2.2 KWP - Non Sub

Ever Green Solar provides a quotation for a 2.2 KW ON GRID solar power system, including detailed specifications and materials required for installation. The total cost is 155,000.00 INR, inclusive of GST, with specified payment terms and warranty details. The proposal emphasizes the company's commitment to sustainability and making solar energy economically viable for consumers.

Uploaded by

acsojan452
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views4 pages

2.2 KWP - Non Sub

Ever Green Solar provides a quotation for a 2.2 KW ON GRID solar power system, including detailed specifications and materials required for installation. The total cost is 155,000.00 INR, inclusive of GST, with specified payment terms and warranty details. The proposal emphasizes the company's commitment to sustainability and making solar energy economically viable for consumers.

Uploaded by

acsojan452
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Ever Green Solar

Company Address :-
81/75, N.C.C ROAD, GST NO:- 19ESRPK1175D1ZG
BANIPUR ,HABRA, NORTH 24 PGS

To Quotation No:-EGS/QUO/16758
Gopal Pramanik Date:02-Jun-25
9800984554 Expiry Date:
[email protected]
Bill To Ship To
Kakdip Kakdip

West Bengal West Bengal


743347 743347

2.2 KW Solar Plant ON GRID System

TECHNO-COMMERCIAL PROPOSAL
1. Company Profile

“I feel more confident than ever that the power to save the planet rests with the
individual consumer.”
– Denis Hayes

“The only way forward, if we are going to improve the quality of the environment, is
to get everybody involved.”
– Richard Rogers

“The sun is the only safe nuclear reactor, situated as it is some ninety-three million
miles away.”
– Stephanie Mills

“Convergence between economy, ecology and energy should define our future.”
– PM Modi

At Everenergy, we look forward to these days where we, every people in this mother
earth would be able to contribute to nature by producing its own energy. Solar is the
easiest way to achieve our dream of a sustainable green future. We help to achieve
this by making Solar more economically viable to each and every person.

Business and sustainability can go hand-in-hand. Our unique strategy interweaves


business goals with environmental sustainability and social responsibility, producing
mutually beneficial results.

We, social entrepreneurs, are working with industry-leading technologies and also
making it viable to all forms of consumer. We are making Solar not only
economically viable but also take care of its sustainability to make your savings to the
maximum.

We have people who are working in the industry for more than 8 years with the
Industry leaders. We have a cumulative experience of more than 50 MW in all around
the industry. Now its time to make the solar more viable with our knowledge of the
technology and economics of the Industry.

Lets join our hands together for a better future for you and your family as well as our
environment.
2. Bills Of Materials
Sl No Material Name Supplier Qty UOM Specification
1 2KW-1PH ON GRID PV Blink / Microtek/ 1 NOS IP65, Built-in WiFi / GPRS
INVERTER Growatt / Sungrow / with real-time PV Monitoring
Exide / Equivalent
2 ACDB 1-3 (1 Phase) EVERGREEN SOLAR 1 NOS ACDB BOX 450x300x210,
AC MCB 16A 240 v, SPD 40
KA
3 DCDB 1-3,1 in 1 out EVERGREEN SOLAR 1 NOS IP65 BOX 180X180X100,
16A 2POLE, DC SPD 40KA
4 GI STRUCTURE REPUTATED 60 KG 200 KM/H WIND
WITH STRUT PRESSURE TESTED,
CHANNEL MINIMUM 85 MICRON
HOTDIP GALVANIZED
5 DC CABLE 4SQ MM POLYCAB 40 MTR 4SQ MM 1Core Type-1
6 2.5 SQ MM 2C AC MESCAB 5 MTR 2.5 SQ MM AC CABLE 2
CABLE CU CORE
7 CABLE TIE REPUTED 1 PACK UV PROTECTED
300*300MM
8 PVC PIPE 1 INCH REPUTED 5 NOS ISI
9 PVC TEE & ELBOW EVERGREEN SOLAR 1 PACK
10 MC 4 CONNECTOR ELMAX 4 NOS
11 CABLE TRAY REPUTED 3 NOS 45 X 45
12 PVC INSULATOR 2 NOS
FOR LA
13 ELECTRODE ROD REPUTED 3 NOS Cu Bonded Earthing Rod
2MTR
14 EARTHING BUSBAR REPUTED 3 NOS GALVANISED
15 EARTHING REPUTED 1 BAG BFC
CHEMICALS 25KG
16 EARTHING REPUTED 2 NOS TIN/ ALU
PROTECTION BOARD
17 AC EARTHING EVERGREEN SOLAR 1 NOS
18 DC EARTHING EVERGREEN SOLAR 1 NOS
19 LIGHTING EVERGREEN SOLAR 1 NOS
ARRESTER
EARTHING
20 installation and EVERGREEN SOLAR 2000 WP
commissioning
21 EARTHING PIT REPUTED 3 NOS 12*12
COVER
22 EARTHING CABLE REPUTED 20 MTR 10SQ MM
23 580-590 WP TOPCON Vikram / Adani/ 4 Nos TOPCON Series, N-type,
SPV MODULE- N Waaree / Equivalent - Bifacial Transparent
TYPE - NON DCR Tier One Make Backsheet SPV Modules -(
ALMM Listed )- 30 Years
Warranty
3. Project Economics
Sl No Description Quantity Rate (Without GST) Total (Without GST)
1 2.2KW Solar Power Plant 1 136,203.87 136,203.87
ON GRID System

4. Tax

12% GST ON 95342.709 GST 12% = 11,441.13 AMOUNT WITH 12% GST 155,000.00
70% AMOUNT = 106,783.83
18% GST ON 40861.161 GST 18% = 7,355.01 AMOUNT WITH 18% GST
30% AMOUNT = 48,216.17

5. Payment Terms
20% Upon Issuing PO 60% Before Dispatch 10% upon material receipt 10% upon successful installation and
= 31,000.00 = 93,000.00 at site = 15,500.00 commissioning = 15,500.00

6. Term & Conditions


1. Scope of work: The cost includes design, supply, installation, and commissioning of the
system.

2. Warranty: The panels will have a performance warranty of 30 years and have TUV & IEC
performance certificates. The Inverter will have 10 years manufacturing warranty.

3. Delivery: "Transportation cost is included ."

4. Net-Meter & other Govt charges are extra included .

5. Taxes: GST @12% on 70% of the amount and 18% on the remaining 30% amount.

6. Delivery Period: 15-20 days after receiving the Purchase order in advance.