0% found this document useful (0 votes)
17 views1 page

GHD XX PW DRG PB 00001

The document outlines general plumbing notes, water supply system notes, and builders work notes, emphasizing compliance with the Uniform Plumbing Code of the Philippines and protection of existing services during construction. It details responsibilities of the contractor regarding installation, verification of site conditions, and adherence to specifications for plumbing materials and equipment. Additionally, it includes guidelines for condensate pipework installation and the need for proper access and maintenance provisions for plumbing systems.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views1 page

GHD XX PW DRG PB 00001

The document outlines general plumbing notes, water supply system notes, and builders work notes, emphasizing compliance with the Uniform Plumbing Code of the Philippines and protection of existing services during construction. It details responsibilities of the contractor regarding installation, verification of site conditions, and adherence to specifications for plumbing materials and equipment. Additionally, it includes guidelines for condensate pipework installation and the need for proper access and maintenance provisions for plumbing systems.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

GENERAL PLUMBING NOTES: WATER SUPPLY SYSTEM NOTES: ABBREVIATIONS LEGENDS

1. ALL PLUMBING INSTALLATIONS SHALL CONFORM WITH LATEST EDITION OF UNIFORM PLUMBING CODE OF THE PHILIPPINES (UPCP), AND COMPLY 1. ALL EXISTING SERVICES AND BUILDING FEATURES NOT BEING ALTERED BY THIS PROJECT ARE TO BE PROTECTED FROM DAMAGES. CONTRACTOR kW KILOWATTS
AAV AIR ADMITTANCE VALVE AREA DRAIN / CATCH BASIN
WITH THE STANDARD RULES AND REGULATIONS OF THE NATIONAL AND LOCAL AUTHORITIES. SHALL BE RESPONSIBLE IN SAFEGUARDING ALL EXISTING ADJACENT SURFACES, ELEMENTS AND UTILITIES AGAINST DAMAGES DUE TO THE CONSTRUCTION.
2. PLUMBING FIXTURES CATEGORIES AND SPECIFICATION AS PER OWNER'S APPROVED SELECTION SHALL BE REFER TO ARCHITECTURAL DRAWINGS 2. CONTRACTOR SHALL BE ACCOUNTABLE AT THEIR OWN EXPENSE ANY REPAIRS IN ALL DAMAGES INCURRING TO EXISTING SERVICES CAUSED BY THE CONTRACTOR'S LAV LAVATORY
BVA BALANCING VALVE
AND SPECIFICATIONS. OPERATION. FLOOR DRAIN
3. CONTRACTOR SHALL EXECUTE ALL OF THE WORK IN ACCORDANCE WITH APPROVED SHOP AND INSTALLATION DRAWINGS AS PER THE PROVISIONS 3. CONTRACTOR SHALL VERIFY ALL EXISTING SITE CONDITIONS, DIMENSIONS, ROUTES AND EQUIPMENT SETTING-OUT PRIOR TO PROCEEDING WITH THE AD AREA DRAIN Li. LITERS
OF THE TECHNICAL SPECIFICATIONS. CONSTRUCTION. SHOPDRAWING SHALL BE PROVIDED IF THE ROUTING IS TO BE MODIFIED PER SITE CONDITIONS.
