JSA Level Transmitter Installation Numbered Sections

The Job Safety Analysis (JSA) outlines safe work procedures for the installation of a Yokogawa EJX110A Level Transmitter in a hazardous area within an oil and gas facility. It details the purpose, scope, reference codes, job steps with associated hazards, risk assessments, recommended controls, and required personal protective equipment (PPE). Emergency response measures for various incidents are also included, along with related documents and approvals necessary for the job.

Uploaded by

Robby Robby
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
76 views3 pages

JSA Level Transmitter Installation Numbered Sections

The Job Safety Analysis (JSA) outlines safe work procedures for the installation of a Yokogawa EJX110A Level Transmitter in a hazardous area within an oil and gas facility. It details the purpose, scope, reference codes, job steps with associated hazards, risk assessments, recommended controls, and required personal protective equipment (PPE). Emergency response measures for various incidents are also included, along with related documents and approvals necessary for the job.

Uploaded by

Robby Robby
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

JOB SAFETY ANALYSIS (JSA)

Activity: Installation of Level Transmitter


Project: Revitalisasi Unit CDU – Refinery Unit XX, Indonesia

Instrument: Yokogawa EJX110A – Diaphragm Type, Ex-d, SIL2, IP67

1. Purpose
To establish safe work procedures and risk mitigation for the installation of Level
Transmitter in oil and gas processing facilities, including activities such as lifting,
positioning, mounting, electrical wiring, calibration, and functional testing.

2. Scope
This JSA applies to the mechanical and electrical installation of Level Transmitter Yokogawa
EJX110A in a classified hazardous area, including integration with existing process lines and
control systems.

3. Reference Codes and Standards


- IEC 61010-1: Safety requirements for electrical equipment
- IEC 61511: Functional safety for SIS in process industry
- IEC 60079-14: Electrical installations in explosive atmospheres
- ISO 17025: Calibration and test requirements
- OSHA 1910.147: Lockout/Tagout (LOTO) procedures

4. Job Safety Analysis Table (Detailed)


Job Step Hazard Risk Recommend PPE Responsible
Identificatio Assessment ed Control Required Party
n Measures
1. Site Work High (if no Ensure Helmet, Permit
Preparation without control), Permit to Safety Vest, Holder / Site
and Permit permit, Medium Work is Safety Shoes Supervisor
to Work undefined (with permit obtained
hazards, system) and site HSE
unauthorize induction is
d access completed.
Isolate work
area.
2. Lockout Unexpected High Perform Insulated Authorized
and Tagout energization electrical Gloves, Technician
(LOTO) , residual and process Helmet,
pressure isolation, Goggles
lock valves
and
switches,
confirm zero
energy state.
3. Lifting Falling Medium Use certified Helmet, Rigger /
and object, lifting lifting gear Safety Shoes, Operator
Transportin injury, pinch and follow Gloves
g Instrument point rigging plan,
inspect sling,
secure load,
guide
manually at
safe
distance.
4. Mounting Pressure High Depressuriz Face Shield, Instrument
on Process release, e line before Gloves, Technician
Line incorrect breaking Helmet
flange flange, use
alignment, correct
pinching gasket, align
flanges,
torque in
sequence.
5. Electrical Short circuit, Medium to Verify Insulated Electrician
Connection incorrect High power off, Gloves,
wiring, use correct Safety Shoes,
shock wiring Goggles
diagram,
check
grounding,
do IR test
before
power on.
6. Incorrect Medium Use Gloves, Instrument
Calibration calibration, calibrated Safety Engineer
& Loop output error, test device, Glasses
Testing loop failure simulate
input and
verify
output,
validate
against
datasheet
spec.
7. Final Loose bolts, Low Double- Helmet, Supervisor
Inspection missing tag, check Safety Vest
and Tagging documentati connections,
on error torque
settings,
attach tag,
fill
inspection
checklist
and
handover.

5. Emergency Response
In case of:
- Electric shock: shut down power and call site medic
- Fall incident: secure area and alert HSE
- Fire: activate nearest fire extinguisher and alarm system
- Chemical release: evacuate and notify control room

6. Related Documents and Approvals


- Work Permit
- Isolation Certificate
- Instrument Datasheet & Calibration Certificate
- LOTO Register