Scrum Open 1

The document details the results of a Scrum Open assessment taken on October 16, 2024, where the participant scored 60% with 18 correct and 12 incorrect answers. It includes various questions related to Scrum principles, roles, and practices, along with feedback for each question. The document encourages reviewing The Scrum Guide on Scrum.org for improvement before retaking the assessment.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views30 pages

Scrum Open 1

The document details the results of a Scrum Open assessment taken on October 16, 2024, where the participant scored 60% with 18 correct and 12 incorrect answers. It includes various questions related to Scrum principles, roles, and practices, along with feedback for each question. The document encourages reviewing The Scrum Guide on Scrum.org for improvement before retaking the assessment.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 30

10/16/24, 11:00 AM Scrum Open

Scrum Open

Percentage: 60%

Duration: 00:10:50

Date started: Wed 16 Oct '24 11:48

Date finished: Wed 16 Oct '24 11:59

Feedback
Thank you for taking the Open assessment of Scrum. Please review The Scrum
Guide on Scrum.org and take this assessment again to improve your score.

Ken Schwaber

Continue here

Return to Scrum.org

all questions 18 correct 12 incorrect 0 bookmarked

https://www.classmarker.com/online-test/start/results/?quiz=3qg5fac7589c0416 1/30
10/16/24, 11:00 AM Scrum Open

Question 1 of 30

The Developers should have all the skills needed to:

(choose the best answer)

A. Do all of the development work, except for specialized testing that requires
additional tools and environments.

B. Turn the Product Backlog items they select into an Increment of a useful and
valuable product.

C. Complete the project as estimated when the date and cost are committed to
the Product Owner.

Feedback
The Developers are a group of professionals who do the work of delivering an Increment
of done product at the end of each Sprint. As a team, Developers have all of the skills
necessary to create a product Increment.

https://www.classmarker.com/online-test/start/results/?quiz=3qg5fac7589c0416 2/30
10/16/24, 11:00 AM Scrum Open

Question 2 of 30

Which statement best describes Scrum?

(choose the best answer)

A. A framework for creating complex products in complex environments.

B. A defined and predictive process that conforms to the principles of


Scientific Management.

C. A complete methodology that defines how to develop software.

D. A cookbook that defines best practices for software development.

Feedback
Scrum is a lightweight framework that helps people, teams and organizations generate
value through adaptive solutions for complex problems.

https://www.classmarker.com/online-test/start/results/?quiz=3qg5fac7589c0416 3/30
10/16/24, 11:00 AM Scrum Open

Question 3 of 30

When does the next Sprint begin?

(choose the best answer)

A. Immediately following the next Sprint


Planning.

B. Immediately after the conclusion of the


previous Sprint.

C. When the Product Owner is ready.

D. Next Monday.

Feedback
A new Sprint starts immediately after the conclusion of the previous Sprint.

https://www.classmarker.com/online-test/start/results/?quiz=3qg5fac7589c0416 4/30
10/16/24, 11:00 AM Scrum Open

Question 4 of 30

An organization has decided to adopt Scrum, but management wants to change the
terminology to fit with terminology already used. What will likely happen if this is done?

(choose the best answer)

A. Without a new vocabulary as a reminder of the change, very little change


may actually happen.

B. The organization may not understand what has changed with Scrum and the
benefits of Scrum may be lost.

C. Management may feel less anxious.

D. All of the above.

https://www.classmarker.com/online-test/start/results/?quiz=3qg5fac7589c0416 5/30
10/16/24, 11:00 AM Scrum Open

Question 5 of 30

When might a Sprint be cancelled?

(choose the best answer)

A. When the Sprint Goal becomes obsolete.

B. When it becomes clear that not everything will be finished by the


end of the Sprint.

C. When the sales department has an important new opportunity.

D. When the Developers feel that the work is too hard.

Feedback
A Sprint could be cancelled if the Sprint Goal becomes obsolete. Only the Product
Owner has the authority to cancel the Sprint.

https://www.classmarker.com/online-test/start/results/?quiz=3qg5fac7589c0416 6/30
10/16/24, 11:00 AM Scrum Open

Question 6 of 30

Who is required to attend the Daily Scrum?