4. ALL DIMENSIONS ARE IN METER UNLESS OTHERWISE NOTED. 4. ALL PIPING SHALL BE RUN PARALLEL TO BUILDING LINES AND BE SUPPORTED AND ANCHORED AS REQUIRED TO FACILITATE EXPANSION AND CONTRACTION. ALL FLOOR CLEAN OUT
CB CATCH BASIN LL, L/L LOW LEVEL
5. ALL PLUMBING DRAWINGS SHALL BE READ IN CONJUNCTION WITH GENERAL NOTES, TECHNICAL SPECIFICATIONS, MISCELLANEOUS DETAILS AND PIPING SHALL BE CONCEALED EXCEPT IN UNFINISHED SPACES. ALL PIPING EXPOSED TO VIEW SHALL BE ROUTED AS HIGH AS POSSIBLE TO THE UNDERSIDE OF
INSTRUMENTATION DRAWINGS. THE STRUCTURAL. CCO CEILING CLEAN OUT LPS LITER PER SECOND CEILING CLEAN OUT
6. PLUMBING DRAWINGS ARE DIAGRAMATIC ONLY, ALL WORKS SHALL BE EXECUTED AS PER APPROVED CONTRACTOR'S SHOP DRAWINGS COORDINATED 5. UNLESS OTHERWISE STATED ALL HORIZONTAL RUNS OF WATER PIPES SHALL RUN ABOVE CEILING LEVEL AND DROP DOWN WITHIN A PLUMBING SHAFT,
WITH FIRE PROTECTION, HVAC, ELECTRICAL, STRUCTURAL AND ARCHITECTURAL DRAWINGS. NO MEASUREMENT SHALL BE TAKEN FROM THESE CONCEALED IN WALLS AND/OR INSIDE THE PLANTROOM AND AWAY FROM PUBLIC VIEW TO AVOID UNSIGHTLY APPEARANCE. CDP CONDENSATE DRAIN PIPE MIN. MINIMUM CONTINUATION CUT
DRAWINGS AND SHALL NOT BE USED FOR ARCHITECTURAL, STRUCTURAL OR OTHER WORKS. 6. WATER SUPPLY PIPES SHOULD BE LAID AS STRAIGHT AS POSSIBLE TO MINIMIZE FRICTION LOSSES. INSTALLATION SHALL BE FREE FROM UPWARD BENDS AND FLOW DIRECTION
7. ALL PIPE DIAMETERS ARE INTERNAL PIPE DIAMETER IN MILLIMETERS, REFER TO MANUFACTURER'S STANDARD FOR EQUIVALENT PIPE DIAMETER AS DOWNWARD DIPS TO AVOID AIR POCKETS AND IMPURITY DEPOSITS. CONT'N CONTINUATION MM MILIMETER
PER SPECIFIED PIPE MATERIAL. IF THE DIAMETER IS NOT AVAILABLE THE CONTRACTOR SHALL USE THE NEXT LARGER DIAMETER. 7. HANGERS, ANCHORS AND BRACKET SYSTEM SHALL SUPPORT THE STABILITY OF THE SUSPENDED PIPES AND ITS CONTENTS. MATERIAL SHALL CONFORM WITH THE Ø DIAMETER
8. EQUIPMENT SIZES AND LOCATIONS ARE INDICATIVE ONLY, CONTRACTOR SHALL COORDINATE WITH ACTUAL SIZES AND OTHER SERVICE RELATIVE SECTIONS AND SHALL NOT PROMOTE GALVANIC ACTION. INSULATION SHALL NOT BE COMPRESSED AND/OR CRUSHED, A CRADLE PLATE OR PIPE CV CHECK VALVE M3 CUBIC METER
REQUIREMENTS AS PER APPROVED MATERIALS TO SUIT THE FINAL LOCATION OF EQUIPMENT AND SUBMIT SHOP DRAWINGS FOR APPROVAL. SHIELD ON HANGERS AND SUPPORT SHALL BE REQUIRED. STACK
9. PLUMBING MATERIALS SHALL COMPLY WITH ARCHITECTURAL & ENGINEERING DESIGN CRITERIA. 8. ELEVATIONS FOR THE HOT WATER SYSTEM PIPING ARE TO BE VERIFIED PRIOR TO CONSTRUCTION AGAINST EXISTING CONDITIONS. CWS COLD WATER SUPPLY NO. NUMBER
10. ACCESS PANELS SHALL BE PROVIDED FOR ALL CONCEALED VALVES, CONTROLS, OR ANY PLUMBING EQUIPMENT REQUIRING INSPECTION AND 9. PROVIDE CONCRETE THRUST BLOCK AND SUFFICIENT ANCHORING SUPPORT FOR ABRUPT PIPE CHANGES IN DIRECTION PARTICULARLY FOR PRESSURIZED
