22 05 03 Improvement of New Power Plant Roofing at Puerto Princesa International Airport Bid Documents
22 05 03 Improvement of New Power Plant Roofing at Puerto Princesa International Airport Bid Documents
IMPROVEMENT OF NEW
POWER PLANT ROOFING
AT
PUERTO PRINCESA INTERNATIONAL
AIRPORT
22-05-03
Sixth Edition
May 31 – June 20, 2022
Preface
2
TABLE OF CONTENTS
3
7. Warranty..................................................................................................................22
8. Liability of the Contractor.......................................................................................22
9. Termination for Other Causes .................................................................................22
10. Dayworks ................................................................................................................23
11. Program of Work.....................................................................................................23
12. Instructions, Inspections and Audits .......................................................................23
13. Advance Payment ...................................................................................................23
14. Progress Payments ..................................................................................................23
15. Operating and Maintenance Manuals......................................................................23
Section V. Special Conditions of Contract..................................................... 25
Section VI. Specifications ................................................................................ 27
Section VII. Drawings ...................................................................................... 33
Section VIII. Bill of Quantities ....................................................................... 44
Section IX. Bidding Forms Sample ................................................................ 55
Section X. Checklist of Technical and Financial Documents ...................... 82
4
Glossary of
Terms, Abbreviations, and Acronyms
ABC – Approved Budget for the Contract.
ARCC – Allowable Range of Contract Cost.
BAC – Bids and Awards Committee.
Bid – A signed offer or proposal to undertake a contract submitted by a bidder in response to
and in consonance with the requirements of the bidding documents. Also referred to as
Proposal and Tender. (2016 revised IRR, Section 5[c])
Bidder – Refers to a contractor, manufacturer, supplier, distributor and/or consultant who
submits a bid in response to the requirements of the Bidding Documents. (2016 revised IRR,
Section 5[d])
Bidding Documents – The documents issued by the Procuring Entity as the bases for bids,
furnishing all information necessary for a prospective bidder to prepare a bid for the Goods,
Infrastructure Projects, and/or Consulting Services required by the Procuring Entity. (2016
revised IRR, Section 5[e])
BIR – Bureau of Internal Revenue.
BSP – Bangko Sentral ng Pilipinas.
CDA – Cooperative Development Authority.
Consulting Services – Refer to services for Infrastructure Projects and other types of projects
or activities of the GOP requiring adequate external technical and professional expertise that
are beyond the capability and/or capacity of the GOP to undertake such as, but not limited to:
(i) advisory and review services; (ii) pre-investment or feasibility studies; (iii) design; (iv)
construction supervision; (v) management and related services; and (vi) other technical services
or special studies. (2016 revised IRR, Section 5[i])
Contract – Refers to the agreement entered into between the Procuring Entity and the Supplier
or Manufacturer or Distributor or Service Provider for procurement of Goods and Services;
Contractor for Procurement of Infrastructure Projects; or Consultant or Consulting Firm for
Procurement of Consulting Services; as the case may be, as recorded in the Contract Form
signed by the parties, including all attachments and appendices thereto and all documents
incorporated by reference therein.
Contractor – is a natural or juridical entity whose proposal was accepted by the Procuring
Entity and to whom the Contract to execute the Work was awarded. Contractor as used in these
Bidding Documents may likewise refer to a supplier, distributor, manufacturer, or consultant.
CPI – Consumer Price Index.
DOLE – Department of Labor and Employment.
DTI – Department of Trade and Industry.
Foreign-funded Procurement or Foreign-Assisted Project – Refers to procurement whose
funding source is from a foreign government, foreign or international financing institution as
5
specified in the Treaty or International or Executive Agreement. (2016 revised IRR, Section
5[b]).
GFI – Government Financial Institution.
GOCC – Government-owned and/or –controlled corporation.
Goods – Refer to all items, supplies, materials and general support services, except Consulting
Services and Infrastructure Projects, which may be needed in the transaction of public
businesses or in the pursuit of any government undertaking, project or activity, whether in the
nature of equipment, furniture, stationery, materials for construction, or personal property of
any kind, including non-personal or contractual services such as the repair and maintenance of
equipment and furniture, as well as trucking, hauling, janitorial, security, and related or
analogous services, as well as procurement of materials and supplies provided by the Procuring
Entity for such services. The term “related” or “analogous services” shall include, but is not
limited to, lease or purchase of office space, media advertisements, health maintenance
services, and other services essential to the operation of the Procuring Entity. (2016 revised
IRR, Section 5[r])
GOP – Government of the Philippines.
Infrastructure Projects – Include the construction, improvement, rehabilitation, demolition,
repair, restoration or maintenance of roads and bridges, railways, airports, seaports,
communication facilities, civil works components of information technology projects,
irrigation, flood control and drainage, water supply, sanitation, sewerage and solid waste
management systems, shore protection, energy/power and electrification facilities, national
buildings, school buildings, hospital buildings, and other related construction projects of the
government. Also referred to as civil works or works. (2016 revised IRR, Section 5[u])
LGUs – Local Government Units.
NFCC – Net Financial Contracting Capacity.
NGA – National Government Agency.
PCAB – Philippine Contractors Accreditation Board.
PhilGEPS - Philippine Government Electronic Procurement System.
Procurement Project – refers to a specific or identified procurement covering goods,
infrastructure project or consulting services. A Procurement Project shall be described,
detailed, and scheduled in the Project Procurement Management Plan prepared by the agency
which shall be consolidated in the procuring entity's Annual Procurement Plan. (GPPB Circular
No. 06-2019 dated 17 July 2019)
PSA – Philippine Statistics Authority.
SEC – Securities and Exchange Commission.
SLCC – Single Largest Completed Contract.
UN – United Nations.
6
Section I. Invitation to Bid
7
Republic of the Philippines
CIVIL AVIATION AUTHORITY OF THE PHILIPPINES
8
3. Bidding will be conducted through open competitive bidding procedures using non-
discretionary “pass/fail” criterion as specified in the 2016 revised Implementing Rules and
Regulations (IRR) of Republic Act (RA) No. 9184.
4. Interested bidders may obtain further information from CAAP – AREA IV BAC Office
on May 31, 2022 until deadline of submission of bid and inspect the Bidding Documents
at the address given below from Monday to Friday – 8:00 am to 5:00 pm, except for
holidays.
5. A complete set of Bidding Documents may be acquired by interested bidders on May 31,
2022 until deadline of submission of bid from given address and website/s below and
upon payment of the applicable fee for the Bidding Documents, pursuant to the latest
Guidelines issued by the GPPB, in the amount of Five Thousand Pesos & 00/100 Only
(PhP5,000.00) (exclusive of additional 12% VAT).The Procuring Entity shall allow the
bidder to present its proof of payment for the fees by presenting the official receipt in
person or by sending it to the email address given below.
7. Bids must be duly received by the BAC Secretariat through (i) manual submission at
CAAP PPIA BAC Area Center IV Office, Admin Building, Brgy. San Miguel, Puerto
Princesa City, (ii) online or electronic submission as indicated below, or (iii) both, on or
before June 20, 2022, 2:00 p.m. late bids shall not be accepted.
