Common Lift Plan

The document outlines a Common Lift Plan for the Airport Redevelopment Program, detailing the construction manager, appointed person, crane specifications, and a list of items to be lifted along with their respective weights and lifting frequencies. Each item includes information on lifting accessories, maximum boom lengths, and lift radii. Compliance with the plan is confirmed by the signatures of the crane operator and riggers.

Uploaded by

delhinair734
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views6 pages

Common Lift Plan

The document outlines a Common Lift Plan for the Airport Redevelopment Program, detailing the construction manager, appointed person, crane specifications, and a list of items to be lifted along with their respective weights and lifting frequencies. Each item includes information on lifting accessories, maximum boom lengths, and lift radii. Compliance with the plan is confirmed by the signatures of the crane operator and riggers.

Uploaded by

delhinair734
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

Common Lift Plan AXA

Construction Manager: John


/Everton Airport Redevelopment Program Package 3 Air
Lift Appointed Person: Marvin Smith Project Name/No.: Terminal Building –
Crane Model/Size: MC1 Valid Test Cert. No.: TEREX COMEDIL (RAIL MOUNTED) Serial No. CTT 331-16.pdf Certificate Validity Date: Wednesday, September 23, 2026

Frequency-
Item daily/ Proposed Lifting Proposed Max Weight of the
No. Items to be Lifted weekly/mont Accessories to be Equipment Item Max Boom Length Max Lift Radius Remarks
h used to be used (A)

1.5 m 1 leg 8t
1 Concrete Bucket Daily chain MC1 4T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters 6
2 Waist Bucket Daily 6m 2 leg 6t MC1 1.5T Radius = 12m * cos(30°) = 12m * 0.866 ≈ 10.4 meters 10.4
Fiber Sling 3T
3 Box Pallet with Tools Daily 4M MC1 400KG Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
4 Leg 40T
4 Crane Rails Montly Chain MC1 11T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
1.5 m 1 leg 8t
5 Motar Bucket Daily chain MC1 1T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
2 Leg 6m 6t
6 Wall Shutters Daily chain MC1 3.5 T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
2 Leg 6m 6t
7 Saffold Materials Daily chain MC1 2T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
1.5 m 1 leg 8t
8 Compressor Daily chain MC1 1.5 T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
4XFiber Sling
9 Scissor lift Daily 4t MC1 5T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
3XFiber Sling
10 Sila Mini Dumper Daily 4t MC1 2.5T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters

Note: The total load weight being lifted must always be less than the capacity of the crane.

The above lift plan has been briefed to me and I confirm I understand and will comply with this plan:
Signatures:
Crane Operator: Rigger 1 Rigger 2

Developed by Lift Appointed Person:

MSP050-HSE-110-PLN-01/Issue3/24.09.12
Common Lift Plan AXA

Construction Manager: John


/Everton Airport Redevelopment Program Package 3 Air
Lift Appointed Person: Marvin Smith Project Name/No.: Terminal Building –
Crane Model/Size: MC1 Valid Test Cert. No.: TEREX COMEDIL (RAIL MOUNTED) Serial No. CTT 331-16.pdf Certificate Validity Date: Wednesday, September 23, 2026

Frequency-
Item daily/ Proposed Lifting Proposed Max Weight of the
No. Items to be Lifted weekly/mont Accessories to be Equipment Item Max Boom Length Max Lift Radius Remarks
h used to be used (A)

1.5 m 1 leg 8t
1 Concrete Bucket Daily chain MC1 4T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters 6
2 Waist Bucket Daily 6m 2 leg 6t MC1 1.5T Radius = 12m * cos(30°) = 12m * 0.866 ≈ 10.4 meters 10.4
Fiber Sling 3T
3 Box Pallet with Tools Daily 4M MC1 400KG Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
4 Leg 40T
4 Crane Rails Montly Chain MC1 11T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
1.5 m 1 leg 8t
5 Motar Bucket Daily chain MC1 1T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
2 Leg 6m 6t
6 Wall Shutters Daily chain MC1 3.5 T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
2 Leg 6m 6t
7 Saffold Materials Daily chain MC1 2T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
1.5 m 1 leg 8t
8 Compressor Daily chain MC1 1.5 T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
4XFiber Sling
9 Scissor lift Daily 4t MC1 5T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
3XFiber Sling
10 Sila Mini Dumper Daily 4t MC1 2.5T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters

Note: The total load weight being lifted must always be less than the capacity of the crane.

