NT34 LW01 00PBQ00 S05 0001 - R2 - P&I Diagram For Chlorination System - Revised
NT34 LW01 00PBQ00 S05 0001 - R2 - P&I Diagram For Chlorination System - Revised
Sub-Contractor:
Drawing/Document Title\
P&I DIAGRAM
FOR CHLORINATION SYSTEM
2
K15120
P&I DIAGRAM
FOR CHLORINATION SYSTEM
NOTE
CONTENTS
DESCRIPTION SHEET NO. REVISION
P&I DIAGRAM FOR CHLORINATION SYSTEM SH008 2 B FOR APPROVAL Mar. 15, 2023 K. Flores E. Tumimbang/
J. Kato
S. Yamclee
NHONTRACH3ANDNHONTRACH4
POWERPLANTPROJECT
Owner Project Technical Consultant
..\..\z4070974304174_790b6ec9b1696865354d5d62ec995c31.jpg
PETROVEITNAM POWERCORPORATO
IN
P(V
POWER)
POWER PROJECT
MANAGEMENT BOARD
P(VPP)
EPC Contractor
Sub-Contractor
Drawing Title
P&I DIAGRAM
FOR CHLORINATION SYSTEM
Designer Design Leader ENG. Manager
Scale Owner's Drawing number
Name: Name: Name:
K. Flores E. Tumimbang/ S. Yamclee N/A NT34-LW01-00PBQ00-S05-0001
J. Kato
Signature: Signature: Signature:
Sheet No. Contractor's number Rev. No.
COVER K15120 2
A1 (841 x 595)
EQUIPMENT EQUIPMENT (CONT.) PROCESS PIPING (CONT.) LINE VALVES (CONT.) MISCELLANEOUS (CONT.)
DEBRIS FILTER
EYE WASHER & CONTROL VALVE WITH POSITIONER
TURBINE G SAFETY SHOWER
LOOP SEAL
VS
SINGLE DOUBLE VACUUM SEAL BALL SCREEN
GENERATOR
FLOW FLOW
UPWARD & DOWNWARD SLOPE
SAMPLE COOLER BELLOWS SEALED VALVE
HORIZONTAL BIRD SCREEN
CENTRIFUGAL PUMP
PRESSURE BALANCING
EXTERNAL PIPE
VACUUM DEAERATOR OR VENT WITH SMALL VALVE
SPRAY NOZZLE
PRESSURE RELIEVING
VERTICAL PUMP
EXTERNAL PIPE
WITH SMALL VALVE
SUMP WET PIT EXHAUST VENT
VACUUM PUMP INTO OPEN AIR VACUUM BREAKER
PRESSURE BALANCING &
RELIEVING EXTERNAL PIPE
WITH SMALL VALVE
RING SECTION
CENTRIFUGAL PUMP DIAPHRAGM SEAL
G
EJECTOR OR EDUCTOR LINE VALVES ACTUATOR
G=GEAR (SHOWN)
VORTEX BREAKER
A=AIR WRENCH
VSD VARIABLE SPEED DRIVE C=CHAIN
STEAM JET AIR GATE X=EXTENSION STEM FLOW GLASS
EJECTOR COOLER B=WITH INTEGRAL BYPASS VALVE
D=DEEP STUFFING BOX AND
HC
HYDRAULIC COUPLING
GLOBE LANTERN GLAND
T=TAP IN BOTTOM OF BODY SEAL PIT
(FOR ASME TEST)
DESUPERHEATER ANGLE
POSITIVE DISPLACEMENT
PUMP
P D: DIAPHRAGM SPRAY NOZZLE OR SPARGER NOTE
ROTARY RECIPROCATING
P: PLUNGER
THREE-WAY VALVE STATUS AND SYMBOLS (SHOWN WITH UPWARD/DOWNWARD
FLOW)
PIPELINE COMPONENT
OPEN DURING NORMAL OPERATION
(ALL VALVES EXCEPT BUTTERFLY) PROCESS LINE BREAK OR
CONCENTRIC REDUCER/
RESUMPTION POINT
INCREASER
U-TUBE
FOUR-WAY
SHELL & TUBE TYPE LOCKED OPEN
HEAT EXCHANGER ECCENTRIC REDUCER/ LO
INCREASER
CLOSED DURING NORMAL OPERATION SCT
STRAIGHT TUBE STRAIGHT TUBE NEEDLE (ALL VALVES EXCEPT BUTTERFLY)
WELDED CAP REFERENCE
SINGLE-PASS TWO-PASS SUPPLIER INTERFACE
PINCH
CONE ROOF TANK FLOATING ROOF TANK EXPANSION JOINT
SPECTACLE BLIND DESIGNATION FOR EQUIPMENT FOR CONSTRUCTION
AND PIPING WHICH APPEAR
CHECK ON OTHER P&ID'S
RECIPROCATING BLIND FLANGE CIRCULAR OR HAMMER BLIND E. Tumimbang/
AIR COMPRESSOR BOUNDARY OF EQUIPMENT 2 FOR CONSTRUCTION Sep. 08, 2023 K. Flores S. Yamclee
J. Kato
PACKAGE PROVIDED BY Jun. 07, 2023 K. Flores E. Tumimbang/ S. Yamclee
FOOT 1 FOR CONSTRUCTION
SIMPLEX BASKET STRAINER SUPPLIER J. Kato
INSULATING FLANGE (IF) 0 FOR CONSTRUCTION Apr. 14, 2023 K. Flores E. Tumimbang/ S. Yamclee
DU OR DIELECTRIC UNION (DU) J. Kato
ROTARY FLOW LIMITING DUPLEX BASKET STRAINER E. Tumimbang/
(SHOWN) DRAIN LEG, DRIP POT B FOR APPROVAL Mar. 15, 2023 K. Flores S. Yamclee
AIR COMPRESSOR J. Kato
(OR EXCESS FLOW) CHECK
E. Tumimbang/
RO Y-TYPE / T-TYPE STRAINER A FOR APPROVAL Jan. 17, 2023 K. Flores
J. Kato
M. Trakul
- (SHOWN WITHOUT BLOWOFF VALVE)
Rev Description Date Prepared Reviewed Approved
MIXER / AGITATOR
RO - RESTRICTION ORIFICE
POWER ACTUATED TEMPORARY STARTUP
STRAINER
H HEATER
2 Project
NON-RETURN VALVE NHONTRACH3ANDNHONTRACH4
HM HYDRO-MOTOR
POWERPLANTPROJECT
BACKFLOW PREVENTER SCREEN TYPE STRAINER
CHEMICAL STORAGE DRUM Owner Project Technical Consultant
WITH DISPENSING PUMP PROCESS PIPING
STOP CHECK F FILTER
..\..\z4070974304174_790b6ec9b1696865354d5d62ec995c31.jpg
( )CDL
( )CD SUCCEEDING LETTERS CD