8. All bids must be accompanied by a bid security in any of the acceptable forms and in the
amount stated in ITB Clause 16.
9. Bid opening shall be on June 20, 2022, 3:00 p.m. onwards at CAAP PPIA Conference
Room, Engineering Building, Brgy. San Miguel, Puerto Princesa City, Bids will be
opened in the presence of the bidders’ representatives who choose to attend the activity.
11. Each Bidder shall submit, at their option, hard copy and/or electronic copy of their bids.
a. For hard copy, one original and two copies of the first and second components of its bid.
Three-envelope system.
b. For electronic copy, submit a Searchable Portable Document Format (Searchable PDF),
the first and second components of its bid in two separate files, both must be digitally
signed, and password protected.
9
Rules and Regulations (IRR) of RA No. 9184, without thereby incurring any liability to
the affected bidder or bidders.
JELYN B. GABUCO
Head BAC Secretariat
Civil Aviation Authority of the Philippines-Puerto Princesa International Airport
CAAP – PPIA BAC AREA IV Office
Admin. Building,
National Highway, Brgy. San Miguel
Puerto Princesa City, 5300, Palawan
Telephone Number – (048) 433-4965
[email protected]
10
Section II. Instructions to Bidders
11
1. Scope of Bid
2. Funding Information
2.1. The GOP through the source of funding as indicated below for CAAP Corporate
Budget CY 2021 in the amount of ONE MILLION FOUR HUNDRED NINETY-
NINE THOUSAND EIGHT HUNDRED SEVENTY-SIX PESOS & 78/100
ONLY (PHP1,499,876.78).
2.2. The source of funding is GOCC and GFIs, the proposed Corporate Operating
Budget.
3. Bidding Requirements
The Bidding for the Project shall be governed by all the provisions of RA No. 9184 and
its 2016 revised IRR, including its Generic Procurement Manual and associated policies,
rules and regulations as the primary source thereof, while the herein clauses shall serve as
the secondary source thereof.
Any amendments made to the IRR and other GPPB issuances shall be applicable only to
the ongoing posting, advertisement, or invitation to bid by the BAC through the issuance
of a supplemental or bid bulletin.
The Bidder, by the act of submitting its Bid, shall be deemed to have inspected the site,
determined the general characteristics of the contracted Works and the conditions for this
Project, such as the location and the nature of the work; (b) climatic conditions; (c)
transportation facilities; (c) nature and condition of the terrain, geological conditions at the
site communication facilities, requirements, location and availability of construction
aggregates and other materials, labor, water, electric power and access roads; and (d) other
factors that may affect the cost, duration and execution or implementation of the contract,
project, or work and examine all instructions, forms, terms, and project requirements in
the Bidding Documents.
The Procuring Entity, as well as the Bidders and Contractors, shall observe the highest
standard of ethics during the procurement and execution of the contract. They or through
an agent shall not engage in corrupt, fraudulent, collusive, coercive, and obstructive
12
practices defined under Annex “I” of the 2016 revised IRR of RA No. 9184 or other
integrity violations in competing for the Project.
5. Eligible Bidders
5.1. Only Bids of Bidders found to be legally, technically, and financially capable will
be evaluated.
5.2. The Bidder must have an experience of having completed a Single Largest
Completed Contract (SLCC) that is similar to this Project, equivalent to at least fifty
percent (50%) of the ABC adjusted, if necessary, by the Bidder to current prices
using the PSA’s CPI, except under conditions provided for in Section 23.4.2.4 of the
2016 revised IRR of RA No. 9184.
5.3. For Foreign-funded Procurement, the Procuring Entity and the foreign
government/foreign or international financing institution may agree on another track
record requirement, as specified in the Bidding Document prepared for this purpose.
5.4. The Bidders shall comply with the eligibility criteria under Section 23.4.2 of the
2016 IRR of RA No. 9184.
There is no restriction on the origin of Goods other than those prohibited by a decision of
the UN Security Council taken under Chapter VII of the Charter of the UN.
7. Subcontracts
8. Pre-Bid Conference
The Procuring Entity will hold a pre-bid conference for this Project on the specified date
and time as indicated in paragraph 6 of the IB.
Prospective bidders may request for clarification on and/or interpretation of any part of the
Bidding Documents. Such requests must be in writing and received by the Procuring
Entity, either at its given address or through electronic mail indicated in the IB, at least ten
(10) calendar days before the deadline set for the submission and receipt of Bids.
10.1. The first envelope shall contain the eligibility and technical documents of the Bid as
specified in Section IX. Checklist of Technical and Financial Documents.
13
10.2. If the eligibility requirements or statements, the bids, and all other documents for
submission to the BAC are in foreign language other than English, it must be
accompanied by a translation in English, which shall be authenticated by the
appropriate Philippine foreign service establishment, post, or the equivalent office
having jurisdiction over the foreign bidder’s affairs in the Philippines. For
Contracting Parties to the Apostille Convention, only the translated documents shall
be authenticated through an apostille pursuant to GPPB Resolution No. 13-2019
dated 23 May 2019. The English translation shall govern, for purposes of
interpretation of the bid.
10.3. A valid PCAB License is required, and in case of joint ventures, a valid special
PCAB License, and registration for the type and cost of the contract for this Project.
Any additional type of Contractor license or permit shall be indicated in the BDS.
10.4. A List of Contractor’s key personnel (e.g., Project Manager, Project Engineers,
Materials Engineers, and Foremen) assigned to the contract to be bid, with their
complete qualification and experience data shall be provided. These key personnel
must meet the required minimum years of experience set in the BDS.
10.5. A List of Contractor’s major equipment units, which are owned, leased, and/or under
purchase agreements, supported by proof of ownership, certification of availability
of equipment from the equipment lessor/vendor for the duration of the project, as the
case may be, must meet the minimum requirements for the contract set in the BDS.
11.1. The second bid envelope shall contain the financial documents for the Bid as
specified in Section IX. Checklist of Technical and Financial Documents.
11.2. Any bid exceeding the ABC indicated in paragraph 1 of the IB shall not be accepted.
11.3. For Foreign-funded procurement, a ceiling may be applied to bid prices provided the
conditions are met under Section 31.2 of the 2016 revised IRR of RA No. 9184.
Bidders shall submit offers that comply with the requirements of the Bidding Documents,
including the basic technical design as indicated in the drawings and specifications. Unless
there is a value engineering clause in the BDS, alternative Bids shall not be accepted.
All bid prices for the given scope of work in the Project as awarded shall be considered as
fixed prices, and therefore not subject to price escalation during contract implementation,
except under extraordinary circumstances as determined by the NEDA and approved by
the GPPB pursuant to the revised Guidelines for Contract Price Escalation guidelines.
14
14. Bid and Payment Currencies
14.1. Bid prices may be quoted in the local currency or tradeable currency accepted by the
BSP at the discretion of the Bidder. However, for purposes of bid evaluation, Bids
denominated in foreign currencies shall be converted to Philippine currency based
on the exchange rate as published in the BSP reference rate bulletin on the day of the
bid opening.
