ARRANGEMENTS OF VERTICAL PILE LOAD TEST (INITIAL) AT ODISHA
Design Load: 240 MT Test Load: 240x2.5=600 MT Kentledge Load: 750M.Ton
(As per IS 2911 Part – IV) Dai of Pile= 1200mm
Sand Bags
3.15M Loose Sand
ISMB 450 (17 Nos.)
PRIMARY GIRDER --------- ISMB 600-4 NOS.12.2 M LONG
Steel/Sleeper
.
Sand Filled
Bags
Dial Gauge Datum bar
1000 MT Hydraulic Jack 1 no.
Hydraulic Pump
M.S. Plate
Test Pile Pressure Gauge
Hydraulic Manifold
DETAILS OF KENTLEDGE 12 m (A1)
(A + A2 +₁ × ₂) 11.5m (A2)
1 12 m (A1)
. .
= (144+ 132.25+√144 × 132.25)= (144+ 132.25+ 138) =434.961m3 11.5m (A2)
Avg. weight of wet sand: 1700 Kg. /M3
Total weight of wet sand: (434.961M3× 1700 Kg. /M3) = 739.433MT.
ISMB 600 : 4 nos.×12.20 m@ 122.6 kg/m = 5.983MT
ISMB 400 : 17 nos.×12.20 m @ 72.40kg/m = 15.015MT
Reinforcement Steel :L.S =1.000 MT.
Total Weight of Kentledge=761.566MT > 750M.T.
DETAILS OF JACK
Jack : 1000 M.T. Capacity 1 No. Hydraulic
Jack With pump
Ram dia : 50.00 cm.
Area of Ram : 1963.75 cm2
DETAILS OF PRESSURE GAUGE
Gauge : “MASTA“ Made in England
Least Count : 20 kg/cm2
Per Div : 39.275M.T.
DETAILS OF DIAL GAUGE
Gauge : “Mitutoyo”Made in Japan
Least Count : 0.01 mm
Range : 0- 50mm
No of dial gauge : 4 Nos.
Design Load = 240MT
Load application & increment = 240x 20% = 48.00 MT.
Test load = (240x 2.5) = 600MT
LOAD INCREMENT CHART
LOAD IN DIVISION LOAD IN M.TON.
0 DIV 0.00
1 DIV 39.275
2 DIV 78.550
3 DIV 117.825
4 DIV 157.100
5 DIV 196.375
6 DIV 235.650
7 DIV 274.925
8 DIV 314.200
9 DIV 353.475
10 DIV 392.750
11 DIV 432.025
12 DIV 471.300
13 DIV 510.575
14 DIV 549.850
15 DIV 589.125
15.5 DIV 608.762