0173-Tl150-Ckd-s-935-A Foundation Drawing - Tower Type Ee6+0 (t.20b) Nen
0173-Tl150-Ckd-s-935-A Foundation Drawing - Tower Type Ee6+0 (t.20b) Nen
FOUNDATION DRAWING
150 KV TOWER TYPE EE6+0
(T.20B)
D
600 1200 1200 600 4. CONCRETE FOR BORED PILE : K-225 (fc' = 18.68 Mpa)
48
5. CONCRETE FOR STRUCTURE : K-225 (fc' = 18.68 Mpa)
D
6. STUB SETTING DIMENSION AND NUMBER OF CLEATS INSTALLED REFER TO TOWER
50
48
APPROVAL DRAWING.
4∅10 4 7. REINFORECEMENT CONNECTION REQUIREMENTS:
COV BAR a. OVERLAP BETWEEN REINFORCEMENT = 48D (48 x DIA. OF BAR)
LEAN CONCRETELEANTHK.
CONCRETE
800
700
100mm b. LENGTH OVER THE UPPER END = 48D (48 x DIA. OF BAR)
8D16
600
THK. 100mm 8 8. FINAL GROUND LEVEL SWITCHYARD : EL. ± 0.00 M = EL. + 27.00 M
50
COMPACTED SAND LONG BAR
700
800
THK. 100mm
1400
COMPACTED SAND
BOTTOM OF
50
PILECAP
400
THK. 100mm
50
50 700700 50 D
50 50 BOTTOM OF
1200
800800
L=11500
4 1 : 20
SECTION - B D 75
1 : 20
∅10-150
3600
800
24D19
5
A LONG BAR
∅10-150
STIRRUP
6
STIRRUP BAR
L=11500
24D19
5
1200
50
LONG BAR
800
700
∅10-150
1 STIRRUP
6 6 SECTION - D
1400
1 : 20
50
D19-150 TOP BAR 400
50 700 50
800
D19-150 BOT BAR 2 BOREDPILE DETAIL
50
5
600
SECTION - C
1 : 20 1 : 35
2
800
700
8D16 8
LONG BAR
1400 800 1400
400
1
BACK TO BACKT AT TOP OF STUB
50
PILE CAP REINFORCEMENT PLAN 75
∅10-150
9
Scale 1 : 50 50 700 50 STIRRUP BAR
800
400 6 SECTION - D
5 SECTION - C
1 : 20
L L
1 : 20 2 BOREDPILE DETAIL
1 : 35
800
4∅10
DIRECTION
7
LINE
COV BAR EL. + 25.00 M
YT
YB
24D19 B ∅10-150
5 LONG 6 TOWER
BISECTRICE
XB
XT
CENTER
C
COMPACTED SOIL C
EL. +23.50 M C C
B
DEFINITION
A POINT
D19-150 1
700
A
C
NOTE : DISTANCE A, B, C, D REFER TO STUB SETTING DESAIN TOWER
TOP BAR
EL.+22.80 M C
1500
B
B
C
3-D19 C A
800
SIDE BAR
3 A
B
EL. +22.00 M A
A
4 SPACER A
C
4 BAR LEAN CONCRETE PT. PLN (PERSERO)
D19 D19-150
B
B
Jl. Ehave - Gandul, Kec. Cinere Kota Depok 16514
B A
C TWINK CONCORTIUM
C
7 BORE PILE A
PT. TWINK INDONESIA PT. MULTI FABRINDO GEMILANG
DIA. 400 MM
B
3 SECTION - A - 1 : 20 1 : 30
1 : 35 1 : 60 0173-TL150-CKD-S-935-A A 01/01