15.1. The Bidder shall submit a Bid Securing Declaration or any form of Bid Security in
the amount indicated in the BDS, which shall be not less than the percentage of the
ABC in accordance with the schedule in the BDS.
15.2. The Bid and bid security shall be valid until One Hundred Twenty (120) calendar
days from the date of Opening of Bids. Any bid not accompanied by an acceptable
bid security shall be rejected by the Procuring Entity as non-responsive.
Each Bidder shall submit one copy of the first and second components of its Bid.
The Procuring Entity may request additional hard copies and/or electronic copies of the
Bid. However, failure of the Bidders to comply with the said request shall not be a ground
for disqualification.
If the Procuring Entity allows the submission of bids through online submission to the
given website or any other electronic means, the Bidder shall submit an electronic copy of
its Bid, which must be digitally signed. An electronic copy that cannot be opened or is
corrupted shall be considered non-responsive and, thus, automatically disqualified.
18.1. The BAC shall open the Bids in public at the time, on the date, and at the place
specified in paragraph 9 of the IB. The Bidders’ representatives who are present shall
sign a register evidencing their attendance. In case videoconferencing, webcasting
or other similar technologies will be used, attendance of participants shall likewise
be recorded by the BAC Secretariat.
In case the Bids cannot be opened as scheduled due to justifiable reasons, the
rescheduling requirements under Section 29 of the 2016 revised IRR of RA No. 9184
shall prevail.
15
18.2. The preliminary examination of Bids shall be governed by Section 30 of the 2016
revised IRR of RA No. 9184.
19.1. The Procuring Entity’s BAC shall immediately conduct a detailed evaluation of all
Bids rated “passed” using non-discretionary pass/fail criteria. The BAC shall
consider the conditions in the evaluation of Bids under Section 32.2 of 2016 revised
IRR of RA No. 9184.
19.2. If the Project allows partial bids, all Bids and combinations of Bids as indicated in
the BDS shall be received by the same deadline and opened and evaluated
simultaneously so as to determine the Bid or combination of Bids offering the lowest
calculated cost to the Procuring Entity. Bid Security as required by ITB Clause 16
shall be submitted for each contract (lot) separately.
19.3. In all cases, the NFCC computation pursuant to Section 23.4.2.6 of the 2016 revised
IRR of RA No. 9184 must be sufficient for the total of the ABCs for all the lots
participated in by the prospective Bidder.
Within a non-extendible period of five (5) calendar days from receipt by the Bidder of the
notice from the BAC that it submitted the Lowest Calculated Bid, the Bidder shall submit
its latest income and business tax returns filed and paid through the BIR Electronic Filing
and Payment System (eFPS), and other appropriate licenses and permits required by law
and stated in the BDS.
The documents required in Section 37.2 of the 2016 revised IRR of RA No. 9184 shall
form part of the Contract. Additional Contract documents are indicated in the BDS.
16
Section III. Bid Data Sheet
17
Bid Data Sheet
ITB Clause
5.2 For this purpose, contracts similar to the Project refer to contracts which have
the same major categories of work, which shall be:
“Building Construction”
7.1 Subcontracting is not allowed.
10.3 Valid PCAB License or Special PCAB License in case of Joint Ventures, and
registration (Small B – License Category C & D) for the type and cost of this
project.
10.4 The key personnel must meet the required minimum years of experience set
below:
18
Password for the files shall only be provided by the bidder during the
opening of the bids.
c. For electronic copy, both files, the first and second components must be
named accordingly (i.e., Eligibility and Technical, Financial), and be
placed in a folder named with the identification number of this bidding.
d. Electronic copy may be submitted via USB flash drive or cd/dvd rom, or
thru email [email protected].
e. An electronic copy that cannot be opened or is corrupted shall be
considered non-responsive and, thus, automatically disqualified.
f. Likewise, an electronic copy that contains virus/malware as determined
by the BAC pc/laptop shall not be opened and be considered non-
responsive and, thus, automatically disqualified.
19.2 Partial bid is not allowed. The infrastructure project is packaged in a single lot
and the lot shall not be divided into sub-lots for the purpose of bidding
evaluation, and contract award.
20 The bidder with the Lowest Calculated Bid (LCB) that complies with and is
responsive to all the requirements and conditions shall:
- Construction/Work schedule
- S-curve
- PERT/CPM
- Manpower Schedule
- Equipment Utilization Schedule
- Construction/Work methods
- Constructor’s All Risk Insurance
- Construction Safety & Health Programs (CSHP) approved by the
Department of Labor & Employment (DOLE) (IMPROVEMENT OF
NEW POWER PLANT ROOFING AT PUERTO PRINCESA
INTERNATIONAL AIRPORT)
- Performance Security
19
Section IV. General Conditions of Contract
20
1. Scope of Contract
This Contract shall include all such items, although not specifically mentioned, that can be
reasonably inferred as being required for its completion as if such items were expressly
mentioned herein. All the provisions of RA No. 9184 and its 2016 revised IRR, including
the Generic Procurement Manual, and associated issuances, constitute the primary source
for the terms and conditions of the Contract, and thus, applicable in contract
implementation. Herein clauses shall serve as the secondary source for the terms and
conditions of the Contract.
This is without prejudice to Sections 74.1 and 74.2 of the 2016 revised IRR of RA No.
9184 allowing the GPPB to amend the IRR, which shall be applied to all procurement
activities, the advertisement, posting, or invitation of which were issued after the
effectivity of the said amendment.
3. Possession of Site
4.1. The Procuring Entity shall give possession of all or parts of the Site to the Contractor
based on the schedule of delivery indicated in the SCC, which corresponds to the
execution of the Works. If the Contractor suffers delay or incurs cost from failure
on the part of the Procuring Entity to give possession in accordance with the terms
of this clause, the Procuring Entity’s Representative shall give the Contractor a
Contract Time Extension and certify such sum as fair to cover the cost incurred,
which sum shall be paid by Procuring Entity.
4.2. If possession of a portion is not given by the above date, the Procuring Entity will
be deemed to have delayed the start of the relevant activities. The resulting
adjustments in contract time to address such delay may be addressed through
contract extension provided under Annex “E” of the 2016 revised IRR of RA No.
9184.
The Contractor shall employ the key personnel named in the Schedule of Key Personnel
indicating their designation, in accordance with ITB Clause 10.3 and specified in the BDS,
to carry out the supervision of the Works.
The Procuring Entity will approve any proposed replacement of key personnel only if their
relevant qualifications and abilities are equal to or better than those of the personnel listed
in the Schedule.
21
5. Performance Security
5.1. Within ten (10) calendar days from receipt of the Notice of Award from the
Procuring Entity but in no case later than the signing of the contract by both parties,
the successful Bidder shall furnish the performance security in any of the forms
prescribed in Section 39 of the 2016 revised IRR.
5.2. The Contractor, by entering into the Contract with the Procuring Entity,
acknowledges the right of the Procuring Entity to institute action pursuant to RA
No. 3688 against any subcontractor be they an individual, firm, partnership,
corporation, or association supplying the Contractor with labor, materials and/or
equipment for the performance of this Contract.
The Contractor, in preparing the Bid, shall rely on any Site Investigation Reports referred
to in the SCC supplemented by any information obtained by the Contractor.
