 14-09-2025 GNT GNT-NDL DMT CMZ SL 220 221 TRD AOH of ATD Shadow 60+60 MINS SSE/TRD/NDL

3 14-09-2025 GNT GNT-NDL VKN YARD DN ENGG TWS block MAIN 1 block of 180 min -- -- SSE/PWAY/VKN

2 14-09-2025 GNT GNT-NDL CEM VKN UP 82 88 TRD AOH of ATDs Shadow 60+60 No. 4

UP and
3 14-09-2025 GNT GNT-KCC NBR YARD ST NBR-MAG,NBR-REP B/I M/I shadow 2 blocks of 30 min each JE/S/GNT ESM
DN

15-09-2025 (Monday)

1 15-09-2025 GNT GNT-NDL NDL YARD SL 256 256 TRD ISOLATORMAINTENANCE Shadow 60 MINS SSE/TRD/NDL

3 15-09-2025 GNT GNT-NDL VKN YARD DN ENGG TWS block MAIN 1 block of 180 min -- -- SSE/PWAY/VKN
S&T, OHE staff
3 15-09-2025 GNT GNT-NDL PRCA YARD ENGG & ST Redundant Glued Joint Renewal Main 2 Blocks of 90 min each flexible slot SSE/SW/NLPD
required
16-09-2025 (Tuesday)

1 16-09-2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER Shadow 1 BLOCK 60 MIN JE/SIG/NDL

2 16-09-2025 GNT GNT-NDL GZL CMZ SL 233 234 TRD UIOL MAINTENANCE Shadow 60+60 MINS SSE/TRD/NDL

17-09-2025 (Wednesday)

1 17-09-2025 GNT GNT-NDL GZL CMZ SL 238 239 TRD AOH OF ATD Shadow 60+60 MINS SSE/TRD/NDL
Pending works/ Remarks block may be planed as 9.00 17.00h Tower car, Rail
2 17-09-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA
attention per B/S hrs rs crane & OHE
Pending works/ Remarks block may be planed as 9.00 17.00h Tower car, Rail
3 17-09-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA
attention per B/S hrs rs crane & OHE
18-09-2025 (Thursday)

1 18-09-2025 GNT GNT-NDL CMZ YARD SL 230 232 TRD AOH OF ATD Shadow 60+60 MINS SSE/TRD/NDL
Pending works/ Remarks block may be planed as 9.00 17.00h Tower car, Rail
2 18-09-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA
attention per B/S hrs rs crane & OHE
Pending works/ Remarks block may be planed as 9.00 17.00h Tower car, Rail
3 18-09-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA
attention per B/S hrs rs crane & OHE
19-09-2025 (Friday)

1 19-09-2025 GNT GNT-NDL NDL YARD SL 256 256 TRD AOH OF ATD Shadow SSE/TRD/NDL

2 19-09-2025 GNT GNT-NDL GZL YARD ST LC-192 EKT MAINTENANCE Shadow 1 BLCOK 30 MIN ESM/NDL
Block Planned Demanded On Date
Sub KM Planned block Timings Train
Major Station/Station Main or Planned Block Duration Output Supervisor Block Timings Remarks (S&T, Caution Order
S.No Date Div Secti Direction Dept Type of Work Repercu (HH:MM) OHE, Tower Car,
Section Shadow (in mins) From To Deputed Impositions/
on From To From To Unit Quantity sions Power block, etc)
(HH:MM) (HH:MM) From To Alterations
Pending works/ Remarks block may be planed as 9.00 17.00h Tower car, Rail
3 19-09-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA
attention per B/S hrs rs crane & OHE
Pending works/ Remarks block may be planed as 9.00 17.00h Tower car, Rail
4 19-09-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA
attention per B/S hrs rs crane & OHE
5 19-09-2025 GNT GNT-NDL GJJ YARD ST Both B/I Monthly Inspection Shadow 2 Blocks of each 30MIN. JE/S/KCD ESM

20-09-2025 (Saturday)

1 20-09-2025 GNT GNT-NDL GZL CMZ SL 233 234 TRD AOH OF ATD Shadow 60+60 MINS SSE/TRD/NDL
Pending works/ Remarks block may be planed as 9.00 17.00h Tower car, Rail
2 20-09-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA
attention per B/S hrs rs crane & OHE
3 20-09-2025 GNT GNT-NDL DMT YARD ST LC-197 EKT MANTENANCE Shadow 1 BLCOK 30 MIN ESM/GID
Pending works/ Remarks block may be planed as 9.00 17.00h Tower car, Rail
4 20-09-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA
attention per B/S hrs rs crane & OHE
21-09-2025 (Sunday)
Pending works/ Remarks block may be planed as 9.00 17.00h Tower car, Rail
1 21-09-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA
attention per B/S hrs rs crane & OHE
9.00 17.00h Tower car, Rail
1 21-09-2025 GNT GNT-NDL DMT YARD ENGG TWS block Main 1 block of 180 min SSE/PWAY/GID
hrs rs crane & OHE
Pending works/ Remarks block may be planed as 9.00 17.00h Tower car, Rail
2 21-09-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA
attention per B/S hrs rs crane & OHE
3 21-09-2025 GNT GNT-NDL GKM CEM UP 89 95 TRD AOH of CLs Shadow 75+75 10

22-09-2025 (Monday)
TOWERCAR/PIC
1 22-09-2025 GNT GNT-NDL NDL YARD SL 256 257 TRD POH OF ATD Shadow 60+60 SSE/TRD/NDL
KUP
2 22-09-2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER Shadow 1 BLCOK 60 MIN JE/SIG/NDL

3 22-09-2025 GNT GNT-NDL GZL CMZ SL 240 242 TRD AOH OF ATD Shadow 60+60 MINS

4 22-09-2025 GNT GNT-NDL CEM VKN DN 88 82 TRD AOH of CLs Shadow 75+75 10

23-09-2025 (Tuesday)

1 23-09-2025 GNT GNT-NDL NDL YARD SL 256 257 TRD AOH OF ATD Shadow 90+90 MINS SSE/TRD/NDL

2 23-09-2025 GNT GNT-NDL GKM YARD ST Both B/I Monthly Inspection Shadow 2 Blocks of each 30MIN. JE/S/KCD ESM
UP and AOH of T/os, Crossover and 14:45-
3 23-09-2025 GNT GNT-NDL VKN YARD 82 83 TRD Main 75+75 12:30-13:45
DN CLs. 16:00
24-09-2025 (Wednesday)
TOWERCAR/PIC
1 24-09-2025 GNT GNT-NDL NDL YA LINE SL 1KM 2 KM TRD POH OF ATD Shadow 60+60 SSE/TRD/NDL
KUP
2 24-09-2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER Shadow 1 BLCOK 60 MIN JE/SIG/NDL

3 24-09-2025 GNT GNT-NDL GZL CMZ SL 240 242 TRD AOH OF ATD Shadow 60+60 MINS

4 24-09-2025 GNT GNT-NDL CEM VKN DN 88 82 TRD AOH of CLs Shadow 75+75 No. 10

25-09-2025 (Thursday)

1 25-09-2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER Shadow 1 BLOCK 30 MIN JE/SIG/NDL

