0% found this document useful (0 votes)
13 views2 pages

CW58

The document is a Quality Control Form for a grouting authorization report related to a construction project. It includes sections for various areas to be grouted, as well as spaces for signatures and dates from mechanical and civil subcontractors, inspectors, and the client. The form is designed to ensure proper authorization and documentation of the grouting process.

Uploaded by

João Fernandes
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views2 pages

CW58

The document is a Quality Control Form for a grouting authorization report related to a construction project. It includes sections for various areas to be grouted, as well as spaces for signatures and dates from mechanical and civil subcontractors, inspectors, and the client. The form is designed to ensure proper authorization and documentation of the grouting process.

Uploaded by

João Fernandes
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

PROJECT:

OWNER:

QUALITY CONTROL FORM CW 58 PROJ. No.: QCF REV. SH. 1 OF 1

GROUTING AUTHORIZATION REPORT SUBCONTRACTOR: CW 58 N°

STEEL STRUCTURES
STATIC EQUIPMENT
ROTATING MACHINERY

ITEMS TO BE GROUTED

AREA AREA
AREA AREA
AREA AREA
AREA AREA
AREA AREA
AREA AREA
AREA AREA
AREA AREA

RELEASED BY

MECHANICAL DATE CONTRACTOR’ S DATE


SUBCONTRACTOR MECHAN. SUPERV.

REMARKS:

RECEIVED BY

CIVIL DATE CONTRACTOR’ S DATE


SUBCONTRACTOR CIVIL SUPERV.

INSPECTORS C.CONTRACTOR CONTRACTOR CLIENT


NAME
SIGNATURE
DATE

You might also like