Drawing of Shimul Enterprise-Vertical

The document outlines specifications for elevator installation, including load-bearing capacities and dimensions for various components such as machine rooms and buffers. It details the required distances, heights, and spacing for structural elements like rail brackets and ring beams. Additionally, it emphasizes the importance of adhering to specific measurements for safety and functionality.

Uploaded by

sp89engr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views1 page

Drawing of Shimul Enterprise-Vertical

The document outlines specifications for elevator installation, including load-bearing capacities and dimensions for various components such as machine rooms and buffers. It details the required distances, heights, and spacing for structural elements like rail brackets and ring beams. Additionally, it emphasizes the importance of adhering to specific measurements for safety and functionality.

Uploaded by

sp89engr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1.

0
1.75

R5
R4
R3
R2
R1
F
785
860

500 Rail brackets every spacing =2000mm ≤2000 500


≥2500
300

75KN
95KN
20KN
30KN
35KN
Load bearing capacity
CWT buffer
J
hydraulic buffer

distance J
polyurethane buffer

grid
CWT
≥300

protection
150~400
200~350

machine room
car buffer
net door height 2100 net height
distance J F
≥2300

machine room door.


floor distance door hole net height 2200

finished floor
finished floor
machine room
pit depth traveling height overhead net height height≥2500

of elevator door opening, don't be


All reserved holes in machine room

benchmarked against the position of


are benchmarked against the position
500 Ring beam is reserved in the hoistway every 2000mm, which is done by others ≤2000 500
Hoistway side elevation

(min. 20 KN)
hook/ by others

R5
hook load-bearing
machine room roof

300
300
floor slab

R4
machine room

machine room
net height

K
net door height 2100
≥2300
floor distance door hole net height 2200

finished floor
finished floor
machine room
finished floor

by others
pit depth traveling height overhead net height height≥2500
overspeed