2 25-09-2025 GNT GNT-NDL CMZ DMT SL 218 219 TRD CL'S MAINTENANCE Shadow 60+60+60 MINS SSE/TRD/NDL TOWERCAR
CLS=
3 25-09-2025 GNT GNT-NDL CEM YARD UP&DN 88 90 TRD T/OS MAINTENANCE Shadow 60+60 No. SSE/TRD/VKN
10,
Crank handle 1,2,3&4 No
4 25-09-2025 GNT GNT-NDL NLPD Yard ST Shadow 4 block each 30 minutes JE /SIGNAL /NLPD ESM
M/Inspection Train
26-09-2025 (Friday)
TOWERCAR/PIC
1 26-09-2025 GNT GNT-NDL NDL NDPL SL 256 257 TRD SCL MAINTENANCE WORK Shadow 60+60 SSE/TRD/NDL
KUP
2 26-09-2025 GNT GNT-NDL CMZ DMT SL 218 219 TRD CL'S MAINTENANCE Shadow 60+60+60 MINS SSE/TRD/NDL TOWERCAR

2 26-09-2025 GNT GNT-NDL NLPD YARD SL ENGG TWS block Main 1 block of 180 min SSE/PWAY/NLPD TOWERCAR
CLS=
3 26-09-2025 GNT GNT-NDL CEM YARD UP&DN 88 90 TRD T/OS MAINTENANCE Shadow 60+60 No. SSE/TRD/VKN
10,
Crank handle 1,2,3&4 No
4 26-09-2025 GNT GNT-NDL NLPD Yard ST Shadow 4 block each 30 minutes JE /SIGNAL /NLPD ESM
M/Inspection Train
Block Planned Demanded On Date
Sub KM Planned block Timings Train
Major Station/Station Main or Planned Block Duration Output Supervisor Block Timings Remarks (S&T, Caution Order
S.No Date Div Secti Direction Dept Type of Work Repercu (HH:MM) OHE, Tower Car,
Section Shadow (in mins) From To Deputed Impositions/
on From To From To Unit Quantity sions Power block, etc)
(HH:MM) (HH:MM) From To Alterations

27-09-2025 (Saturday)

1 27-09-2025 GNT GNT-NDL CMZ DMT SL 221 223 TRD TUNNEL SCL MAINTENANCE Shadow 60+60 SSE/TRD/NDL TOWERCAR
Pending works/ Remarks block may be planed as 9.00 17.00h Tower car, Rail
2 27-09-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA
attention per B/S hrs rs crane & OHE
Pending works/ Remarks block may be planed as 9.00 17.00h Tower car, Rail
3 27-09-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA
attention per B/S hrs rs crane & OHE
28-09-2025 (Sunday)

1 28-09-2025 GNT GNT-NDL DMT CMZ SL 220 221 TRD AOH of ATD Shadow 60+60 MINS SSE/TRD/NDL

2 28-09-2025 GNT GNT-NDL CEM VKN UP 82 88 TRD AOH of ATDs Shadow 60+60 No. 4

2 28-09-2025 GNT GNT-NDL GID DMT DN ENGG PQRS block Main 1 block of 180 min SSE/PWAY/GID
UP and
3 28-09-2025 GNT GNT-KCC NBR YARD ST NBR-MAG,NBR-REP B/I M/I shadow 2 blocks of 30 min each JE/S/GNT ESM
DN
29-09-2025 (Monday)
TOWERCAR/PIC
1 29-09-2025 GNT GNT-NDL NDL YARD SL 256 257 TRD POH OF ATD Shadow 60+60 SSE/TRD/NDL
KUP
2 29-09-2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER Shadow 1 BLCOK 60 MIN JE/SIG/NDL

3 29-09-2025 GNT GNT-NDL GZL CMZ SL 240 242 TRD AOH OF ATD Shadow 60+60 MINS

4 29-09-2025 GNT GNT-NDL CEM VKN DN 88 82 TRD AOH of CLs Shadow 75+75 10

30-09-2025 (Tuesday)

1 30-09-2025 GNT GNT-NDL NDL YARD SL 256 257 TRD AOH OF ATD Shadow 90+90 MINS SSE/TRD/NDL

2 30-09-2025 GNT GNT-NDL GKM YARD ST Both B/I Monthly Inspection Shadow 2 Blocks of each 30MIN. JE/S/KCD ESM

2 30-09-2025 GNT GNT-NDL GID DMT DN ENGG PQRS block Main 1 block of 180 min SSE/PWAY/GID
UP and AOH of T/os, Crossover and 14:45- C/o:1,
3 30-09-2025 GNT GNT-NDL VKN YARD 82 83 TRD Main 75+75 12:30-13:45
DN CLs. 16:00 T/os:2
14:00- S&T, OHE staff
4 30-09-2025 GNT GNT-NDL NDPU YARD ENGG & ST Redundant Glued Joint Renewal Main 2 Blocks of 90 min each 8:00-9:30 SSE/SW/NLPD
15:30 required
01-10-2025 (Wednesday)
TOWERCAR/PIC
1 01-10-2025 GNT GNT-NDL NDL YA LINE SL 1KM 2 KM TRD POH OF ATD Shadow 60+60 SSE/TRD/NDL
KUP
2 01-10-2025 GNT GNT-NDL GID DMT DN ENGG PQRS block Main 1 block of 180 min SSE/PWAY/GID

2 01-10-2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER Shadow 1 BLCOK 60 MIN JE/SIG/NDL

3 01-10-2025 GNT GNT-NDL GZL CMZ SL 240 242 TRD AOH OF ATD Shadow 60+60 MINS

4 01-10-2025 GNT GNT-NDL CEM VKN DN 88 82 TRD AOH of CLs Shadow 75+75 No. 10

02-10-2025 (Thursday)

1 02-10-2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER Shadow 1 BLOCK 30 MIN JE/SIG/NDL

2 02-10-2025 GNT GNT-NDL CMZ DMT SL 218 219 TRD CL'S MAINTENANCE Shadow 60+60+60 MINS SSE/TRD/NDL TOWERCAR

2 02-10-2025 GNT GNT-NDL GID DMT DN ENGG PQRS block Main 1 block of 180 min SSE/PWAY/GID
CLS=
3 02-10-2025 GNT GNT-NDL CEM YARD UP&DN 88 90 TRD T/OS MAINTENANCE MAIN 60+60 No. SSE/TRD/VKN
10,
Crank handle 1,2,3&4 No
4 02-10-2025 GNT GNT-NDL NLPD Yard ST Shadow 4 block each 30 minutes JE /SIGNAL /NLPD ESM
M/Inspection Train
03-10-2025 (Friday)
TOWERCAR/PIC
1 03-10-2025 GNT GNT-NDL NDL NDPL SL 256 257 TRD SCL MAINTENANCE WORK Shadow 60+60 SSE/TRD/NDL
KUP
2 03-10-2025 GNT GNT-NDL CMZ DMT SL 218 219 TRD CL'S MAINTENANCE Shadow 60+60+60 MINS SSE/TRD/NDL TOWERCAR

2 03-10-2025 GNT GNT-NDL GID DMT DN ENGG PQRS block Main 1 block of 180 min SSE/PWAY/GID
CLS=
3 03-10-2025 GNT GNT-NDL CEM YARD UP&DN 88 90 TRD T/OS MAINTENANCE MAIN 60+60 No. SSE/TRD/VKN
10,
Crank handle 1,2,3&4 No
4 03-10-2025 GNT GNT-NDL NLPD Yard ST Shadow 4 block each 30 minutes JE /SIGNAL /NLPD ESM
M/Inspection Train
Block Planned Demanded On Date
Sub KM Planned block Timings Train
Major Station/Station Main or Planned Block Duration Output Supervisor Block Timings Remarks (S&T, Caution Order
S.No Date Div Secti Direction Dept Type of Work Repercu (HH:MM) OHE, Tower Car,
Section Shadow (in mins) From To Deputed Impositions/
on From To From To Unit Quantity sions Power block, etc)
(HH:MM) (HH:MM) From To Alterations