DIA., Ø DIAMETER NC NORMALLY CLOSED PIPE DROP
MAINTENANCE. ACCESS PANELS SHALL BE OF SUFFICIENT SIZE AND SO LOCATED THAT THE CONCEALED ITEMS MAY BE SERVICED AND MAINTAINED WATER PIPES AS PER APPLICABLE CODES AND STANDARDS.
OR COMPLETELY REMOVED AND REPLACED. 10. HOT WATER PIPING FROM THE PROPOSED WTE EQUIPMENT TO THE EXISTING HEAT PUMP PLANTROOMS SHALL BE INSULATED COPPER PIPES. EXISTING
11. CONTRACTOR SHALL PROVIDE AND INSTALL ALL NECESSARY HANGERS AND SUPPORTS OF EQUIPMENT, PIPES AND OTHER APPURTENANCES POLYPROPYLENE RANDOM COPOLYMER PIPES (PPRC) WITHIN THE HEAT PUMP ROOM SHALL BE REPLACED WITH INSULATED COPPER PIPES IN ORDER TO DMH DRAINAGE MANHOLE OC ON CENTER PARKING DRAIN
ACCORDING TO INDUSTRY STANDARDS, FOR COMPLETE AND FUNCTIONING SYSTEMS. WHICH MAY OR MAY NOT BE INCLUDED IN THE DRAWINGS. WITHSTAND 90°C INCOMING HOT WATER TEMPERATURE.
DN DOWN RD ROOF DRAIN
12. PIPE SLEEVES SHALL BE PROVIDED ON ALL PIPES PENETRATING WALLS AND ANY STRUCTURAL ELEMENT WHERE REQUIRED. PIPE SLEEVES SHALL 11. THERMAL EXPANSION JOINTS SHALL BE PROVIDED ON INTERVALS IN ACCORDANCE TO PIPE MANUFACTURER'S RECOMMENDATIONS. ROOF GUTTER DRAIN
BE ONE PIPE SIZE LARGER AND ALL PIPE PENETRATION THROUGH ROOF AND EXTERIOR WALLS SHALL BE FULLY WATERPROOFED. 12. LOCATE AND ORIENT VALVES AND OTHER ACCESSORIES FOR EASE OF ACCESS, FULL LIMITS OF OPERATION AND MAINTENANCE.
DS DOWNSPOUT RWP RAINWATER PIPE
13. ALL OUTDOOR PLUMBING EQUIPMENT, CONTROLS, PIPE WORK SHALL BE FULLY PROTECTED FROM THE ADVERSE EFFECTS OF TEMPERATURE, 13. CONNECTIONS FOR DISSIMILAR PIPE MATERIALS SHALL BE IN ACCORDANCE TO THE PIPE MANUFACTURER'S RECOMMENDED CONNECTION FITTINGS.
SOLAR RADIATION AND ACTUAL WEATHER CONDITION. 14. VALVES ON PLANS ARE INDICATIVE ONLY AND SHALL BE SUBJECT TO DEVIATIONS BASED ON ACTUAL FIELD CONDITIONS AND/OR AS DIRECTED BY THE ENGINEER. SEWER / STORMWATER MANHOLE
DWG. DRAWING SH SHOWER
14. CONTRACTOR IS RESPONSIBLE TO PROVIDE EXPANSION AND CONTRACTION COMPENSATOR FITTINGS FOR ALL PLUMBING SYSTEMS AND 15. ALL HIGH POINTS OF THE EVERY BOOSTED WATER SYSTEM SHALL BE PROVIDED WITH AUTOMATIC AIR VENT AND THE LOW POINT SHALL BE PROVIDED WITH
EQUIPMENTS INSTALLED ACROSS THE EXPANSION JOINT IN STRUCTURAL FRAMING. DRAIN POINT WHETHER ON LAYOUT OR NOT. FA, F/A FROM ABOVE SMH SEWER MANHOLE CHECK VALVE
15. ALL PLUMBING SERVICES UNDERGROUND SHALL BE INSTALLED STRICTLY IN ACCORDANCE WITH PIPE MANUFACTURER'S RECOMMENDATIONS. 16. DOMESTIC WATER PIPE SHALL BE SIZED NOT TO EXCEED 2.4 m/s WATER VELOCITY.
PROVIDE APPROVED TYPE OF WARNING TAPE BEFORE FINAL BACKFILLING. 17. CONTRACTOR SHALL INCLUDE THE DEVICES TO ABSORB THE WATER HAMMERRING CAUSED BY SUDEN SURGE OF HIGH BACK PRESSURES. FB, F/B FROM BELOW SK SINK GATE VALVE / ISOLATION VALVE
