0% found this document useful (0 votes)
36 views23 pages

Scaffold Leg FT Basis - Imperial

The document is a Field Reference Guide for scaffolding in the Oil and Gas industry, detailing various types of scaffolds, their measurements, and calculation methods. It emphasizes the importance of optimizing asset performance and provides guidelines for estimating work activity and productivity. Additionally, it includes information on modifications, conversion tables, and condition factors affecting scaffolding work rates.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
36 views23 pages

Scaffold Leg FT Basis - Imperial

The document is a Field Reference Guide for scaffolding in the Oil and Gas industry, detailing various types of scaffolds, their measurements, and calculation methods. It emphasizes the importance of optimizing asset performance and provides guidelines for estimating work activity and productivity. Additionally, it includes information on modifications, conversion tables, and condition factors affecting scaffolding work rates.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 23
FrFPrrrrrererere ( ARCADIS | ma" SCAFFOLDING IMPERIAL Scaffold Leg Ft basis ONS To) NOISE Woe te a Cnr eae Tm =i le etat colt] Talo _ generating value for our clients, our people and the community. We ‘do this by helping our clients obtain optimum value from money ‘Spent on operating, using and owning assets, and delivering _ optimised asset performance and availability. Utilizing over 100 years of experience and expertise in the Oil and Gas industry, working for many of the major national and international oil companies, we help clients improve margins and drive efficiency across their portfolio of investments throughout the life cycle of the assets, anywhere in the world. We work with clients to improve their business margins by maximizing project and-program values for investments and increasing POET and performance of assets in the Oil, Gas and Chemical industries. Recognizing that knowledge retention and subsequent utilization is the corner stone of all improvements, we have-collated-baseline information covering all CAPEX and OPEX activities for use by our fel Tal toe This Field Reference Guide is part of a suite of publications intended for use by our people and our clients and is intended to support work activity estimating, and baselining productivity performance @Arcadis (UK) Limitedpreviously EC Harris ( as permitted by the Copyright; Designs and Pa be reproduced or transmitted, uke la) of any nature without the prio UK) Limited) 2014 SCAFFOLDING Scaffold Groups General Scaffolds (measure = Leg Feet) Independent Independent Tower Birdcage (Dance Floor) Mobile Tower (Rolling) ee ee Special Scaffolds (measure = Square Feet) Cantilever (Knee out) Platform Bridging Suspended (Hanging) Ramps Miscellaneous (measure = various) FrFPrFPrrrreree SCAFFOLD TYPE: INDEPENDENT Plan View ~>,,Vertical Standards ~~" (legs) 7 Elevation a Height ee Free standing scaffold with no internal Seopa vertical standards (legs!) and which is Seed not a tower. Unit of CET ett ialg Loge? Height to top of decking x no. of vertical Calculation sianiaitie All tubes, clamps, base plates, screw What’s included jacks, horizontals, verticals, diagonal bracing, etc. Use an independent scaffold up to 8ft wide for scaffolding around vessels, tanks, columns, equipment and the like. Decking measured separately bores icy Page 4 SCAFFOLD TYPE: INDEPENDENT TOWER Internal Vertical --"" Standards (legs) Elevation ‘ : Height + Scaffold Similar to a Birdcage Scaffold, but with a potter gl slit a) plan area that does not exceed 100ft? Unit of becca Loa ree Height to top of decking x no. of vertical standards All tubes, clamps, base plates, screw What's included jacks, horizontals, verticals, diagonal bracing, etc. ery Decking measured separately. Plan View forte Tirely) eee | FFPFRFRSBRRE RVD SCAFFOLD TYPE: BIRDCAGE (DANCE FLOOR) Internal Vertical Plan View ---""" "Standards (legs) Elevation Freestanding scaffold with a plan area Scaffold exceeding 100ft?, and is not deemed Description independent (i.e. has internal vertical standards). Unit of Ter tal Logiee Height to top of decking x no. of vertical standards All tubes, clamps, base plates, screw What’s included jacks, horizontals, verticals, diagonal bracing, etc. Comments Decking measured separately. Calculation Page 6 SCAFFOLD TYPE: MOBILE (ROLLING) TOWER Plan View Elevation / : Height Pe Scaffold Similar to independent scaffold, but Description provided with wheels Unit of LER tis Leg res Height to top of decking x no. of vertical fer TetiEtitelg) etanciatid All tubes, clamps, base plates, screw What's included jacks, horizontals, verticals, diagonal bracing, etc. Comments Decking measured separately. Phe RRR eee ee FrPrrerereeere SCAFFOLD TYPE: CANTILEVER (KNEE OUT) a z i o Norm includes any scaffolding built above up to 1 lift (6% ft high) Elevation -Y. Scaffold A scaffold that is raked out from a Description structure. Unit of 2S Square Feet on plan ee ore Plan length x Plan width = Area, for one All tubes, clamps, horizontals, verticals, og 2a ied ie diagonal bracing, etc. Norm applies to signle lift (up to 6% ft high) - any subsequent lifts shall be Comments measured as the appropriate category of general scaffolding. Decking measured separately. Page 8 SCAFFOLD TYPE: PLATFORM Elevation > Norm includes any scaffolding built above up to 1 lift (6% ft high) Scaffold erected on a structure. en Square Feet on plan Plan length x Plan width = Area, for one Calculation lift. All tubes, clamps, horizontals, verticals, diagonal bracing, etc. What's included Norm applies to signle lift (up to 6% ft high) - any subsequent lifts shall be Comments measured as the appropriate category of general scaffolding. Decking measured separately. Roe eRe eee FREBRBERSBERE BS SCAFFOLD TYPE: SUSPENDED (HANGING) ! Norm includes any Elevation scaffolding built above | up to 1 lift (6% ft high) ee Reectiition Scaffold suspended from a structure. read oan ‘Square Feet on plan eee Pian lott

You might also like