DUCTED AIR FLOW
CENTRIFUGAL BLOWER INDICATE CONTROL DAMPERS
OR COMPRESSOR SILENCER
(TYPICAL)
AIR MOVEMENT (NON-DUCTED) ( )CD
SINGLE BLADE OR
BUTTERFLY
MANUAL BALANCE
FH
HUMIDIFIERS FOR 0.30 MICROMETER DOP 1 FOR CONSTRUCTION Jun. 07, 2023 K. Flores E. Tumimbang/
J. Kato
S. Yamclee
EQUIPMENT DRAIN
COLLECTION UNIT ..\..\z4070974304174_790b6ec9b1696865354d5d62ec995c31.jpg
FL POST INDICATOR VALVE PLUGGED FLOOR DRAIN SAMSUNG C&T VIETNAM MACHINERY
Engineering & Construction Group INSTALLATION CORPORATION -
OR SURFACE COLLECTION UNIT JSC
Sub-Contractor
BALL DRIP VALVE
ADJUSTABLE
FIRE SYSTEM
WATER MOTOR ALARM Drawing Title
P&I DIAGRAM
FOR CHLORINATION SYSTEM
MOTOR OPERATED VALVE Designer Design Leader ENG. Manager
Scale Owner's Drawing number
Name: Name: Name:
K. Flores E. Tumimbang/ S. Yamclee
J. Kato
N/A NT34-LW01-00PBQ00-S05-0001
Signature: Signature: Signature:
Sheet No. Contractor's number Rev. No.
SH002 K15120 2
A1 (841 x 595)
NOTE
MECHANICAL LINE OR
VORTEX L( )
INSTRUMENT SUPPLY
DP SINGLE SOLENOID (NOTE 10) PETROVEITNAM POWERCORPORATO
IN
P(V
POWER)
FILLED SYSTEM POWER PROJECT
MANAGEMENT BOARD
P(VPP)
PNEUMATIC SIGNAL OR UNDEFINED RESET AFTER LATCH (OPTIONAL)
SIGNAL FOR PROCESS FLOW DIAGRAMS FE
EPC Contractor
L( )
GWR
GWR - GUIDED WAVE RADAR SAMSUNG C&T VIETNAM MACHINERY
(SHOWN) Engineering & Construction Group INSTALLATION CORPORATION -
ELECTRICAL SIGNAL TURBINE OR PROPELLER TYPE
RAD - RADAR VALVE BODIES & FAILURE MODES JSC
1. ON-OFF MOV TYPICAL IDENTIFICATION FOR PIPE SIZE, DETAIL IDENTIFICATION RULE CAN BE FOUND IN PLANT IDENTIFICATION SYSTEM
CLASS, MATERIAL AND INSULATION
UU SSS WW AA NNN
GENERAL
EXAMPLE OF
- INTERCONNECTING LOGIC SEQUENCE CONTROL NORMALLY APPLICATION:
MOV USED FOR LOCAL AUXILIARY CONTROL SYSTEM
M NNAAANNAANN C A 1
EQUIPMENT IDENTIFICATION NUMBERING
EQUIPMENT IDENTIFICATION CODE
(1) (2) (3)
* OPEN/CLOSE LIMIT SWITCHES ARE INCLUDED SYSTEM SERIAL NUMBERING
(1) CLASS/RATING
SUPPLIER DESIGNATOR SYSTEM CODE
A : 2500#SP (ASME B16.5)
UNIT CODE
B : 2500# (ASME B16.5)
C : 1500#SPL (ASME B16.5) UNIT IDENTIFICATION NUMBERS
2. INCHING D : 1500# (ASME B16.5)
00 PLANT COMMON
E : 900# (ASME B16.5)
FURNISHED BY EQUIPMENT SUPPLIER F : 600# (ASME B16.5) 30 NHON TRACH 3
MOV G : 300# (ASME B16.5)
40 NHON TRACH 4
M NNAAANNAANN H : 150# (ASME B16.5)
FURNISHED BY TURBINE SUPPLIER J : 125# (ASME B16.1)
INC X : Special as Designated
EQUIPMENT IDENTIFICATION LETTERS
* OPEN/CLOSE LIMIT SWITCHES AND POSITION TRANSMITTER ARE INCLUDED FURNISHED BY HRSG SUPPLIER
(2) PIPING MATERIAL
A MECHANICAL EQUIPMENT G ELECTRICAL EQUIPMENT
A : ALLOY STEEL (Cr-Mo)
AA VALVES, DAMPERS, ETC. INCL. ACTUATORS, GA JUNCTION BOXES AND CABLE/BUS BAR PENETRATIONS
B : CARBON STEEL (CS) ALSO MANUAL, RUPTURE DISK, EQUIPMENT (NOTE 1) (HIGH VOLTAGE)
AB ISOLATING ELEMENTS, AIR LOCKS GB JUNCTION BOXES AND CABLE/BUS BAR PENETRATIONS
C : STAINLESS STEEL (304 or 304L) AC HEAT EXCHANGER (INCLUDING ATTEMPERATORS) (MEDIUM VOLTAGE)
D : STAINLESS STEEL (316 OR 316L), DUPLEX STAINLESS STEEL AE TURNING. DRIVING, LIFTING AND SLEWING GEAR GC JUNCTION BOXES AND CABLE/BUS BAR PENETRATIONS
3. MODULATING AF CONVEYOR (LOW VOLTAGE)
INSULATION TYPE E : CAST IRON or DUCTILE IRON (CI or DI) AG GENERATOR UNIT GD JUNCTION BOXES AND CABLE/BUS BAR PENETRATIONS
AH HEATING, COOLING AND AIR CONDITIONING UNITS (CONTROL)
F : GALVANIZED CARBON STEEL AK DEAERATOR UNIT GE JUNCTION BOXES AND CABLE/BUS BAR PENETRATIONS NOTE
PETROVEITNAM POWERCORPORATO
IN
P(V
POWER)
POWER PROJECT
MANAGEMENT BOARD
P(VPP)
TWO-WAY HAND-ACTUATED EPC Contractor
HS ON/OFF WITCHING VALVE E ANALOG AND BINARY SIGNAL CONDITIONING
NNAAANNAANN SAMSUNG C&T VIETNAM MACHINERY
IN PNEUMATIC SIGNAL LINE EA OPEN LOOP CONTROL (ANALOGUE INDICATION) Engineering & Construction Group INSTALLATION CORPORATION -
1. HYDRAULIC ON-OFF VALVE JSC
EG ALARM, ANNUNCIATION (ALARM FOR DANGER)
EH ALARM, ANNUNCIATION (PRE ALARM)
EM PROCES COMPUTER (TEXT VALUE, INTERNAL Sub-Contractor
MOV
SUPPLIER DESIGNATOR VARIABLES, ETC.)
