8. Scheduled the remaining works to be done in Sector 39 site, in 26-06-2025 27-06-2025
MS-Project after the site visit.
9. Drafted an agreement to be signed between the client and 27-06-2025 27-06-2025
I<
contractor
10. False ceiling for the Master Bedroom for the Sector 39 - 28-06-2025 30-06-2025 �
residence
11. Looping drawing for the ground floor of Sector 39 - residence 28-06-2025 01-07-2025
J---
?���
Architect: PANKAJ NAGALIA
COA No.: CA/90/12781
Signature of the Student with date Signature of the Architect/ In-Charge with Seal
Note: Name of the Architect Mr. Pankaj Nagalia
The Exact date of Commencement of work and completion of work should be clearly mentioned in the duration column
This report duly filled In should reach the Practical Training Programme Coordination not later than 10 1• of every month
This report must be signed by the senior architect of the firm/ organization/ company COA Registration Number: CA/1990/12781
Make copies of this sheet to sent the progress report for every month. Add additional sheets if needed.