KTU-20023-000-001-E - General Arrangement - 1387
KTU-20023-000-001-E - General Arrangement - 1387
TV
18
16100
G
13200
N
4 4 4 4 4 4 4 4 4 4
10500
9650
722
38 645
9238
K
7800
5640
8070
5486
5486
9050
O
7100
11800
700
980
W
-5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135
14400
frame spacing 600 mm frame spacing 700 mm frame spacing 700 mm frame spacing 600 mm
N )
Forecastle Deck
Topdeck 16100mm A.B.
IO 24
Fill/Disch
/De-aer
SWBR. UP box
Entr. Entr.
1x Crew
T
UP hold.
0
Office CO2
cables cables
ROOM
Hold
DN UP
Vent.
Hold
cables cables
Vent.
C 2
DN
ER ER Bsn.
-
Vent. Prov. Esc. Store
Supply
-5 0 5 10 15
Chief Officer 20 Store
25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 0 5 10 15 20 25
Dayroom
Officer Hold Hold
Vent. Vent.
U
Emergency Generator
8
WSH
Hold
Chief Officer
Esc. Entr.
Bedroom
OPENING
Void Floor
0
Bunker
R
er St.
vent Acc.
Esc.
T 3-
S 2
Bridgedeck 13200mm A.B.
Main deck 7100 mm A.B. Tweendeck 5640 mm A.B.
Tweendeck 5180 mm A.B.
N
a.b. FC d
mm eck
180
N
WL 5
A
WL5
640
mm
a.b.
B
C
O
Messroom /
CONSOLE
Dayroom
Switchboard (24.4 m²) Galley
E
DN
Room 2 (17.2 m²)
O
F
CH
ESC.
AR
T
TA
DN
B
G
LE
Switchboard Kn
Room 1 uc
N kle
Hold
C D
WC
vent.
Entr.
Steering Gear
Room DN UP
Locker
5865.922 m3 / 207153.3 cuft Hold
Vent. BThr.
91
Room WT
UP Ballast Water
ER
-5 0 5 10 15 20 25
Generator
Generator ER Flush
GMDSS
Console
C
Vent. Esc. Bosun Store
-5 0 5 10 cables cables
15 20 Hatch 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135
Hold
E
vent.
Generator Hold
Workshop Changeroom Vent./
WS Provision Entr.
WM &
P
Esc. Dryer Store
WM
U
1x Crew 2x Crew 2x Crew
(8.8 m²) (8.8 m²) (8.8 m²) Paint Store
Acc.
Esc.
P S
LO Aux MGO
Day
R S
Above Tanktop 1460/2060 mm A.B. Above Tanktop 980 mm A.B. Boatdeck 10500 mm A.B.
I
.
mm a.b
180
WL 5
MGO MGO 30 16 12 10 06
(
Ballast Water
SEA CHEST
T
Void Day
Fresh Water Settl.
WL
564
0m 0 1 2 3 4 5 6 7
ma C.L C.L
.b.
M/H
Sludge
WL
98
0m
Void Ballast Water m
a.b Chief Engineer
.
Bedroom
DN (7.7 m²)
Ballast Water
R
Hold UP
25 vent. Chain
General particulars
cables cables
DN
Hold (8.0 m²)
Vent.
15 t/m2 Ballast Water
O
Lashing Store
ER
Bow UP
Length over all 93,50 m
Thruster 01
-5 0 5 10 15 20 25
Esc.
30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 Hold
120 Room
125 130 135 -5 0 5 10 15 20 25 Length between perpendiculars 91,70 m
Captain
Hold Vent./
Dayroom Breadth moulded 14,40 m
F
vent. Entr. Chain
(11.1 m²)
Locker Captain
Bedroom
(8.4 m²)
Depth moulded 7,10 m
Void
Ballast Water
Design draught 5,486 m
Ballast Water 61600
Deadweight (approx.) 4700 t
M/H
Leak Oil
Sludge
mm
FIKA 02-06-23
20
71 Ballast Water Ballast Water Ballast Water UPDATED AS PER FURTHER DEVELOPMENTS
.
a.b
WL
Ballast Water
m
0m
08 B
18
L1
Dirty Oil 73
04 ISSUED REV.B AS PER UPDATED RELEVANT DOCUMENT FIKA 05-04-23
W
Ballast Water
REV.A APPROVED w/o COMMENT BY CLASS RINA 20-10-22
a.b. A
WL
84 0m
m
02 ISSUED FOR CLASS APPROVAL FIKA 15-09-22
REV MODIFICATION BY DATE
Void
CW Drain
76
Lub Oil Sump 50 Void Void Ballast Water
PT. KARYA TEKNIK UTAMA
01 Jl. TANJUNG RIAU - KAWASAN INDUSTRI SEKUPANG
-5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 Batam, Kepri, Indonesia
Void
Telp (0778) 327691, 327692
Fax (0778) 32790
Ballast Water
Ballast Water
03 CHECKED BY : KEVIN DATE : 15-09-22
Bilge Water
70 Ballast Water Ballast Water Ballast Water
Sewage APPROVED BY : KEVIN DATE : 15-09-22
72
CLIENT : MINISHIPS CLASS : RINA
19
Sea chest SHIP
YARD NO.
61 54
MGO
4700DWT GEARLESS MPV KTU-1387
FW LO LO ME
Void Overflow
GB DRAWING NO.:
52 77 17 Ballast Water 13 Ballast Water 11 Ballast Water 07 Ballast Water TITLE
KTU-20023-000-001
GENERAL ARRANGEMENT PLAN SCALE: SHEET: REV. :
1:125 1/1 E