Kfil - Co.ls.1.0 Landscape Masterplan r2 24.06.2025
Kfil - Co.ls.1.0 Landscape Masterplan r2 24.06.2025
33 ABSORPTION TOWER
34 DE-DUSTER
35 ID FAN
36 STEEL STACK PROPERTY
CULVERT
LINE
37 GAS PURIFICATION CONTROL ROOM
38 SUBSTATION 1#
CULVERT
COMPOUND WALL
CULVERT
HM 7MW
IDE
HM RD. TOP
+491.70
Raw Material Yard-2
Raw Material Yard-1
Area 14985 Sq.m 10#MCC Area 14520 Sq.m
RAILWAY SIDING
RAILWAY SIDING
RAILWAY SIDING COKE
SCREENING
UNLOADING 9 M WIDE 31
下至
0.0m平台
BUILDING LAKE-A
PLATFORM RD. TOP Tree
+490.00
HM
9 M WIDE
RAILWAY HM
SIDING
LABOUR
CANTEEN YARD-2
COAL BUILDING MATERIAL
Gate
IN GATE
WALL
OUND
RAIN WATER
HARVESTING 50 lts RO CYCLE STAND
COMP
6 M WIDE HZ6
100 lts water
cooler
6 M WIDE
POND-D RD. TOP 50 lts water
cooler
2 4 5 +491.70 2.113665°
GREENBELT
1
500000
800000
15 lts RO
900000
LAKE-C
50 lts water
COKE
cooler
9 M WIDE
9 M WIDE
29 SCREENING
418000
418000
LL BURDEN
2320000
WA
150
150
150
700000
1300000
150
500 lph RO
ND BUILDING
POU Neem
LINE OF BOUNDARY
CO M Tree
EXISTING
38 STORE
Security
LAKE-B
FACTORY
40 lts water
cooler Security
ROCK
SECURITY
ROCK
432.0 W
11 10 9 8 7 EMPLOYEES
RD. TOP
P-14
SCREEN
ROSTRUM
PRJECTOR
+491.11
storage
full ht.
SCREEN TO DETAIL
units
-2 (66)
X 46'8"
Well Shell
Tables
TRAINING
Discussion
34'11"
No.16 Cooling
P-13
P-13
storage
RECORDS-HR
15'7" X 23'7"
racks
Sump
+ 493.65 LVL
RECORDS-GA
15'7" X 23'7"
P-12
9 M WIDE 9 M WIDE 9 M WIDE P.
storage
racks
ROAD UNDER CONSTRUCTION
P-12
RD. TOP
66"
g
e
s
a
a
s
d
g
e
p
H.
a
36"
w
s
s
p
a
i
e
AS PER DEAITL
d
w
WALL BELOW
i
+ 493.65 LVL
P-11
P-3
DETAIL
ROCK
Bore
WATER BODY
+491.00
P-11
ENTRANCE
RD. TOP
FULL HT PARTITION
MAIN
AS PER DEAITL
MEETING TABLE
Well
MEETING TABLE
9' 0" X 4' 0"
POND
g
D1
capin
No.11
Lands
P-14
e
Service Door
g
a
s
s
62"
B
area
a
p
d
e
w
PROJECTOR
i
D5
GP-5
V3
+492.00
SCREEN
REF:KFIL\
waiting
41' 4" X 29' 3"
WD\4.02
SHAFT
D9
SHAFT
PROJECTOR
SCREEN
RECEPTION
Visitors
GP-7
GP-8
+ 493.65 LVL
20' 0" X 18' 0"
H.R - G.A DEPT.
Sculpture
Abstract
LIBRARY
MEETING-HR
LIFT
LIFT
GP-4
20' X 12'0"
18' 6" X 11' 3"
HEAD HR
D1
ENTRANCE
EXTENT OF FUTURE
Product Panel
AcCo .
PLANT
P-11
D1
TOP OF ROAD LVL AT
AcCo .