04-10-2025 (Saturday)

1 04-10-2025 GNT GNT-NDL CMZ DMT SL 221 223 TRD TUNNEL SCL MAINTENANCE Shadow 60+60 SSE/TRD/NDL TOWERCAR

1 04-10-2025 GNT GNT-NDL CMZ DMT SL 221 223 TRD TUNNEL SCL MAINTENANCE Shadow 60+60 SSE/TRD/NDL TOWERCAR
Pending works/ Remarks block may be planed as 9.00 17.00h Tower car, Rail
2 04-10-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA
attention per B/S hrs rs crane & OHE
Pending works/ Remarks block may be planed as 9.00 17.00h Tower car, Rail
3 04-10-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA
attention per B/S hrs rs crane & OHE
05-10-2025 (Sunday)

1 05-10-2025 GNT GNT-NDL DMT CMZ SL 220 221 TRD AOH of ATD Shadow 60+60 MINS SSE/TRD/NDL

2 05-10-2025 GNT GNT-NDL CEM VKN UP 82 88 TRD AOH of ATDs Main 60+60 No. 4

2 05-10-2025 GNT GNT-NDL GID DMT DN ENGG PQRS block Main 1 block of 180 min SSE/PWAY/GID
UP and
3 05-10-2025 GNT GNT-KCC NBR YARD ST NBR-MAG,NBR-REP B/I M/I shadow 2 blocks of 30 min each JE/S/GNT ESM
DN
06-10-2025 (Monday)

1 06-10-2025 GNT GNT-NDL CEM VKN UP 82 88 TRD AOH of ATDs Main 60+60 4

2 06-10-2025 GNT GNT-NDL NDL YARD SL 256 256 TRD AOH OF ATD Shadow SSE/TRD/NDL

3 06-10-2025 GNT GNT-NDL GZL YARD ST LC-192 EKT MAINTENANCE Shadow 1 BLCOK 30 MIN ESM/NDL

07-10-2025 (Tuesday)

1 07-10-2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER MAIN 1 BLOCK 30 MIN JE/SIG/NDL

2 07-10-2025 GNT GNT-NDL CMZ DMT SL 218 219 TRD CL'S MAINTENANCE MAIN 60+60+60 MINS SSE/TRD/NDL TOWERCAR
S&T ,OHE
3 07-10-2025 GNT GNT-NDL GNT YARD SL ENGG Tamping MAIN 2 blocks of 120+120 min flexible slot SSE/PWAY/GNT
Required
08-10-2025 (Wednesday)

1 08-10-2025 GNT GNT-NDL CMZ GZL SL 238 239 TRD CL'S MAINTENANCE MAIN 60+60 MINS SSE/TRD/NDL TOWER CAR

1 08-10-2025 GNT GNT-NDL NDL YARD SL ENGG TWS block MAIN 1 block of 180 min SSE/PWAY/NDL TOWER CAR
Pending works/ Remarks block may be planed as 9.00 17.00h Tower car, Rail
2 08-10-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA
attention per B/S hrs rs crane & OHE
S&T ,OHE
3 08-10-2025 GNT GNT-NDL GNT YARD SL ENGG Tamping MAIN 2 blocks of 120+120 min flexible slot SSE/PWAY/GNT
Required
09-10-2025 (Thursday)

1 09-10-2025 GNT GNT-NDL NDL NDPL ST LC-186 EKT MAINTENANCE MAIN 1 BLOCK 30 MIN ESM/NDL

2 09-10-2025 GNT GNT-NDL NDPL YARD SL 253 255 TRD UIOL MAINTENANCE Shadow 60+60 MINS SSE/TRD/NDL TOWER CAR
S&T ,OHE
3 09-10-2025 GNT GNT-NDL GNT YARD SL ENGG Tamping MAIN 2 blocks of 120+120 min flexible slot SSE/PWAY/GNT
Required
10-10-2025 (Friday)

1 10-10-2025 GNT GNT-NDL GZL NDPL SL 246 247 TRD CLS MAINTENACE Shadow 60+60 MINS SSE/TRD/NDL TOWER CAR

2 26-09-2025 GNT GNT-NDL NLPD YARD SL ENGG TWS block Main 1 block of 180 min SSE/PWAY/NLPD TOWERCAR
14:45-
2 10-10-2025 GNT GNT-NDL VKN SYM DN 72 82 TRD AOH of CLs Main 75+75 12:30-13:45 10
16:00
3 10-10-2025 GNT GNT-NDL NDPU YARD ST Both B/I Monthly Inspection Shadow 2 Blocks of each 30" JE/S/PPM ESM
S&T ,OHE
4 10-10-2025 GNT GNT-NDL GNT YARD SL ENGG Tamping MAIN 2 blocks of 120+120 min flexible slot SSE/PWAY/GNT
Required
11-10-2025 (Saturday)

1 11-10-2025 GNT GNT-NDL GJJ YARD ST Both B/I Monthly Inspection Shadow 2 Blocks of each 30MIN. JE/S/KCD ESM
S&T, OHE staff
2 11-10-2025 GNT GNT-NDL PRCA YARD ENGG & ST Rail Renewal Main 2 Blocks of 90 min each flexible slot SSE/SW/NLPD
required
Crank handle 5,6,7&8 No
3 11-10-2025 GNT GNT-NDL NLPD Yard ST Shadow 4 blocks each 30 minutes JE /SIGNAL /NLPD ESM
M/Inspection Train
12-10-2025 (Sunday)
Block Planned Demanded On Date
Sub KM Planned block Timings Train
Major Station/Station Main or Planned Block Duration Output Supervisor Block Timings Remarks (S&T, Caution Order
S.No Date Div Secti Direction Dept Type of Work Repercu (HH:MM) OHE, Tower Car,
Section Shadow (in mins) From To Deputed Impositions/
on From To From To Unit Quantity sions Power block, etc)
(HH:MM) (HH:MM) From To Alterations

13-10-2025 (Monday)

1 13-10-2025 GNT GNT-NDL NDL YARD SL 256 256 TRD ISOLATORMAINTENANCE Shadow 60 MINS SSE/TRD/NDL
S&T, OHE staff
3 13-10-2025 GNT GNT-NDL PRCA YARD ENGG & ST Redundant Glued Joint Renewal Main 2 Blocks of 90 min each flexible slot SSE/SW/NLPD
required
14-10-2025 (Tuesday)

1 14-10-2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER Shadow 1 BLOCK 60 MIN JE/SIG/NDL

2 14-10-2025 GNT GNT-NDL GZL CMZ SL 233 234 TRD UIOL MAINTENANCE Shadow 60+60 MINS SSE/TRD/NDL
S&T, OHE staff
3 14-10-2025 GNT GNT-NDL PRCA YARD ENGG & ST Redundant Glued Joint Renewal Main 2 Blocks of 90 min each flexible slot SSE/SW/NLPD
required
15-10-2025 (Wednesday)

