0% found this document useful (0 votes)
9 views2 pages

EFLU Variation Letter

The document contains two requests from Buildskill Projects Pvt Ltd to the Project Manager at UPRNN Ltd for approval of variations and extra items related to electrical works for the MBC hostel at EFLU. Each request references specific work orders and highlights deviations from the original BOQ items, urging for prompt approval to ensure smooth project completion. Attached to each request is a variation statement with proposed items for consideration.

Uploaded by

cuprnn
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views2 pages

EFLU Variation Letter

The document contains two requests from Buildskill Projects Pvt Ltd to the Project Manager at UPRNN Ltd for approval of variations and extra items related to electrical works for the MBC hostel at EFLU. Each request references specific work orders and highlights deviations from the original BOQ items, urging for prompt approval to ensure smooth project completion. Attached to each request is a variation statement with proposed items for consideration.

Uploaded by

cuprnn
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

To, Date: 10.06.

2020
Project Manager,
UPRNN Ltd, ESI Hospital,
Sanath Nagar,
Hyderabad – 500038

Dear Sir,
Sub: Request for approval of variation and extra item for the following work orders
for the work of Electrical works for MBC hostel at EFLU.
Ref No: 1) Work Order No.223 Dated: 22.05.2020

With Reference to the above work orders, we are executing the works at site. In
that we have got some deviations as per the estimate submitted from the BOQ Items
sanctioned. Hence we request you to find the below variation statement along with proposed
items as per the site.
Hence kindly approve the same at the earliest inorder for the smooth flow of work
completion..
Thanking you

Attached: Annexures I
Yours faithfully,
For Buildskill Projects Pvt Ltd

Director
To, Date: 28.03.2020
Project Manager,
UPRNN Ltd, ESI Hospital,
Sanath Nagar,
Hyderabad – 500038

Dear sir,
Sub: Request for approval of variation and extra item for the following work order
for the work of Electrical works for MBC hostel at EFLU.
Ref No: 1) Work Order No.56 Dated: 30.01.2020

With Reference to the above work order, we are executing the works at site. In that
we have got some deviations as per the estimate submitted from the BOQ Items sanctioned.
Hence we request you to find the below variation statement along with proposed items as per
the site.
Hence kindly approve the same at the earliest in order for the smooth flow of work
completion..
Thanking you

Attached: Annexures I
yours faithfully,
For Buildskill Projects Pvt Ltd

Director