Display
Rotating
Product
Display
HANDICAPPED
LADIES/
TOILET
NOTICE BOARD
P-9
+ 493.65 LVL
CASHIER
GENTS TOILET
ROOM
COUNTER
12
CASH
MEETING TABLE
RAILS OF COAL CHARGING & COKE PUSHING CAR
D6
18
MEETING TABLE
6' 0" X 3' 3"
INTERSECTION TO BE
D5
ALT # 2
DISCUSSION
D3PANTRY LAYOUT PENDING
TABLE
ALT # 1
D2
FROM LIVING FORM
PARIVARTAN ROOM
RAILS OF COAL CHARGING & COKE PUSHING CAR
D3
15' X 19' 1"
P7
D3
16' X 15'1"
15'5" X 10' 7"
MEETING-3
80 lts RO per
TR-CH-2.
TR-CH-1.
LADIES
JANITOR
FLARE FLARE
AS PER DEAITL
WALL BELOW
27000
37500
floor
D3
D4
D4
P-1
STORE
STORE ROOM
9'10" X 8' 6"
HARDWARE
10' X 7' 9"
D1
1800 MM WD PASSAGE
D1
SHAFT
STACK STACK
CE5'
V2
V2
ASCERTAINED AS PER SITE
J
D4
PASSAGE
SHAFT
V1
SHAFT.
P5
GENTS
CE4'
REF DWG-KFIL\WD
D4
V1
492.00
P3
( GROUP - 6 )
FUTURE EXPANSION
D4
TELEPHONE EXCHANGE ROOM
PROJECTOR
SCREEN
DETAIL
STORE RM
14'7" X 9'9"
D5
16' 2" X 7' 1"
ROSTRUM
BATTERIES ROOM
(54)
9' 10" X 21' 6"
CE3'
ELEC
D3
V1
CONDITIONS
P4
D2
2800X1500
SHAFT.
D5
13
D3
22
ELEC ROOM
22
TRAINING -FURNITURE TO
CE2'
P-2
REF DWG-KFIL\
(Interior on hold)
45'3" X 28'10"
FIRE ESCAPE
A
20'6" X 6'1"
17
SCREEN
CE6'
15 1ST PHASE 15
2ND PHASE 32 15
CE1'
492.00 492.00
TOILET TOILET
14 16 32 16
SHAFT.
EMRG. KFIL ADMIN
Q=3t
PIT
5M
TIP
Ø800
23 25 24
E
COKE
50 lts water
cooler 50 lts water
cooler
494.0
50 lts water
C.C.R WARF/COKE
100 lts water
cooler
cooler
39 QUENCHING
RD. TOP RD. TOP HOUSE
+492.30 +492.40
COMPOUND
WALL
9 M WIDE 9 M WIDE 9 M WIDE RD. TOP
+494.00
MELT SHOP
20 lts RO
O & M OFFICE
EMPLOYEE +
RS
35 35
RAMP
EXTENT OF FUTURE
COMPR.
LABOR CANTEEN
A-3500
WITH MOTOR
C.W. PUMP
W1
W1
W
STEEL PLANT AREA
9 M WIDE
9 M WIDE
7 M WIDE
Spectro Lab
GREENBELT
36 36
LINE OF BOUNDARY
RD. TOP
OVER NIGHT
50 lts water
cooler
EXISTING
+493.60
PARKING LOT 250 lph RO
MANUFACTURING UNIT
38
4 M WIDE
7 M WIDE
DG House
Cooling
50 lts water
Tower
PROPOSED
cooler
KFIL FACTORY
RD. TOP
+494.40 RD. TOP
+496.50
F T RE STEEL
PLANT
.314
497.2
BU
494
P1F1
AD
.284 .RO
.496
R.L OR LV
L .497
R.L OR LV
L C.C
Foundry
FBDC
FLO IDF FLO Office
P1F1
7 M WIDE C
FBD LPG DISPOSAL HOPPER -STA
SUB ING N
GARDEN STEEL PLANT AREA R.L
.386
.498 LVL
7
ISTTATIO
EX-S
RD. TOP SUB ING
P2F2
OR
SB & FS
Projection