16. PLUMBING SERVICE THROUGHOUT IN THE PROJECT SHALL BE LABELED AND IDENTIFIED AS PER CODES. ALL EQUIPMENT AND VALVES SHALL BE 18. PUMP FLOWRATE CAPACITY SHALL BE SIMILAR TO THE EXISTING PUMP RATINGS AND/OR CUMULATIVE TO THE PUMP RATINGS OF THE AREAS BEING SERVED
PROVIDED WITH APPROVED TYPE OF IDENTIFICATION NAMEPLATE. BY THE HOT WATER SYSTEM. FCO FLOOR CLEAN OUT SP SOIL PIPE
17. PLUMBING PIPEWORK SHALL INCLUDE INSULATION IF REQUIRED AS SPECIFIED AND REQUIRED BY MANUFACTURER AND APPLICABLE CODES. 19. UPON COMPLETION, THE SYSTEM SHALL BE SUBJECTED TO HYDROSTATIC PRESSURE TESTING IN ACCORDANCE TO UPCP STANDARD. FLOAT VALVE
18. EQUIPMENT'S PAD SHALL BE PROVIDED FOR ALL FLOOR MOUNTED EQUIPMENT. PAD SHALL BE 100MM MINIMUM IN HEIGHT. 20. ELECTRIC STORAGE TYPE WATER HEATERS SHALL SUPPLY 140°F (60°C) HOT WATER TO PLUMBING FIXTURES. FD FLOOR DRAIN TA, T/A TO ABOVE
19. ALL PIPEWORK BELOW GROUND OUTSIDE BUILDINGS SHALL BE DIRECTLY BURIED IN SOIL AT A MINIMUM DEPTH OF 600MM IN PEDESTRIAN AND 21. FLUSHING AND DISINFECTING OF PIPING SHALL CONFORM TO AWWA STANDARD C601 AND FOLLOW THE APPROVED PROCEDURES SUBMITTED. OPEN AND PRESSURE REDUCING VALVE
LANDSCAPED AREAS AND 1000MM ELSEWHERE. PIPING CROSSING IN ROADWAYS SHALLOWER THAN 1000MM SHALL BE ENCASED IN CONCRETE AT CLOSE VALVES, FAUCETS AND HOSE BIBS AT 30 MINUTES INTERVALS DURING DISINFECTION PERIOD. THE PROTECTION AND DISINFECTION OF WATER LINES FFL FLOOR FINISHED LEVEL TB, T/B TO BELOW
LEAST 200MM THICK WITH STEEL MESH REINFORCEMENT ABOVE THE PIPE CROWN. SHALL BE AS PER NPC.
20. CONTRACTOR SHALL PURCHASE PLUMBING MATERIALS AND EQUIPMENT CONFORMING TO STANDARDS MENTIONED IN THE CONTRACT DOCUMENT, 22. REFER TO ARCHITECTURAL INFORMATION FOR THE SANITARY FIXTURE DETAILS AND TECHNICAL SPECIFICATIONS. FWG FLOOR WASTE GULLY TD TRENCH DRAIN PUMP
OTHERWISE MAY SUBMIT ALONG SIDE WITH DETAILED COMPARISON BETWEEN PROPOSAL & SPECIFIED SYSTEMS. 23. AUTOMATIC AIR VENTS WILL BE INSTALLED AT HIGH POINTS AND AT THE TOP OF ALL RISERS.
21. CONTRACTOR SHALL SUBMIT AS-BUILT DRAWING AND OPERATION AND MAINTENANCE MANUALS FOR ALL THE INSTALLED SYSTEMS AND EQUIPMENT. 24. WET SERVICES WILL NOT BE INSTALLED ABOVE ELECTRICAL OR ICT ROOMS. GCO GROUND CLEAN OUT TDH TOTAL DYNAMIC HEIGHT ELECTRIC WATER HEATER
22. EACH PIECE OF EQUIPMENT AND ALL OF THE SYSTEMS SHALL BE TESTED AND ADJUSTED TO ENSURE PROPER FUNCTIONING OF ALL CONTROLS, 25. PIPE SIZES SPECIFIED ON THE DRAWINGS ARE NOMINAL INTERNAL BORE SIZES. IT SHOULD BE NOTED THAT THESE SIZES ACROSS ALL HYDRAULIC AND PIPING
ELIMINATION OF NOISE AND VIBRATION AND LEFT IN FIRST CLASS OPERATING CONDITION. MATERIAL SYSTEMS HAVE BEEN STANDARDIZED. THE FOLLOWING TABLE INDICATES THE PIPE SIZES USED AND THEIR IMPERIAL EQUIVALENT. GV GATE VALVE TYP TYPICAL
M WATER METER
HL, H/L HIGH LEVEL UG, U/G UNDERGROUND

