Response :
Yes / Comply
No / Not Acceptable
TECHNICAL BID EVALUATION FOR
Legends
TRANSFORMER VTA : Vendor To Advice
*) Vendor Name
NO DESCRIPTION PHR REQUIREMENTS Bidder REMARK
Proposal / Response
A GENERAL
1 Brand Name VTA Trafindo
2 Bid Date
3 Country Of Origin Location Indonesia
4 Applicable State and Local Codes: Comply with All NEMA, IEEE, ANSI and NEC ANSI/IEEE C57.12
5 Country Of Manufacture Location Indonesia
6 Manufacture Location Location Tangerang
7 Engineering Location Location Tangerang
8 Year Production Max 1 year from Production
B PROJECT SPECIFICATION REQUIREMENT
1 Equipment Item No. Refer to MTO for Transformer Comply
2 Data Sheet
Data Sheet for 2500kVA Transformer Required Comply
Data Sheet for 1500kVA Transformer Required Comply
Data Sheet for 150kVA Transformer Required Comply
3 Schematic Diagram
Schematic Diagram for 2500kVA Transformer Required Comply
Schematic Diagram for 1500kVA Transformer Required Comply
Schematic Diagram for 150kVA Transformer Required Comply
4 Drawing
General Arrangement for 2500kVA Transformer Required Comply
General Arrangement for 1500kVA Transformer Required Comply
General Arrangement for 150kVA Transformer Comply
5 Standard
All NEMA, IEEE, ANSI and NEC Required ANSI/IEEE C57.12
6 Environmental
Ambient temperature Min 20, Max 40 Comply
Altitude <400 ft above sea level Comply
Location Outdoor Comply
Area Classification Non hazardous Comply
Relative Humidity 60-90% Comply
Average Rainfall 135inches per year Comply
Maximum wind velocity 125miles per hour (for design) Comply
Atmospheric Contaminants Corosive Element Moisture, Dust 0.0125mg/cu.ft Comply
Seismic Zone Zone 2 Comply
C 2500/3250 kVA (ONAN / ONAF)
1 Manufacturer : VTA Trafindo
2 Capacity 2500/3250 kVA (ONAN / ONAF) 2500/3250 kVA (ONAN / ONAF)
3 Primarily voltage 13800 V 13800 V
750 kVA OA 13.8 kV ± 16% in 5/8 % step
4 As per point 2
(at 55 °C temperature rise)
Rated power
937.5 kVA FA 13.8 kV ± 16% in 5/8 % step
5 As per point 2
(at 55 °C temperature rise)
6 Primary Tap changing range 5 tap: 2 x 5% above and 2 x 5% below 5 tap: 2 x 5% above and 2 x 5% below
7 Secondary Voltage 4160 V 4160 V
8 Secondary Tap changing range N/A N/A
9 Frequency 60 Hertz 60 Hertz
10 Phase 3 3
11 Winding Connection (Vector Group) Dyn 1 Dyn-1
12 Temperature Rise
a. Oil 50 50
b. Winding 55 55
15 No Load Losses 4500 Watt 4500 Watt
16 Total Losses at full load 24350 Watt 24350 Watt
17 Impedance 6.5% 6.50%
18 Basic Insulation Level
Response :
Yes / Comply
No / Not Acceptable
TECHNICAL BID EVALUATION FOR
Legends
TRANSFORMER VTA : Vendor To Advice
*) Vendor Name
NO DESCRIPTION PHR REQUIREMENTS Bidder REMARK
Proposal / Response
a. HV 110 kV 110 kV
b. LV 60 kV 60 kV
19 Cooling Class ONAN / ONAF ONAN / ONAF
20 Insulation Oil Mineral, Non PCB Mineral, Non PCB
21 Radiator type Panel, removable c/w isolation valve Panel, removable c/w isolation valve
22 Tank Cover Bolted Bolted
23 Winding Wire
a. Material copper, round at primary and rectangular at secondary Copper
b. Insulation Type Enamel "PVF" Comply
c. Insulation Temperature class A A
24 Bushing position
a. HV Side Side
b. LV Side Side
25 Bushing terminal
a. HV, Connector type NEMA Pad, 4 hole Comply
b. HV, Size (hole diameter) c/w cable connector suitable size 1 x 3/C, 350 MCM Comply
c. HV, Conductor material Copper Copper
d. Provide Cable Connector for HV Required Comply
e. Number of LV bushing terminal 4 4
f. LV, Connector Type NEMA Pad, 4 hole Comply
g. LV, Size (hole diameter) c/w cable connector suitable size 2 x 3/C, 350 MCM Comply
h. LV, Conductor material Copper Comply
Provide Cable Connector for LV Required Comply
26 Enclosure NEMA 3R Comply
27 Painting
a. Color ANSI 70 "Sky Grey", Munsell no 5 Comply
b. Type Glossy Comply
28 Dimension
a. Length VTA Approx. 3285 mm
