Rosario Tamil Pandiyan A - April 2025 - Arcadis Format CV

Rosario Tamil Pandiyan is an Associate Principal Engineer with over 15 years of experience in electrical design for substations, metro projects, and thermal power plants. He possesses extensive knowledge of UK standards and engineering software, and has successfully led design teams on various high-profile projects. His expertise includes preparing electrical design reports, specifications, and collaborating with multiple engineering disciplines and clients.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views8 pages

Rosario Tamil Pandiyan A - April 2025 - Arcadis Format CV

Rosario Tamil Pandiyan is an Associate Principal Engineer with over 15 years of experience in electrical design for substations, metro projects, and thermal power plants. He possesses extensive knowledge of UK standards and engineering software, and has successfully led design teams on various high-profile projects. His expertise includes preparing electrical design reports, specifications, and collaborating with multiple engineering disciplines and clients.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

Rosario Tamil Pandiyan

Associate Principal Engineer


Rosario is a Main Plant Electrical Engineer, with over 15 yrs.
experience in Design and Detail Engineering UK Substation, Metro
Substation, Thermal power plants, Infrastructure & MEP for Metro Rail
Projects.
Extensive design experience in Concept, Detail and Valid for
construction electrical design for UK Main Plant Substation,
Infrastructure Dry Utilities, Metro Electrification system, HV & LV
Key Information distribution system, Lighting design, small power.

Core skills Strong knowledge in preparing Electrical Design reports and


 Design Knowledge in specifications.
Main Plant Substation,
Metro and Infra Projects
Knowledge with UK – SPEN and SSEN, National Grid, BSEN, IEC, IS,
 Knowledge in UK – SPEN ADDC(Abudhabi),KHARAMAA(Qatar),DEWA(Dubai), NFPA
& SSEN, NG Standards.
standards,IEC
Expertise in Engineering software such as Trimble, Dialux/Relux
BS,ADDC,Kharamaa,IS
 Design knowledge in Leading the UK Main Plant team successfully and guiding them in the
Equipment /Cabling right direction to achieve their goals
/Earthing /Lightning and
illumination layout and Completed the Task Manager Academy (TMA) training successfully
Control schemes. and have started applying it in my work.
 Interact with all
Developed strong collaboration with the BA team.
engineering disciplines,
construction project Project Experience
managers, and clients.
 Preparation of Design Arcadis Design Consulting India Pvt. Ltd
criteria/Design calculation
Position: Associate Principal Engineer (Electrical)
Education & Qualifications
QUALIFICATIONS
Fetteresso 400/132kV (SSEN Project)
 BE Electrical & Electronics
 Review of Single Line Diagram
 Review of Phasing Diagram
MEMBERSHIPS
 Review of Substation plan layout and Elevations
 Member of IET  Review of Primary Equipment layout and elevations
 Review of structure layout and elevations
 Review of Bus bar and connector layout and elevations
 Review of Bus bar and connector schedules
 Review of lighting layout
 Review of Earthing layout
 Review of Labelling Package
 Review of Installation Drawings
 Review of MEWP plan and elevation
 Review of LVAC Package

1
Rosario Tamil Pandiyan | Resume

Kilmorack 132/11kV Indoor Substation (SSEN Project)

 Review of Single Line Diagram


 Review of Substation plan layout and Elevations
 Review of lighting Package
 Review of Labelling Package
 Review of MEWP plan and elevation

Aigas 132/11kV Substation (SSEN Project)

 Review of Single Line Diagram


 Review of Phasing Diagram
 Review of Substation plan layout and Elevations
 Review of MEWP plan and elevation

Newarthill Substation – 33kV Reactor Compound (SPEN Project)

 Review of Mechanical Interlocking


 Review of Substation plan layout and Elevations
 Review of Primary Equipment layout and elevations
 Review of structure layout and elevations
 Review of Bus bar and connector layout and elevations
 Review of Bus bar and connector schedules
 Review of lighting layout
 Review of Earthing layout
 Review of Labelling Package
 Review of Installation Drawings
 Review of LVAC Package
 Review of switchgear Building

Fort Augustus GSP Reinforcement – 132/33kV Substation (SSEN Project)