7. Warranty
7.1. In case the Contractor fails to undertake the repair works under Section 62.2.2 of the
2016 revised IRR, the Procuring Entity shall forfeit its performance security, subject
its property(ies) to attachment or garnishment proceedings, and perpetually
disqualify it from participating in any public bidding. All payables of the GOP in his
favor shall be offset to recover the costs.
7.2. The warranty against Structural Defects/Failures, except that occasioned-on force
majeure, shall cover the period from the date of issuance of the Certificate of Final
Acceptance by the Procuring Entity. Specific duration of the warranty is found in
the SCC.
Subject to additional provisions, if any, set forth in the SCC, the Contractor’s liability
under this Contract shall be as provided by the laws of the Republic of the Philippines.
If the Contractor is a joint venture, all partners to the joint venture shall be jointly and
severally liable to the Procuring Entity.
Contract termination shall be initiated in case it is determined prima facie by the Procuring
Entity that the Contractor has engaged, before, or during the implementation of the
contract, in unlawful deeds and behaviors relative to contract acquisition and
implementation, such as, but not limited to corrupt, fraudulent, collusive, coercive, and
obstructive practices as stated in ITB Clause 4.
22
10. Dayworks
Subject to the guidelines on Variation Order in Annex “E” of the 2016 revised IRR of RA
No. 9184, and if applicable as indicated in the SCC, the Dayworks rates in the Contractor’s
Bid shall be used for small additional amounts of work only when the Procuring Entity’s
Representative has given written instructions in advance for additional work to be paid for
in that way.
11.1. The Contractor shall submit to the Procuring Entity’s Representative for approval
the said Program of Work showing the general methods, arrangements, order, and
timing for all the activities in the Works. The submissions of the Program of Work
are indicated in the SCC.
11.2. The Contractor shall submit to the Procuring Entity’s Representative for approval an
updated Program of Work at intervals no longer than the period stated in the SCC.
If the Contractor does not submit an updated Program of Work within this period,
the Procuring Entity’s Representative may withhold the amount stated in the SCC
from the next payment certificate and continue to withhold this amount until the next
payment after the date on which the overdue Program of Work has been submitted.
The Contractor shall permit the GOP or the Procuring Entity to inspect the Contractor’s
accounts and records relating to the performance of the Contractor and to have them
audited by auditors of the GOP or the Procuring Entity, as may be required.
The Procuring Entity shall, upon a written request of the Contractor which shall be
submitted as a Contract document, make an advance payment to the Contractor in an
amount not exceeding fifteen percent (15%) of the total contract price, to be made in lump
sum, or at the most two installments according to a schedule specified in the SCC, subject
to the requirements in Annex “E” of the 2016 revised IRR of RA No. 9184.
The Contractor may submit a request for payment for Work accomplished. Such requests
for payment shall be verified and certified by the Procuring Entity’s Representative/Project
Engineer. Except as otherwise stipulated in the SCC, materials and equipment delivered
on the site but not completely put in place shall not be included for payment.
15.1. If required, the Contractor will provide “as built” Drawings and/or operating and
maintenance manuals as specified in the SCC.
23
15.2. If the Contractor does not provide the Drawings and/or manuals by the dates stated
above, or they do not receive the Procuring Entity’s Representative’s approval, the
Procuring Entity’s Representative may withhold the amount stated in the SCC from
payments due to the Contractor.
24
Section V. Special Conditions of Contract
25
Special Conditions of Contract
GCC Clause
2 The Intended Completion Date is Ninety (90) calendar days.
NOTE: The contract duration shall be reckoned from the start date and
not from contract effectivity date.
NOTE: The start date shall be the date of receipt of the Notice to Proceed.
7.2 Warranty
In case of permanent structures, such as buildings of types 4 and 5 as
classified under the National Building Code of the Philippines and other
structures made of steel, iron, or concrete which comply with relevant
structural codes (e.g., DPWH Standard Specifications), such as, but not
limited to, steel/concrete bridges, flyovers, aircraft movement areas,
ports, dams, tunnels, filtration and treatment plants, sewerage systems,
power plants, transmission and communication towers, railway system,
and other similar permanent structures: Fifteen (15) years.
13 The amount of the advance payment shall not exceed 15% of the total
contract price. However, as per Department of Transportation (DOTr)
Policy, the Procuring Entity will not give advance payment to contractors.
Page 26
Section VI. Specifications
Page 27
Republic of the Philippines
CIVIL AVIATION AUTHORITY OF THE PHILIPPINES
1.0 GENERAL
Page 28
case to the Procuring Entity. Request for changes, alteration and deviation of
work on the approved program of work, lay-outs plan, design and scope of
work shall not be done without the approval of the Head of Procuring Entity.
TWO (2) SETS of clean Plans and specification shall always be kept at the
jobsite to be available to the Head of Procuring Entity or his/her representative upon
his request during the construction.
The contractor shall be responsible for securing all necessary permits related to
the project, including payment of assessed as may be required.
The details of work are the best enumerated below, but be noted that the Contract
includes all works and services although not specifically mentioned herein, but are
needed to fully complete the Project.
The Contractor shall bear the responsibility of checking all the numbers and
units as indicated in the Bill of Quantities. It is understood that the Contractor shall
supply and install the required units in accordance with the Plans and the Specifications.
Any excess in the bill of quantities shall be the property of the Procuring Entity.
Page 29
3. In case of a price difference, the Procuring Entity (CAAP) shall receive all
benefits of the difference in cost involved in any substitution and the
Contract shall be altered by Change Order to credit the Procuring Entity
(CAAP) with any savings so obtained.
The Contractor shall conduct thorough inspection of the existing job site
conditions.
The scope of work shall include all additions necessary in order to implement
the whole set of approved Plans, Working Drawings and Specifications.
The Contractor shall secure and do all the legwork necessary for all pertinent
permits needed for the Procuring Entity.
The Contractor shall construct all works in accordance with the Plans and
Specifications. All items shown on the Plans but not mentioned in the Specifications
shall be included. Discrepancies shall be verified with the Head of Procuring Entity.
The Contractor shall have licensed professionals required in the execution of the
project which they have submitted in their bid. Shop drawings of actual reference
marks shall be verified and approved by the Head of Procuring Entity prior to any
permanent construction. Contactor shall refer to the General Nature and Scope of Work
and other Bid Documents for more extensive description of the work.
The Contractor shall submit details and shop drawings, templates, and schedules
required for the coordination of the work of the various trades. Drawings should
include information on all working dimensions, arrangement and sectional views,
connections and materials.
The Contractor shall be responsible for the safety and safe working practices of
its respective employees and agents.
The Head of Procuring Entity may at any time without invalidating the Contract
make changes by altering, adding to or deducting from the work as covered by the
drawings, specifications, and general scope in written instructions.
Page 30
6.0 MOBILIZATION/DEMOBILIZATION
Mobilization shall include all activities and associated costs for transportation
of contractor’s personnel, equipment, and operating supplies to the site; establishment
of offices, temporary facilities and other necessary general facilities for the contractor’s
operations at the site.