1 15-10-2025 GNT GNT-NDL GZL CMZ SL 238 239 TRD AOH OF ATD Shadow 60+60 MINS SSE/TRD/NDL
S&T, OHE staff
3 15-10-2025 GNT GNT-NDL PRCA YARD ENGG & ST Redundant Glued Joint Renewal Main 2 Blocks of 90 min each flexible slot SSE/SW/NLPD
required
16-10-2025 (Thursday)

1 16-10-2025 GNT GNT-NDL CMZ YARD SL 230 232 TRD AOH OF ATD Shadow 60+60 MINS SSE/TRD/NDL

17-10-2025 (Friday)

1 17-10-2025 GNT GNT-NDL NDL YARD SL 256 256 TRD AOH OF ATD Shadow SSE/TRD/NDL

2 17-10-2025 GNT GNT-NDL GZL YARD ST LC-192 EKT MAINTENANCE Shadow 1 BLCOK 30 MIN ESM/NDL

3 17-10-2025 GNT GNT-NDL GJJ YARD ST Both B/I Monthly Inspection Shadow 2 Blocks of each 30MIN. JE/S/KCD ESM

18-10-2025 (Saturday)

1 18-10-2025 GNT GNT-NDL GZL CMZ SL 233 234 TRD AOH OF ATD Shadow 60+60 MINS SSE/TRD/NDL
Pending works/ Remarks block may be planed as 9.00 17.00h Tower car, Rail
2 18-10-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA
attention per B/S hrs rs crane & OHE
3 18-10-2025 GNT GNT-NDL DMT YARD ST LC-197 EKT MANTENANCE Shadow 1 BLCOK 30 MIN ESM/GID
Pending works/ Remarks block may be planed as 9.00 17.00h Tower car, Rail
4 18-10-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA
attention per B/S hrs rs crane & OHE
19-10-2025 (Sunday)
Pending works/ Remarks block may be planed as 9.00 17.00h Tower car, Rail
1 19-10-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA
attention per B/S hrs rs crane & OHE
Pending works/ Remarks block may be planed as 9.00 17.00h Tower car, Rail
2 19-10-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA
attention per B/S hrs rs crane & OHE
3 19-10-2025 GNT GNT-NDL GKM CEM UP 89 95 TRD AOH of CLs Shadow 75+75 10

20-10-2025 (Monday)
TOWERCAR/PIC
1 20-10-2025 GNT GNT-NDL NDL YARD SL 256 257 TRD POH OF ATD Shadow 60+60 SSE/TRD/NDL
KUP
2 20-10-2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER Shadow 1 BLCOK 60 MIN JE/SIG/NDL

3 20-10-2025 GNT GNT-NDL GZL CMZ SL 240 242 TRD AOH OF ATD Shadow 60+60 MINS

4 20-10-2025 GNT GNT-NDL CEM VKN DN 88 82 TRD AOH of CLs Main 75+75 10

21-10-2025 (Tuesday)

1 21-10-2025 GNT GNT-NDL NDL YARD SL 256 257 TRD AOH OF ATD Shadow 90+90 MINS SSE/TRD/NDL

2 21-10-2025 GNT GNT-NDL GKM YARD ST Both B/I Monthly Inspection Shadow 2 Blocks of each 30MIN. JE/S/KCD ESM
UP and AOH of T/os, Crossover and 14:45- C/o:1,
3 21-10-2025 GNT GNT-NDL VKN YARD 82 83 TRD Main 75+75 12:30-13:45
DN CLs. 16:00 T/os:2
22-10-2025 (Wednesday)
TOWERCAR/PIC
1 22-10-2025 GNT GNT-NDL NDL YA LINE SL 1KM 2 KM TRD POH OF ATD Shadow 60+60 SSE/TRD/NDL
KUP
2 22-10-2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER Shadow 1 BLCOK 60 MIN JE/SIG/NDL
Block Planned Demanded On Date
Sub KM Planned block Timings Train
Major Station/Station Main or Planned Block Duration Output Supervisor Block Timings Remarks (S&T, Caution Order
S.No Date Div Secti Direction Dept Type of Work Repercu (HH:MM) OHE, Tower Car,
Section Shadow (in mins) From To Deputed Impositions/
on From To From To Unit Quantity sions Power block, etc)
(HH:MM) (HH:MM) From To Alterations

3 22-10-2025 GNT GNT-NDL GZL CMZ SL 240 242 TRD AOH OF ATD Shadow 60+60 MINS

4 22-10-2025 GNT GNT-NDL CEM VKN DN 88 82 TRD AOH of CLs Main 75+75 No. 10

23-10-2025 (Thursday)

1 23-10-2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER Shadow 1 BLOCK 30 MIN JE/SIG/NDL

2 23-10-2025 GNT GNT-NDL CMZ DMT SL 218 219 TRD CL'S MAINTENANCE Shadow 60+60+60 MINS SSE/TRD/NDL TOWERCAR
CLS=
3 23-10-2025 GNT GNT-NDL CEM YARD UP&DN 88 90 TRD T/OS MAINTENANCE MAIN 60+60 No. SSE/TRD/VKN
10,
Crank handle 1,2,3&4 No
4 23-10-2025 GNT GNT-NDL NLPD Yard ST Shadow 4 block each 30 minutes JE /SIGNAL /NLPD ESM
M/Inspection Train
24-10-2025 (Friday)
TOWERCAR/PIC
1 24-10-2025 GNT GNT-NDL NDL NDPL SL 256 257 TRD SCL MAINTENANCE WORK Shadow 60+60 SSE/TRD/NDL
KUP

2 24-10-2025 GNT GNT-NDL CMZ DMT SL 218 219 TRD CL'S MAINTENANCE Shadow 60+60+60 MINS SSE/TRD/NDL TOWERCAR
CLS=
3 24-10-2025 GNT GNT-NDL CEM YARD UP&DN 88 90 TRD T/OS MAINTENANCE MAIN 60+60 No. 10, SSE/TRD/VKN
T/O=2
Crank handle 1,2,3&4 No
4 24-10-2025 GNT GNT-NDL NLPD Yard ST Shadow 4 block each 30 minutes JE /SIGNAL /NLPD ESM
M/Inspection Train

25-10-2025 (Saturday)

1 25-10-2025 GNT GNT-NDL CMZ DMT SL 221 223 TRD TUNNEL SCL MAINTENANCE Shadow 60+60 SSE/TRD/NDL TOWERCAR
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 25-10-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
Towerstaff
car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
3 25-10-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
26-10-2025 (Sunday)

1 26-10-2025 GNT GNT-NDL DMT CMZ SL 220 221 TRD AOH of ATD Shadow 60+60 MINS SSE/TRD/NDL

2 26-10-2025 GNT GNT-NDL CEM VKN UP 82 88 TRD AOH of ATDs Main 60+60 No. 4

UP and
3 26-10-2025 GNT GNT-KCC NBR YARD ST NBR-MAG,NBR-REP B/I M/I shadow 2 blocks of 30 min each JE/S/GNT ESM
DN

27-10-2025 (Monday)

TOWERCAR/PIC
1 27-10-2025 GNT GNT-NDL NDL YARD SL 256 257 TRD POH OF ATD Shadow 60+60 SSE/TRD/NDL
KUP

2 27-10-2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER Shadow 1 BLCOK 60 MIN JE/SIG/NDL

3 27-10-2025 GNT GNT-NDL GZL CMZ SL 240 242 TRD AOH OF ATD Shadow 60+60 MINS

4 27-10-2025 GNT GNT-NDL CEM VKN DN 88 82 TRD AOH of CLs Main 75+75 10

28-10-2025 (Tuesday)