EU COMBINED ANALOGUE AND BINARY SIGNAL
NNAAANNAANN ( ) : F,L,P,T
CONDITIONING (STATUS)
EW PROTECTION ALARM INDUCING TRIP OR A BACK UP
FURNISHED BY EQUIPMENT STATE. Drawing Title
SUPPLIER P&I DIAGRAM
FOR CHLORINATION SYSTEM
Designer Design Leader ENG. Manager
Scale Owner's Drawing number
Name: Name: Name:
K. Flores E. Tumimbang/ S. Yamclee
J. Kato
N/A NT34-LW01-00PBQ00-S05-0001
Signature: Signature: Signature:
Sheet No. Contractor's number Rev. No.
SH004 K15120 2
A1 (841 x 595)
POWER SUPPLY (BY OTHERS) UPS POWER SUPPLY (BY OTHERS)
400 VAC, 3 P, 4 W, 50 Hz 230 VAC, 1 P, 2 W, 50 Hz *1 *1 *1 INDOOR OUTDOOR
HARD WIRED SIGNALS FROM DCS
CONTROL MONITORING (BY OTHERS)
SIGNALS CHLORINE GAS LEAK DETECTOR MONITOR UNIT
HARD WIRED SIGNALS TO DCS (BY OTHERS) CHLORINE CHLORINE CHLORINE
LOCAL CONTROL PANEL 1. RUNNING SIGNAL EVAPORATOR A EVAPORATOR B EVAPORATOR C A B
MOTOR CONTROL CENTER AUX. POWER SUPPLY FOR CHLORINATION SYSTEM 2. COMMON ALARM CONTROL PANEL CONTROL PANEL CONTROL PANEL 00PBQ62CQ081 00PBQ62CQ082
00BJG61GH001 00PBY62GH001 00PBY62GH002 00PBY62GH003 00PBY62GH004 AAH AAH AAH AAH
230 VAC, 1 P, 2 W, 50 Hz 3. GAS LEAK DETECTION (COMMON)
00PBQ51CQ081 00PBQ51CQ082 00PBQ54CQ081 00PBQ54CQ082
REDUNDANT MODBUS COMMUNICATION AAH AAH AAH AAH
TO DCS (BY OTHERS) 00PBQ51CQ081 00PBQ51CQ082 00PBQ54CQ081 00PBQ54CQ082
FRP DUCTING
*1 *1 *1 *1 *1
GAS EXHAUST GAS EXHAUST GAS EXHAUST GAS EXHAUST GAS EXHAUST
FAN A FAN B FAN C FAN D FAN E GAS EXHAUST FAN
00PBQ53AN006 00PBQ53AN007 00PBQ53AN008 00PBQ53AN009 00PBQ53AN010 CAPACITY : 384 m3/min PER EACH
Q'TY : 5 NOS.
MONORAIL (BY OTHERS)
2
00PBQ51CP501 00PBQ51CP084 AA930
LIQUID Cl2
PRESSURE RELIEF
00PBQ51
00PBQ51
00PBQ51
CHLORINE GAS LEAK
AA301
AA303
AA305
REFERENCE
DN15
DN15
DN25
SYSTEM C
NITROGEN PURGING
SYSTEM DN20
00PBQ51
DETECTOR SENSOR A
00PBQ51CQ081 2 DN25
M DN25
PA+
1. NT34-LW01-00PBQ00-J19-0001-I&C DATAFIELD DCS SIGNAL LIST FOR
CHLORINATION SYSTEM
00PBQ51BB013 BR001 00PBQ51CP083
DN25-STPG370 00PBQ51 00PBQ51 00PBQ51 00PBQ51 00PBQ51 00PBQ51 PS
00PBQ51 00PBQ51
00PBQ51 AA913 AA914 AA915 AA916 AA917 AA918 AA041 00PBQ51CP083
AA925 DN20 DN20 DN20 DN20 DN20 DN20 AA001 INDOOR OUTDOOR
FLEXIBLE CONNECTOR 2
DN25-STPG370
DN20 00PBQ51 DN20 00PBQ51 DN20 00PBQ51 DN20 00PBQ51 DN20 00PBQ51 DN20 00PBQ51 00PBQ51
00PBQ51
AA901 AA902 AA903 AA904 AA905 AA906
BR003
BB016
2
LIQUID Cl2
PRESSURE RELIEF
00PBQ51
AA307
DN25
SYSTEM B
*2a PA+
CHLORINE GAS CONTAINER 00PBQ51
(FOR OPERATION) WEIGHING SCALE 00PBQ51CP082 BR006
2
PLATFORM A DN25-STPG370
LIQUID CHLORINE
2 CAPACITY : 1,000 kg PER EACH
Q'TY : 12 NOS.
