CURRICULUM VITAE
. Name : ----Nitin Sharma------------------
. Date of Birth : 05.01.1980 Citizenship: Indian
. Education : Bachelor of Engineering in Electrical Engineering from
MaharanaPratap Collage of Technology(M.P.) in 2002 with
70 % aggregate marks.
. Other Training : One year training in Thermal Power Plant from
National Power Training Institute, Badarpur,New Delhi
under Ministry of Power (GOI) ( From 2007 to 2008)
with 73 % aggregate marks
. Employment Record:
Period Employer Position held
March 23 to till date R.S Infra Project Pvt. Ltd Manager(TL Project)
HEC Infra Prjects Ltd. Project Manager(TL Project)
Jan.22- March 23
Dec 19- Dec.21 M/s Radhevaram Project In-charge(TL Project)
April 15 – Nov.19 REC Power Distribution Co.Ltd Asst. Project Manager
Jan.2014- April 15 M/s Feedback Infrastructure Ltd M/s Resident Engineer (R-
APDRP)
Dec’2011- Dec 2013 M/s ICT Pvt. Ltd. Astt. Manager(FSP-2)
Nov’08 – Nov’11 M/s Saggi Electricals Company Project Engineer(RGGVY)
April2003 – June2007 Engineers &consultants Pvt. Ltd. Site Engineer(Telecom
TSP)
.
Page 1 of
CURRICULUM VITAE
Detailed Tasks Assigned Name of assignment or project:
1. To be in-charge of the concerned project lot Construction of 2 nos.132 KV D/C
package and coordinate with other experts of Transmission line(R.S. Infra Projects Pvt. Ltd.)
the Consultant’s Team Location: Haryana
2. Report to Team Leader and interact with staff Line Name:220 Kv Nain S/s to 132 KV Jattal
of Client as per contract management S/s(15 KM)
framework 220 Kv Nain to 132 Kv Sec.18 Panipat(27 KM)
3. Supervision of survey work carried out by the Construction of 132 Kv D/C Transmission
Contractor; line(HEC Infra Projects Ltd.)
4. Preparation of project monitoring scheme and
formats for reporting progress of supply and Location: Haryana
installation works Working as Project Manager and monitoring the
5. Supervision of all civil and electrical work as TKC.
construction works, concreting work, erection Name of line:
of poles and so on in accordance with the 1)Shifting of 132kv BBMB Hisar(220kv)-Sirsa-
technical specifications and other works Hanumangarh D/C line(13.84 Km)
contract documents 2)Creation of 132kv S/C line mainly through
6. Keep record of Contractor’s activities and work overhead arrangement & partially through XLPE
progress underground cable from Bhanderi to Guhana
7. Ensure proper administration of Contracts substation.(7.72kms+1.80kms)
8. Assist Team Leader to review the Contractor’s 3)Creation of LILO of 66kv BBMB Ballabhgarh
work program and scheme for the deployment Sector-58 Faridabad line(Tower portion
of plant, equipment and machinery 1.24kms+ Cable portion 2.589kms)
9. Undertake measurement and recording thereof 4)Construction of 132kv D/C line from Mund to
in measurement books including verification of Muana S/s-11.55kms.
BOQ as per term of contract 5)Creation of LILO OF 66KV AT 66KV S/S
10. Coordinate between Contractor and respective Sector-23 Faridabad with underground cable-
designated representatives of the Client for 0.424km
power shutting on feeder to ensure that the 6) 66kv S/C Ford Escort-1 line with underground
work done and get held up on this accent. Cable- 2.5km.
11. Monitoring of the progress of work for timely Client: HVPNL
completion
12. Supervision, scrutiny and approval of final Name of assignment or project:
setting out by the Contractor RGGVY12th Plan, DDUGJY, IPDS (M/s REC
13. Assist Team Leader to update drawings, Power Distribution Co.Ltd.).
setting up quantity and quality control Cost Rs.2361 Cr.
procedures and review of contractor’s method Location: UP
of construction Monitoring of Govt.of India Projects As PMA:
14. Monitoring contractor’s operations including Electrified the 26066 un-electrified habitations.
adherence to safety and environmental Client: UPPCL
requirements
15. Direct Field Engineers for issuing site Name of assignment or project:
instructions RAPDRP-B in M.P, (M/s Feedback
16. Assist Team Leader for preparation of variation Infrastructure Pvt.Ltd.)
orders Cost Rs.250 Crores.
