0% found this document useful (0 votes)
19 views1 page

Kfil - Co.ls.1.0 Landscape Masterplan r2 24.06.2025

The document outlines the master plan for the construction of a Coke Oven Power Plant, detailing various components such as coal handling systems, bunkers, and processing facilities. It includes a list of structures and their descriptions, as well as notes on landscaping and electrical settings. The document emphasizes the importance of confirming dimensions and specifications with relevant contractors and architects before commencement of work.

Uploaded by

raveen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views1 page

Kfil - Co.ls.1.0 Landscape Masterplan r2 24.06.2025

The document outlines the master plan for the construction of a Coke Oven Power Plant, detailing various components such as coal handling systems, bunkers, and processing facilities. It includes a list of structures and their descriptions, as well as notes on landscaping and electrical settings. The document emphasizes the importance of confirming dimensions and specifications with relevant contractors and architects before commencement of work.

Uploaded by

raveen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

F NCTIONS MASTERPLAN- LANDSCAPE

COKE OVEN POWER PLANT


BUILDING AND CONSTRUCTION NAME TABLE
SL DESCRIPTION
1 OVER GROUND BUNKERS
2 COAL HANDLING BELT CONVEYOR GALLERY 1# LEGEND
3
4
PRIMARY CRUSHING HOUSE

COAL HANDLING BELT CONVEYOR GALLERY 2#


INFRASTR. ILDING LANDSCAPE ELECTRICAL SETTING-O T NOTES
5 COAL HANDLING JUNCTION 1#

6 COAL HANDLING BELT CONVEYOR GALLERY 3#


PAVED AREA/ SERVICE YARD EX. GREEN BELT RETAINED 9m HT. LED STREET LIGHTS - 204 Nos. AS PER SITE / CHK ON SITE
7 COAL BLENDING SILOS
TEMP. STRUCTURES EX. TREES GUEST HOUSE AREA @ 30m C/C APPROX,
SETTING OUT DIM.
8 COAL HANDLING BELT CONVEYOR GALLERY 4#
TO VENDOR SPECS, WIPRO OR SIMILAR
9 SECONDARY CRUSHING HOUSE PROPERTY LINE PROPOSED LANDSCAPE
C/L S/O SETTING OUT CENTERLINE
10 COAL HANDLING BELT CONVEYOR GALLERY 5#
COMPOUND WALL ON PROPERTY LINE PROPOSED TREES AS PER L'SCAPE HI-MAST LIGHTS (15 to 30m HT.)
11 COAL HANDLING JUNCTION 2#
DESIGN/ PROPOSAL ( SPECIALLY TO VENDOR SPECS, WIPRO OR SIMILAR, 1. TOTAL STATION TO BE CARRIED OUT BY CIVIL
12 COAL HANDLING BELT CONVEYOR GALLERY 6# COMPOUND WALL (INTERNAL) ALONG THE ROADS & IN COKE OVEN CONTROLLED INDIVIDUALLY OR FROM SECURITY CONTRACTOR BEFORE COMMENCEMENT OF WORK AND
13 COAL TOWER PLANT AREA)
CABIN SETTING-OUT DIMENSIONS TO BE CONFIRMED WITH THE
14 STAMPING STATION EXISTING/ DEMOLISHED
PROPOSED VERTICAL GARDEN 3M HT. ARCHITECT BEFORE COMMENCEMENT. ANY
15 COKE OVEN WITH BOILER
DRAIN CONNECTION U/G NOTE: DISCREPANCIES IN SETTING-OUT TO BE BROUGHT TO
16 INTERMEDIATE PLATFORM OF COKE OVEN
RUNNING LENGTH OF ROAD = 7950m ~ 8kms APPROX. ARCHITECT'S NOTICE IMMEDIATELY.
17 END PLATFORM OF COKE OVEN
PROPOSED STRUCTURES
18 RAILS OF COAL CHARGING & COKE PUSHING CAR
2. SETTING-OUT AND ROAD LVL AT INTERSECTION TO BE
19 RAILS OF COKE QUENCHING CAR
ASCERTAINED AS PER SITE & TO BE CONFIRMED BY M/s.
20 PIPE TRUSS NOTE PROPOSED SERVICE RD AB&H.
21 PIPE FRAME
ETWEEN NH-63 KFIL PROPERT I.E
22 EMERGENCY CHIMNEY
ETWEEN GATE 1 4 IS NOT 3. STORM WATER DRAIN FLOW, SLOPES & DIMENSIONS TO
23 COKE QUENCHING TOWER
INDICATED IN THIS DWG. BE CONFIRMED BY M/s. AB&H.
24 COKE QUENCHING SETTLING TANK AND PUMP HOUSE
GREEN COVER / TREES ALONG
25 COKE WHARF
NORTH & EAST ROAD TO BE ALSO
26 COKE SCREENING BELT CONVEYOR GALLERY 1#
INCLUDED IN LANDSCAPE SCOPE GENERAL NOTES
27 COKE SCREENING JUNCTION 1#