This Item shall consist of the general description of the materials, equipment,
workmanship and construction requirements of concrete structure and the concrete
portions of composite structures conforming to the alignment, grades, design,
dimensions and details shown on the Plans and accordance with the specifications for
piles, reinforcing steel, structural steel, structural concrete and other items which
constitute the completed structure. The class of concrete to be used in the structure or
part of the structure shall be as specified in Item 405, Structural Concrete.
The work includes all materials, labor and equipment for the construction of
concrete pedestal of covered area including cut, bend & place of reinforced steel bars
and formworks as specified on the plans.
All steel works, including steel welding works, shall be executed with
workmanship of the best quality. The work includes all materials, labor and
equipment’s utilized for the fabrication of steel rafter, steel rigid, steel fascia frame,
steel girt and roofing works.
Page 31
machine and other electrical equipment’s necessary for the completion on the scope of
work
The painting contractor shall supply all labor, paint materials, and equipment
necessary, and shall perform all painting and finishing work as shown in the schedule
of painting and finishing work for the project.
Before any painting is to be done, all surfaces shall be cleaned, smoothed and
freed from dust, dirt grease, and other foreign substances. All parts where paint remover
has been used shall be washed off with paint or lacquer thinner. All paints shall be
spread evenly and carefully.
All paint and paint materials shall be delivered to the building site in unbroken
packages, compliant with the specifications prescribes in the “Bill of Quantities” and
bearing the marks of the specified brand. No adulteration of specified paints with other
brand shall be allowed.
Application:
The contractor shall include a Construction Safety and Health Program for the
project by providing necessary gear and protective accessories for workers such as
safety helmet, shoes, vest, gloves, boots and raincoats if necessary are to be provided.
The Contractor should also provide two (2) units of Handheld radio for the necessary
coordination with the Control Tower during the activity. A Safety Practitioner and
Health Personnel are required a list of safety protocols shall be provided. The contractor
shall be solely liable for any accidents/injury caused to any person by reason of
negligence at the work area.
Page 32
Section VII. Drawings
Page 33
Page 34
Page 35
Page 36
Page 37
Page 38
Page 39
Page 40
Page 41
Page 42
Page 43
Section VIII. Bill of Quantities
Page 44
{CONTRACTOR'S LOGO IN MAIN PAGE}
BILL OF QUANTITIES
CONCRETE WORKS
1
Pesos_______________Amount in Words
______________________________________
______________________________________ 1.44 CU.M.
___and________________________________
________________________________
centavos
2 STEEL WORKS
Pesos_______________Amount in Words
______________________________________
______________________________________
___and________________________________ 6,908.26 KGS
________________________________
centavos
3 ROOFING WORKS
Pesos_______________Amount in Words
______________________________________
______________________________________ 285.18 SQ.M.
___and________________________________
________________________________
centavos
4 PLUMBING WORKS
Pesos_______________Amount in Words
______________________________________
______________________________________ 1.0 LOT
___and________________________________
________________________________
centavos
5 PAINTING WORKS
Pesos_______________Amount in Words
______________________________________
______________________________________ 1.0 LOT
___and________________________________
________________________________
centavos
6 WATERPROOFING
Pesos_______________Amount in Words
______________________________________
______________________________________ 240.0 SQ.M.
___and________________________________
________________________________
centavos
Signature
Printed Name
Position
Name of Company
Date
Page 45
{CONTRACTOR'S LOGO IN MAIN PAGE}
BID PROPOSAL
PROJECT: Improvement of New Power Plant Roofing
SUBMITTED BY:
Signature______________________________________________
Printed Name______________________________________________
Position______________________________________________
Name of Company______________________________________________
Date______________________________________________
46
{CONTRACTPR’S LOGO IN MAIN PAGE}
DETAILED E STIMATE
A. Materials
Qty Unit Description of Materials Unit Price Amount
18 bags Portland Cement
1 cu.m. Fine Sand
2 cu.m. Gravel 3/4
15 pcs RSB 16mm dia x 6m
46 pcs RSB 10mm dia x 6m
5 lot G.I. Tie wire #16
5 pcs Ordinary Plywood 1/4
40 pcs Coco Lumber 2x3x12
7 kgs Assrt CWN
Material Cost…
B. Labor
No. of Person Designation No. of Days Rate/Day Amount
1 Foreman 7
1 Skilled 7
3 Laborer 7
Labor Cost…
Sub-total…
47
B. Labor
No. of Person Designation No. of Days Rate/Day Amount
1 Foreman 35
2 Welder 35
4 Laborer 35
Labor Cost…
C. Equipment
Qty Description of Equipment No. of Days Rate/Day Amount
1 Cut-off machine 10
2 Welding machine 23
1 Sander 10
1 Portable Generator 35
Equipment Cost…
Sub-total…
Material Cost…
B. Labor
No. of Person Designation No. of Days Rate/Day Amount
1 Foreman 15
2 Skilled 15
5 Laborer 15
Labor Cost…
Sub-total…
48
B. Labor
No. of Person Designation No. of Days Rate/Day Amount
1 Skilled 3
3 Laborer 3
Labor Cost…
Sub-total…
49
6. WATERPROOFING Qty=240 sq.m.
A. Materials
Qty Unit Description of Materials Unit Price Amount
3 sets Concrete Epoxy, LV, gal
3 kgs Rugs
4 pcs Putty knife
41 pails Cementatitious Waterproofing
33 gals Acrylic Water based Epoxy paint, gray
11 gals Epoxy Reducer
8 bags Portland cement
2 sets Paint Roller w/ tray 9"
4 pcs Spatula 4"
3 pcs Silicon Water proofing sealant
3 pcs Steel brush
2 pcs Paint brush 4"
2 pcs Paint brush 1 1/2"
3 pcs Paint brush 1"
1 pcs Caulking gun
Material Cost…
B. Labor
No. of Person Designation No. of Days Rate/Day Amount
1 Skilled 5
2 Laborer 5
Labor Cost…
Sub-total…
50
SUMMARY FOR UNIT PRICES OF MATERIALS
SUBMITTED BY:
Signature:
Printed Name:
Position:
Name Company:
Date:
51
{ATTACH COMPANY LETTERHEAD/LOGO}
SUBMITTED BY:
Signature:
Printed Name:
Position:
Name Company:
Date:
52
{ATTACH COMPANY LETTERHEAD/LOGO}
SUBMITTED BY:
Signature:
Printed Name:
Position:
Name Company:
Date:
53
54
Section IX. Bidding Forms Sample
55
Bid Form for the Procurement of Infrastructure Projects
[shall be submitted with the Bid]
_____________________________________________________________________
BID FORM
Date : _________________
Project Identification No. : _________________
b. We offer to execute the Works for this Contract in accordance with the PBDs;
c. The total price of our Bid in words and figures, excluding any discounts offered
below is: [insert information];
d. The discounts offered and the methodology for their application are: [insert
information];
e. The total bid price includes the cost of all taxes, such as, but not limited to: [specify
the applicable taxes, e.g. (i) value added tax (VAT), (ii) income tax, (iii) local taxes,
and (iv) other fiscal levies and duties], which are itemized herein and reflected in
the detailed estimates,
f. Our Bid shall be valid within the/a period stated in the PBDs, and it shall remain
binding upon us at any time before the expiration of that period;
h. We are not participating, as Bidders, in more than one Bid in this bidding process,
other than alternative offers in accordance with the Bidding Documents;
i. We understand that this Bid, together with your written acceptance thereof included
in your notification of award, shall constitute a binding contract between us, until a
1
currently based on GPPB Resolution No. 09-2020
56
formal Contract is prepared and executed; and
j. We understand that you are not bound to accept the Lowest Calculated Bid or any
other Bid that you may receive.
l. We acknowledge that failure to sign each and every page of this Bid Form, including
the Bill of Quantities, shall be a ground for the rejection of our bid.
