0173-Tl150-Ckd-s-935-A Foundation Drawing - Tower Type Ee6+0 (t.20b) Nen

The document outlines the foundation drawing for a 150 kV tower type EE6+0 related to the construction of the GITET 500 kV Cikande project. It includes detailed specifications for materials, dimensions, and reinforcement requirements. The drawing is a collaborative effort by PT. Twink Indonesia and PT. Multi Fabrindo Gemilang, dated March 6, 2024.

Uploaded by

rinracer8
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
46 views2 pages

0173-Tl150-Ckd-s-935-A Foundation Drawing - Tower Type Ee6+0 (t.20b) Nen

The document outlines the foundation drawing for a 150 kV tower type EE6+0 related to the construction of the GITET 500 kV Cikande project. It includes detailed specifications for materials, dimensions, and reinforcement requirements. The drawing is a collaborative effort by PT. Twink Indonesia and PT. Multi Fabrindo Gemilang, dated March 6, 2024.

Uploaded by

rinracer8
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

TWINK CONCORTIUM

PT. PLN (PERSERO)


UNIT INDUK PEMBANGUNAN JAWA BAGIAN BARAT PT. TWINK INDONESIA
Jl. Ehave - Gandul, Kec. Cinere Kota Depok 16514
PT. MULTI FABRINDO GEMILANG

FOUNDATION DRAWING
150 KV TOWER TYPE EE6+0
(T.20B)

GITET 500 kV CIKANDE

PEKERJAAN PEMBANGUNAN GITET 500 KV CIKANDE BESERTA OUTLET TERKAIT


0173.PJ/DAN.01.03/F01020000/2024, TANGGAL 06 MARET 2024
TWINK CONCORTIUM REVISION
(PT.TWINK INDONESIA - PT. MULTI FABRINDO GEMILANG)
TWINK CENTRE 7TH FLOOR A
JL. KAPTEN PIERE TENDEAN NO. 82 JAKARTA 12790
LENGTH OVER THE UPPER END NOTES:
1. ALL DIMENSIONS ARE IN MILIMITERS UNLESS OTHERWISE STATED, LEVELS IN
4∅10 4 (48D) METER.
2. REINFORCEMENT :
3600 COV BAR LENGTH OVER THE UPPER END D ≥ 13 MM = BJTD 42 (U-42) - DEFORMED
(48D) Ø ≤ 13 MM = BJTP 28 (U-28) - PLAIN
3. LEAN CONCRETE : K-100 (fc' = 8.30 Mpa)

D
600 1200 1200 600 4. CONCRETE FOR BORED PILE : K-225 (fc' = 18.68 Mpa)

48
5. CONCRETE FOR STRUCTURE : K-225 (fc' = 18.68 Mpa)

D
6. STUB SETTING DIMENSION AND NUMBER OF CLEATS INSTALLED REFER TO TOWER

50

48
APPROVAL DRAWING.
4∅10 4 7. REINFORECEMENT CONNECTION REQUIREMENTS:
COV BAR a. OVERLAP BETWEEN REINFORCEMENT = 48D (48 x DIA. OF BAR)
LEAN CONCRETELEANTHK.
CONCRETE

800
700
100mm b. LENGTH OVER THE UPPER END = 48D (48 x DIA. OF BAR)
8D16
600
THK. 100mm 8 8. FINAL GROUND LEVEL SWITCHYARD : EL. ± 0.00 M = EL. + 27.00 M

50
COMPACTED SAND LONG BAR

700
800
THK. 100mm

1400
COMPACTED SAND
BOTTOM OF

50
PILECAP

400
THK. 100mm

50
50 700700 50 D
50 50 BOTTOM OF
1200

800800

D19-150 TOP BAR


PILECAP

D19-150 BOT BAR


2
1
4 SECTION - B

L=11500
4 1 : 20
SECTION - B D 75
1 : 20
∅10-150
3600

800
24D19
5
A LONG BAR
∅10-150
STIRRUP
6
STIRRUP BAR

L=11500
24D19
5
1200

50
LONG BAR

800
700
∅10-150
1 STIRRUP
6 6 SECTION - D

1400
1 : 20

50
D19-150 TOP BAR 400
50 700 50
800
D19-150 BOT BAR 2 BOREDPILE DETAIL

50
5
600

SECTION - C
1 : 20 1 : 35
2

800
700
8D16 8
LONG BAR
1400 800 1400

400
1
BACK TO BACKT AT TOP OF STUB

50
PILE CAP REINFORCEMENT PLAN 75
∅10-150
9
Scale 1 : 50 50 700 50 STIRRUP BAR

800
400 6 SECTION - D
5 SECTION - C
1 : 20
L L

1 : 20 2 BOREDPILE DETAIL
1 : 35
800

4∅10

DIRECTION
7

LINE
COV BAR EL. + 25.00 M

YT
YB
24D19 B ∅10-150
5 LONG 6 TOWER
BISECTRICE

XB
XT
CENTER

BAR STIRRUP DIRECTION


1500

BACK FILL WITH C

C
COMPACTED SOIL C
EL. +23.50 M C C

B
DEFINITION
A POINT

D19-150 1
700

A
C
NOTE : DISTANCE A, B, C, D REFER TO STUB SETTING DESAIN TOWER

TOP BAR
EL.+22.80 M C
1500

B
B
C

3-D19 C A
800

SIDE BAR
3 A

B
EL. +22.00 M A
A

4 SPACER A

C
4 BAR LEAN CONCRETE PT. PLN (PERSERO)
D19 D19-150
B

UNIT INDUK PEMBANGUNAN JAWA BAGIAN BARAT


BOT BAR
2 THK. 100mm
C

B
Jl. Ehave - Gandul, Kec. Cinere Kota Depok 16514
B A

SAND LAYER 0173.PJ/DAN.01.03/F01020000/2024 Date : 06 Maret 2024


A

THK. 100 mm PEMBANGUNAN GITET 500 KV CIKANDE


11500

COMPACTED SOIL BESERTA OUTLET TERKAIT


A

C TWINK CONCORTIUM
C

7 BORE PILE A
PT. TWINK INDONESIA PT. MULTI FABRINDO GEMILANG
DIA. 400 MM
B

A GITET 500KV CIKANDE


FOUNDATION DRAWING - TOWER TYPE EE6+0
EL. +10.50 M (T.20B)

600 1200 1200 600


3600 PT. TWINK INDONESIA

3 SECTION - A - 1 : 20 1 : 30
1 : 35 1 : 60 0173-TL150-CKD-S-935-A A 01/01