0% found this document useful (0 votes)
17 views1 page

LETTER No. 1-2023 REQUEST FOR FEASIBILITY AND DESIGN POINT FOR UTILIZATION SYSTEM 10-22.9 KV IRURO DAM

This letter from Mrs. Dunia Pelagia Alarcon Flores requests ELECTRODUNAS S.A.A. to assess the feasibility of electrical supply for a project at Iruro Dam, requiring a maximum demand of 32 KW. It outlines necessary documentation and information needed for the feasibility study, including legal representation and property ownership verification. The designated contact for the project is Eng. Walter Rufo Machaca Carbajal.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views1 page

LETTER No. 1-2023 REQUEST FOR FEASIBILITY AND DESIGN POINT FOR UTILIZATION SYSTEM 10-22.9 KV IRURO DAM

This letter from Mrs. Dunia Pelagia Alarcon Flores requests ELECTRODUNAS S.A.A. to assess the feasibility of electrical supply for a project at Iruro Dam, requiring a maximum demand of 32 KW. It outlines necessary documentation and information needed for the feasibility study, including legal representation and property ownership verification. The designated contact for the project is Eng. Walter Rufo Machaca Carbajal.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Ica, June 13, 2023

LETTER No. 001-2023


Gentlemen: ELECTRODUNAS S.A.A.
Panamerican Highway South Km 300.5, Urbanization La Angostura, Ica
Attention: Commercial Management
Subject: Request for the feasibility of electrical supply and establishment of point of
design for a maximum demand of 32 KW, for the project:
USAGE SYSTEM IN MT, AT 10/22.9 KV, THREE-PHASE
FOR IRURO DAM, LUCANAS DISTRICT, PROVINCE OF
LUCANAS, AYACUCHO DEPARTMENT
Reference: R.D. No. 018-2002-EM/DGE

From my consideration:

Through this letter, I am pleased to address your represented entity for the purpose of
greet you cordially and at the same time inform you that the file is being prepared.
technician of the mentioned project, so it is essential to have the feasibility of
electric power supply.

For this purpose, in compliance with the current legal regulations (R.D. N° 018-
2002-EM/DGE), item 9.1, we reached the following documents:

1. Request from the Interested Party or the design engineer to the concessionaire for the
feasibility and the design point.
2. Copy of the document that certifies the legal representation of the Interested Party.
2 copies of the location map at a scale of 1/5000 or 1/10000 with
indication of the access routes to the area to be electrified or physical references that
allow their easy location with respect to existing facilities.
4. Copy of the document that verifies ownership of the property. In the case of properties
rented, additionally present the written authorization from the owner to
request the electrical supply from the Concessionaire.
5. Maximum demand, coincidence factor, and equipment ratio.

We also request that you provide us with the network parameters at the point of
design, to carry out the study of protection against ground faults.

Finally, a person has been designated responsible for the preparation of the Project.
Electrician to Eng. Walter Rufo Machaca Carbajal, with CIP Registration No. 119943 to whom
they can contact according to the following data:

Cell phone: 935675207


Email:[email protected]

Without any further ado, awaiting your attention to this matter, we remain yours.

Sincerely,

________________________________

Mrs. Dunia Pelagia Alarcon Flores

Legal Representative Consortium Acari

You might also like