Name: ___________________________________________________________________
Signature: ________________________________________________________________
Duly authorized to sign the Bid for and behalf of: __________________________________
Date: ___________________
57
{ATTACH COMPANY LETTERHEAD/LOGO}
Statement of all its ON-GOING government and private contracts, including contracts awarded but not yet started, if any, whether similar or not similar in nature and complexity to the contract to be bid
58
Government
Private
Total value of
outstanding works
Submitted by: ____________________________________________
(Print Name & Signature)
Designation: ____________________________________________
Date: _______________________
{ATTACH COMPANY LETTERHEAD/LOGO}
59
b. Address Contract Amount at
Name of Contract Nature of Work Description % c. Contract Duration
Award
c. Telephone No. d. Date Started
e. Date Completed
Designation: ____________________________________________
Date: _______________________
JOINT RESOLUTION
Whereas, ______________________________________ (Bidder / Name of
Particular JV Partner), duly organized and existing under the Laws of the
____________________________, with office address at
____________________________________________________________, represented
herein by its __________________________, ___________________________, and
______________________________________________ (Name of Particular JV Partner),
duly organized and existing under the Laws of the
___________________________________, with main office address at
____________________________________________________, represented by herein by
its ______________________________________________________, have entered into a
Joint Venture ( JV ) Agreement to undertake the following project / contract:
Whereas, in order to facilitate the orderly execution and conduct of the contract that was
entered into by the joint venture in the name of the joint venture, it is hereby resolved by the
parties in the Joint Venture as follows:
b. That, the parties agreed to make _________( Name of Particular Lead Partner )
__________ as the Lead Partner of the Joint Venture and ( Name of Authorized
Officer ) ________ as the Official Representative & Managing Partner of the Joint
Venture, and are granted full power and authority to do, execute and perform any and
all acts necessary and/or to represent the Joint Venture in the Eligibility Check,
Bidding and Undertaking of the said contract in the name of the Joint Venture, as
fully and effectively and the Joint Venture may do and if personally present with full
power of substitution and revocation. ________________________ is fully
authorized and empowered to sign any or all documents pertaining to the above stated
project / contract in the name of the Joint Venture.
c. That the parties agree to be jointly and severally liable for their participation in the
Eligibility Check, Bidding and Undertaking of the said contract.
d. That the terms of the JV Agreement entered into the parties shall be valid and is co-
terminus with the final completion and turnover of the Name of Contract / Project to
the agency of the government, which in this case, the (Name of Procurement Entity);
60
IN WITNESS THEREFORE, We hereby sign jointly this Joint Resolution this ________ day
of _______________, 20 ____ in ______________.
__________________________ _____________________________
Designation / Position Designation / Position
_________________________ _____________________________
Designation / Position Designation / Position
_______________________________
_______________________________
_______________________________
_______________________________
61
ACKNOWLEDGEMENT
BEFORE ME, a Notary Public, for and in the City of _____________________, Philippines,
this ______ day of ____________, 20____ personally appeared the following persons:
This Instrument consists of THREE (3) pages including this page wherein this
Acknowledgement is written and signed by the parties and their instrumental witnesses on
each and every page thereon.
WITNESS MY HAND AND NOTARIAL SEAL at the place and date hereinafter first
above written.
NOTARY PUBLIC
62
Bid Securing Declaration Form
[shall be submitted with the Bid if bidder opts to provide this form of bid security]
________________________________________________________________________
REPUBLIC OF THE PHILIPPINES)
CITY OF _____________________) S.S.
I/We understand that, according to your conditions, bids must be supported by a Bid
Security, which may be in the form of a Bid Securing Declaration.
1. I/We accept that: (a) I/we will be automatically disqualified from bidding for any
procurement contract with any procuring entity for a period of two (2) years upon receipt
of your Blacklisting Order; and, (b) I/we will pay the applicable fine provided under Section
6 of the Guidelines on the Use of Bid Securing Declaration, within fifteen (15) days from
receipt of the written demand by the procuring entity for the commission of acts resulting
to the enforcement of the bid securing declaration under Sections 23.1(b), 34.2, 40.1 and
69.1, except 69.1(f),of the IRR of RA No. 9184; without prejudice to other legal action the
government may undertake.
2. I/We understand that this Bid Securing Declaration shall cease to be valid on the following
circumstances:
a. Upon expiration of the bid validity period, or any extension thereof pursuant to your
request;
b. I am/we are declared ineligible or post-disqualified upon receipt of your notice to such
effect, and (i) I/we failed to timely file a request for reconsideration or (ii) I/we filed a
waiver to avail of said right; and
c. I am/we are declared the bidder with the Lowest Calculated Responsive Bid, and I/we
have furnished the performance security and signed the Contract.
IN WITNESS WHEREOF, I/We have hereunto set my/our hand/s this ____ day of [month]
63
[Insert signatory’s legal capacity]
Affiant
[Jurat]
[Format shall be based on the latest Rules on Notarial Practice]
64
Omnibus Sworn Statement (Revised)
[shall be submitted with the Bid]
______________________________________________________________________
REPUBLIC OF THE PHILIPPINES)
CITY/MUNICIPALITY OF ______ ) S.S.