b. Width VTA Approx. 3118 mm
c. Height VTA Approx. 2370 mm
d. Weight VTA Approx. 6580 kg
e. Volume of oil VTA Approx. 2240 Ltr
29 Tap Changer Rotary 5 tap Comply
30 Oil thermometer Dial type Comply
31 Winding thermometer Dial type Comply
32 Oil filling valve Globe Valve, size 1" Comply
33 Oil drain valve Globe Valve, size 1" c/w sampling tap Comply
34 Oil level indicator Dial type Comply
35 Pressure relief device 8 psi, Comply, 10 psi
36 Pressure vacuum gauge -10psi to +10psi, Qualitrol, Qualitrol or Equal Comply
37 Pressure vacuum bleeder Installed at Press Vac Gauge, Qualitrol or Equal Comply
38 Earth Terminal 5 pc, stainless steel pad w/ cooper/brass alloy bolt Comply
39 Radiator Valve Block valve Comply
40 Heater with thermostat 220V, minimum capacity 200W Comply
41 Sudden pressure relay N/A N/A
42 Relay 87 T N/A N/A
43 Cooling Fan Rating 220 V, 1 phase, 60 Hz, TEFC motor Comply
44 Gasket Neoprene, No joint Comply
45 Terminal/Control Box Provided Comply
a. Control terminal block Stainless Steel terminal,GE or approved equal Comply
b. CT terminal block Stainless Steel Shorting bar,GE or approved equal Comply
46 Name plate Stainless Steel, Nameplate C Comply
47 Jacking facility Refer to ANSI Comply
48 Electric Power for All Accessories Internal Comply
Polymer, Heavy duty, 15 kV, MCOV 12.7 kV, 10 kA at 40
49 Lightning Arrester Comply
kV
50 HV Bushing Boot N/A N/A
D 1500/2000 kVA (ONAN/ONAF)
1 Manufacturer : VTA Trafindo
2 Capacity 1500/2000kVA (ONAN/ONAF) 1500/2000kVA (ONAN/ONAF)
3 Primary Voltage 13200 V 13200 V
Response :
Yes / Comply
No / Not Acceptable
TECHNICAL BID EVALUATION FOR
Legends
TRANSFORMER VTA : Vendor To Advice
*) Vendor Name
NO DESCRIPTION PHR REQUIREMENTS Bidder REMARK
Proposal / Response
4 Primary Tap changing range 5 tap: 2 x 5% above and 2 x 5% below 5 tap: 2 x 5% above and 2 x 5% below
5 Secondary Voltage 4160 V 4160 V
6 Secondary Tap changing range N/A N/A
7 Frequency 60 Hertz 60 Hertz
8 Phase 3 3
9 Winding Connection (Vector Group) Dyn 1 Dyn 1
10 Temperature Rise
a. Oil 50 50
b. Winding 55 55
11 No Load Losses 2550 Watt 2550 Watt
12 Total Losses at full load 16000 Watt 16000 Watt
13 Impedance 6.5% 6.50%
14 Basic Insulation Level
a. HV 110 kV 110 kV
b. LV 60 kV 60 kV
15 Cooling Class ONAN / ONAF ONAN / ONAF
16 Insulation Oil Mineral, Non PCB Mineral, Non PCB
17 Radiator type Panel, removable c/w isolation valve Panel, removable c/w isolation valve
18 Tank Cover Bolted Bolted
19 Winding Wire
a. Material copper, round at primary and rectangular at secondary Copper
b. Insulation Type Enamel "PVF" Comply
c. Insulation Temperature class A A
20 Bushing position
a. HV Side Side
b. LV Side Side
21 Bushing terminal
a. HV, Connector type NEMA Pad, 4 hole Comply
b. HV, Size (hole diameter) c/w cable connector suitable size 1 x 3/C, 250 MCM Compy
c. HV, Conductor material Copper Copper
d. Provide Cable Connector for HV Required Copper
e. Number of LV bushing terminal 4 4
f. LV, Connector Type NEMA Pad, 4 hole Comply
g. LV, Size (hole diameter) c/w cable connector suitable size 2 x 3/C, 250 MCM Comply
h. LV, Conductor material Copper Copper
Provide Cable Connector for LV Required Comply
22 Enclosure NEMA 3R Comply
23 Painting
a. Color ANSI 70 "Sky Grey", Munsell no 5 Comply
b. Type Glossy Comply
24 Dimension
a. Length VTA Approx. 3092 mm
b. Width VTA Approx. 2760 mm
c. Height VTA Approx. 2059 mm
d. Weight VTA Approx. 5600 kg
e. Volume of oil VTA Approx. 1740 Ltr
25 Tap Changer Rotary 5 tap Comply
26 Oil thermometer Dial type Comply
27 Winding thermometer Dial type Comply
28 Oil filling valve Globe Valve, size 1" Comply
29 Oil drain valve Globe Valve, size 1" c/w sampling tap Comply
30 Oil level indicator Dial type Comply
31 Pressure relief device 8 psi, Comply, 10 psi
32 Pressure vacuum gauge -10psi to +10psi, Qualitrol, Qualitrol or Equal Comply