 Preparation of equipment schedule, Busbar calculations, Busbar & Connector Schedules, Cable Sizing,
Flood Lighting Calculation etc.
 Review of Main Plant layout and section, Busbar connector layout, lighting layout, Temporary cable
route layout etc.
 Preparation of Metering and Protection Diagram, Trip Matrix and review of Control and relay panel GA
Drawing and schematics.
 Coordination with Civil team for Cable routing and Transformer Bund
 Preparation of Installation Drawings

North Kyle Wind Farm – 132/33kV Substation (SPEN Project)

 Preparation of equipment schedule, Busbar calculations, Busbar & Connector Schedules, Cable Sizing,
Flood Lighting Calculation etc.
 Review of Main Plant layout and section, Busbar connector layout, lighting layout, Temporary cable
route layout etc.
 Coordination with Civil team for Cable routing and Transformer Bund

2
Rosario Tamil Pandiyan | Resume

Markhill Cluster Works (Including Chirmorie & Stranoch) 275/132/33kV (SPEN Project)

 Preparation of Short circuit force calculation.


 Preparation of HV Cable Sizing
 Preparation of Phasing Diagram
 Preparation of Mechanical Interlocking Diagram
 Preparation of Substation plan layout and Elevations
 Preparation of Primary Equipment layout and elevations
 Preparation of structure layout and elevations
 Preparation of HV and LV cable layout and sections
 Preparation of Bus bar and connector layout and elevations
 Preparation of Bus bar and connector schedules
 Preparation of lighting layout
 Preparation of Earthing layout
 Preparation of lighting protection layout
 Preparation of Labelling Schedule
 Preparation of Modular Building layout
 Preparation of LVAC SLD
 Preparation of Installation Drawings

Glenrothes 275kV Switchgear replacement (SPEN Project)

 Preparation of Phasing Diagram


 Preparation of Mechanical Interlocking Diagram
 Preparation of Substation plan layout and Elevations
 Preparation of Primary Equipment layout and elevations
 Preparation of structure layout and elevations
 Preparation of Bus bar and connector layout and elevations
 Preparation of Bus bar and connector schedules
 Preparation of lighting layout
 Preparation of Earthing layout
 Preparation of Labelling Schedule
 Preparation of Installation Drawings

ICP – Downbarn SPR 132/33kV

 Preparation of Phasing Diagram


 Preparation of Mechanical Interlocking Diagram
 Preparation of Substation plan layout and Elevations
 Preparation of Primary Equipment layout and elevations
 Preparation of structure layout and elevations
 Preparation of Bus bar and connector layout and elevations
 Preparation of Bus bar and connector schedules
 Preparation of lighting layout
 Preparation of Earthing layout
 Preparation of Labelling Schedule
 Preparation of Installation Drawings

Thornton North 275/25kV Substation and Currie 275/25kV Substation (SPEN Projects)

 Preparation of Phasing Diagram


 Preparation of Mechanical Interlocking Diagram
 Preparation of Substation plan layout and Elevations
 Preparation of Primary Equipment layout and elevations

3
Rosario Tamil Pandiyan | Resume

 Preparation of structure layout and elevations


 Preparation of Bus bar and connector layout and elevations
 Preparation of Bus bar and connector schedules
 Preparation of lighting layout
 Preparation of Earthing layout
 Preparation of Labelling Schedule
 Preparation of Installation Drawings

UK BP Hail – Electrical Vehicle Charger

Project: Kentish Town, Thames Circle, Manchester Hospital, Manchester Piccadilly

 Preparation of SLD drawing design and schematic representation.


 Preparation of Amtech calculation for Cable Sizing.
 Preparation of Lighting calculation using Dialux.
 Preparation of Lightning Risk Assessment
 Preparation of Earthing Calculation and layout.
 Review of SLD, Block Diagram, Earthing Schematic, Lighting layout.
 Preparation of Load Schedule and cable Schedule.

Fortis Green Water Pumping Station – Water, UK

 Preparation of SLD drawing design, cable sizing, schematic representation.


 Single Line Diagram for two different options to transfer the water to different distribution network.
 Preparation of Amtech calculation for both options and updated the SLD accordingly.

Thames Water Cockfosters Service Reservoir – Water, UK

 Preparation of SLD drawing design, cable sizing, schematic representation.


 Preparation of Amtech calculation for both options and updated the SLD accordingly.