28 COKE SCREENING BELT CONVEYOR GALLERY 2#


1. ALL STRUCTURAL DRAWINGS TO BE READ IN
29 COKE SCREENING BUILDING 1#
CONJUCTION WITH ARCHITECTURAL DRAWINGS.
30 COKE SCREENING BELT CONVEYOR GALLERY 3#
ANY DISCREPANCIES TO BE BROUGHT TO ARCHITECT'S
31 COKE SCREENING BUILDING 2#
NOTICE
32 HEAT RECOVERY BOILER

33 ABSORPTION TOWER
34 DE-DUSTER

35 ID FAN
36 STEEL STACK PROPERTY
CULVERT
LINE
37 GAS PURIFICATION CONTROL ROOM
38 SUBSTATION 1#
CULVERT

COMPOUND WALL
CULVERT

39 SUBSTATION 2# & CENTRAL CONTROL ROOM


COMPOUND WALL

HM 7MW
IDE
HM RD. TOP
+491.70
Raw Material Yard-2
Raw Material Yard-1
Area 14985 Sq.m 10#MCC Area 14520 Sq.m
RAILWAY SIDING
RAILWAY SIDING
RAILWAY SIDING COKE
SCREENING
UNLOADING 9 M WIDE 31
下至
0.0m平台

BUILDING LAKE-A
PLATFORM RD. TOP Tree
+490.00

HM
9 M WIDE
RAILWAY HM
SIDING
LABOUR
CANTEEN YARD-2
COAL BUILDING MATERIAL
Gate
IN GATE
WALL
OUND

RAIN WATER
HARVESTING 50 lts RO CYCLE STAND
COMP

6 M WIDE HZ6
100 lts water
cooler

6 M WIDE
POND-D RD. TOP 50 lts water
cooler

2 4 5 +491.70 2.113665°

GREENBELT
1

500000

800000
15 lts RO

900000
LAKE-C
50 lts water

COKE
cooler
9 M WIDE

9 M WIDE
29 SCREENING

418000

418000
LL BURDEN

2320000
WA

150

150

150

700000

1300000

150
500 lph RO

ND BUILDING
POU Neem

LINE OF BOUNDARY
CO M Tree

COKE OVEN WITH POWER PLAN

EXISTING
38 STORE

Security
LAKE-B

FACTORY
40 lts water
cooler Security

PROPERTY MAIN ENT.


LINE GATE
SILOS VISITORS/
6 M WIDE

ROCK

SECURITY
ROCK
432.0 W
11 10 9 8 7 EMPLOYEES
RD. TOP
P-14

SCREEN
ROSTRUM

PRJECTOR
+491.11

storage
full ht.

SCREEN TO DETAIL
units

-2 (66)
X 46'8"
Well Shell

Tables

TRAINING
Discussion

34'11"
No.16 Cooling

P-13
P-13

storage
RECORDS-HR
15'7" X 23'7"

racks
Sump

+ 493.65 LVL

RECORDS-GA
15'7" X 23'7"

P-12
9 M WIDE 9 M WIDE 9 M WIDE P.

storage
racks
ROAD UNDER CONSTRUCTION

P-12
RD. TOP

66"

g
e
s
a

a
s
d
g
e

p
H.

a
36"

w
s
s
p
a

i
e

AS PER DEAITL
d
w

WALL BELOW
i

WD\6.1 FOR STAIR


REF DWG-KFIL\
PROPOSED ROAD EXISTING TO NEW FACTORY

+ 493.65 LVL

P-11
P-3

DETAIL

ROCK
Bore

WATER BODY
+491.00

P-11

ENTRANCE
RD. TOP

FULL HT PARTITION
MAIN

AS PER DEAITL
MEETING TABLE
Well

9' 0" X 4' 0"

MEETING TABLE
9' 0" X 4' 0"
POND
g

D1
capin

No.11
Lands

P-14
e

Service Door
g
a
s
s
62"

B
area
a
p
d
e
w

PROJECTOR
i

D5
GP-5

V3
+492.00

SCREEN
REF:KFIL\

waiting
41' 4" X 29' 3"
WD\4.02

SHAFT

D9
SHAFT

PROJECTOR
SCREEN

RECEPTION

Visitors
GP-7

GP-8

+ 493.65 LVL
20' 0" X 18' 0"
H.R - G.A DEPT.