33 Pressure vacuum bleeder Installed at Press Vac Gauge, Qualitrol or Equal Comply
34 Earth Terminal 5 pc, stainless steel pad w/ cooper/brass alloy bolt Comply
35 Radiator Valve Block valve Comply
36 Heater with thermostat 220V, minimum capacity 200W Comply
37 Sudden pressure relay N/A N/A
38 Relay 87 T N/A N/A
39 Cooling Fan Rating 220 V, 1 phase, 60 Hz, TEFC motor Comply
Response :
Yes / Comply
No / Not Acceptable
TECHNICAL BID EVALUATION FOR
Legends
TRANSFORMER VTA : Vendor To Advice
*) Vendor Name
NO DESCRIPTION PHR REQUIREMENTS Bidder REMARK
Proposal / Response
40 Gasket Neoprene, No joint Comply
41 Terminal/Control Box Provided Comply
a. Control terminal block Stainless Steel terminal,GE or approved equal Comply
b. CT terminal block Stainless Steel Shorting bar,GE or approved equal Comply
42 Name plate Stainless Steel, Nameplate C Comply
43 Jacking facility Refer to ANSI Comply
44 Electric Power for All Accessories Internal Comply
Polymer, Heavy duty, 15 kV, MCOV 12.7 kV, 10 kA at 40
45 Lightning Arrester Comply
kV
46 HV Bushing Boot N/A N/A
E 150kVA (ONAN)
1 Manufacturer : VTA Trafindo
2 Capacity 150kVA (ONAN) 150kVA (ONAN)
3 Primary Voltage 13200 V 13200 V
4 Primary Tap changing range 5 tap: 2 x 5% above and 2 x 5% below 5 tap: 2 x 5% above and 2 x 5% below
5 Secondary Voltage 480 V 480 V
6 Secondary Tap changing range N/A N/A
7 Frequency 60 Hertz 60 Hertz
8 Phase 3 3
9 Winding Connection (Vector Group) Dyn 1 Dyn 1
10 Temperature Rise
a. Oil 50 50
b. Winding 55 55
11 No Load Losses 425 Watt 425 Watt
12 Total Losses at full load 2350 Watt 2350 Watt
13 Impedance 4% 4.00%
14 Basic Insulation Level
a. HV 110 kV 110 kV
b. LV 30 kV 30 kV
12 Pole Diameter 8" to 12" Comply
12 Core Construction 6 core or stacking vertical winding position Comply
15 Cooling Class ONAN ONAn
16 Insulation Oil Mineral, Non PCB Mineral, Non PCB
17 Tank Shape Round Round
18 Tank Cover Cone Cone
19 Winding Wire
a. Material Copper Copper
b. Insulation Type Enamel "PVF" Comply
c. Insulation Temperature class A A
20 Bushing position
a. HV Top Top
b. LV Side Side
21 Bushing terminal
a. HV, Connector type ANSI Eye bolt connector Comply
b. HV, Size (hole diameter) 12mm Comply
c. HV, Conductor Material Copper Copper
d. Number of LV bushing terminal 4 Comply
e. LV, Connector Type ANSI Eye bolt connector Comply
f. LV, Size (hole diameter) 15mm Comply
g. LV, Conductor Material Copper Copper
22 Enclosure NEMA 3R Comply
23 Painting
a. Color ANSI 70 "Sky Grey", Munsell no 5 Comply
b. Type Glossy Comply
24 Dimension
a. Length VTA Approx. 970 mm
b. Width VTA Approx. 800 mm
c. Height VTA Approx. 1805 mm
d. Weight VTA Approx. 880 kg
e. Volume of oil VTA Approx. 280 Ltr
25 Tap Changer Rotary 5 tap Comply
26 Oil level indicator Dial type Comply
Response :
Yes / Comply
No / Not Acceptable
TECHNICAL BID EVALUATION FOR
Legends
TRANSFORMER VTA : Vendor To Advice
*) Vendor Name
NO DESCRIPTION PHR REQUIREMENTS Bidder REMARK
Proposal / Response
27 Pressure Relief Valve Yes Comply
28 Drain valve Globe valve w/ sampling tap Comply
29 Grounding lug Stainless Steel pad, copper/brass alloy bolt Comply
30 Gasket Neoprene, No joint Comply
31 Name plate Stainless Steel, NEMA C Comply
32 Lifting lug Required, 2 pcs Comply
33 Guying hook Required, 2 pcs Comply
34 Pole mounted Transformer bracket 2 sets, hot dip galvanized c/w bolt and nut Comply
Polymer, Heavy duty, 15 kV, MCOV 12.7 kV, 10 KA at 40
35 Lightning Arrester Comply
kv
F OTHER REQUIRMENT
1 Witness Test / Inspection Required Comply
2 Vendor service :
Commissioning Required Comply
Supervision Required Comply
Training Required Comply
Intermediate inspection Required Comply
3 Safety Requirement ( PPE, JSA, Working Permit, etc ) Required
G NAME PLATES
1 Each equipment Required Comply