1 28-10-2025 GNT GNT-NDL NDL YARD SL 256 257 TRD AOH OF ATD Shadow 90+90 MINS SSE/TRD/NDL

2 28-10-2025 GNT GNT-NDL GKM YARD ST Both B/I Monthly Inspection Shadow 2 Blocks of each 30MIN. JE/S/KCD ESM

2 28-10-2025 GNT GNT-NDL CMZ DMT SL 218 219 TRD CL'S MAINTENANCE Shadow 60+60+60 MINS SSE/TRD/NDL TOWERCAR

2 28-10-2025 GNT GNT-NDL NLPD YARD SL ENGG TWS block Main 1 block of 180 min SSE/PWAY/NLPD TOWERCAR

C/o:1,
UP and AOH of T/os, Crossover and 14:45-
3 28-10-2025 GNT GNT-NDL VKN YARD 82 83 TRD Main 75+75 12:30-13:45 T/os:2
DN CLs. 16:00
,
14:00- S&T, OHE staff
4 28-10-2025 GNT GNT-NDL NDPU YARD ENGG & ST Redundant Glued Joint Renewal Main 2 Blocks of 90 min each 8:00-9:30 SSE/SW/NLPD
15:30 required
Block Planned Demanded On Date
Sub KM Planned block Timings Train
Major Station/Station Main or Planned Block Duration Output Supervisor Block Timings Remarks (S&T, Caution Order
S.No Date Div Secti Direction Dept Type of Work Repercu (HH:MM) OHE, Tower Car,
Section Shadow (in mins) From To Deputed Impositions/
on From To From To Unit Quantity sions Power block, etc)
(HH:MM) (HH:MM) From To Alterations

29-10-2025 (Wednesday)
TOWERCAR/PIC
1 29-10-2025 GNT GNT-NDL NDL YA LINE SL 1KM 2 KM TRD POH OF ATD Shadow 60+60 SSE/TRD/NDL
KUP

2 29-10-2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER Shadow 1 BLCOK 60 MIN JE/SIG/NDL

3 29-10-2025 GNT GNT-NDL GZL CMZ SL 240 242 TRD AOH OF ATD Shadow 60+60 MINS

4 29-10-2025 GNT GNT-NDL CEM VKN DN 88 82 TRD AOH of CLs Main 75+75 No. 10

30-10-2025 (Thursday)

1 30-10-2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER Shadow 1 BLOCK 30 MIN JE/SIG/NDL

2 30-10-2025 GNT GNT-NDL CMZ DMT SL 218 219 TRD CL'S MAINTENANCE Shadow 60+60+60 MINS SSE/TRD/NDL TOWERCAR
CLS=
3 30-10-2025 GNT GNT-NDL CEM YARD UP&DN 88 90 TRD T/OS MAINTENANCE MAIN 60+60 No. 10, SSE/TRD/VKN
T/O=2
Crank handle 1,2,3&4 No
4 30-10-2025 GNT GNT-NDL NLPD Yard ST Shadow 4 block each 30 minutes JE /SIGNAL /NLPD ESM
M/Inspection Train

31-10-2025 (Friday)

TOWERCAR/PIC
1 31-10-2025 GNT GNT-NDL NDL NDPL SL 256 257 TRD SCL MAINTENANCE WORK Shadow 60+60 SSE/TRD/NDL
KUP

2 31-10-2025 GNT GNT-NDL CMZ DMT SL 218 219 TRD CL'S MAINTENANCE Shadow 60+60+60 MINS SSE/TRD/NDL TOWERCAR

CLS=
3 31-10-2025 GNT GNT-NDL CEM YARD UP&DN 88 90 TRD T/OS MAINTENANCE MAIN 60+60 No. 10, SSE/TRD/VKN
T/O=2
Crank handle 1,2,3&4 No
4 31-10-2025 GNT GNT-NDL NLPD Yard ST Shadow 4 block each 30 minutes JE /SIGNAL /NLPD ESM
M/Inspection Train

01-11-2025 (Saturday)

1 01-11-2025 GNT GNT-NDL CMZ DMT SL 221 223 TRD TUNNEL SCL MAINTENANCE Shadow 60+60 SSE/TRD/NDL TOWERCAR

Tower car, Rail


Pending works/ Remarks block may be planed as 9.00 17.00h
2 01-11-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
3 01-11-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
02-11-2025 (Sunday)

1 02-11-2025 GNT GNT-NDL DMT CMZ SL 220 221 TRD AOH of ATD Shadow 60+60 MINS SSE/TRD/NDL

2 02-11-2025 GNT GNT-NDL CEM VKN UP 82 88 TRD AOH of ATDs Main 60+60 No. 4

UP and
3 02-11-2025 GNT GNT-KCC NBR YARD ST NBR-MAG,NBR-REP B/I M/I shadow 2 blocks of 30 min each JE/S/GNT ESM
DN

03-11-2025 (Monday)

1 03-11-2025 GNT GNT-NDL NDL YARD SL 256 256 TRD ISOLATORMAINTENANCE Shadow 60 MINS SSE/TRD/NDL

S&T, OHE staff


2 03-11-2025 GNT GNT-NDL PRCA YARD ENGG & ST Redundant Glued Joint Renewal Main 2 Blocks of 90 min each flexible slot SSE/SW/NLPD
required

04-11-2025 (Tuesday)

1 04-11-2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER Shadow 1 BLOCK 60 MIN JE/SIG/NDL

2 04-11-2025 GNT GNT-NDL GZL CMZ SL 233 234 TRD UIOL MAINTENANCE Shadow 60+60 MINS SSE/TRD/NDL

S&T, OHE staff


3 04-11-2025 GNT GNT-NDL PRCA YARD ENGG & ST Redundant Glued Joint Renewal Main 2 Blocks of 90 min each flexible slot SSE/SW/NLPD
required
Block Planned Demanded On Date
Sub KM Planned block Timings Train
Major Station/Station Main or Planned Block Duration Output Supervisor Block Timings Remarks (S&T, Caution Order
S.No Date Div Secti Direction Dept Type of Work Repercu (HH:MM) OHE, Tower Car,
Section Shadow (in mins) From To Deputed Impositions/
on From To From To Unit Quantity sions Power block, etc)
(HH:MM) (HH:MM) From To Alterations

05-11-2025 (Wednesday)

1 05-11-2025 GNT GNT-NDL GZL CMZ SL 238 239 TRD AOH OF ATD Shadow 60+60 MINS SSE/TRD/NDL

Tower car, Rail


Pending works/ Remarks block may be planed as 9.00 17.00h
2 05-11-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
3 05-11-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff

S&T, OHE staff


4 05-11-2025 GNT GNT-NDL PRCA YARD ENGG & ST Redundant Glued Joint Renewal Main 2 Blocks of 90 min each flexible slot SSE/SW/NLPD
required

06-11-2025 (Thursday)

1 06-11-2025 GNT GNT-NDL CMZ YARD SL 230 232 TRD AOH OF ATD Shadow 60+60 MINS SSE/TRD/NDL

Tower car, Rail


Pending works/ Remarks block may be planed as 9.00 17.00h
2 06-11-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
3 06-11-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
07-11-2025 (Friday)

1 07-11-2025 GNT GNT-NDL NDL YARD SL 256 256 TRD AOH OF ATD Shadow SSE/TRD/NDL

2 07-11-2025 GNT GNT-NDL GZL YARD ST LC-192 EKT MAINTENANCE Shadow 1 BLCOK 30 MIN ESM/NDL

Tower car, Rail


Pending works/ Remarks block may be planed as 9.00 17.00h
3 07-11-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
4 07-11-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff

5 07-11-2025 GNT GNT-NDL GJJ YARD ST Both B/I Monthly Inspection Shadow 2 Blocks of each 30MIN. JE/S/KCD ESM

08-11-2025 (Saturday)

1 08-11-2025 GNT GNT-NDL GZL CMZ SL 233 234 TRD AOH OF ATD Shadow 60+60 MINS SSE/TRD/NDL

Tower car, Rail


Pending works/ Remarks block may be planed as 9.00 17.00h
2 08-11-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff

3 08-11-2025 GNT GNT-NDL DMT YARD ST LC-197 EKT MANTENANCE Shadow 1 BLCOK 30 MIN ESM/GID

Tower car, Rail


Pending works/ Remarks block may be planed as 9.00 17.00h
4 08-11-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
09-11-2025 (Sunday)
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
1 09-11-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 09-11-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff

3 09-11-2025 GNT GNT-NDL GKM CEM UP 89 95 TRD AOH of CLs Shadow 75+75 flexible slot 10

10-11-2025 (Monday)
TOWERCAR/PIC
1 10-11-2025 GNT GNT-NDL NDL YARD SL 256 257 TRD POH OF ATD Shadow 60+60 SSE/TRD/NDL
KUP
2 10-11-2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER Shadow 1 BLCOK 60 MIN JE/SIG/NDL
Block Planned Demanded On Date
Sub KM Planned block Timings Train
Major Station/Station Main or Planned Block Duration Output Supervisor Block Timings Remarks (S&T, Caution Order
S.No Date Div Secti Direction Dept Type of Work Repercu (HH:MM) OHE, Tower Car,
Section Shadow (in mins) From To Deputed Impositions/
on From To From To Unit Quantity sions Power block, etc)
(HH:MM) (HH:MM) From To Alterations

3 10-11-2025 GNT GNT-NDL GZL CMZ SL 240 242 TRD AOH OF ATD Shadow 60+60 MINS

4 10-11-2025 GNT GNT-NDL CEM VKN DN 88 82 TRD AOH of CLs Main 75+75 10

11-11-2025 (Tuesday)

1 11-11-2025 GNT GNT-NDL NDL YARD SL 256 257 TRD AOH OF ATD Shadow 90+90 MINS SSE/TRD/NDL

2 11-11-2025 GNT GNT-NDL GKM YARD ST Both B/I Monthly Inspection Shadow 2 Blocks of each 30MIN. JE/S/KCD ESM
UP and AOH of T/os, Crossover and 14:45-
3 11-11-2025 GNT GNT-NDL VKN YARD 82 83 TRD Main 75+75 12:30-13:45
DN CLs. 16:00

12-11-2025 (Wednesday)
TOWERCAR/PIC
1 12-11-2025 GNT GNT-NDL NDL YA LINE SL 1KM 2 KM TRD POH OF ATD Shadow 60+60 SSE/TRD/NDL
KUP
2 12-11-2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER Shadow 1 BLCOK 60 MIN JE/SIG/NDL

3 12-11-2025 GNT GNT-NDL GZL CMZ SL 240 242 TRD AOH OF ATD Shadow 60+60 MINS

4 12-11-2025 GNT GNT-NDL CEM VKN DN 88 82 TRD AOH of CLs Main 75+75 No. 10

13-11-2025 (Thursday)

1 13-11-2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER Shadow 1 BLOCK 30 MIN JE/SIG/NDL

2 13-11-2025 GNT GNT-NDL CMZ DMT SL 218 219 TRD CL'S MAINTENANCE Shadow 60+60+60 MINS SSE/TRD/NDL TOWERCAR
CLS=
3 13-11-2025 GNT GNT-NDL CEM YARD UP&DN 88 90 TRD T/OS MAINTENANCE MAIN 60+60 No. 10, SSE/TRD/VKN
T/O=2
Crank handle 1,2,3&4 No
4 13-11-2025 GNT GNT-NDL NLPD Yard ST Shadow 4 block each 30 minutes JE /SIGNAL /NLPD ESM
M/Inspection Train

14-11-2025 (Friday)
TOWERCAR/PIC
1 14-11-2025 GNT GNT-NDL NDL NDPL SL 256 257 TRD SCL MAINTENANCE WORK Shadow 60+60 SSE/TRD/NDL
KUP
2 14-11-2025 GNT GNT-NDL CMZ DMT SL 218 219 TRD CL'S MAINTENANCE Shadow 60+60+60 MINS SSE/TRD/NDL TOWERCAR
CLS=
3 14-11-2025 GNT GNT-NDL CEM YARD UP&DN 88 90 TRD T/OS MAINTENANCE MAIN 60+60 No. 10, SSE/TRD/VKN
T/O=2
Crank handle 1,2,3&4 No
4 14-11-2025 GNT GNT-NDL NLPD Yard ST Shadow 4 block each 30 minutes JE /SIGNAL /NLPD ESM
M/Inspection Train
15-11-2025 (Saturday)

1 15-11-2025 GNT GNT-NDL CMZ DMT SL 221 223 TRD TUNNEL SCL MAINTENANCE Shadow 60+60 SSE/TRD/NDL TOWERCAR
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 15-11-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
Towerstaff
car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
3 15-11-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
16-11-2025 (Sunday)

1 16-11-2025 GNT GNT-NDL DMT CMZ SL 220 221 TRD AOH of ATD Shadow 60+60 MINS SSE/TRD/NDL

2 16-11-2025 GNT GNT-NDL CEM VKN UP 82 88 TRD AOH of ATDs Main 60+60 No. 4
UP and
3 16-11-2025 GNT GNT-KCC NBR YARD ST NBR-MAG,NBR-REP B/I M/I shadow 2 blocks of 30 min each JE/S/GNT ESM
DN

17-11-2025 (Monday)

1 17-11-2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER Shadow 1 BLOCK 30 MIN JE/SIG/NDL

2 17-11-2025 GNT GNT-NDL CMZ DMT SL 218 219 TRD CL'S MAINTENANCE Shadow 60+60+60 MINS SSE/TRD/NDL TOWERCAR
CLS=
3 17-11-2025 GNT GNT-NDL CEM YARD UP&DN 88 90 TRD T/OS MAINTENANCE Shadow 60+60 No. 10, SSE/TRD/VKN
T/O=2
Crank handle 1,2,3&4 No
4 17-11-2025 GNT GNT-NDL NLPD Yard ST Shadow 4 block each 30 minutes JE /SIGNAL /NLPD ESM
M/Inspection Train
18-11-2025 (Tuesday)
TOWERCAR/PIC
1 18-11-2025 GNT GNT-NDL NDL NDPL SL 256 257 TRD SCL MAINTENANCE WORK Shadow 60+60 SSE/TRD/NDL
KUP
Block Planned Demanded On Date
Sub KM Planned block Timings Train
Major Station/Station Main or Planned Block Duration Output Supervisor Block Timings Remarks (S&T, Caution Order
S.No Date Div Secti Direction Dept Type of Work Repercu (HH:MM) OHE, Tower Car,
Section Shadow (in mins) From To Deputed Impositions/
on From To From To Unit Quantity sions Power block, etc)
(HH:MM) (HH:MM) From To Alterations