00PBQ51CW001 PS
00PBQ51CP082 (TO SH006, B-1)
WEIGHING SCALE MONITOR UNIT
00PBQ51CW003 FOR CONSTRUCTION
00PBQ51
PA― BB015
DN25-STPG370
WIA- WIA- *3b 00PBQ51CP085 E. Tumimbang/
00PBQ51
00PBQ51CW001 00PBQ51CW002 2 FOR CONSTRUCTION Sep. 08, 2023 K. Flores S. Yamclee
BR004
J. Kato
2
PI PS 00PBQ51 E. Tumimbang/
WIT WIT 1 FOR CONSTRUCTION Jun. 07, 2023 K. Flores S. Yamclee
00PBQ51CP502 00PBQ51CP085 AA931 J. Kato
00PBQ51CW001 00PBQ51CW002 E. Tumimbang/
0 FOR CONSTRUCTION Apr. 14, 2023 K. Flores S. Yamclee
J. Kato
00PBQ51
00PBQ51
00PBQ51
CHLORINE GAS LEAK
AA302
AA304
AA306
DN15
DN15
DN25
K. Flores E. Tumimbang/ S. Yamclee
B FOR APPROVAL Mar. 15, 2023
2
DETECTOR SENSOR B DN25 J. Kato
*2a *2b 00PBQ51CQ082 Jan. 17, 2023 K. Flores E. Tumimbang/ M. Trakul
00PBQ51 M DN25
A FOR APPROVAL
J. Kato
DN20 BR002
Rev Description Date Prepared Reviewed Approved
DN25-STPG370 00PBQ51 00PBQ51 00PBQ51 00PBQ51 00PBQ51 00PBQ51 00PBQ51 00PBQ51
00PBQ51 AA919 AA920 AA921 AA922 AA923 AA924 AA042 AA002 Project
AA926 DN20 DN20 DN20 DN20 DN20 DN20
2
CONTAINER AUX. VALVE NHONTRACH3ANDNHONTRACH4
CHLORINE GAS CONTAINER
CHLORINE GAS CONTAINER POWERPLANTPROJECT
DN20 00PBQ51
AA907 DN20 00PBQ51
AA908 DN20 00PBQ51
AA909 DN20 00PBQ51
AA910 DN20 00PBQ51
AA911 DN20 00PBQ51
AA912 (FOR STORAGE)
00PBQ52BB001~00PBQ52BB012 Owner Project Technical Consultant
CAPACITY : 1,000 kg PER EACH
00PBQ51BB007 00PBQ51BB008 00PBQ51BB009 00PBQ51BB010 00PBQ51BB011 00PBQ51BB012 Q'TY : 12 NOS.
CHLORINE GAS CONTAINER TRUNNION
..\..\z4070974304174_790b6ec9b1696865354d5d62ec995c31.jpg
2
PLATFORM B SAMSUNG C&T VIETNAM MACHINERY
00PBQ51CW002 Engineering & Construction Group INSTALLATION CORPORATION -
JSC
00PBQ51 OUTSIDE
BR005
DN150-PVC DUCT CHLORINE GAS LEAK Sub-Contractor
INSIDE
(TO SH008, B-1)
Drawing Title
CHLORINE GAS CONTAINER ROOM
P&I DIAGRAM
VL VL VL VL VL
FOR CHLORINATION SYSTEM
Designer
SUCTION LOUVER A SUCTION LOUVER B SUCTION LOUVER C SUCTION LOUVER D SUCTION LOUVER E CHLORINATION BUILDING Name:
Design Leader ENG. Manager
Name: Name:
Scale Owner's Drawing number
(BY OTHERS) (BY OTHERS) (BY OTHERS) (BY OTHERS) (BY OTHERS) K. Flores E. Tumimbang/ S. Yamclee N/A NT34-LW01-00PBQ00-S05-0001
J. Kato
00PBQ53AN001 00PBQ53AN002 00PBQ53AN003 00PBQ53AN004 00PBQ53AN005
Signature: Signature: Signature:
Sheet No. Contractor's number Rev. No.
