1 2 3 4 5 6 7 8 9 10 11 12
H
1 2 3 4 H
11040
450
3795 3105 3910 450
450
S1 S1 S1
A
G S1 G
S1 S1 S1
2060
1-Y8 SCHEDULE OF SLABS
Ext Ast1 Ast2
Slab Slab (Parallel to Short span
S.No (Parallel to Long span
Panel Thickness direction) direction)
3280
1 S1 125 Y8 @ 175mm c/c Y8 @ 175mm c/c
F F
4775
* 1-Y8 EXTRA BAR AT TOP AT SUPPORTS BETWEEN
S1 CRANCKED BARS
S1
7225
S1
S1
1495
E E
//APPROVED//
B Sd/-
1-Y8 Dt: 14-09-2022.
Ext
D
ENGINEER-IN-CHIEF (PR), D
2225
STAIRCASE HYDERABAD
S1 //TRUE COPY//
C
450
S1 S1
C
S1 S1 C
1-Y8 Ext DEPUTY EXECUTIVE ENGINEER
1535
450
450
DESIGNS.
600 600 GOVERNMENT OF TELANGANA
B PANCHAYAT RAJ B
ENGINEERING DEPARTMENT
GROUND FLOOR ROOF SLAB LAYOUT @ + 3.30M Lvl NAME OF WORK:- CONSTRUCTION OF NEW
GRAM PANCHAYAT BUILDINGS (NORTH FACING)
GRANT : MGNREGS
NOTE: No.of Floors : GROUND FLOOR ONLY
S
A Read this drawing along with General notes Drg. Title : GROUND FLOOR ROOF SLAB REV A
LAYOUT @ + 3.30M Lvl (R0)
W
Drawing no. 2223 / AEE 3 / DEE 2 / Designs / Buildings / MGNREGS / GP BUILDING / E
Drg.No : 2223 / AEE 3 / DEE 2 / Designs / Buildings / MGNREGS
TYPE DESIGN / G / 2022 / SD-01, Dt: 14-09-2022. N
/ GP BUILDING / TYPE DESIGN / G / 2022 / SD-08, Dt:14-09-2022.
1 2 3 4 5 6 7 8 9 10 11 12