BUILDERS WORK NOTES: CONDENSATE PIPEWORK NOTES: Hp HORSE POWER UR URINAL


WYE STRAINER

1. ALL OTHER OPENINGS ON THE FLOORS OR WALLS ARE TO BE DETAILED AND IDENTIFIED ON DEDICATED DRAWINGS PROVIDED BY THE CONTRACTOR AND 1. CONDENSATE PIPEWORK WILL BE COLLECTED FROM ALL AIR HANDLING UNITS (AHU'S) AND FAN COIL UNITS. HOSE BIB
2. FOR FINAL LOCATIONS OF MECHANICAL EQUIPMENT REFER TO THE MECHANICAL SERVICES DRAWINGS. IL INVERT LEVEL US, U/S UNDERSLAB
REQUIRE PRIOR APPROVAL OF THE STRUCTURAL ENGINEER.
2. ALL OPENINGS FOR SERVICES ROUTES, EQUIPMENT LOCATIONS, SERVICE AND MAINTENANCE SPACE MUST BE CHECKED AND SET OUT 3. ONLY ONE MATERIAL AND ONE MANUFACTURER WILL BE USED FOR THE ENTIRE INSTALLATION. REFER TO THE SPECIFICATION FOR THE PIPE MATERIAL.
4. THE INSTALLATION WILL BE IN STRICT ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. LOCAL SITE CONDITIONS AND FACTORS MUST ALSO BE IV ISOLATION VALVE VP VENT PIPE
TAKING INTO ACCOUNT THE MANUFACTURER'S RECOMMENDATIONS AND GOOD WORKING PRACTICE.
3. OPENINGS FOR DRAINAGE AND OTHER PIPEWORK PASSING THROUGH CORE DRILLED HOLES WILL BE MARKED UP BY THE CONTRACTOR ON SITE. IN CONSIDERATION AND FURTHER GUIDANCE SOUGHT FROM THE MANUFACTURER'S TECHNICAL ENGINEERING TEAM.
JS JANITOR SINK VSTR VENT STACK THROUGH ROOF
APPROVAL REQUIRED PRIOR TO START CORE CUTTING 5. EXPANSION PROVISION SHALL BE INCLUDED AS RECOMMENDED BY THE MANUFACTURER.
4. ALL HOLES AND OPENINGS ON THE FLOORS LIKE SERVICE RISERS WILL BE MADE GOOD WITH EITHER CONCRETE INFILL AND WHERE SERVICES 6. ALL CONDENSATE DRAINAGE PIPES SHALL BE WITH SLOPE OF 1:100
KS KITCHEN SINK WHA WATER HAMMER ARRESTOR
WILL BE SLEEVED IN ACCORDANCE WITH THE SPECIFICATION, OR PROVIDED WITH AN OPEN MESH FLOORING SYSTEM TO BE DETAILED AND 7. CONSIDERATION WILL BE MADE FOR CONDENSATE PIPEWORKS ROUTED THROUGH HVAC CONDITIONED AREAS AND CEILING VOIDS TO BE INSULATED AS PER
PROVIDED BY THE CONTRACTOR. SPECIFICATION.
KWP KITCHEN WASTE PIPE WC WATER CLOSET
5. EQUIPMENT PLINTHS, SERVICE PLATFORMS AND WEATHERING DETAILS INCLUDING FLASHINGS AND DRESSING OF ALL SERVICE PENETRATIONS 8. CONSIDERATION WILL BE MADE FOR CONDENSATE PIPEWORKS ROUTED THROUGH ACOUSTIC SENSITIVE AREA AND CEILING VOIDS TO BE INSULATED AS PER
AS REQUIRED ARE TO BE DETAILED AND PROVIDED BY THE CONTRACTOR. SPECIFICATION
6. ALL FIRE COMPARTMENT PENETRATIONS BY SERVICES WILL BE PROVIDED WITH A FIRE STOP MATERIAL USING A PROPRIETARY METHOD TO 9. ACCESS TO CONDENSATE STACKS TO BE PROVIDED AT THE BASE, EVERY OTHER LEVEL AND AT EACH CHANGE OF DIRECTION ON ALL STACKS. ACCESS ON
INCLUDE THE APPROPRIATE SERVICE INSULATION (AND VAPOUR BARRIER) SYSTEM. APPROPRIATE ALLOWANCES WILL BE MADE FOR SANITARY AND WASTE FLOATS TO BE PROVIDED AT THE END OF ALL HORIZONTAL RUNS,TURNED THROUGH 90/45 DEGREES AS NECESSARY TO ALLOW ACCESS
MOVEMENT OF SERVICES. CERTIFIED TEST DATA WILL BE PROVIDED FOR ALL METHODS AND MATERIALS USED. FOR RODDING.
7. ALL PIPEWORK PASSING THROUGH FIRE RATED WALLS AND FIRE BREAKS WILL BE PROVIDED WITH OVERSIZED SLEEVES CAST INTO THE WALL. 10. WHERE PIPEWORK IS BOXED-IN OR ENCASED THE ARCHITECT WILL PROVIDE SUITABLE REMOVABLE ACCESS PROVISION WITHIN THE PIPE BOXING OR
SLEEVES WILL BE MANUFACTURED FROM A SIMILAR MATERIAL TO THE PIPE WORK. ENCASEMENT TO ALLOW SERVICING AND MAINTENANCE.
8. PROVIDE PUDDLE FLANGES FOR ALL PIPES CROSSING WATER AND WATER PROOFED STRUCTURE. 11. CONDENSATE DRAIN INSULATION AS PER TABLE.
WATER SUPPLY PIPE SCHEDULE DRAINAGE PIPE SCHEDULE
SANITARY DRAINAGE SYSTEM NOTES: PLUMBING TAG TYPE OF PIPE SYSTEM LOCATION REMARKS TYPE OF PIPE SYSTEM LOCATION REMARKS

