1.
0
1.75
R5
R4
R3
R2
R1
F
785
860
500 Rail brackets every spacing =2000mm ≤2000 500
≥2500
300
75KN
95KN
20KN
30KN
35KN
Load bearing capacity
CWT buffer
J
hydraulic buffer
distance J
polyurethane buffer
grid
CWT
≥300
protection
150~400
200~350
machine room
car buffer
net door height 2100 net height
distance J F
≥2300
machine room door.
floor distance door hole net height 2200
finished floor
finished floor
machine room
pit depth traveling height overhead net height height≥2500
of elevator door opening, don't be
All reserved holes in machine room
benchmarked against the position of
are benchmarked against the position
500 Ring beam is reserved in the hoistway every 2000mm, which is done by others ≤2000 500
Hoistway side elevation
(min. 20 KN)
hook/ by others
R5
hook load-bearing
machine room roof
300
300
floor slab
R4
machine room
machine room
net height
K
net door height 2100
≥2300
floor distance door hole net height 2200
finished floor
finished floor
machine room
finished floor
by others
pit depth traveling height overhead net height height≥2500
overspeed