(choose the best answer)

A. The Scrum Master and


Product Owner.

B. The Developers and Scrum


Master.

C. The Developers.

D. The Developers and Product


Owner.

E. The Scrum Team.

Feedback
Only the people doing the work described on the Sprint Backlog need to inspect and
adapt at the Daily Scrum. If the Product Owner or Scrum Master are actively working on
items in the Sprint Backlog, they participate as Developers, they will need to be at the
Daily Scrum.

https://www.classmarker.com/online-test/start/results/?quiz=3qg5fac7589c0416 7/30
10/16/24, 11:00 AM Scrum Open

Question 7 of 30

What is the function or purpose of Management in Scrum?

(choose the best answer)

A. Identify and remove people that are not working hard enough.

B. Monitor the progress of the Developers on the Scrum Team.

C. Support the Product Owner with insights and information into high value
product and system capabilities. Support the Scrum Master to encourage
organizational change that fosters empiricism, self-management, bottom-up
intelligence, and intelligent product delivery.

D. Continually monitor staffing levels of the Scrum Team.

Feedback
Management has no official role or accountability on a Scrum Team. However,
management external to the Scrum Team is relevant in setting the vision and strategy to
guide the overall direction of the organization.

https://www.classmarker.com/online-test/start/results/?quiz=3qg5fac7589c0416 8/30
10/16/24, 11:00 AM Scrum Open

Question 8 of 30

What is the main reason for the Scrum Master to be at the Daily Scrum?

(choose the best answer)

A. To gather status and progress information to report to management.

B. To write down any changes to the Sprint Backlog, including adding new
items, and tracking progress on the burn-down.

C. They do not have to be there; they only need to ensure the Developers have
a Daily Scrum.

D. To make sure every team member answers the three questions.

Feedback
The Scrum Master only ensures that all Scrum events take place and are positive,
productive, and kept within the timebox.

https://www.classmarker.com/online-test/start/results/?quiz=3qg5fac7589c0416 9/30
10/16/24, 11:00 AM Scrum Open

Question 9 of 30

The timebox for a Daily Scrum is?

(choose the best answer)

A. 15 minutes for a 4-week sprint. For shorter Sprints it is


usually shorter.

B. 4 hours.

C. The same time of day every day.

D. 15 minutes.

E. Two minutes per person.

Feedback
The Daily Scrum is always a 15-minute event. Because it is a short event, the timebox is
not influenced by the Sprint length.

https://www.classmarker.com/online-test/start/results/?quiz=3qg5fac7589c0416 10/30
10/16/24, 11:00 AM Scrum Open

Question 10 of 30

Who is responsible for managing the progress of work during a Sprint?

(choose the best answer)

A. The Scrum Master.

B. The most junior member of the team.

C. The Product Owner.

D. The Developers.

Feedback
The Developers use the Daily Scrum to inspect progress toward the Sprint Goal and to
inspect how progress is trending toward completing the work in the Sprint Backlog.

https://www.classmarker.com/online-test/start/results/?quiz=3qg5fac7589c0416 11/30
10/16/24, 11:00 AM Scrum Open

Question 11 of 30

Which of the following are examples of a Scrum Team practicing Scrum poorly or not exhibiting
traits of a self-managing Scrum Team?

(choose the best three answers)

A. The Developers have all the skills they need to create a valuable,
useful Increment.

B. Stakeholders attend the Daily Scrum to check on the Scrum Team’s


progress.

C. The Developers create their own Sprint Backlog, reflecting all work
that is required to meet the Definition of Done.

D. The Developers are collaboratively selecting their own work during the
Sprint.

E. The Developers invite external stakeholders to the Sprint Planning to


ask them how to turn a Product Backlog item into an Increment via a
complete and detailed Sprint Backlog.

F. The Developers are working within the boundaries of their


organizations functional description and nicely handing off work from
analyst to developer to tester to integration.

You did not select all available correct options.