Sculpture
Abstract
LIBRARY
MEETING-HR

LIFT
LIFT
GP-4

20' X 12'0"
18' 6" X 11' 3"
HEAD HR

D1
ENTRANCE
EXTENT OF FUTURE

Product Panel
AcCo .
PLANT

P-11

D1
TOP OF ROAD LVL AT

AcCo .

Display
Rotating
Product
Display
HANDICAPPED
LADIES/

TOILET
NOTICE BOARD

P-9

+ 493.65 LVL
CASHIER

GENTS TOILET
ROOM
COUNTER
12

CASH

MEETING TABLE
RAILS OF COAL CHARGING & COKE PUSHING CAR

8' 0" X 3' 3"


STEEL PLANT AREA

D6
18

MEETING TABLE
6' 0" X 3' 3"
INTERSECTION TO BE

D5
ALT # 2

DISCUSSION
D3PANTRY LAYOUT PENDING

TABLE
ALT # 1
D2
FROM LIVING FORM

PARIVARTAN ROOM
RAILS OF COAL CHARGING & COKE PUSHING CAR

D3
15' X 19' 1"
P7
D3

16' X 15'1"
15'5" X 10' 7"

15'5" X 10' 7"

MEETING-3
80 lts RO per

TR-CH-2.

TR-CH-1.

LADIES
JANITOR
FLARE FLARE

AS PER DEAITL
WALL BELOW
27000
37500
floor

D3

D4

D4

LINE OF ROOF ABOVE


40000

P-1

STORE

STORE ROOM
9'10" X 8' 6"
HARDWARE
10' X 7' 9"
D1
1800 MM WD PASSAGE

D1
SHAFT
STACK STACK

CE5'

V2

V2
ASCERTAINED AS PER SITE

J
D4

LIBRARY- SHIFTED TO REPLACE


5000X1500

PASSAGE
SHAFT

V1
SHAFT.

P5

INTV. HR (Interior on hold)


D4
TEL OPR TABLE
D1
FINANCE RECORDS ROOM (LONG TERM)

GENTS
CE4'

REF DWG-KFIL\WD

28' 2" X 20' 3"


1000

NTWRK & UPS RM

\5.0 FOR TOILET


9' 10" X 16' 6"
1000

D4
V1
492.00

P3

( GROUP - 6 )
FUTURE EXPANSION

D4
TELEPHONE EXCHANGE ROOM

PROJECTOR
SCREEN
DETAIL

STORE RM
14'7" X 9'9"
D5
16' 2" X 7' 1"

ROSTRUM
BATTERIES ROOM

(54)
9' 10" X 21' 6"
CE3'

ELEC

D3
V1
CONDITIONS

I.T .TRAINING TO BE TAKEN UP IN CURRENT STAGE

P4
D2
2800X1500
SHAFT.

D5
13

D3
22

ELEC ROOM
22

TRAINING -FURNITURE TO
CE2'

WD\6.2 FOR STAIR

P-2

BE TAKEN UP LATER (40)


D2

REF DWG-KFIL\

(Interior on hold)
45'3" X 28'10"
FIRE ESCAPE
A

20'6" X 6'1"
17

SCREEN
CE6'
15 1ST PHASE 15
2ND PHASE 32 15

CE1'
492.00 492.00

TOILET TOILET

14 16 32 16

SHAFT.
EMRG. KFIL ADMIN
Q=3t

PIT
5M

TIP

RAILS OF COAL CHARGING & COKE PUSHING CAR


50 lts water
cooler
BUILDING
19
WID

RAILS OF COAL CHARGING & COKE PUSHING CAR

Ø800
23 25 24
E

COKE
50 lts water
cooler 50 lts water
cooler
494.0
50 lts water

C.C.R WARF/COKE
100 lts water
cooler
cooler

39 QUENCHING
RD. TOP RD. TOP HOUSE
+492.30 +492.40
COMPOUND
WALL
9 M WIDE 9 M WIDE 9 M WIDE RD. TOP
+494.00
MELT SHOP
20 lts RO