The above lift plan has been briefed to me and I confirm I understand and will comply with this plan:
Signatures:
Crane Operator: Rigger 1 Rigger 2

Developed by Lift Appointed Person:

MSP050-HSE-110-PLN-01/Issue3/24.09.12
Common Lift Plan AXA

Construction Manager: John


/Everton Airport Redevelopment Program Package 3 Air
Lift Appointed Person: Marvin Smith Project Name/No.: Terminal Building –
Crane Model/Size: MC1 Valid Test Cert. No.: TEREX COMEDIL (RAIL MOUNTED) Serial No. CTT 331-16.pdf Certificate Validity Date: Wednesday, September 23, 2026

Frequency-
Item daily/ Proposed Lifting Proposed Max Weight of the
No. Items to be Lifted weekly/mont Accessories to be Equipment Item Max Boom Length Max Lift Radius Remarks
h used to be used (A)

1.5 m 1 leg 8t
1 Concrete Bucket Daily chain MC1 4T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters 6
2 Waist Bucket Daily 6m 2 leg 6t MC1 1.5T Radius = 12m * cos(30°) = 12m * 0.866 ≈ 10.4 meters 10.4
Fiber Sling 3T
3 Box Pallet with Tools Daily 4M MC1 400KG Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
4 Leg 40T
4 Crane Rails Montly Chain MC1 11T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
1.5 m 1 leg 8t
5 Motar Bucket Daily chain MC1 1T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
2 Leg 6m 6t
6 Wall Shutters Daily chain MC1 3.5 T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
2 Leg 6m 6t
7 Saffold Materials Daily chain MC1 2T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
1.5 m 1 leg 8t
8 Compressor Daily chain MC1 1.5 T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
4XFiber Sling
9 Scissor lift Daily 4t MC1 5T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
3XFiber Sling
10 Sila Mini Dumper Daily 4t MC1 2.5T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters

Note: The total load weight being lifted must always be less than the capacity of the crane.

The above lift plan has been briefed to me and I confirm I understand and will comply with this plan:
Signatures:
Crane Operator: Rigger 1 Rigger 2

Developed by Lift Appointed Person:

MSP050-HSE-110-PLN-01/Issue3/24.09.12
Common Lift Plan AXA

Construction Manager: John


/Everton Airport Redevelopment Program Package 3 Air
Lift Appointed Person: Marvin Smith Project Name/No.: Terminal Building –
Crane Model/Size: MC1 Valid Test Cert. No.: TEREX COMEDIL (RAIL MOUNTED) Serial No. CTT 331-16.pdf Certificate Validity Date: Wednesday, September 23, 2026

Frequency-
Item daily/ Proposed Lifting Proposed Max Weight of the
No. Items to be Lifted weekly/mont Accessories to be Equipment Item Max Boom Length Max Lift Radius Remarks
h used to be used (A)

1.5 m 1 leg 8t
1 Concrete Bucket Daily chain MC1 4T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters 6
2 Waist Bucket Daily 6m 2 leg 6t MC1 1.5T Radius = 12m * cos(30°) = 12m * 0.866 ≈ 10.4 meters 10.4
Fiber Sling 3T
3 Box Pallet with Tools Daily 4M MC1 400KG Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
4 Leg 40T
4 Crane Rails Montly Chain MC1 11T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
1.5 m 1 leg 8t
5 Motar Bucket Daily chain MC1 1T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
2 Leg 6m 6t
6 Wall Shutters Daily chain MC1 3.5 T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
2 Leg 6m 6t
7 Saffold Materials Daily chain MC1 2T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
1.5 m 1 leg 8t
8 Compressor Daily chain MC1 1.5 T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
4XFiber Sling
9 Scissor lift Daily 4t MC1 5T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
3XFiber Sling
10 Sila Mini Dumper Daily 4t MC1 2.5T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters

Note: The total load weight being lifted must always be less than the capacity of the crane.