1. SANITARY DRAINAGE SYSTEM INSIDE THE BUILDING SHALL BE ONE PIPE SYSTEM. VENT PIPE SHALL BE PROVIDED FOR EACH FIXTURES TO AVOID RISER TAG
SIPHONING EFFECT AS INSTALLED ACCORDING TO CODE REQUIREMENTS AND GOOD PRACTICE. HIGH DENSITY OPERATION & MAINTENANCE
ALL BURRIED PIPES EQUAL BUILDING, RAW MATERIALS,
2. PROVIDE TRAPS FITTING ON ALL PLUMBING FIXTURES TO FORM A SEAL THAT WILL PREVENT THE PASSAGE OF FOUL ODORS FROM THE DRAIN PIPES POLYETHYLENE (HDPE) COLD WATER SUPPLY
RISER TO 50 MMØ AND LARGER AND PRODUCTION 1
INTO THE AIR WITHIN THE BUILDING. CONNECT VENT PIPE ON EACH FIXTURE OR AS INDICATED ON THE DRAWING. SDR 11
SYSTEM ABBREVIATION PIPE DIRECTION RAINWATER DRAINAGE BUILDING, ADMINISTRATION
3. ALL WET AREAS SUCH AS TOILETS, BATHROOMS, SHOWERS, KITCHENS, PUMP ROOMS AND ETC. SHALL BE PROVIDED WITH FLOOR DRAINS WITH XXX (UP)
INTEGRAL TRAP SEAL AND DRAIN PIPE SIZE FOR FLOOR DRAIN SHALL BE 50MM MINIMUM DIAMETER WITH VENT PIPE AS REQUIRED IN PLUMBING CODES. BUILDING,
XXX OPERATIONS &
4. EXTEND VENT STACKS ABOVE ROOF SLAB AT LEAST 600MM AND TERMINATE WITH VENT CAP. VENT CAP SHALL BE COMPLETE WITH MOSQUITO PROOF BAKERY/IN-HOUSE,
PIPE SIZE PIPE DIRECTION COLD WATER MAINTENANCE BUILDING,
WIRE MESH. PRODUCTION ANCILLARY,...
(DOWN) SUPPLY SYSTEM RAW MATERIALS, AND
5. UNLESS OTHERWISE NOTED ALL UNDERGROUND SEWAGE PIPES SHALL HAVE A MINIMUM SLOPE OF 1%. ALL ABOVE GROUND PIPES SHALL HAVE ALL PRODUCTION 1 BUILDING
ABOVE GROUND PIPES SHALL HAVE A 2% SLOPE. OPERATION & MAINTENANCE
6. CONNECTION OF ANY HORIZONTAL WASTE OR SOIL PIPE AT GROUND FLOOR SHOULD BE MADE AT LEAST 3000MM (10 FT) AWAY FROM THE BASE OF THE
WASTE OR SOIL STACK IN A MULTI-STORY BUILDING.
DRAINAGE PIPE LEGEND STAINLESS STEEL PIPES SOFTWATER SYSTEM
OPERATION & MAINTENANCE
BUILDING
BUILDING, RAW MATERIALS,
AND PRODUCTION 1
7. THE DRAINAGE PIPEWORK SHALL INCLUDE CLEANOUT AT ALL CHANGES IN DIRECTION AND SHALL BE PROVIDED AT, OR NEAR, THE FOOT OF EACH ABOVE GROUND SHALL BE
LINETY (SCHEDULE 40) SS316 CONDENSATE DRAINAGE BUILDING, ADMINISTRATION
STACK. PROVIDED WITH INSULATION
BUILDING,
8. TYPE OF MATERIAL AND FINISH FOR THE STRAINER AND GRATINGS SHALL BE STRICTLY IN ACCORDANCE WITH THE APPROVAL OF OWNER OR PE DESCRIPTION RO WATER SYSTEM