O & M OFFICE

EMPLOYEE +

RS
35 35

RAMP
EXTENT OF FUTURE

COMPR.
LABOR CANTEEN

A-3500

WITH MOTOR
C.W. PUMP

W1
W1

W
STEEL PLANT AREA
9 M WIDE

9 M WIDE
7 M WIDE

Spectro Lab

GREENBELT
36 36
LINE OF BOUNDARY

RD. TOP
OVER NIGHT
50 lts water
cooler
EXISTING

+493.60
PARKING LOT 250 lph RO

40 NOS 7 M WIDE EMPTY TRUCK PATH FOR


PATH
TRUCK
FOR MOVEMENT
TRUCK MOVEMENT
PROPERTY
FACTORY

TRUCKS PARKING( 4 NOS.) MANUFACTURING UNIT


Cooling
BACKUP LAND/ Tower LINE
MANUFACTURING UNIT
SLAG YARD C/L3

MANUFACTURING UNIT
38
4 M WIDE
7 M WIDE

DG House
Cooling
50 lts water
Tower
PROPOSED
cooler

KFIL FACTORY
RD. TOP
+494.40 RD. TOP
+496.50
F T RE STEEL
PLANT

.314
497.2

BU

494
P1F1

AD
.284 .RO

Sand Storage Area


.286
P1F1

.496
R.L OR LV
L .497
R.L OR LV
L C.C
Foundry

FBDC
FLO IDF FLO Office
P1F1

GAS WASTE SAND


ENTRANCE EXTENT OF FUTURE TION
P2F2

7 M WIDE C
FBD LPG DISPOSAL HOPPER -STA
SUB ING N
GARDEN STEEL PLANT AREA R.L
.386
.498 LVL
7
ISTTATIO
EX-S
RD. TOP SUB ING
P2F2

OR
SB & FS

Projection
P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1

FLO
Fettling Shop & Finished Goods
WITH SIGNAGE +501.00 BUILDING EXIS
T
P1F1

F1
F1 F1
P1 P1F1 P1F1 P1F1 P1 P1
F1
P1

F1
P1

Pattern Shop
SECURITY
F1

AREA TO BE
P1 F1

SCRAP
P1
F1

Casting Inward
P1

F1
D S
LFP
P1

F1

YARD YAR AP ROAD

New
P1 ROAD F1
F1 P1
P1

Assurance
FLATTENED
F1

SCR
P1

CRANE
STREET LIGHT

Office
Quality
F1
P1
F1
TO DETAIL
F1
P1
P1

F1
P1

GATE
F1
P1
F1
F1
P1 P1

KSP Felting Shop


BACK Finished Casting
F1

RCC BOX CULVERT WITH PERFORATED COVER


GREENBELT
P1

F1
P1

P1
F1

Storage & Rework shop BLACK CASTING YARD


F1
P1

12M WIDE
F1
P1
STREET LIGHT
Scrap Yard
GATE
F1

BRIDGE TO DETAIL
Scrap Yard
P1

COMPOUND
F1
F1
P1
P1

P1
F1 498.45
P1
F1

Scrap Yard WEIGH

GARDEN

LANE
F1
P1 F1

ING
P1
F1

WALL

EXIT
P1

12M WIDE
495.2 F1

GATE 5
P1

9.375 M WIDE Casting outward


ROAD
F1

GREENBELT TO BE ACQUIRED
P1

CHAMBER

F1
12M WIDE

ROAD

BACK GATE

FENCING
P1

45
495. ROAD F1
P1

C/L1'
AIN
DR
X
BO
T
ROAD ROAD
ROAD
SHED SHED PR
EC
AS

C/L1
F1

P1

12.75M WIDE 7.5 M WIDE 7.5 M WIDE TRUCK P1F1


F1
P1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1
F1
P1 P1F1 P1F1
security

F2
P2
F2
P2
security
F2
P2
F1
P1
P1F1
P1F1
F1
P1 P1F1 P1F1
F1
P1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1
F1
P1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1
LINE
CABLE LINE
CABLE

P1F1 P1F1 P1F1


TOWER TOWER
SECURITY
SECURITY

P1F1
F1
P1 P1F1 P1F1
F1
P1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1
F1
P1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1
TOILET
TOILET
P1F1
TOWER
BSNL TOWER
BSNL