The above lift plan has been briefed to me and I confirm I understand and will comply with this plan:
Signatures:
Crane Operator: Rigger 1 Rigger 2

Developed by Lift Appointed Person:

MSP050-HSE-110-PLN-01/Issue3/24.09.12
Common Lift Plan AXA

Construction Manager: John


/Everton Airport Redevelopment Program Package 3 Air
Lift Appointed Person: Marvin Smith Project Name/No.: Terminal Building –
Crane Model/Size: MC1 Valid Test Cert. No.: TEREX COMEDIL (RAIL MOUNTED) Serial No. CTT 331-16.pdf Certificate Validity Date: Wednesday, September 23, 2026

Frequency-
Item daily/ Proposed Lifting Proposed Max Weight of the
No. Items to be Lifted weekly/mont Accessories to be Equipment Item Max Boom Length Max Lift Radius Remarks
h used to be used (A)

1.5 m 1 leg 8t
1 Concrete Bucket Daily chain MC1 4T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters 6
2 Waist Bucket Daily 6m 2 leg 6t MC1 1.5T Radius = 12m * cos(30°) = 12m * 0.866 ≈ 10.4 meters 10.4
Fiber Sling 3T
3 Box Pallet with Tools Daily 4M MC1 400KG Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
4 Leg 40T
4 Crane Rails Montly Chain MC1 11T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
1.5 m 1 leg 8t
5 Motar Bucket Daily chain MC1 1T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
2 Leg 6m 6t
6 Wall Shutters Daily chain MC1 3.5 T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
2 Leg 6m 6t
7 Saffold Materials Daily chain MC1 2T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
1.5 m 1 leg 8t
8 Compressor Daily chain MC1 1.5 T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
4XFiber Sling
9 Scissor lift Daily 4t MC1 5T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
3XFiber Sling
10 Sila Mini Dumper Daily 4t MC1 2.5T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters

Note: The total load weight being lifted must always be less than the capacity of the crane.

The above lift plan has been briefed to me and I confirm I understand and will comply with this plan:
Signatures:
Crane Operator: Rigger 1 Rigger 2

Developed by Lift Appointed Person:

MSP050-HSE-110-PLN-01/Issue3/24.09.12
Common Lift Plan AXA

Construction Manager: John


/Everton Airport Redevelopment Program Package 3 Air
Lift Appointed Person: Marvin Smith Project Name/No.: Terminal Building –
Crane Model/Size: MC1 Valid Test Cert. No.: TEREX COMEDIL (RAIL MOUNTED) Serial No. CTT 331-16.pdf Certificate Validity Date: Wednesday, September 23, 2026

Frequency-
Item daily/ Proposed Lifting Proposed Max Weight of the
No. Items to be Lifted weekly/mont Accessories to be Equipment Item Max Boom Length Max Lift Radius Remarks
h used to be used (A)

1.5 m 1 leg 8t
1 Concrete Bucket Daily chain MC1 4T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters 6
2 Waist Bucket Daily 6m 2 leg 6t MC1 1.5T Radius = 12m * cos(30°) = 12m * 0.866 ≈ 10.4 meters 10.4
Fiber Sling 3T
3 Box Pallet with Tools Daily 4M MC1 400KG Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
4 Leg 40T
4 Crane Rails Montly Chain MC1 11T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
1.5 m 1 leg 8t
5 Motar Bucket Daily chain MC1 1T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
2 Leg 6m 6t
6 Wall Shutters Daily chain MC1 3.5 T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
2 Leg 6m 6t
7 Saffold Materials Daily chain MC1 2T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
1.5 m 1 leg 8t
8 Compressor Daily chain MC1 1.5 T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
4XFiber Sling
9 Scissor lift Daily 4t MC1 5T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters
3XFiber Sling
10 Sila Mini Dumper Daily 4t MC1 2.5T Radius = 12m * cos(60°) = 12m * 0.5 = 6 meters

Note: The total load weight being lifted must always be less than the capacity of the crane.

The above lift plan has been briefed to me and I confirm I understand and will comply with this plan:
Signatures:
Crane Operator: Rigger 1 Rigger 2

Developed by Lift Appointed Person:

MSP050-HSE-110-PLN-01/Issue3/24.09.12