OPERATION & MAINTENANCE BAKERY/IN-HOUSE,
ARCHITECT. BUILDING PRODUCTION ANCILLARY,...
9. PROPOSED SANITARY UTILITIES SHALL CONFORM TO THE ACTUAL LOCATION, DEPTH AND INVERT ELEVATION OF ALL EXISTING PIPE AND STRUCTURES KITCHEN
AS VERIFIED BY THE CONTRACTOR. HOT WATER FROM LPG OPERATION & MAINTENANCE
10. SEWER SYSTEM SHALL BE COORDINATE WITH LOCAL AUTHORITIES AND CONNECTED TO CITY SEWER WHERE AVAILABLE. IN CASES WHERE THE SITES PROVIDED WITH INSULATION POLYVINYL CHLORIDE OPERATION & MAINTENANCE
OVERFLOW BOILER TO CALORIFIER BUILDING BUILDING, RAW MATERIALS,
ARE LOCATED WITHIN AN AREA CONTAINING A MUNICIPALITY DRAINAGE NETWORK, THE MAIN SEWAGE LINES SHALL BE CONNECTED DIRECTLY TO THE PIPES (PVC) SERIES 1000
AND PRODUCTION 1
11. MANHOLES AND INSPECTION CHAMBERS FRAMES AND COVERS SHALL BE HEAVY DUTY IN AREAS SUBJECTED TO TRAFFIC AND MEDIUM DUTY IN OTHER DOMESTIC SANITARY
SANITARY BUILDING, ADMINISTRATION
AREAS. ALL WEATHER-EXPOSED PIPES SEWER
ALL BURRIED PIPES LESS BUILDING,
12. SANITARY SEWAGE, WASTE, VENT, DRAINAGE AND RAIN WATER PIPING TO ABOVE THE ROOF LINE PRIOR TO BACK FILL, THE TEST AND PROVE SYSTEMS SHALL BE COATED WITH UV
STORMWATER THAN 40 MMØ BAKERY/IN-HOUSE,
SHALL BE WATER TIGHT UNDER A 3 METERS HEAD OF WATER AS PER NPCP. PROTECTION PAINT
PRODUCTION ANCILLARY,...
13. ALL OTHER LIFT PITS WILL BE PROVIDED WITH A SUMP SUITABLE FOR DRAINING THROUGH THE USE OF A PORTABLE PUMP SYSTEM.
VENT
POLYPROPYLENE GUARDHOUSE 1 & 2, OPERATION & MAINTENANCE
RANDOM COPOLYMER COLD WATER SUPPLY ADMINISTRATION BUILDING, BUILDING, RAW MATERIALS,
SAN WASTE
BAKERY/IN-HOUSE,
RAINWATER PIPEWORK NOTES: (PPRN) PN25
PRODUCTION ANCILLARY, ALL WEATHER-EXPOSED PIPES VENT
AND PRODUCTION 1
BUILDING, ADMINISTRATION
DISPATCHING AND SHALL BE COATED WITH UV BUILDING,
1. THE RAINWATER PIPEWORK INSTALLATION BY DEFINITION WILL INCLUDE ALL PIPEWORK AND FITTINGS OUTSIDE AND INSIDE, FIXED TO OR PASSING WAREHOUSE BUILDING, PROTECTION PAINT.
THROUGH THE BUILDING STRUCTURE INCLUDING DRAINS BELOW THE BUILDING, TO THE POINT OF CONNECTION TO THE BURIED DRAIN ADJACENT TO THE
BUILDING, USED TO REMOVE PRECIPITATION FROM A ROOF.
WATER SUPPLY PIPE LEGEND CONDENSATE DRAIN INSULATION MRF BUILDING, LPG TANK