F1
P1 P1F1 P1F1 P1F1 P1F1
F1
P1 P1F1 P1F1 P1F1

PARKING F1
P1
OUTGATE PE
RF
OR
ATE
D
CO
VE
R

GREENBELT
H
WIT
RT

EXISTING LINE 1200mm DIA. HUME PIPE


LVE

PRIVATE
CU
X
BO
C
F1
RC

PRIVATE
P1

COW TRAP DRAIN


P1F1 F1
F1 F1 F1

COMPOUND
F1 P1 P1F1
P1 P1 P1F1 P1 P1 F1
P1F1 P1F1 P1 F1
P1F1 P1F1 P1F1
F1 P1F1 P1F1 P1
F1 P1F1 P1F1 P1F1
F1 P1F1

PROPERTY
F1 P1 P1F1 F1
P1
F1
F1
P1
P1
P1 P1F1
P1F1
P1
F1
F1 HIGH MAST
F1 P1
P1F1 P1F1 P1F1 P1F1 P1F1
F1 1 F1
F1
P1
P1
P1 P1
P1F1
LIGHT TO
P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1 P1F
P1F1 P1F1 F1
F1
F1
P1
P1 P1F1 DETAIL

PROPERTY
P1F1 P1F1 F1 P1 P1F1
P1F1 F1 F1 P1 P1F1
P1F1 P1F1 F1 1 F1 P1
P1 P1 P1F1 P1F1
P1 P1F1 F1 F1 P1 P1F1
P1F F1 P1F1 P1F1 P1F1 P1F1
P1F1 P1 P1F1 P1 P1F1
P1F1 P1F1 P1 P1F1 P1F1
P1F1 P1F1 F1 P1F1 P1F1 P1F1 P1F1 F1
P1F1 P1F1 P1F1 P1F1 F1 F1 F1 F1 P1
P1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1
P1F1 P1F1 P1 P1F1 P1F1 P1F1 P1F1 P1F1 P1 P1F1 P1 P1F1 P1F1 P1F1 P1

TO BE ACQUIRED
TO BE ACQUIRED WALL ON RD. TOP PROPERTY CHAMBER

PROPERTY LINE BUS & 2-4 SECURITY +501.60 WEIGH BRIDGE 28 NOS
WITH-OUT GATE GREENBELT
CONTROL RM.
GREENBELT LINE PROPERTY PROPERTY GREENBELT
WHEELER QUEUED GREENBELT HUME PIPE 1200mm DIA. 3 ROW

GATE PARKING PARKING LINE LINE


15nos. TRUCK & TRACTOR
KOPPAL-HOSPET -NATIONAL HIGHWAY-63 C/L3 C/L2 C/L4 C/L5 PARKING AREA FOR
CASTING LOADING KOPPAL-HOSPET -NATIONAL HIGHWAY-63

OVER NIGHT NHB


GATE 4 GATE 3 GATE 2 QUEUED GATE 1
TRUCK PARKING COKE OVEN K-ROAD MATERIAL PARKING EAST
PART MASTERPLAN ENT. (FUTURE) ENTRY ENTRY OUT-GATE ENTRY ENTRANCE

KFIL FACTORY/ COKE OVEN POWER PLANT


SCALE 1:2500
NOTE PROPOSED
REF: DWG NO. CO/KFIL/SITE/1.0/R0 FOR MASTER PLAN PART PLAN- SERVICE RD PART PLAN-A
PHASING AREA STATEMENT STREET LIGHTING/ F'PATH DESIGN- ETWEEN NH-63 STREET LIGHTING/ F'PATH DESIGN-
COKE OVEN GATE-4 TO K-RD GATE-3 KFIL PROPERT I.E EAST ENT. GATE-1 TO K-RD GATE-3
PHASE-1 ROADS REF. CO/KFIL/SL/2.0 FOR AREA DET. ETWEEN GATE 1 REF. CO/KFIL/SL/2.0 FOR AREA DET.
87.2 ACRES/ 87 ACRES 7.6 GUNTAS 4 IS NOT INDICATED
PHASE-2 ROADS
IN THIS DWG.