P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1
FLO
Fettling Shop & Finished Goods
WITH SIGNAGE +501.00 BUILDING EXIS
T
P1F1
F1
F1 F1
P1 P1F1 P1F1 P1F1 P1 P1
F1
P1
F1
P1
Pattern Shop
SECURITY
F1
AREA TO BE
P1 F1
SCRAP
P1
F1
Casting Inward
P1
F1
D S
LFP
P1
F1
New
P1 ROAD F1
F1 P1
P1
Assurance
FLATTENED
F1
SCR
P1
CRANE
STREET LIGHT
Office
Quality
F1
P1
F1
TO DETAIL
F1
P1
P1
F1
P1
GATE
F1
P1
F1
F1
P1 P1
F1
P1
P1
F1
12M WIDE
F1
P1
STREET LIGHT
Scrap Yard
GATE
F1
BRIDGE TO DETAIL
Scrap Yard
P1
COMPOUND
F1
F1
P1
P1
P1
F1 498.45
P1
F1
GARDEN
LANE
F1
P1 F1
ING
P1
F1
WALL
EXIT
P1
12M WIDE
495.2 F1
GATE 5
P1
GREENBELT TO BE ACQUIRED
P1
CHAMBER
F1
12M WIDE
ROAD
BACK GATE
FENCING
P1
45
495. ROAD F1
P1
C/L1'
AIN
DR
X
BO
T
ROAD ROAD
ROAD
SHED SHED PR
EC
AS
C/L1
F1
P1
F2
P2
F2
P2
security
F2
P2
F1
P1
P1F1
P1F1
F1
P1 P1F1 P1F1
F1
P1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1
F1
P1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1
LINE
CABLE LINE
CABLE
P1F1
F1
P1 P1F1 P1F1
F1
P1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1
F1
P1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1
TOILET
TOILET
P1F1
TOWER
BSNL TOWER
BSNL
F1
P1 P1F1 P1F1 P1F1 P1F1
F1
P1 P1F1 P1F1 P1F1
PARKING F1
P1
OUTGATE PE
RF
OR
ATE
D
CO
VE
R
GREENBELT
H
WIT
RT
PRIVATE
CU
X
BO
C
F1
RC
PRIVATE
P1
COMPOUND
F1 P1 P1F1
P1 P1 P1F1 P1 P1 F1
P1F1 P1F1 P1 F1
P1F1 P1F1 P1F1
F1 P1F1 P1F1 P1
F1 P1F1 P1F1 P1F1
F1 P1F1
PROPERTY
F1 P1 P1F1 F1
P1
F1
F1
P1
P1
P1 P1F1
P1F1
P1
F1
F1 HIGH MAST
F1 P1
P1F1 P1F1 P1F1 P1F1 P1F1
F1 1 F1
F1
P1
P1
P1 P1
P1F1
LIGHT TO
P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1 P1F
P1F1 P1F1 F1
F1
F1
P1
P1 P1F1 DETAIL
PROPERTY
P1F1 P1F1 F1 P1 P1F1
P1F1 F1 F1 P1 P1F1
P1F1 P1F1 F1 1 F1 P1
P1 P1 P1F1 P1F1
P1 P1F1 F1 F1 P1 P1F1
P1F F1 P1F1 P1F1 P1F1 P1F1
P1F1 P1 P1F1 P1 P1F1
P1F1 P1F1 P1 P1F1 P1F1
P1F1 P1F1 F1 P1F1 P1F1 P1F1 P1F1 F1
P1F1 P1F1 P1F1 P1F1 F1 F1 F1 F1 P1
P1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1 P1F1
P1F1 P1F1 P1 P1F1 P1F1 P1F1 P1F1 P1F1 P1 P1F1 P1 P1F1 P1F1 P1F1 P1
TO BE ACQUIRED
TO BE ACQUIRED WALL ON RD. TOP PROPERTY CHAMBER
PROPERTY LINE BUS & 2-4 SECURITY +501.60 WEIGH BRIDGE 28 NOS
WITH-OUT GATE GREENBELT
CONTROL RM.