Severentrent Sewage Treatment Plant Sites Feasibility Study – Water, UK

 Preparation of Load Schedule for feasibility study based on site survey Photos.
 Preparation of SLD based on Load Schedule.
 Coordination with Lead office.

Kirby – Inchicore Bess – 110kV Ampacity & Short Circuit Calculation

 Preparation of Ampacity of the 110kV ACSR Conductor.


 Preparation of Short Circuit Force Calculation for 110kV Equipment’s.
 Preparation of Short circuit Force applied layout.

RIYADH CITY SOUTH, Abudhabi – Infra Project


WAHAT YAS, Abudhabi – Infra Project
YAS SOUTH – Refurbishment Infra Project

 Preparation of LV Load Schedule based on Plot area requirements.


 Preparation of LV Layouts as per Load Schedule.
 Transformer Sizing and Loading, Cable sizing.
 Street lighting design calculation using Dialux
 Preparation of Street lighting circuiting
 Preparation of design reports.
4
Rosario Tamil Pandiyan | Resume

 Preparation MV, FOC layouts and schematics.


 Preparation of Standard Typical drawings for LV,MV,FOC&Street Lighting.
 Co-ordination with MCC & Telecom Teams.
 Co-ordination with Lead Office & Site Team & ADDC(Authority)

M/s. Mitsubishi Heavy Industries, Doha, Qatar.


Position: Design Engineer.
Project: Doha Metro Project, Doha, Qatar.

 Responsibility: Preparation of technical specification for Doha Metro Project – 132/33kV Bulk Power
supply substation 33kV Shunt Reactor and Power factor panel as per Kaharamaa Requirements.
 Preparation of technical specification for Metro outgoing 33kV MV Cables, Earthing, MEP - lightning,
illumination(lighting), Fire Alarm and Deluge system as per Kaharamaa Requirements.
 Preparation of layout for Earthing, cable tray & routing, lightning, illumination(Lighting) systems, Shunt
Reactor yard layout.
 Preparation of Fire Alarm, Deluge system layout.
 Sizing of HT & LT cables along with schedule, Illumination (lux level), earthing.
 Preparation of SLD, control wiring and schematic drawing for 33kV Shunt Reactor, Traction Power
supply, Station Power Supply, Relay panel, metering and protection panel according to Kaharamaa
standards.
 Technical discussion with vendors, reviewing and approving the vendor drawings & documents of 33kV
Shunt Reactor and Power Factor Panel.
 Detailed Engineering for 33kV Shunt Reactor works.
 Support in reviewing 33kV Shunt Reactor Architectural and structural drawings and calculations.
 Co-ordination with Consultants and client – Qatar Rail for deliverables.
 Oversee compliance to quality process & take part in quality inspections.
 Participate project Kick off Meeting.
 Submission of monthly progress report to customers.
 Co-ordination with all departments such as Engineering, Purchase, Production, Quality, and Dispatch
of materials as per the schedule.
 Co-Ordination with Sub Contractors(ABB & NCC) as per the schedule
 Sorting the technical queries raised during preparation of Drawings / Fabrication / Erection.
 Co-ordination with Erection & Commissioning department both at office and at site for completion of
project with agreed performance parameters.
 Establish Project Closeout plan.
 Additionally, working for System Assurance Team activities
 Checking and validating the test completion in Comply Pro – Bentley Software.
 These validation process linked with Hazard and mitigation activities.
 Additionally, working for Testing & Commissioning Team activities
 Check and review the Energy site test reports and Preparation of Static test reports for Metro Energy
system Tests.
 Apply and get PTW(Permit To Work) from Construction Commissioning Rail Management for Energy
testing activities.
 Working as Electrical duty holder for site team.
 After Handed over to Q-rail, apply and get Permit To Work from Owner of Doha Metro.

M/s. WS Atkins (India) PVT LTD, Bangalore, India.