Feedback
The Daily Scrum is for the Developers. It should not be used by
external stakeholders to check progress.
During Sprint Planning the Scrum Team should be crafting the Sprint
Goal based on the set of Product Backlog items selected for the Sprint.
The Developers identify the necessary work to meet the Sprint Goal.
Scrum Team members do not have titles, and no sub-teams; such as
testing, architecture, or operations are recognized. Accountability

https://www.classmarker.com/online-test/start/results/?quiz=3qg5fac7589c0416 12/30
10/16/24, 11:00 AM Scrum Open

belongs with the Scrum Team as a whole, regardless of whether team


members have specialized skills.

Question 12 of 30

When does a Developer become accountable for the value of a Product Backlog item selected
for the Sprint?

(choose the best answer)

A. During the Daily Scrum.

B. Never. The entire Scrum Team is accountable for creating value every Sprint.

C. Whenever a team member can accommodate more work.

D. At the Sprint Planning Event.

Feedback
All members of the Scrum Team share in the accountability for creating value every
Sprint.

https://www.classmarker.com/online-test/start/results/?quiz=3qg5fac7589c0416 13/30
10/16/24, 11:00 AM Scrum Open

Question 13 of 30

Which statement best describes the Sprint Review?

(choose the best answer)

A. It is a demo at the end of the Sprint for everyone in the organization to check
on the work done.

B. It is a mechanism to control Developer activity during a Sprint.

C. It is when the Scrum Team and stakeholders inspect the outcome of a Sprint
and figure out what to do next.

Feedback
Every event in Scrum, besides the Sprint, which is a container for the other events, is an
opportunity to Inspect and Adapt.

Question 14 of 30

True or False: It is mandatory that the product Increment be released to production at the end
of each Sprint.

True

False

Feedback
The product Increment should be usable at the end of every Sprint, but it does not have
to be released.

https://www.classmarker.com/online-test/start/results/?quiz=3qg5fac7589c0416 14/30
10/16/24, 11:00 AM Scrum Open

Question 15 of 30

Which of the following services is appropriate for a Scrum Master in regard to the Daily Scrum?

(choose the best answer)

A. Lead the discussions of the Developers.

B. Teach the Developers to keep the Daily Scrum within the 15 minute timebox.

C. Ensure that all 3 questions have been answered.

D. All answers apply.

E. Facilitate in a way that ensures each team member has a chance to speak.

Feedback
The Scrum Master ensures that the Developers have the event, but the Developers are
responsible for conducting the Daily Scrum. The Scrum Master teaches the Developers
to keep the Daily Scrum within the 15-minute timebox. The Scrum Master enforces the
rule that only members participate in the Daily Scrum.

https://www.classmarker.com/online-test/start/results/?quiz=3qg5fac7589c0416 15/30
10/16/24, 11:00 AM Scrum Open

Question 16 of 30

When should a Developer on a Scrum Team be replaced?

(choose the best answer)

A. As needed, with no special allowance for changes in


productivity.

B. Every Sprint to promote shared learning.

C. As needed, while taking into account a short-term reduction


in productivity.

D. Never, it reduces productivity.

Feedback
Scrum Teams typically go through some steps before achieving a state of increased
performance. Changing membership typically reduces cohesion, affecting performance
and productivity in the short term.

https://www.classmarker.com/online-test/start/results/?quiz=3qg5fac7589c0416 16/30
10/16/24, 11:00 AM Scrum Open

Question 17 of 30

When does a Sprint conclude?

(choose the best answer)

A. When all Product Backlog items meet their Definition of Done.

B. When the Sprint Retrospective is complete.

C. When the Product Owner decides enough has been delivered to meet
the Sprint Goal.

D. When all the tasks are completed by the Developers.

Feedback
The Sprint is a container for the following timeboxed events: Sprint Planning, Daily
Scrum, Sprint Review, and Sprint Retrospective. Sprints are fixed length events of one
month or less to create consistency, and a new Sprint starts immediately after the
conclusion of the previous Sprint.

The Sprint Retrospective concludes the Sprint, and is timeboxed to a maximum of three
hours for a one-month Sprint. For shorter Sprints, the event is usually shorter

Though not typical, a Sprint can end if the Sprint Goal becomes obsolete. Only the
Product Owner has the authority to end the Sprint prematurely.

https://www.classmarker.com/online-test/start/results/?quiz=3qg5fac7589c0416 17/30
10/16/24, 11:00 AM Scrum Open

Question 18 of 30

Which statement best describes a Product Owner's responsibility?