GREENBELT LINE PROPERTY PROPERTY GREENBELT
WHEELER QUEUED GREENBELT HUME PIPE 1200mm DIA. 3 ROW
TR RTH
-ALL DIMENSIONS ARE IN MM. RESPONSIBLE FOR THEIR RESPECTIVE PRODUCT'S QUALITY R1: 12.11.2021 CLIENT
UE
1. UPDATED AS PER LATEST MASTERPLAN.
NO
- DO NOT SCALE DWGS, ALL DIMS ARE TO BE CHECKED ON & PERFORMANCE. AHCEPL
HVAC : DRAWN BY : TAYYIBA/ DHANYA
SITE
- ALL STRUCTURAL/SERVICE DWGS TO BE READ IN
INTERFACING & COMPATIBILITY OF THEIR PRODUCTS WITH
THE OTHER IMMEDIATE MATERIALS SHOULD BE ENSURED. R2: 24.06.2025
CIVIL CONTR. - - CIVIL/ BOQ : AHCEPL CHECKED
66, HUTCHIN'S RD, 2ND CROSS,
ST THOMAS TN, BANGALORE 560084
CONJUNCTION WITH ARCHITECTURAL DWGS, TO BE
CO-RELATED WITH SCHEDULE OF QUANTITIES. - SHOP DWGS. TO BE PREPARED BY THE RELEVANT
1. LEGENDS HAVE BEEN UPDATED.
2. EXISTING TREE INDICATED.
CIVIL/ CRUTHI - - PMC : AHCEPL
- THE DET. IN ALL DWGS TO BE READ PROPERLY, AGENCIES ( MS FABRICATOR, ROOFING CONTRACTOR, ETC.) FILE PATH:\\Lf-5\d\LF-1 DATA\D Drive\KFIL-2020\KFIL_COKE OVEN P.P_2020\2. DRAWINGS\1. KFIL_SITE
UNDERSTOOD AND EXECUTED BY COMPETENT, QUALIFIED @ GOT APP. BEFORE EXECUTION.
3. PROPOSED SERVICE RD BETWEEN NH-63 & KFIL PROPERTY (I.E BETWEEN GATE 1 & 4) IS NOT INDICATED IN THIS DWG. YET TO BE ADDED.
STRUCTURAL - - SERIES\KFIL.CO.LS_LANDSCAPE\KFIL.CO.LS.1.0_LANDSCAPE MASTERPLAN_R1_24.06.2025.dwg
TEL : 080 - 25485161 FAX : 080 - 25485162 E-mail : [email protected]
ENGINEERING PERSONNEL TRAINED IN CONSTRUCTION
WORK OF SUCH NATURE, POSSESSING ADEQUATE
KNOWLEDGE OF GOOD ENGINEERING PRACTICE &
- THIS DWG IS THE PROPERTY OF LIVING FORM ARCHITECTS
BANGALORE AND NOT TO BE COPIED OR USED WITHOUT P.H.E. - - PRO ECT TITLE DRAWING TITLE
THEIR PERMISSION OR LOANED TO A THIRD PARTY FOR ANY
RELEVANT CODES AND STANDARDS.
- ARCHITECTURAL CONSULTANTS CANNOT TAKE
PURPOSE OTHER THAN FOR WHICH IT HAS BEEN ISSUED. ELECTRICAL - - ADVANCE COP PROPOSED LANDSCAPE DESIGN FOR KFIL
PART MASTER PLAN- LANDSCAPE
RESPONSIBILITY FOR ERRORS/LAPSES DURING EXECUTION
- COKE OVEN/ P.P
AS A CONSEQUENCE OF IMPROPER, INADEQUATE OR
EXTERNAL DIMENSION FROM OUT TO CENTRELINE.
LANDSCAPE * COKE OVEN WITH 30M/W POWER PLANT,
INCOMPETENT STUDY OF DWGS.
- ANY DOUBTS/ERRORS IN DWGS. TO BE BROUGHT TO THE
- INTERNAL DIMENSION FROM c/c.
P.M.C./ AHCEPL - - HOSPET,KARNATAKA DWG NO CO/KFIL/LS/1.0/R2
NOTICE OF THE ARCHITECT. - GRID LINES ALIGNED TO EXISTING BUILDING.