17. Maintain record of working drawings &
construction Year: Jan 2014 – April 15
18. Assist the Field Engineers of the Client for Location: Bhopal, M.P
recording of measurement of completed works
19. Write a daily project diary which shall record all Client: MPPKVVCL
events pertaining to the administration of the Main project features: Erection of 33/11 Kv
Works Contract, requests from and orders Sub-Stations 6 Nos, 33 KV Line 75 Kms, 11 Kv
given to the Contractor, all major activities and Line 121 Kms, LT Line 1840 Kms, DTR 100
men and machinery deployed by the
KVA 475 Nos, 63 KVA 10 Nos 25 KVA 1719
Contractor, and any other information which
Nos(HVDS), Meter Shifting 106843 Nos, Meter
Page 2 of 4
CURRICULUM VITAE
may at a later date be of assistance in Replacement 77404 Nos
resolving queries which may arise concerning
execution of the Works; Positions held: Resident Engineer
20. Assist Team Leader for evaluation of
Contractor’s claims keeping in view
Name of assignment or project:
Contractor’s conformance and compliance with
his contractual obligations. FSP in M.P, (M/s ICT Pvt.Ltd.)
21. Approve materials and sources of materials, Cost Rs.57.49 Crores.
laying methods, sampling and testing
Year: Dec 2011 – Dec 2013
procedures and quality control measures to
ensure the required standards and consistency Location: Rajgarh, M.P
in quality; Client: MPPKVVCL
22. Quality control, verification of alignment of
poles, verification of stringing, alignments in Main project features: Erection of 684 km (228
sub-stations and in all types of lines, inspection Ckm) 11kV line, 278 km LT line, erection of 495
of works, acceptance/rejection of the Nos 25kVA transformers;
completed works Positions held: Astt. Manager
23. Check the laboratory and field tests carried out
by the Contractor, and carry out independent Name of assignment or project:
tests as required; RGGVY in Uttrakhand. (M/s Saggi Electricals
24. Order special tests of materials and/or Ltd)
completed Works, where required, and/or
Cost Rs. 77 Crore
order removal and substitution of improper
materials and/or Works as required in Year:N0v’08 –Nov’11;
consultation with Client. Location: Pouri, Uttrakhand
25. Verification of Contractor’s monthly estimates
of the completed works Main project features: Electrification of 651
26. Verify all quantity measurements and un-electrified villages,1296 km(432 ckm)HT
calculations required for payment purposes line,358 km LT line,610 No.DTR(306-
and ensure that these are carried out in a 25Kva,210-16Kva,94-10Kva)
manner and at the frequencies specified in the
Works Contract documents; Positions held: Project Engineer
27. Assist the Team Leader in the preparation of Name of assignment or project:
interim certificates for works completed
satisfactorily and as per specifications and TSP Project of Telecom (M/s Viz Engineers
qualities mentioned in the contract document &Consultant Pvt. Ltd.)
28. Keep record of minutes of the weekly site Cost Rs. 20 Crore – Delhi Project
meeting Cost Rs. 50 Crore – Kerela Project
29. Preparation of monthly progress reports
Year: Apr’03 – June’07;
30. Final inspection of works
31. Verification of Contractor’s Statements at Location: Delhi & Kerela
completion Client: Aircell Celluler
32. Compilation and verification of “As-Built
Drawings” Main project features: Construct the 11Kv line
33. Preparation of Contract completion Reports from tapping to project site 135 Km(45 ckm),
34. Assist Team Leader in identifying possible Erection & Electrification 1500 Tower ,Erection
reasons for delays, if any, and suggest of shelters, installation & commissioning of
mitigation measures, thereof. DG,AC installation &commissioning of
35. Assist the Team Leader on the completion of
Distribution transformers 120 nos.of 25Kva for
works in particular, by preparing list of defects
to be corrected by the Contractor. Telecom Towers;Providing Earthing for
Tower,DG,AC,Shelters &all other equipment.
Positions held: Site Engineer
Page 3 of 4
CURRICULUM VITAE
Full name : Nitin Sharma
E-Mail Add. : nitin.power13gmail.com
Contact no. : 8392904217
Page 4 of 4