SH005 K15120 2
A1 (841 x 595)
CHLORINE GAS VENT STEAM VENT
OUTSIDE OUTSIDE
00PBQ54 INSIDE INSIDE PI
BR197 00PBQ54CP501 00PBQ54
DN40-STPG370
BR011
00PBQ54
CHLORINE GAS
AA304
00PBQ54
DN15
DN40-STPG370
BR504
(TO SH007, A-1)
DN40-STPG370
00PBQ54
BR011
DN40-STPG370
DN25-STPG370
DN25-STPG370
DN25-STPG370
00PBQ54
00PBQ54
00PBQ54
BR008
BR009
BR010
00PBQ54
BR504
DN40-STPG370 00PBQ54
BR505
DN25-STPG370
CHLORINE GAS VENT
O.D.3/8" x I.D.1/4" PE TUBE O.D.3/8" x I.D.1/4" PE TUBE 00PBQ54 O.D.3/8" x I.D.1/4" PE TUBE (TO SH007, A-1)
BR197
DN40-STPG370
00PBQ54
BR001
LIQUID CHLORINE DN25-STPG370
DN25-STPG370
DN40-STPG370
DN25-STPG370
DN40-STPG370
DN25-STPG370
DN40-STPG370
(FROM SH005, D-6) Cl2 GAS Cl2 GAS Cl2 GAS
00PBQ54
00PBQ54
00PBQ54
00PBQ54
00PBQ54
00PBQ54
00PBQ54
00PBQ54
00PBQ54
AA007
AA008
AA009
DN25
DN25
DN25
BR501
BR194
BR502
BR195
BR503
BR196
PRESSURE RELIEF PRESSURE RELIEF PRESSURE RELIEF
SYSTEM A SYSTEM B SYSTEM C
00PBQ54 00PBQ54 00PBQ54
AA091 AA092 AA093
2
GAS PRESSURE GAS PRESSURE GAS PRESSURE
2
PA+ PA+ PA+
00PBQ54CP081 REDUCING VALVE A 00PBQ54CP082
2
REDUCING VALVE B
2 00PBQ54CP083
2
REDUCING VALVE C
2
PA+ PA+ PA+
DN25-STPG370
DN25-STPG370
DN25-STPG370
00PBQ54AA081 00PBQ54AA082 00PBQ54AA083
00PBQ54CP508 PS 00PBQ54CP509 PS 00PBQ54CP510 PS
00PBQ54
00PBQ54
00PBQ54
BR033
BR034
BR035
PIS 00PBQ54CP081 PIS 00PBQ54CP082 PIS 00PBQ54CP083
00PBQ54CP508 00PBQ54CP509 00PBQ54CP510 NOTE
00PBQ54
00PBQ54
INDOOR OUTDOOR
AA301
AA302
AA303
00PBQ54 00PBQ54 00PBQ54
DN15
DN15
DN15
AA901 GAS FILTER A AA902 GAS FILTER B AA903 GAS FILTER C
00PBQ54AT001 00PBQ54AT002 00PBQ54AT003
00PBQ54 00PBQ54 00PBQ54 00PBQ54 00PBQ54 00PBQ54
BR191 DN25 BR005 BR192 DN25 BR006 BR193 DN25 BR007
DN25-STPG370 DN25-STPG370 DN25-STPG370 DN25-STPG370 DN25-STPG370 DN25-STPG370
00PBQ54 00PBQ54 00PBQ54
AA004 AA005 AA006
Cl2 EVAP. A CP Cl2 EVAP. B CP Cl2 EVAP. C CP
TA± TA± TA±
DN25-STPG370
DN25-STPG370
DN25-STPG370
00PBQ54CT501 00PBQ54CT502 00PBQ54CT503 *3c
00PBQ54
00PBQ54
00PBQ54
2
BR002
BR003
BR004
TI TI TI
00PBQ54CT501 00PBQ54CT502 00PBQ54CT503
TT
00PBQ54CT501
2 Cl2 EVAP. A CP
TT
00PBQ54CT502
2 Cl2 EVAP. B CP
TT
00PBQ54CT503
2 Cl2 EVAP. C CP
REFERENCE
00PBQ54
00PBQ54
CHLORINATION SYSTEM
AA001
AA002
AA003
DN25
DN25
DN25
00PBQ54CT084 00PBQ54CT085 00PBQ54CT086 DETECTOR SENSOR C
TS TS TS
Cl2 EVAP. A CP Cl2 EVAP. B CP Cl2 EVAP. C CP 00PBQ54CQ081
00PBQ54CT084 00PBQ54CT085 00PBQ54CT086
LA± LA± LA±
LS
00PBQ54CL081
00PBQ54CL081
LS
00PBQ54CL082
00PBQ54CL082
LS
00PBQ54CL083
00PBQ54CL083
2
DN20 W/ ISOLATION KIT DN20 W/ ISOLATION KIT DN20 W/ ISOLATION KIT
LI S LI S LI S
00PBQ54CL501 DN20 DN20 00PBQ54CL503 DN20 DN20 00PBQ54CL505 DN20 DN20
HEATER 18 kW 00PBQ54 00PBQ54 00PBQ54 HEATER 18 kW 00PBQ54 00PBQ54 00PBQ54 HEATER 18 kW 00PBQ54 00PBQ54 00PBQ54
AA032 AA044 AA010 AA033 AA045 AA011 AA034 AA046 AA012
*5 CHLORINE *5 CHLORINE *5 CHLORINE
EVAPORATOR A
00PBQ54AC001
DN25
2 EVAPORATOR B
00PBQ54AC002
DN25
2 EVAPORATOR C
00PBQ54AC003
DN25
2
DN25-SUS316
DN20-SUS316
DN25-SUS316
DN20-SUS316
DN25-SUS316
DN20-SUS316
00PBQ54 00PBQ54 00PBQ54
CHLORINE EVAPORATOR
00PBQ54
00PBQ54
00PBQ54
00PBQ54
00PBQ54
00PBQ54
AA401 AA402 AA403
BR404
BR028
BR405
BR029
BR406
BR030
CAPACITY : 200 kg/h PER EACH
W/ ISOLATION KIT W/ ISOLATION KIT W/ ISOLATION KIT
Q'TY : 100% X 1 NO. FOR NT3
100% X 1 NO. FOR NT4
100% X 1 NO. FOR NT34 STANDBY
Project
00PBQ54
BY OTHERS BY OKM BR031 ..\..\z4070974304174_790b6ec9b1696865354d5d62ec995c31.jpg
1 m OUTSIDE OF DN40-SUS316
PETROVEITNAM POWERCORPORATO
IN
P(V
POWER)
THE BATTERY LIMIT
POWER PROJECT
MANAGEMENT BOARD
P(VPP)
FOR CLEANING OF
EPC Contractor
CHLORINE GAS SCRUBBER SYSTEM
T2 VIETNAM MACHINERY
00PBQ54 SAMSUNG C&T
Engineering & Construction Group INSTALLATION CORPORATION -
00PBQ56 00PBQ56 1:100 BR407 JSC
BR003 BR002 DN25
SERVICE WATER SUPPLY DN25-SUS316
MIN. 150 L/min. x 2 bar G DN40-SUS316 DN25-SUS316
00PBQ56 Sub-Contractor
00PBQ54
AA002 1:100 BR408
T3
DN100-CPVC
00PBQ56
DN25 00PBQ54
POTABLE WATER SUPPLY BR001 1:100 Drawing Title
BR403
MIN. 80 L/min. x 2 bar G DN25-SUS316
00PBQ56 DN25-CPVC P&I DIAGRAM
AA001 DRAIN PIT
EMERGENCY SHOWER AND EYE WASH STAND (BY OTHERS) FOR CHLORINATION SYSTEM
00PBQ56AT001 Designer Design Leader ENG. Manager
Scale Owner's Drawing number
Q'TY : 1 NO. Name: Name: Name:
DRAIN K. Flores E. Tumimbang/ S. Yamclee
J. Kato
N/A NT34-LW01-00PBQ00-S05-0001
Signature: Signature: Signature:
Sheet No. Contractor's number Rev. No.