(choose the best answer)

A. Keep stakeholders from distracting the Developers.

B. Maximizing the value of the work the Scrum Team does.

C. Managing the project and ensuring that the work meets the commitments to
the stakeholders.

D. Directing the Developers.

Feedback
The Product Owner is accountable for maximizing the value of the product and the work
of the Scrum Team.

https://www.classmarker.com/online-test/start/results/?quiz=3qg5fac7589c0416 18/30
10/16/24, 11:00 AM Scrum Open

Question 19 of 30

The Developers should not be interrupted during the Sprint and the Sprint Goal should remain
intact. These are conditions that foster creativity, quality and productivity.

(Which one the following answers is FALSE?)

A. The Developers may work with the Product Owner to add or remove work if
they find themselves with more or less capacity than expected.

B. The Sprint Backlog is fully formulated in the Sprint Planning event and does
not change during the Sprint.

C. As a decomposition of the selected Product Backlog items, the Sprint


Backlog changes and may grow as the work emerges.

D. The Product Owner can help clarify or optimize the Sprint when asked by the
Developers.

Feedback
The Sprint Backlog makes visible all of the work that the Developers identify as
necessary to meet the Sprint Goal. The Developers modify the Sprint Backlog throughout
the Sprint, and the Sprint Backlog emerges during the Sprint.

https://www.classmarker.com/online-test/start/results/?quiz=3qg5fac7589c0416 19/30
10/16/24, 11:00 AM Scrum Open

Question 20 of 30

Who should know the most about the progress toward a business objective or a release, and
be able to explain the alternatives most clearly?

(choose the best answer)

A. The Developers

B. The Project Manager

C. The Scrum Master

D. The Product Owner

Feedback
The Product Owner is the sole person responsible for ordering the Product Backlog.
Their responsibilities include making the Product Backlog visible, transparent, and clear
to all.

https://www.classmarker.com/online-test/start/results/?quiz=3qg5fac7589c0416 20/30
10/16/24, 11:00 AM Scrum Open

Question 21 of 30

A Scrum Team consists of the following:

(choose the best three answers)

A. Users

B. Product Owner

C. Customers

D. Developers

E. Scrum Master

Feedback
The Scrum Team consists of one Scrum Master, one Product Owner, and Developers.

https://www.classmarker.com/online-test/start/results/?quiz=3qg5fac7589c0416 21/30
10/16/24, 11:00 AM Scrum Open

Question 22 of 30

What should the Scrum Team do during the first Sprint?

(choose the best answer)

A. Develop a plan for the rest of the release.

B. Create a valuable and useful Increment.

C. Create the complete Product Backlog to be developed in


subsequent Sprints.

D. Determine the complete architecture and infrastructure for the


product.

Feedback
The heart of Scrum is a Sprint, which is one month or less during which a done, usable,
valuable product Increment is created. This applies to every Sprint.

https://www.classmarker.com/online-test/start/results/?quiz=3qg5fac7589c0416 22/30
10/16/24, 11:00 AM Scrum Open

Question 23 of 30

Who creates the Definition of Done?

(choose the best answer)

A. The Scrum Team, in a collaborative effort where the result is the common
denominator of all members' definitions.

B. The Scrum Master since they are responsible for the productivity of the
Developers.

C. The Product Owner since they are responsible for the product's success.

D. If it is not an organizational standard, the Scrum Team must create a


Definition of Done appropriate for the product.

Feedback
If the Definition of Done for an Increment is part of the standards of the organization, all
Scrum Teams must follow it as a minimum. If it is not an organizational standard, the
Scrum Team must create a Definition of Done appropriate for the product.

https://www.classmarker.com/online-test/start/results/?quiz=3qg5fac7589c0416 23/30
10/16/24, 11:00 AM Scrum Open

Question 24 of 30

Why is the Daily Scrum held at the same time and same place?

(choose the best answer)

A. The place can be named.

B. Rooms are hard to book and this lets it be


booked in advance.