BAKERY/IN-HOUSE,
PRODUCTION ANCILLARY,...
FARM, WTP, LANDSCAPE HB
2. ONLY ONE MATERIAL AND ONE MANUFACTURER WILL BE USED FOR THE ENTIRE INSTALLATION. REFER TO THE TECHNICAL SPECIFICATIONS FOR THE LINETY CONDENSATE DRAIN LINE PROVISIONS
PIPE MATERIAL. DESCRIPTION PIPE SIZE (mm) PRODUCTION ANCILLARY &
3. THE INSTALLATION WILL BE IN STRICT ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. LOCAL SITE CONDITIONS AND FACTORS MUST
PE THICKNESS OF INSULATION(mm)
O&M BUILDING, RAW KITCHEN WASTE DRAINAGE DISPATCH AND WAREHOUSE
ALSO BE IN CONSIDERATION AND FURTHER GUIDANCE SOUGHT FROM THE MANUFACTURER'S TECHNICAL ENGINEERING TEAM. HVAC CONDITIONED 25 AND SMALLER 20 MATERIALS AND PROVIDED WITH INSULATION BUILDING
COLD WATER
AREAS AND CEILING VOIDS TO BE INSULATED AS PER SPECIFICATION PRODUCTION 1 BUILDING
4. EXPANSION PROVISION SHALL BE INCLUDED AS RECOMMENDED BY THE MANUFACTURER. 32 TO 50 25 HOT WATER SUPPLY AND WASTE WATER CONTAINING
HOT WATER COPPER PIPES TYPE K CHLORINATED POLYVINYL RAW MATERIALS BUILDING
5. CONSIDERATION WILL BE MADE FOR RAINWATER PIPEWORKS ROUTED THROUGH. RETURN PROVIDED WITH INSULATION. HIGH FOG (FATS, OIL & GREASE)
65 TO 200 32 CHLORIDE (CPVC) WASTE DRAINAGE SYSTEM AND PRODUCTION 1
6. ACCESS TO RAINWATER DOWNPIPES TO BE PROVIDED AT THE BASE, EVERY OTHER LEVEL AND AT EACH CHANGE OF DIRECTION ON ALL STACKS. ANCILLARY HOT WATER COPPER PIPES ARE APPLICABLE CLEAN AND MAINTAIN WITH
HOT WATER RETURN SCHEDULE 40 BUILDING
PLANT TO INTERIOR OF PRODUCTION HIGH TEMPERATURE WATER
ACCESS ON SANITARY AND WASTE FLOATS TO BE PROVIDED AT THE END OF ALL HORIZONTAL RUNS,TURNED THROUGH 90/45 DEGREES AS NECESSARY
ANCILLARY HOT WATER...
TO ALLOW ACCESS FOR RODDING. RO REVERSE OSMOSIS HIGH DENSITY
7. RAINWATER OUTLET SHALL BE PROVIDED FOR ALL ROOF MAY OR MAY NOT INDICATED. OPERATION & MAINTENANCE
POLYETHYLENE (HDPE) SN SUMP DISCHARGE
POLYPROPYLENE PRODUCTION ANCILLARY BUILDING
HOT WATER SUPPLY AND 8
RANDOM COPOLYMER BUILDING OUTSIDE HOT PROVIDED WITH INSULATION
RETURN
(PPRN) PN25 WATER PLANTROOM

GENERAL NOTES, Size

ABBREVIATIONS, LEGENDS AND A1


SYMBOLS

Drawing No. Rev

12595611-GHD-XX-PW-DRG-PB-00001 0

You might also like