AFFIDAVIT
I, [Name of Affiant], of legal age, [Civil Status], [Nationality], and residing at [Address of
Affiant], after having been duly sworn in accordance with law, do hereby depose and state
that:
[If a partnership, corporation, cooperative, or joint venture:] I am the duly authorized and
designated representative of [Name of Bidder] with office address at [address of Bidder];
[If a sole proprietorship:] As the owner and sole proprietor, or authorized representative of
[Name of Bidder], I have full power and authority to do, execute and perform any and all acts
necessary to participate, submit the bid, and to sign and execute the ensuing contract for [Name
of the Project] of the [Name of the Procuring Entity], as shown in the attached duly notarized
Special Power of Attorney;
[If a partnership, corporation, cooperative, or joint venture:] I am granted full power and
authority to do, execute and perform any and all acts necessary to participate, submit the bid,
and to sign and execute the ensuing contract for [Name of the Project] of the [Name of the
Procuring Entity], as shown in the attached [state title of attached document showing proof of
authorization (e.g., duly notarized Secretary’s Certificate, Board/Partnership Resolution, or
Special Power of Attorney, whichever is applicable;)];
3. [Name of Bidder] is not “blacklisted” or barred from bidding by the Government of the
Philippines or any of its agencies, offices, corporations, or Local Government Units, foreign
government/foreign or international financing institution whose blacklisting rules have been
recognized by the Government Procurement Policy Board, by itself or by relation,
membership, association, affiliation, or controlling interest with another blacklisted
person or entity as defined and provided for in the Uniform Guidelines on Blacklisting;
65
4. Each of the documents submitted in satisfaction of the bidding requirements is an
authentic copy of the original, complete, and all statements and information provided
therein are true and correct;
5. [Name of Bidder] is authorizing the Head of the Procuring Entity or its duly authorized
representative(s) to verify all the documents submitted;
[If a sole proprietorship:] The owner or sole proprietor is not related to the Head of the
Procuring Entity, members of the Bids and Awards Committee (BAC), the Technical Working
Group, and the BAC Secretariat, the head of the Project Management Office or the end-user
unit, and the project consultants by consanguinity or affinity up to the third civil degree;
[If a partnership or cooperative:] None of the officers and members of [Name of Bidder] is
related to the Head of the Procuring Entity, members of the Bids and Awards Committee
(BAC), the Technical Working Group, and the BAC Secretariat, the head of the Project
Management Office or the end-user unit, and the project consultants by consanguinity or
affinity up to the third civil degree;
[If a corporation or joint venture:] None of the officers, directors, and controlling stockholders
of [Name of Bidder] is related to the Head of the Procuring Entity, members of the Bids and
Awards Committee (BAC), the Technical Working Group, and the BAC Secretariat, the head
of the Project Management Office or the end-user unit, and the project consultants by
consanguinity or affinity up to the third civil degree;
7. [Name of Bidder] complies with existing labor laws and standards; and
c. Making an estimate of the facilities available and needed for the contract to be bid, if
any; and
d. Inquiring or securing Supplemental/Bid Bulletin(s) issued for the [Name of the Project].
9. [Name of Bidder] did not give or pay directly or indirectly, any commission, amount, fee,
or any form of consideration, pecuniary or otherwise, to any person or official, personnel
or representative of the government in relation to any procurement project or activity.
66
10. In case advance payment was made or given, failure to perform or deliver any of the
obligations and undertakings in the contract shall be sufficient grounds to constitute
criminal liability for Swindling (Estafa) or the commission of fraud with
unfaithfulness or abuse of confidence through misappropriating or converting any
payment received by a person or entity under an obligation involving the duty to
deliver certain goods or services, to the prejudice of the public and the government of
the Philippines pursuant to Article 315 of Act No. 3815 s. 1930, as amended, or the
Revised Penal Code.
IN WITNESS WHEREOF, I have hereunto set my hand this __ day of ___, 20__ at
____________, Philippines.
[Jurat]
67
AUTHORITY OF SIGNATORY
(SECRETARY’S CERTIFICATE)
I,, a duly elected and qualified Corporate Secretary of (Name of the Bidder), a
corporation duly organized and existing under and by virtue of the law of the, DO HEREBY
CERTIFY, that:
I am familiar with the facts herein certified and duly authorized to certify the same;
At the regular meeting of the Board of Directors of the said Corporation duly
convened and held on at which meeting a quorum was present and acting throughout, the
following resolutions were approve, and the same have been annulled, revoked and amended
in any way whatever and are in full force and effect on the date hereof:
RESOLVED FERTHER THAT, the Board hereby authorized its President to:
a. execute a waiver of jurisdiction whereby the(Name of the Bidder)hereby submits
itself to the jurisdiction of the Philippine government and hereby waives its right to
question the jurisdiction of the Philippine court;
b. execute a waiver that the (Name of the Bidder) shall not seek and obtain writ of
injunctions or prohibition or restraining order against the CAAP or any other agency
in connection with this Project to prevent and restrain the bidding procedures related
thereto, the negotiating and award of a contract to a successful bidder, and the
carrying out of the awarded project.
_
(Corporate Secretary)
SUBSCRIBED AND SWORN to before me this day _______ of, 20___ affiant
exhibited to me his/her Community Tax Certificate No. issued on
at, Philippines.
68
Notary Public
Until 31 December 20
PRT No.:
Issued at:
Issued on:
TIN No.:
Doc. No.
Page No.:
Book No.:
Series of
69
AUTHORITY OF SIGNATORY
(SPECIAL POWER OF ATTORNEY)
IN WITNESS WHEREOF, I have hereunto set may hand this _____ date of
________________, 20____ at ______________________________.
ACKNOWLEDGEMENT
[Format shall be based on the latest Rules on Notarial Practice]
70
Contractor’s Organizational Chart for the Project
Submit Copy of the Organizational Chart that the Contractor intends to use to execute the
contract if awarded to him. Indicate in the chart the names of the Key Engineering Personnel
who will be assigned in the Project.
Attach the required Proposed Organizational Chart for the Contract as stated above.
Designation : ________________________________
Date : _________________
71
{ATTACH COMPANY LETTERHEAD/LOGO}
72
Personnel for this project
1. Name
2. Address
3. Date of Birth
4. Employed Since
5. Experience
6. Previous Employment
7. Education
8. PRC License
Note: Attached individual PRC License of the (professional) personnel.
Submitted by : _______________________________________________
(Signature over Printed Name)
Designation : _______________________________________________
Date : _______________________________________________
{ATTACH COMPANY LETTERHEAD/LOGO}
Date: ___________
Dear Sir:
Supplementing our Organizational Chart for the Contract, we have the honor to submit
herewith, and to certify as true and correct, the following pertinent information:
That (Name of Employee) shall personally perform the duties of the said position
in the above-mentioned project, if and when the same is awarded in our favor.
That (Name of Employee) shall employ the best care, skill and ability in performing
his duties in accordance with the Contract Agreement, Conditions of Contract, Plans,
Specifications, Special Provisions, and other provisions embodied in the proposed
contract.
That (Name of Employee) shall be personally present at the jobsite all the time to
supervise the phase of the construction work pertaining to his assignment as
(Designation) .
That (Name of Employee) is aware that he shall be authorized to handle only one
contract at a time.
73
That in order to guarantee that (Name of Employee) shall perform his duties properly
and be personally present in the Job Site, he is hereby required to secure a certificate
of appearance for the Procuring Entity’s Engineer at the end of every month.
That in the event that I/we elect or choose to replace (Name of Employee) with
another Engineer, the Procuring Entity will be accordingly notified by us in writing
at least twenty one (21) days before making replacement. We will submit to the
Procuring Entity, for prior approval, the name of the proposed new (Designation) ,
his qualification, experience, list of projects undertaken and other relevant
information.
That any willful violation on my/our part of the herein conditions may prejudice
my/our standing as a reliable contractor in future bidding of the Procuring Entity.
CONCURRED BY:
(Name of Engineer)
74
{ATTACH COMPANY LETTERHEAD/LOGO}
Date: ___________
Dear Sir:
I hereby certify that (Name of Bidder) has engaged my services as (Designation) for
(Name of the Project) , if awarded in their favor.
As (Designation) , I know I will have to stay in the job site all the time to supervise and
managed the Contract works to the best of my ability, and aware that I am authorized to
handle only one (1) contract at a time.
I do not allow the use of my name for the purpose of enabling the above-mentioned
Contractor to qualify for the Contract without any firm commitment on my part to assume
the post of (Designation) .