SH006 K15120 2
A1 (841 x 595)
CHLORINE GAS VENT
00PBQ54 OUTSIDE
BR505
CHLORINE GAS VENT DN25-STPG370
INSIDE
(FROM SH006, B-6) 00PBQ54
BR506
00PBQ54
DN25-STPG370
BR011
CHLORINE GAS O.D.3/8" x I.D.1/4"
DN40-STPG370 00PBQ54
00PBQ54 PE TUBE BR024
(FROM SH006, A-6) BR011
DN150-GRP
DN40-STPG370
DN25-STPG370
DN25-STPG370
DN25-STPG370
*3d
DN100-GRP
DN100-GRP
DN100-GRP
DN100-GRP
DN100-GRP
2
00PBQ54
00PBQ54
00PBQ54
30PBQ20
30PBQ20
00PBQ20
40PBQ20
40PBQ20
O.D.3/8" x I.D.1/4" O.D.3/8" x I.D.1/4" 2 2
BR012
BR013
BR014
2
BR001
BR002
BR003
BR004
BR005
PE TUBE PE TUBE 2
00PBQ54
00PBQ54
00PBQ54
30PBQ20 30PBQ20
30PBQ20 30PBQ20
00PBQ20 00PBQ20
40PBQ20 40PBQ20
40PBQ20 40PBQ20
DN100
DN100
DN100
DN100
DN100
AA014
AA015
AA016
AA001
AA002
AA003
AA004
AA005
DN25
DN25
DN25
DETECTOR SENSOR D
NO
NO
NO
NO
NO
00PBQ54CQ082 2 2 2 2 2
DN100
DN100
DN100
DN100
DN100
00PBQ54 00PBQ54 00PBQ54
AA041
AA042
AA043
AA044
AA045
NO
NO
NO
NO
NC
M
M
AH001 AH002 AH003
TA― TA― TA―
00PBQ54CT081 H HM 00PBQ54CT082 H HM 00PBQ54CT083 H HM
TS TS TS
00PBQ54CT081 00PBQ54CT082 00PBQ54CT083
DN40-CPVC
DN40-CPVC
Q'TY : 100% X 1 NO. FOR NT3 00PBQ54AA084 00PBQ54AA085 00PBQ54AA086
00PBQ54
00PBQ54
00PBQ54
2
BR015
BR016
BR017
DIFFUSER A DIFFUSER B DIFFUSER C DIFFUSER D DIFFUSER E
100% X 1 NO. FOR NT4
100% X 1 NO. FOR NT34 STANDBY 2 2 DIFFUSER
CAPACITY : 27.3 m3/h PER EACH
30PBQ20BN001 30PBQ20BN002 00PBQ20BN003 40PBQ20BN004 40PBQ20BN005
00PBQ54
00PBQ54
4-20 mA SIGNAL 4-20 mA SIGNAL 4-20 mA SIGNAL 50% X 2 NOS. FOR NT4
AA017
AA018
AA019
DN40
DN40
DN40
FROM LCP FOR FROM LCP FOR FROM LCP FOR 100% X 1 NO. FOR NT34 STANDBY
CHLORINATION CHLORINATION CHLORINATION
SYSTEM SYSTEM SYSTEM NHON TRACH 3 STANDBY-UNIT NHON TRACH 4
FI FI FI
00PBQ54CF501 00PBQ54CF502 00PBQ54CF503
PI PI PI
00PBQ54CP503 00PBQ54CP505 00PBQ54CP507
NOTE
PI PI PI
00PBQ54CP502 00PBQ54CP504 00PBQ54CP506 1. OKM WILL SUPPLY ONLY WITHIN 50m OF CHLORINE SOLUTION PIPING
CHLORINATOR
OUTSIDE THE BUILDING. IN EXCESS, IT SHALL BE SUPPLIED BY OTHERS.