2 18-11-2025 GNT GNT-NDL CMZ DMT SL 218 219 TRD CL'S MAINTENANCE Shadow 60+60+60 MINS SSE/TRD/NDL TOWERCAR
CLS=
3 18-11-2025 GNT GNT-NDL CEM YARD UP&DN 88 90 TRD T/OS MAINTENANCE Shadow 60+60 No. 10, SSE/TRD/VKN
T/O=2
Crank handle 1,2,3&4 No
4 18-11-2025 GNT GNT-NDL NLPD Yard ST Shadow 4 block each 30 minutes JE /SIGNAL /NLPD ESM
M/Inspection Train
19-11-2025 (Wednesday)

1 19-11-2025 GNT GNT-NDL CMZ DMT SL 221 223 TRD TUNNEL SCL MAINTENANCE Shadow 60+60 SSE/TRD/NDL TOWERCAR
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 19-11-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
Towerstaff
car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
3 19-11-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
20-11-2025 (Thursday)

1 20-11-2025 GNT GNT-NDL DMT CMZ SL 220 221 TRD AOH of ATD Shadow 60+60 MINS SSE/TRD/NDL

2 20-11-2025 GNT GNT-NDL CEM VKN UP 82 88 TRD AOH of ATDs Shadow 60+60 No. 4
UP and
3 20-11-2025 GNT GNT-KCC NBR YARD ST NBR-MAG,NBR-REP B/I M/I shadow 2 blocks of 30 min each JE/S/GNT ESM
DN

21-11-2025 (Friday)

1 21-11-2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER Shadow 1 BLOCK 60 MIN JE/SIG/NDL

2 21-11-2025 GNT GNT-NDL GZL CMZ SL 233 234 TRD UIOL MAINTENANCE Shadow 60+60 MINS SSE/TRD/NDL

22-11-2025 (Saturday)

1 22-11-2025 GNT GNT-NDL GZL CMZ SL 238 239 TRD AOH OF ATD Shadow 60+60 MINS SSE/TRD/NDL
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 22-11-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
Towerstaff
car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
3 22-11-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
23-11-2025 (Sunday)

1 23-11-2025 GNT GNT-NDL CMZ YARD SL 230 232 TRD AOH OF ATD Shadow 60+60 MINS SSE/TRD/NDL
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 23-11-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
Towerstaff
car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
3 23-11-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
24-11-2025 (Monday)

1 24-11-2025 GNT GNT-NDL NDL YARD SL 256 256 TRD ISOLATORMAINTENANCE Shadow 60 MINS SSE/TRD/NDL
S&T, OHE staff
2 24-11-2025 GNT GNT-NDL PRCA YARD ENGG & ST Redundant Glued Joint Renewal Main 2 Blocks of 90 min each flexible slot SSE/SW/NLPD
required

25-11-2025 (Tuesday)

1 25-11-2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER Shadow 1 BLOCK 60 MIN JE/SIG/NDL

2 25-11-2025 GNT GNT-NDL GZL CMZ SL 233 234 TRD UIOL MAINTENANCE Shadow 60+60 MINS SSE/TRD/NDL

26-11-2025 (Wednesday)

1 26-11-2025 GNT GNT-NDL GZL CMZ SL 238 239 TRD AOH OF ATD Shadow 60+60 MINS SSE/TRD/NDL
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 26-11-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
Towerstaff
car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
3 26-11-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
27-11-2025 (Thursday)

1 27-11-2025 GNT GNT-NDL CMZ YARD SL 230 232 TRD AOH OF ATD Shadow 60+60 MINS SSE/TRD/NDL
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 27-11-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
Block Planned Demanded On Date
Sub KM Planned block Timings Train
Major Station/Station Main or Planned Block Duration Output Supervisor Block Timings Remarks (S&T, Caution Order
S.No Date Div Secti Direction Dept Type of Work Repercu (HH:MM) OHE, Tower Car,
Section Shadow (in mins) From To Deputed Impositions/
on From To From To Unit Quantity sions Power block, etc)
(HH:MM) (HH:MM) From To Alterations
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
3 27-11-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
28-11-2025 (Friday)

1 28-11-2025 GNT GNT-NDL NDL YARD SL 256 256 TRD AOH OF ATD Shadow SSE/TRD/NDL

2 28-11-2025 GNT GNT-NDL GZL YARD ST LC-192 EKT MAINTENANCE Shadow 1 BLCOK 30 MIN ESM/NDL
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
3 28-11-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
Towerstaff
car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
4 28-11-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
5 28-11-2025 GNT GNT-NDL GJJ YARD ST Both B/I Monthly Inspection Shadow 2 Blocks of each 30MIN. JE/S/KCD ESM

29-11-2025 (Saturday)

1 29-11-2025 GNT GNT-NDL GZL CMZ SL 233 234 TRD AOH OF ATD Shadow 60+60 MINS SSE/TRD/NDL
Pending works/ Remarks block may be planed as 9.00 17.00h Tower car, Rail
2 29-11-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA
attention per B/S hrs rs crane & OHE
3 29-11-2025 GNT GNT-NDL DMT YARD ST LC-197 EKT MANTENANCE Shadow 1 BLCOK 30 MIN ESM/GID
Pending works/ Remarks block may be planed as 9.00 17.00h Tower car, Rail
4 29-11-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA
attention per B/S hrs rs crane & OHE
30-11-2025 (Sunday)
Pending works/ Remarks block may be planed as 9.00 17.00h Tower car, Rail
1 30-11-2025 GNT GNT-NDL CMZ JBK DL 231 177 OHE - CON Shadow 2 Blocks of each 120min SSE/TrD/C/BZA
attention per B/S hrs rs crane & OHE
Pending works/ Remarks block may be planed as 9.00 17.00h Tower car, Rail
2 30-11-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA
attention per B/S hrs rs crane & OHE
3 30-11-2025 GNT GNT-NDL GKM CEM UP 89 95 TRD AOH of CLs Shadow 75+75 10

01-12-2025 (Monday)

1 01-12-2025 GNT GNT-NDL CEM VKN UP 82 88 TRD AOH of ATDs Shadow 60+60 4

2 01-12-2025 GNT GNT-NDL NDL YARD SL 256 256 TRD AOH OF ATD Shadow SSE/TRD/NDL

3 01-12-2025 GNT GNT-NDL GZL YARD ST LC-192 EKT MAINTENANCE Shadow 1 BLCOK 30 MIN ESM/NDL

02-12-2025 (Tuesday)

1 02-12-2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER Shadow 1 BLOCK 30 MIN JE/SIG/NDL

2 02-12-2025 GNT GNT-NDL CMZ DMT SL 218 219 TRD CL'S MAINTENANCE Shadow 60+60+60 MINS SSE/TRD/NDL TOWERCAR

03-12-2025 (Wednesday)

1 03-12-2025 GNT GNT-NDL CMZ GZL SL 238 239 TRD CL'S MAINTENANCE Shadow 60+60 MINS SSE/TRD/NDL TOWER CAR
Tower car, Rail
Pending works/ Remarks block may be planed as 9.00 17.00h
2 03-12-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
04-12-2025 (Thursday)

1 04-12-2025 GNT GNT-NDL NDL NDPL ST LC-186 EKT MAINTENANCE Shadow 1 BLOCK 30 MIN ESM/NDL

2 04-12-2025 GNT GNT-NDL NDPL YARD SL 253 255 TRD UIOL MAINTENANCE Shadow 60+60 MINS SSE/TRD/NDL TOWER CAR

05-12-2025 (Friday)