WORKING DRAWING PART MASTER PLAN- REVISIONS ISS ED ON 24.06.2025 CONSULTANTS


N
LANDSCAPE- COKE OVEN P.P
R0: 09.06.2021
1. THIS DRAWING WAS PREVIOUSLY EMAILED TO M/s.GARDENWORLD AS CO/KFIL/SL1.0/R0.
CHECKED BY STRUCTURAL : AHCEPL JOB NO. : ARCHITECTS LIVING FORM
2. LOCATION OF ADMIN OFFICE, EMPLOYEE / LABOR CANTEEN & RAILING SIDING CANTEEN REVISED POST G-MEETING WITH MD ON 22.05.2021. HC EM ELECTRICAL : AHCEPL DATE : 19.06.2020 DESIGN +
NOTES: -ALL AGENCIES EXECUTING WORK ON SITE ARE ARCHITECTURE
- - PLUMBING : AHCEPL SCALE : 1:2500 (A1)

TR RTH
-ALL DIMENSIONS ARE IN MM. RESPONSIBLE FOR THEIR RESPECTIVE PRODUCT'S QUALITY R1: 12.11.2021 CLIENT

UE
1. UPDATED AS PER LATEST MASTERPLAN.

NO
- DO NOT SCALE DWGS, ALL DIMS ARE TO BE CHECKED ON & PERFORMANCE. AHCEPL
HVAC : DRAWN BY : TAYYIBA/ DHANYA
SITE
- ALL STRUCTURAL/SERVICE DWGS TO BE READ IN
INTERFACING & COMPATIBILITY OF THEIR PRODUCTS WITH
THE OTHER IMMEDIATE MATERIALS SHOULD BE ENSURED. R2: 24.06.2025
CIVIL CONTR. - - CIVIL/ BOQ : AHCEPL CHECKED
66, HUTCHIN'S RD, 2ND CROSS,
ST THOMAS TN, BANGALORE 560084
CONJUNCTION WITH ARCHITECTURAL DWGS, TO BE
CO-RELATED WITH SCHEDULE OF QUANTITIES. - SHOP DWGS. TO BE PREPARED BY THE RELEVANT
1. LEGENDS HAVE BEEN UPDATED.
2. EXISTING TREE INDICATED.
CIVIL/ CRUTHI - - PMC : AHCEPL
- THE DET. IN ALL DWGS TO BE READ PROPERLY, AGENCIES ( MS FABRICATOR, ROOFING CONTRACTOR, ETC.) FILE PATH:\\Lf-5\d\LF-1 DATA\D Drive\KFIL-2020\KFIL_COKE OVEN P.P_2020\2. DRAWINGS\1. KFIL_SITE
UNDERSTOOD AND EXECUTED BY COMPETENT, QUALIFIED @ GOT APP. BEFORE EXECUTION.
3. PROPOSED SERVICE RD BETWEEN NH-63 & KFIL PROPERTY (I.E BETWEEN GATE 1 & 4) IS NOT INDICATED IN THIS DWG. YET TO BE ADDED.
STRUCTURAL - - SERIES\KFIL.CO.LS_LANDSCAPE\KFIL.CO.LS.1.0_LANDSCAPE MASTERPLAN_R1_24.06.2025.dwg
TEL : 080 - 25485161 FAX : 080 - 25485162 E-mail : [email protected]
ENGINEERING PERSONNEL TRAINED IN CONSTRUCTION
WORK OF SUCH NATURE, POSSESSING ADEQUATE
KNOWLEDGE OF GOOD ENGINEERING PRACTICE &
- THIS DWG IS THE PROPERTY OF LIVING FORM ARCHITECTS
BANGALORE AND NOT TO BE COPIED OR USED WITHOUT P.H.E. - - PRO ECT TITLE DRAWING TITLE
THEIR PERMISSION OR LOANED TO A THIRD PARTY FOR ANY
RELEVANT CODES AND STANDARDS.
- ARCHITECTURAL CONSULTANTS CANNOT TAKE
PURPOSE OTHER THAN FOR WHICH IT HAS BEEN ISSUED. ELECTRICAL - - ADVANCE COP PROPOSED LANDSCAPE DESIGN FOR KFIL
PART MASTER PLAN- LANDSCAPE
RESPONSIBILITY FOR ERRORS/LAPSES DURING EXECUTION
- COKE OVEN/ P.P
AS A CONSEQUENCE OF IMPROPER, INADEQUATE OR
EXTERNAL DIMENSION FROM OUT TO CENTRELINE.
LANDSCAPE * COKE OVEN WITH 30M/W POWER PLANT,
INCOMPETENT STUDY OF DWGS.
- ANY DOUBTS/ERRORS IN DWGS. TO BE BROUGHT TO THE
- INTERNAL DIMENSION FROM c/c.
P.M.C./ AHCEPL - - HOSPET,KARNATAKA DWG NO CO/KFIL/LS/1.0/R2
NOTICE OF THE ARCHITECT. - GRID LINES ALIGNED TO EXISTING BUILDING.