CAPACITY : 150 kg/h PER EACH AUTO CONTROL AUTO CONTROL AUTO CONTROL
Q'TY : 100% X 1 NO. FOR NT3
100% X 1 NO. FOR NT4 CHLORINATOR A CHLORINATOR B CHLORINATOR C
00PBQ54BB001 00PBQ54BB002 00PBQ54BB003
2 2
100% X 1 NO. FOR NT34 STANDBY
2 BY OTHERS
1 m OUTSIDE OF
BY OKM
THE BUILDING
O.D.22mm x I.D.15mm O.D.22mm x I.D.15mm O.D.22mm x I.D.15mm
VINYL HOSE
00PBQ54
VINYL HOSE VINYL HOSE
T1
REFERENCE
2
BR401 INJECTOR WATER SUPPLY FROM CW
T4 1. NT34-LW01-00PBQ00-J19-0001-I&C DATAFIELD DCS SIGNAL LIST FOR
DN15-CPVC R MIN. 109.2 m3/h x 1.0~1.5 bar G CHLORINATION SYSTEM
00PBQ54 OUTSIDE
BR024 (SEE NOTE NO.1) WARNING HORN B
2
DN150-GRP 00PBQ56EG082
INSIDE
OUTSIDE
INSIDE
DPA+
00PBQ55CP082
DN40-CPVC
DN40-CPVC
DN40-CPVC
DN100-GRP
DN100-GRP
DN100-GRP
00PBQ54
00PBQ54
00PBQ54
00PBQ54
00PBQ54
00PBQ54
BR018
BR021
BR019
BR022
BR020
BR023
DPS
00PBQ55CP082
00PBQ55
00PBQ55
DN15 AA310
AA309
DN15
AA302 DN15
DPI
AA026 00PBQ54
AA027 00PBQ54
AA028 00PBQ54
DN100
DN100
AA029
AA030
AA031
00PBQ55
00PBQ55
NO
NO
NO
AA303
DN15
DN150-CPVC
DN25-CPVC
ELECTRICAL : 400 VAC, 50 Hz, 3 PHASE, 30 kW
00PBQ55
00PBQ55
BR001
BR501
00PBQ54
00PBQ54
00PBQ54
00PBQ54
00PBQ54
00PBQ54
DN100
DN100
AA020
AA021
AA022
DN40
DN40
DN40
DN15-CPVC
DN15-CPVC
00PBQ55
00PBQ55
BR302
BR301
00PBQ55
AA501
DN25
INJECTOR
TYPE: ADJUSTABLE THROAT TYPE FOR CONSTRUCTION
00PBQ55
BACK PRESSURE : 1.0 bar G BR009 DN100 DN100
2
WATER PRESSURE : MIN. 5.5 bar G 00PBQ55 00PBQ55 00PBQ55
00PBQ55
INJECTOR A INJECTOR B INJECTOR C DN125 DN150 DN150
DN150
AA001
DN100-CPVC NO BR006 BR004 BR002 E. Tumimbang/
FLOW RATE : 54.6 m3/h
NO
00PBQ54BN001 00PBQ54BN002 00PBQ54BN003 00PBQ55 2 FOR CONSTRUCTION Sep. 08, 2023 K. Flores S. Yamclee
J. Kato
Q'TY : 100% X 1 NO. FOR NT3 00PBQ55 AA009 M NO DN125-CPVC NO DN150-CPVC NO DN150-CPVC
AA011 K. Flores E. Tumimbang/ S. Yamclee
1 FOR CONSTRUCTION Jun. 07, 2023
100% X 1 NO. FOR NT4 00PBQ55 00PBQ55 00PBQ55 J. Kato
*1 AA007 AA004 AA002 E. Tumimbang/
100% X 1 NO. FOR NT34 STANDBY MANUAL 0 FOR CONSTRUCTION Apr. 14, 2023 K. Flores
J. Kato
S. Yamclee
00PBQ54 00PBQ54
00PBQ54 00PBQ54
00PBQ54 00PBQ54
CHLORINE INJECTION
00PBQ55
DN100
DN100
DN100
STRAINER A
AA041
AA042
AA043
AA401
E. Tumimbang/
DN25
NO
NO
NC
2
M
2
PA―
2
00PBQ55AT001 J. Kato
00PBQ55
DN15-CPVC
00PBQ55AP001 00PBQ55CP081
BR011
E. Tumimbang/
00PBQ54
J. Kato
DN100
DN100
DN100
DN150-CPVC
AA023
AA024
AA025
PS PI
DN25-CPVC
NO
NO
NO
00PBQ55
00PBQ55
DPA+ Rev Description Date Prepared Reviewed Approved
BR008
BR401
00PBQ55CP081 00PBQ55CP501
00PBQ55CP083
00PBQ55
00PBQ55
00PBQ55
Project
AA503
AA307
AA301
DN25
DN15
DN15
DPS
00PBQ55CP083 NHONTRACH3ANDNHONTRACH4
DN100-CPVC
DN100-CPVC
DN100-CPVC
00PBQ55
00PBQ55
POWERPLANTPROJECT
00PBQ54
00PBQ54
00PBQ54
DN15 AA312
AA311
DN15
AA304 DN15
BR025
BR026
BR027
00PBQ55
DPI
AA504
DN25
00PBQ55
00PBQ55
AA305
DN15
DN25-CPVC
00PBQ55
DN150
00PBQ55
AA006
BR502
NC
PA± ..\..\z4070974304174_790b6ec9b1696865354d5d62ec995c31.jpg
00PBQ55CP084
DN15-CPVC
DN15-CPVC
00PBQ55
00PBQ55
BR304
BR303
PETROVEITNAM POWERCORPORATO
IN
P(V
POWER)
00PBQ55
PS PI POWER PROJECT
MANAGEMENT BOARD
P(VPP)
AA502
CHLORINE INJECTION
DN25
00PBQ55CP084 00PBQ55CP504 00PBQ55
AA091
BOOSTER PUMP B EPC Contractor
00PBQ55
00PBQ55
00PBQ55 00PBQ55AP002
AA308
AA306
DN15
DN15
2
Engineering & Construction Group
DN100-CPVC NO DN125 BR007 DN150 BR005 DN150 BR003 JSC
00PBQ55 00PBQ55
BR012 00PBQ55 AA010 M NO DN125-CPVC NC DN150-CPVC NC DN150-CPVC
AA012 Sub-Contractor
DN150-CPVC 00PBQ55 00PBQ55 00PBQ55
*1
DN100-CPVC
00PBQ55
MANUAL
00PBQ55
AA402
DN25
BR403
STRAINER B
00PBQ54 00PBQ55AT002 MANUAL STRAINER
1:100 BR408 Drawing Title
CAPACITY : 109.2 m3/h PER EACH
DN25-CPVC
DRAIN WATER
00PBQ55
TREATED EXHAUST
CHLORINE GAS SCRUBBER
DN150-FRP
SYSTEM)
PI
00PBQ56CP501
00PBQ56
AA301
DN15
DN25 BOSS CONNECTOR CAUSTIC SODA SOLUTION
SAMPLING PORT
00PBQ51
DN150
BR005 *4
CHLORINE GAS LEAK DN150-PVC DUCT NO MIST ELIMINATOR
00PBQ56 CHLORINE GAS SCRUBBER
(FROM SH005, F-7) AA003 M
SYSTEM
DN25 BOSS CONNECTOR AIR EXHAUST FAN
SAMPLING PORT STAGE 1 STAGE 2 STAGE 3 00PBQ56AN001
00PBQ54
DN150 BR032
CHLORINE GAS LEAK LA-
DN150-PVC DUCT 00PBQ56CL081
DN 50 FILL PORT
NO
00PBQ56 *4 QUICK DISCONNECT
(FROM SH006, D-7) LCP
AA004 LA-
00PBQ56CL081 NOTE
LS M
00PBQ56CL081
LI BUND WALL
00PBQ56CL501
H=500 (BY OTHERS)
CAUSTIC SODA SOLUTION STORAGE TANK
DN25 DN25 (20% x 1900L) 00PBQ56
CAUSTIC SODA DN50 BR401
00PBQ56BB001
00PBQ56 00PBQ56
AA601 AA302
RECIRCULATION PUMP
00PBQ56AP001 00PBQ56
AA401
DN50-CPVC
REFERENCE
2
1. NT34-LW01-00PBQ00-J19-0001-I&C DATAFIELD DCS SIGNAL LIST FOR
CHLORINE GAS SCRUBBER SYSTEM CHLORINATION SYSTEM
00PBQ56AT002
CAPACITY : 272 kg OF CHLORINE
Q'TY : 1 NO.