2 Colors Stainless steel with Black background Comply
Machine-engraved metal, fastened with tapped and two
3 Materials stainless steel screws metal, fastened with tapped and two Comply
stainless steel screws
Nameplate shall refer to the applicable IEC standards, including the following items as a
4
minimum
- Manufacturer's Name Required Comply
- Manufacturer's Serial Number Required Comply
- Manufactured year Required Comply
- Number of the Standard Required Comply
- Rated Voltages (V or kV) Required Comply
- Rated Capacity (VA or kVA) Required Comply
- Rated Frequency (Hz) Required Comply
- Rated Current (A or kA) Required Comply
- Short Circuit Withstand Current (kA) Required Comply
- Short Circuit Duration (s) Required Comply
H PACKING AND SHIPPING
1 Equipment Packed Required Comply
2 Inspection Required Comply
3 Preparation Required Comply
Clean and free from scale, welding spatter and foreign
4 The interior of all equipment (Control Boxes) Comply
objects
5 Mechanical equipment Sprayed or flushed with a suitable rust preventive Comply
Applied through all openings while the engine is slow-
6 Rust preventive Comply
rolled
7 Internal bracing or supports for shipping Required Comply
8 Painting Distinctive colour Comply
9 Lifting points and the centre of gravity Required Comply
10 Item and serial number Required Comply
11 Electrical parts Packed in such a manner Comply
I INSPECTION AND TEST
1 Factory Acceptance Test
1. Visual inspection of appearance Required Comply
2. Construction Required Comply
3. Dimensions Required Comply
4. Mechanical operation test Required Comply
Response :
Yes / Comply
No / Not Acceptable
TECHNICAL BID EVALUATION FOR
Legends
TRANSFORMER VTA : Vendor To Advice
*) Vendor Name
NO DESCRIPTION PHR REQUIREMENTS Bidder REMARK
Proposal / Response
5. Electrical operating and control sequence circuit test Required Comply
6. Check of Equipment ratings Required Comply
7. Insulation resistance measurement Required Comply
8. Check of test reports Required Comply
9. Correctness of rating on the nameplate Required Comply
10 Grounding connections Required Comply
11. All safety features Required Comply
12. All circuit numbering Required Comply
13. The rating and capacity of CT Required Comply
14. HV Test Required Comply
Short Circuit Test Required N/A, by calculation only
14. Other Test See Specification PHR-SP-PGT-EE-004 Comply
2 Site Acceptance Test
1. Inspection and Test Plan (ITP) for field inspection to the Purchaser Required Comply
2. Inspection and testing items to be performed for each electrical component at the Site Required Comply
3. Transformer tested under operational conditions Required Comply
4. The SAT witnessed by both the Employer and the Engineer and the Purchaser Required Comply
5. TFA (Technical Field Advisor) will be Supervisor Installation and Test Commissioning Required Comply
J DOCUMENTATION
1 Engineering Design
1. GA drawing, Assembly, Erection and Detail Drawing Required Comply
2. Data sheet Required Comply
3. Schematic Diagram Required Comply
4. Single Line Diagram Required Not Comply
2 Shop Fabrication
1. ITP Required Comply
2. Inspection and test report Required Comply
3. Other as specified in specification and requisition Required Comply
K DELIVERY TERM AND CONDITION
1 Delivery Time 4 months after PO, DP and Approval Drawing
L GUARANTEE AND SPARE PART
24 months after received or 18 months after final
1 Electrical Warranty (Design & Material) 24 months after delivery
commissioning/acceptance whichever is earlier
2 Penalty 0.1 % per days, max 5% (Base on PO value) Comply
3 2 years Spare parts a Required Comply, 2 years spare part list
M TERMS OF PAYMENT
Down Payment (30%), After Delivery (40%), After installation (25%), Retention after
1 Required Comply
warranty period (5%)