Position: Design Engineer.
Projects:
 ROSARIE LEVEL CROSSING – UK PROJECT
 WAML – UK Rail Project – MEP
 COLOMBO PORT CITY – SRILANKA PROJECT

5
Rosario Tamil Pandiyan | Resume

Middle East Projects:

 DOHA FESTIVAL CITY – MALL - MER


 DOHA METRO RED LINE SOUTH – DD2B STAGE
 SWITCHBOXES/CROSS PASSAGE WITH SUMP/EMERGENCY EXIT:
 DOHA GOLD LINE – DD2B STAGE
 RIYADH METRO VIADUCT 90% SUBMISSION

Responsibility:
 Lighting design and lux level calculations using Dialux Software.
 Cable sizing calculations (L.V schematic Design, Fault analysis and Cable calculations) using Amtech
software.
 Lighting layout and Small Power layout for At grade, subway and entrances, Concourse, intermediate,
platform and under platform levels.
 Cable tray sizing calculation
 Earthing schematic and layouts.
 Lightning protection design and layouts.
 Load estimation, DB Schedule, preparation of single line diagram, preparation of design reports and
site co-ordination.
 Worked on full design of electrical services within station. Preparing Load schedules, Distribution
Schedules, Panel Schedules.
 Coordinating with HVAC, PHE and BACS teams.
 Level crossing project – Doing Form A report for E&P design

M/s. Hyder Consulting India Ltd., Bangalore,India.


Position: Design Engineer.
Projects:
 UK - TP HUTS & SUBSTATIONS DOMESTIC WIRING RENEWALS – SUBSTATION MEP WORKS
(39 STATIONS)
 Cross Rail Projects
 WESTBOURNE PARK ELEVATED BUS DECK, YORK LONDON

Responsibility:
 Lighting Design & CMS layout for the whole station building
 Form B report
 Co-ordination with Civils
 Amtech Calculation
 Lightning Protection Risk assessment
 LV Distribution schematics
 Lighting Design, Small power & CMS layouts
 Fire Alarm Layout
 Earthing and Bonding Layout
 Cable Calculation using Amtech

M/s. Cethar Limited.,Trichy,India.


Position: Engineer-I.
Projects:
 Client: M/s SKS POWR GENERATION (INDIA) LTD., RAIGARH,CHATTISGARH.
 (4X300 MWe Utility power plant)
 Client: M/s SHREE MEGA POWER , BEAWAR, RAJASTHAN.
6
Rosario Tamil Pandiyan | Resume

 (2X150 MWe Utility power plant)


 Client: M/s ARYAN COAL BENEFICATION (I) LTD., KORBA, CHATTISGARH.
 (2X135 MWe Utility power plant)

Responsibility:
 Studying the customer tender specification and prepare the design basis report for the complete
electrical package.
 Preparation of technical specification for Cabling, Earthing, lightning, illumination(lighting),LV
switchgear panels, MV panels, LT & HT Motors, Power & auxiliary Transformers, IPBD, GCB, DC
system battery & charger, UPS, DG set, as per updated IS and IEC codes.
 Preparation of layout for Earthing, cable tray & routing, lightning, illumination(Lighting) systems,
transformer yard layout, Busduct, panel arrangement.
 Sizing of HT & LT cables along with schedule, Illumination (lux level),earthing, Power & auxiliary
transformers, CT & PT, IPBD, DG set (upto 625kVA), DC system & UPS equipments calculation.
 Preparation of SLD, control wiring and schematic drawing for LV panels, MV panels, Transformers,
Relay panel, metering and protection panel for Generator and GCB,220 V DC system battery & charger,
UPS, DG set according to relevant IS, IEC & IEEE codes.
 Preparation of Electrical DCS/PLC IO list.
 Preparation of general arrangement drawing for customer approval and for issuing to vendors.
 Technical discussion with vendors, reviewing and approving the vendor drawings & documents of LV
panels, MV panels, Transformers, LT & HT Motors, Relay panel ,GCB, 220 V DC system battery &
charger, UPS, DG set.
 Initiating and checking of Boiler and BOP packages cable routing from TG building to respective area.
 Detailed Engineering for Power Plant Projects.
 Co-ordination with Consultants and clients for deliverables.
 Oversee compliance to quality process & take part in quality inspections.
 Participate project Kick off Meeting.
 Submission of monthly progress report to customers.
 Co-ordination with all departments such as Engineering, Purchase, Production, Quality, and Dispatch
of materials as per the schedule.
 Sorting the technical queries raised during preparation of Drawings / Fabrication / Erection.
 Co-ordination with Erection & Commissioning department both at office and at site for completion of
project with agreed performance parameters.
 Establish Project Closeout plan