0% found this document useful (0 votes)
6 views4 pages

Boiler Burner Plant Questionnaire

The document is a questionnaire designed for establishing a new plant in the boiler and burner industry, covering various aspects such as general information, location details, legal compliance, product line, design and technology, and more. It seeks detailed responses regarding the plant's objectives, layout, machinery, manpower, quality and safety measures, marketing strategies, financial planning, and risk assessment. This comprehensive approach ensures that all critical factors are considered for successful plant establishment.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views4 pages

Boiler Burner Plant Questionnaire

The document is a questionnaire designed for establishing a new plant in the boiler and burner industry, covering various aspects such as general information, location details, legal compliance, product line, design and technology, and more. It seeks detailed responses regarding the plant's objectives, layout, machinery, manpower, quality and safety measures, marketing strategies, financial planning, and risk assessment. This comprehensive approach ensures that all critical factors are considered for successful plant establishment.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

NEW PLANT ESTABLISHMENT QUESTIONNAIRE - BOILER & BURNER INDUSTRY

1. GENERAL INFORMATION

- Name of the proposed company/plant:

- Nature of products: (e.g., Industrial Burners, Steam Boilers, Thermic Fluid Heaters)

- Type of plant: [ ] Manufacturing [ ] Assembly [ ] Testing [ ] R&D

- Objective of plant setup:

- Expected date of commissioning:

2. LOCATION DETAILS

- Proposed plant location:

- Total plot area and built-up area:

- Land ownership: [ ] Owned [ ] Leased

- Accessibility to:

- Major roads/highways:

- Suppliers:

- Customers:

- Proximity to industrial zone or SEZ?

3. LEGAL & REGULATORY COMPLIANCE

- Company registration number:

- Applicable approvals:

- Factory license:

- Boiler Registration (IBR certification):

- Pollution Control Board (PCB) NOC:

- Fire safety NOC:

- Explosive license (for burner fuel handling):

- Local zoning and land use approvals:

- Labour and safety law compliance?

4. PRODUCT LINE

- Type of boilers: [ ] Water Tube [ ] Fire Tube [ ] Packaged [ ] Others

- Type of burners: [ ] Oil-fired [ ] Gas-fired [ ] Dual-fuel [ ] Industrial


- Custom vs standard product ratio:

- Annual production capacity:

- Product certifications planned: (CE, BIS, ISO, IBR, etc.)

5. DESIGN AND TECHNOLOGY

- In-house design capabilities? [ ] Yes [ ] No

- Software used for design and analysis (e.g., AutoCAD, SolidWorks, CFD tools):

- Any technology collaboration/licensing:

- Plan for R&D or product innovation?

6. PLANT LAYOUT & INFRASTRUCTURE

- Plant layout plan prepared? [ ] Yes [ ] No

- Major sections:

- Raw material storage

- Fabrication & welding

- Machining

- Assembly

- Painting/coating

- Burner calibration/test bench

- Quality control

- Packaging & dispatch

- Crane and material handling equipment required?

7. MACHINERY & EQUIPMENT

- List of key machines: (e.g., CNC, welding machines, bending, hydraulic press)

- Testing equipment for:

- Hydro test

- Combustion efficiency

- Emission analysis

- Automation and control systems required?

8. UTILITIES & ENERGY

- Power requirement (in kVA):


- Source of power: [ ] Grid [ ] DG Set [ ] Solar backup

- Water requirement (litres/day):

- Compressed air system needed?

- Fuel storage system for burner testing (LPG/FO/diesel)?

9. RAW MATERIALS

- List of primary raw materials: (e.g., boiler-grade steel, tubes, insulation, control panels, valves, burners,

motors)

- Sourcing strategy: [ ] Local [ ] Imported

- Inventory and storage strategy:

- Any preferred vendors or long-term contracts?

10. MANPOWER PLANNING

- Number of employees:

- Skilled workers:

- Engineers/designers:

- QA/QC staff:

- Admin/support:

- Required training programs (especially for welding, testing, and safety):

- Labor union regulations (if any):

11. QUALITY & SAFETY

- Quality systems: [ ] ISO 9001 [ ] IBR-approved shop

- Material traceability and inspection plan?

- Safety standards for:

- Pressure testing

- Fuel handling (burners)

- Welding and fabrication

- PPE and EHS systems:

12. MARKETING & DISTRIBUTION

- Target sectors: [ ] Food [ ] Pharma [ ] Chemicals [ ] Textiles [ ] Power [ ] HVAC

- Domestic vs export ratio:


- Distribution strategy: [ ] In-house sales [ ] Dealers [ ] EPC contractors

- Warranty, service & AMC model planned?

13. FINANCIAL & TIMELINE PLANNING

- Estimated project cost:

- Land & building:

- Machinery:

- Licensing & legal:

- Working capital:

- Sources of funding: [ ] Own [ ] Loan [ ] Subsidy

- Project implementation timeline:

- Land acquisition:

- Civil construction:

- Machine procurement:

- Trial run:

- Full production:

14. RISK ASSESSMENT & SUSTAINABILITY

- Key risks:

- Regulatory delays

- Supply chain issues

- Skilled labor availability

- Environmental plans:

- Waste disposal

- Noise and air pollution control

- Sustainable practices

You might also like