BY OTHERS BY OKM
2 2
30QUP20FQ001 30QUP20FQ001 40QUP20FQ001 40QUP20FQ001 A FOR APPROVAL Jan. 17, 2023 K. Flores M. Trakul
J. Kato
2 2
Rev Description Date Prepared Reviewed Approved
1-1/4" DRAIN TUBING 1/4" TUBING 1-1/4" DRAIN TUBING 1/4" TUBING
Project
ANALYZER ANALYZER
NHONTRACH3ANDNHONTRACH4
3/8" DRAIN TUBING 3/8" DRAIN TUBING
DN15 DN15 DN15 DN15 POWERPLANTPROJECT
PI PI
30QUP20CP501 40QUP20CP501 Owner Project Technical Consultant
BY OTHERS BY OKM 30QUP20 BY OTHERS BY OKM 40QUP20
30QUP20 AA002 40QUP20 AA002
30QUP20
40QUP20
2 2
AT002 AT002
AA301
AA301
DN15
DN15
2 2
T5B T5A T6B T6A
2 2
..\..\z4070974304174_790b6ec9b1696865354d5d62ec995c31.jpg
2 2
30QUP20 30QUP20 40QUP20 40QUP20
2 2
30QUP20 40QUP20
AA003 AT001 AA001 AA003 AT001 AA001 EPC Contractor
Sub-Contractor
Drawing Title
P&I DIAGRAM
FOR CHLORINATION SYSTEM
Designer Design Leader ENG. Manager
Scale Owner's Drawing number
Name: Name: Name:
K. Flores E. Tumimbang/ S. Yamclee
J. Kato
N/A NT34-LW01-00PBQ00-S05-0001
Signature: Signature: Signature:
Sheet No. Contractor's number Rev. No.
SH008 K15120 2
A1 (841 x 595)
NT3 @ Seal pit
30QUP50
AT002
AA301
DN15
T7B T7A
30QUP50
BR002
2 DN20
30QUP50
BR002 2 DN20 DN20 DN20
30QUP50
BR001
DRAIN DN20-CPVC DN20-CPVC DN20-CPVC
30QUP50 30QUP50 30QUP50 M 30QUP50
AA004
2 AT001
2
AA002
*6
NT3 SEAL PIT
AA001
2
T7C CHLORINE RESIDUAL ANALYZER
SAMPLING PUMP
DRAIN
30QUP50
BR401 2 30QUP50AP001
DN20-CPVC
NOTE
SEAL PIT
REFERENCE
2
1. NT34-LW01-00PBQ00-J19-0001-I&C DATAFIELD DCS SIGNAL LIST FOR
CHLORINE RESIDUAL ANALYZER CHLORINE RESIDUAL ANALYZER SAMPLING PUMP CHLORINATION SYSTEM
Q'TY : 2 NOS. CAPACITY : 280 L/h x 30 m PER EACH
LOCATION : DISCHARGE OUTFALL ELECTRICAL : 230 VAC, 50 Hz, 1 PHASE, 0.37 kW
Q'TY : 2 NOS.
2
40QUP50FQ001 40QUP50FQ001
*7
1-1/4" DRAIN TUBING 2 1/4" TUBING
FOR CONSTRUCTION
2
K. Flores E. Tumimbang/ S. Yamclee
40QUP50 AA003 AA091 AA901 B FOR APPROVAL Mar. 15, 2023
J. Kato
40QUP50
AT002
AA301
E. Tumimbang/
DN15
2
J. Kato
DRAIN
40QUP50
BR002 DN20
40QUP50
BR002 2 DN20 DN20 DN20
40QUP50
BR001
Rev
Project
Description Date Prepared Reviewed Approved
2 POWERPLANTPROJECT
T8C CHLORINE RESIDUAL ANALYZER
Owner Project Technical Consultant
SAMPLING PUMP
DRAIN
40QUP50
BR401 2 40QUP50AP001
DN20-CPVC ..\..\z4070974304174_790b6ec9b1696865354d5d62ec995c31.jpg
PETROVEITNAM POWERCORPORATO
IN
P(V
POWER)
POWER PROJECT
MANAGEMENT BOARD
P(VPP)
EPC Contractor
Sub-Contractor
SEAL PIT
Drawing Title
P&I DIAGRAM
FOR CHLORINATION SYSTEM
Designer Design Leader ENG. Manager
Scale Owner's Drawing number
Name: Name: Name:
K. Flores E. Tumimbang/ S. Yamclee
J. Kato
N/A NT34-LW01-00PBQ00-S05-0001
Signature: Signature: Signature:
Sheet No. Contractor's number Rev. No.
SH009 K15120 2
A1 (841 x 595)