C. The consistency reduces complexity.

D. The Product Owner demands it.

Feedback
The Daily Scrum is held at the same time and place each day to reduce complexity.

https://www.classmarker.com/online-test/start/results/?quiz=3qg5fac7589c0416 24/30
10/16/24, 11:00 AM Scrum Open

Question 25 of 30

When many Scrum Teams are working on a single product, what best describes the Definition
of Done?

(choose the best answer)

A. All Scrum Teams must have a Definition of Done that makes their combined
Increment valuable and useful.

B. Each Scrum Team uses its own, but must make their definition clear to all
other teams so the differences are known.

C. It depends.

Feedback
The Increment must be valuable and useful. This means that when many Scrum Teams
are working on a single product, they are expected to adhere to a single Definition of
Done for the Increment.

https://www.classmarker.com/online-test/start/results/?quiz=3qg5fac7589c0416 25/30
10/16/24, 11:00 AM Scrum Open

Question 26 of 30

True or False: The Scrum Team must choose at least one high priority process improvement
item, identified during the Sprint Retrospective, and place it in the Sprint Backlog.

True

False

Feedback
An earlier version of the Scrum Guide prescribed the practice of placing one
improvement in the Sprint Backlog. This was removed in the 2020 update to the Scrum
Guide because it was felt to be too prescriptive. However, if this practice provides value
to you then you should adopt it. It is simply not prescribed anymore, but can still be
valuable.

https://www.classmarker.com/online-test/start/results/?quiz=3qg5fac7589c0416 26/30
10/16/24, 11:00 AM Scrum Open

Question 27 of 30

What are two ways a Scrum Master serves to enable effective Scrum Teams?

(choose the best two answers)

A. By keeping high value features high in the Product


Backlog.

B. By removing impediments that hinder the Scrum


Team.

C. By starting and ending the meetings at the proper


time.

D. By facilitating Developer decision-making.

You did not select all available correct options.

Feedback
The Scrum Master serves the Scrum Team in several ways. Facilitation and removing
impediments are examples of ways a Scrum Master helps a team become more
effective.

https://www.classmarker.com/online-test/start/results/?quiz=3qg5fac7589c0416 27/30
10/16/24, 11:00 AM Scrum Open

Question 28 of 30

The three pillars of Scrum are:

(choose the best answer)

A. Planning, Inspection, Adaptation.

B. Transparency, Eliminating Waste,


Kaizen.

C. Transparency, Inspection,
Adaptation.

D. Planning, Demonstration,
Retrospective.

E. Respect For People, Kaizen,


Eliminating Waste.

Feedback
Scrum is founded on empiricism and lean thinking. Empiricism asserts that knowledge
comes from experience and making decisions based on what is known.
The three pillars uphold empirical and lean thinking: transparency, inspection, and
adaptation.

https://www.classmarker.com/online-test/start/results/?quiz=3qg5fac7589c0416 28/30
10/16/24, 11:00 AM Scrum Open

Question 29 of 30

What does it mean to say that an event has a timebox?

(choose the best answer)

A. The event must happen by a given time.

B. The event must happen at a set time.

C. The event must take at least a minimum amount


of time.

D. The event can take no more than a maximum


amount of time.

Feedback
Timeboxed events are events that have a maximum duration.

https://www.classmarker.com/online-test/start/results/?quiz=3qg5fac7589c0416 29/30
10/16/24, 11:00 AM Scrum Open

Question 30 of 30

The CEO asks the Developers to add a "very important" item to a Sprint that is in progress.
What should the Developers do?

(choose the best answer)

A. Discuss the item with the other members of the Scrum Team so the team can
decide what to do.

B. Add the item to the current Sprint Backlog, drop an item of similar size, and
reduce the Sprint Goal.

C. Add the item to the Sprint Backlog for the next Sprint.

D. Add the item to the current Sprint Backlog and do whatever amount of work
is necessary to meet the Sprint Goal while satisfying the CEO.

Feedback
The items selected for a Sprint have been selected as most valuable with the Product
Owner during Sprint Planning. The items serve the Sprint's goal. No changes should be
made that endanger the Sprint Goal. No one external to the Scrum Team can force
changes on the Developers.