The document is a commissioning report for the Earthing and Lightning Protection System of the Sindalah Island Project. It includes details on continuity tests, electrode resistance tests, and calibration information, along with sections for test status and notes. The report is structured to capture data from various tests performed by contractors and verified by the commissioning authority.

Uploaded by

anwaryakub29
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
5 views4 pages

13-900001-4800000997-EES-ELE-MST-000005 T&C Earthing & Lightening Protection

The document is a commissioning report for the Earthing and Lightning Protection System of the Sindalah Island Project. It includes details on continuity tests, electrode resistance tests, and calibration information, along with sections for test status and notes. The report is structured to capture data from various tests performed by contractors and verified by the commissioning authority.

Uploaded by

anwaryakub29
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Sindalah Island Project

Client: Project Management Cx Authority (CxA): Contractor: Supplier


Consultant:

Commissioning Report for Earthing and Lightning Protection System

Cluster No.: Site No.:


Building Name: Location:
Earth Pit/LA Tag: Inspection Date:

Continuity Test for Grounding System (≤1 ohm)


No. From To Test Status Notes

10

11

12

Remarks:

Tool Name Serial No. Model Calibration Date Calibration Due Date

Performed by: Witnessed and verified by:


Company Company
Evolution AECOM ESTD
Name Name
Contractor Supplier CxA PMC
Name
Signature
Date
Sindalah Island Project
Client: Project Management Cx Authority (CxA): Contractor: Supplier
Consultant:

Commissioning Report for Earthing and Lightning Protection System

Cluster No.: Site No.:


Building Name: Location:
Earth Pit/LA Tag: Inspection Date:

Continuity Test for Lightning System


No. From To Test Status Notes

10

11

12

Remarks:

Tool Name Serial No. Model Calibration Date Calibration Due Date

Performed by: Witnessed and verified by:


Company Company
Evolution AECOM ESTD
Name Name
Contractor Supplier CxA PMC
Name
Signature
Date
Sindalah Island Project
Client: Project Management Cx Authority (CxA): Contractor: Supplier
Consultant:

Commissioning Report for Earthing and Lightning Protection System

Cluster No.: Site No.:


Building Name: Location:
Earth Pit/LA Tag: Inspection Date:

Electrode to Earth Resistance Test (≤10 ohm)


Electrode to Electrode to
Avg. Resistance
Electrode No. Potential Spike - Current Spike - Notes
Measurement
Meters Meters

Tool Name Serial No. Model Calibration Date Calibration Due Date

Performed by: Witnessed and verified by:


Company Company
Evolution AECOM ESTD
Name Name
Contractor Supplier CxA PMC
Name
Signature
Date
Sindalah Island Project
Client: Project Management Cx Authority (CxA): Contractor: Supplier
Consultant:

Commissioning Report for Earthing and Lightning Protection System

Cluster No.: Site No.:


Building Name: Location:
Earth Pit/LA Tag: Inspection Date:

Individual Electrode to Earth Resistance Test


Electrode to Electrode to
Avg. Resistance
Electrode No. Potential Spike - Current Spike - Notes
Measurement
Meters Meters

Performed by: Witnessed and verified by:


Company Company
Evolution AECOM ESTD
Name Name
Contractor Supplier CxA PMC
Name
Signature