75
NAME OF PROJECT OWNER COST DATE
COMPLETED
_________ ____________________________________
_________ ____________________________________
_________ ____________________________________
_________ ____________________________________
In case of my separation for any reason whatsoever from the above-mentioned Contractor, I
shall notify the (Name of the Procuring Entity) at least twenty one (21) days before
the effective date of my separation.
(Signature of Engineer)
Notary Public
Until 31 December 20
PRT No.:
Issued at:
Issued on:
TIN No.:
Doc. No.
Page No.
Book No.
Series of
76
KEY PERSONNEL
(FORMAT OF BIO-DATA)
Give the detailed information of the following personnel who are scheduled to be assigned
as full-time field staff for the project. Fill up a form for each person.
Name:
Date of Birth:
Nationality:
Education and Degrees:
Specialty:
Registration:
Length of Service with the Firm:
______Year From _______ (months) _______ (year)
To _______ (months) _______ (year)
Years of Experience:
If Item 7 is less than ten (10) years, give name and length of service with previous
employers for a ten (10) year period (attached additional sheet/s, if necessary:
Experience:
This should cover the past two (2) years of experience. (Attached as many pages
as necessary to show involvement of personnel in projects using the format
below).
a. Name:
b. Name and Address of Owner:
77
c. Name and Address of the Owner’s Engineer (Consultant):
78
List of Equipment, Owned or Leased and/or under Purchased Agreements, Pledge to the Proposed Project
Capacity/
Motor No./ Proof of Ownership/
Description Model/Year Performance/ Plate No. Location Condition
Body No. Lessor or Vendor
Size
A. Owned
I.
II.
III.
IV.
79
V.
B. Leased
I.
II.
III.
IV.
V.
Submitted by : _______________________________________________
(Signature over Printed Name)
Designation : _______________________________________________
Date : _______________________________________________
Contract Agreement Form for the
Procurement of Infrastructure Projects (Revised)
[not required to be submitted with the Bid, but it shall be submitted within ten (10) days after
receiving the Notice of Award (NOA) ]
CONTRACT AGREEMENT
THIS AGREEMENT, made this [insert date] day of [insert month], [insert year]
between [name and address of PROCURING ENTITY] (hereinafter called the “Entity”)
and [name and address of Contractor] (hereinafter called the “Contractor”).
WHEREAS, the Entity is desirous that the Contractor execute [name and identification
number of contract] (hereinafter called “the Works”) and the Entity has accepted the Bid
for [contract price in words and figures in specified currency] by the Contractor for the
execution and completion of such Works and the remedying of any defects therein.
1. In this Agreement, words and expressions shall have the same meanings as are
respectively assigned to them in the Conditions of Contract hereinafter referred to.
2. The following documents as required by the 2016 revised Implementing Rules and
Regulations of Republic Act No. 9184 shall be deemed to form and be read and
construed as part of this Agreement, viz.:
i. Drawings/Plans;
ii. Specifications;
b. Winning bidder’s bid, including the Eligibility requirements, Technical and Financial
Proposals, and all other documents or statements submitted;
Bid form, including all the documents/statements contained in the Bidder’s bidding
envelopes, as annexes, and all other documents submitted (e.g., Bidder’s response to
80
request for clarifications on the bid), including corrections to the bid, if any, resulting
from the Procuring Entity’s bid evaluation;
c. Performance Security;
e. Other contract documents that may be required by existing laws and/or the Procuring
Entity concerned in the PBDs. Winning bidder agrees that additional contract
documents or information prescribed by the GPPB that are subsequently required
for submission after the contract execution, such as the Notice to Proceed, Variation
Orders, and Warranty Security, shall likewise form part of the Contract.
3. In consideration for the sum of [total contract price in words and figures] or such
other sums as may be ascertained, [Named of the bidder] agrees to [state the object
of the contract] in accordance with his/her/its Bid. GPPB Resolution No. 16-2020,
dated 16 September 2020
4. The [Name of the procuring entity] agrees to pay the above-mentioned sum in
accordance with the terms of the Bidding.
IN WITNESS WHEREOF, the parties thereto have caused this Agreement to be executed
the day and year first before written.
for: for:
Acknowledgment
[Format shall be based on the latest Rules on Notarial Practice]
81
Section X. Checklist of Technical and Financial
Documents
82
Checklist of Technical and Financial Documents
I. TECHNICAL COMPONENT ENVELOPE
Legal Documents
⬜ (a) Valid PhilGEPS Registration Certificate (Platinum Membership) (all pages);
or
⬜ (b) Registration certificate from Securities and Exchange Commission (SEC),
Department of Trade and Industry (DTI) for sole proprietorship, or
Cooperative Development Authority (CDA) for cooperatives or its equivalent
document;
and
⬜ (c) Mayor’s or Business permit issued by the city or municipality where the
principal place of business of the prospective bidder is located, or the
equivalent document for Exclusive Economic Zones or Areas;
and
⬜ (e) Tax clearance per E.O. No. 398, s. 2005, as finally reviewed and approved by
the Bureau of Internal Revenue (BIR).
Technical Documents
⬜ (f) Statement of the prospective bidder of all its ongoing government and private
contracts, including contracts awarded but not yet started, if any, whether
similar or not similar in nature and complexity to the contract to be bid; and
⬜ (g) Statement of the bidder’s Single Largest Completed Contract (SLCC) similar
to the contract to be bid, except under conditions provided under the rules;
and
⬜ (h) Philippine Contractors Accreditation Board (PCAB) License; or
Special PCAB License in case of Joint Ventures;
and registration for the type and cost of the contract to be bid; and
⬜ (i) Original copy of Bid Security. If in the form of a Surety Bond, submit also a
certification issued by the Insurance Commission; or
Original copy of Notarized Bid Securing Declaration; and
(j) Project Requirements, which shall include the following:
⬜ a. Organizational chart for the contract to be bid;
⬜ b. List of contractor’s key personnel (e.g., Project Manager, Project
Engineers, Materials Engineers, and Foremen), to be assigned to the
contract to be bid, with their complete qualification and experience
data;
⬜ c. List of contractor’s major equipment units, which are owned, leased,
and/or under purchase agreements, supported by proof of ownership or
certification of availability of equipment from the equipment
lessor/vendor for the duration of the project, as the case may be; and
⬜ (k) Original duly signed Omnibus Sworn Statement (OSS);
and if applicable, Original Notarized Secretary’s Certificate in case of a
corporation, partnership, or cooperative; or Original Special Power of
83
Attorney of all members of the joint venture giving full power and authority
to its officer to sign the OSS and do acts to represent the Bidder.
Financial Documents
⬜ (l) The prospective bidder’s audited financial statements, showing, among others,
the prospective bidder’s total and current assets and liabilities, stamped
“received” by the BIR or its duly accredited and authorized institutions, for
the preceding calendar year which should not be earlier than two (2) years
from the date of bid submission; and
⬜ (m) The prospective bidder’s computation of Net Financial Contracting Capacity
(NFCC).
⬜ (o) Original of duly signed and accomplished Financial Bid Form; and
84
85