1 05-12-2025 GNT GNT-NDL GZL NDPL SL 246 247 TRD CLS MAINTENACE Shadow 60+60 MINS SSE/TRD/NDL TOWER CAR

14:45-
2 05-12-2025 GNT GNT-NDL VKN SYM DN 72 82 TRD AOH of CLs Main 75+75 12:30-13:45 10
16:00

3 05-12-2025 GNT GNT-NDL NDPU YARD ST Both B/I Monthly Inspection Shadow 2 Blocks of each 30" JE/S/PPM ESM

06-12-2025 (Saturday)

1 06-12-2025 GNT GNT-NDL GJJ YARD ST Both B/I Monthly Inspection Shadow 2 Blocks of each 30MIN. JE/S/KCD ESM
Block Planned Demanded On Date
Sub KM Planned block Timings Train
Major Station/Station Main or Planned Block Duration Output Supervisor Block Timings Remarks (S&T, Caution Order
S.No Date Div Secti Direction Dept Type of Work Repercu (HH:MM) OHE, Tower Car,
Section Shadow (in mins) From To Deputed Impositions/
on From To From To Unit Quantity sions Power block, etc)
(HH:MM) (HH:MM) From To Alterations
S&T, OHE staff
2 06-12-2025 GNT GNT-NDL PRCA YARD ENGG & ST Rail Renewal Main 2 Blocks of 90 min each flexible slot SSE/SW/NLPD
required
Crank handle 5,6,7&8 No
3 06-12-2025 GNT GNT-NDL NLPD Yard ST Shadow 4 blocks each 30 minutes JE /SIGNAL /NLPD ESM
M/Inspection Train

07-12-2025 (Sunday)

1 07-12-2025 GNT GNT-NDL KCD YARD UP 106 108 TRD AOH of Turnouts and Crossoves Shadow 2 blocks of 75 min each flexible slot

08-12-2025 (Monday)

1 08-12-2025 GNT GNT-NDL CEM VKN UP 82 88 TRD AOH of ATDs Main 60+60 4

2 08-12-2025 GNT GNT-NDL NDL YARD SL 256 256 TRD AOH OF ATD Shadow SSE/TRD/NDL

3 08-12-2025 GNT GNT-NDL GZL YARD ST LC-192 EKT MAINTENANCE Shadow 1 BLCOK 30 MIN ESM/NDL

09-12-2025 (Tuesday)

1 09-12-2025 GNT GNT-NDL NDL YARD ST EI CHANGE OVER MAIN 1 BLOCK 30 MIN JE/SIG/NDL

2 09-12-2025 GNT GNT-NDL CMZ DMT SL 218 219 TRD CL'S MAINTENANCE MAIN 60+60+60 MINS SSE/TRD/NDL TOWERCAR
S&T ,OHE
3 09-12-2025 GNT GNT-NDL GNT YARD SL ENGG Tamping MAIN 2 blocks of 120+120 min flexible slot SSE/PWAY/GNT
Required

10-12-2025 (Wednesday)

1 10-12-2025 GNT GNT-NDL CMZ GZL SL 238 239 TRD CL'S MAINTENANCE MAIN 60+60 MINS SSE/TRD/NDL TOWER CAR

Tower car, Rail


Pending works/ Remarks block may be planed as 9.00 17.00h
2 10-12-2025 GNT GNT-NDL MRK STUR DL 143 32 OHE - CON Main 2 Blocks of each 120min SSE/TrD/C/BZA crane & OHE
attention per B/S hrs rs
staff
S&T ,OHE
3 10-12-2025 GNT GNT-NDL GNT YARD SL ENGG Tamping MAIN 2 blocks of 120+120 min flexible slot SSE/PWAY/GNT
Required

11-12-2025 (Thursday)

1 11-12-2025 GNT GNT-NDL NDL NDPL ST LC-186 EKT MAINTENANCE MAIN 1 BLOCK 30 MIN ESM/NDL

2 11-12-2025 GNT GNT-NDL NDPL YARD SL 253 255 TRD UIOL MAINTENANCE Shadow 60+60 MINS SSE/TRD/NDL TOWER CAR

S&T ,OHE
3 11-12-2025 GNT GNT-NDL GNT YARD SL ENGG Tamping MAIN 2 blocks of 120+120 min flexible slot SSE/PWAY/GNT
Required

12-12-2025 (Friday)

1 12-12-2025 GNT GNT-NDL GZL NDPL SL 246 247 TRD CLS MAINTENACE Shadow 60+60 MINS SSE/TRD/NDL TOWER CAR

14:45-
2 12-12-2025 GNT GNT-NDL VKN SYM DN 72 82 TRD AOH of CLs Main 75+75 12:30-13:45 10
16:00

3 12-12-2025 GNT GNT-NDL NDPU YARD ST Both B/I Monthly Inspection Shadow 2 Blocks of each 30" JE/S/PPM ESM

S&T ,OHE
4 12-12-2025 GNT GNT-NDL GNT YARD SL ENGG Tamping MAIN 2 blocks of 120+120 min flexible slot SSE/PWAY/GNT
Required

13-12-2025 (Saturday)

1 13-12-2025 GNT GNT-NDL GJJ YARD ST Both B/I Monthly Inspection Shadow 2 Blocks of each 30MIN. JE/S/KCD ESM

S&T, OHE staff


2 13-12-2025 GNT GNT-NDL PRCA YARD ENGG & ST Rail Renewal Main 2 Blocks of 90 min each flexible slot SSE/SW/NLPD
required

Crank handle 5,6,7&8 No


3 13-12-2025 GNT GNT-NDL NLPD Yard ST Shadow 4 blocks each 30 minutes JE /SIGNAL /NLPD ESM
M/Inspection Train
Block Planned Demanded On Date
Sub KM Planned block Timings Train
Major Station/Station Main or Planned Block Duration Output Supervisor Block Timings Remarks (S&T, Caution Order
S.No Date Div Secti Direction Dept Type of Work Repercu (HH:MM) OHE, Tower Car,
Section Shadow (in mins) From To Deputed Impositions/
on From To From To Unit Quantity sions Power block, etc)
(HH:MM) (HH:MM) From To Alterations

14-12-2025 (Sunday)

1 14-12-2025 GNT GNT-NDL NDL YARD SL 256 256 TRD ISOLATORMAINTENANCE Shadow 60 MINS SSE/TRD/NDL

S&T, OHE staff


2 14-12-2025 GNT GNT-NDL PRCA YARD ENGG & ST Redundant Glued Joint Renewal Main 2 Blocks of 90 min each flexible slot SSE/SW/NLPD
required

AKULA Digitally
by AKULA
signed
Digitally signed by
BHARA BHARATH
KUMAR
SRINATH JAGIRDAR
TH Date:
Digitally signed by Date: 2025.06.13
2025.06.14 SYED VAZEER PENUMUD Digitally signed by

17:54:21 +05'30'
SYED VAZEER BABU PENUMUDI RAVITEJA
MAR Digitally signed

KUMAR +05'30'
11:49:18 BABU I RAVITEJA Date:
Date: 2025.06.13 2025.06.13 by M A R NOEL

NOEL
19:08:20 +05'30' Date: 2025.06.14
17:22:50 +05'30' 10:05:48 +05'30'

Sr.DEN/GNT Sr.DSTE/GNT Sr.DEE/TrD/GNT Dy.CE/Gati Sakti Dy.CE/C II /GNT Sr.DOM/GNT