Sindalah Island Project
Client: Project Management Cx Authority (CxA): Contractor: Supplier
Consultant:
Commissioning Report for Earthing and Lightning Protection System
Cluster No.: Site No.:
Building Name: Location:
Earth Pit/LA Tag: Inspection Date:
Continuity Test for Grounding System (≤1 ohm)
No. From To Test Status Notes
10
11
12
Remarks:
Tool Name Serial No. Model Calibration Date Calibration Due Date
Performed by: Witnessed and verified by:
Company Company
Evolution AECOM ESTD
Name Name
Contractor Supplier CxA PMC
Name
Signature
Date
Sindalah Island Project
Client: Project Management Cx Authority (CxA): Contractor: Supplier
Consultant:
Commissioning Report for Earthing and Lightning Protection System
Cluster No.: Site No.:
Building Name: Location:
Earth Pit/LA Tag: Inspection Date:
Continuity Test for Lightning System
No. From To Test Status Notes
10
11
12
Remarks:
Tool Name Serial No. Model Calibration Date Calibration Due Date
Performed by: Witnessed and verified by:
Company Company
Evolution AECOM ESTD
Name Name
Contractor Supplier CxA PMC
Name
Signature
Date
Sindalah Island Project
Client: Project Management Cx Authority (CxA): Contractor: Supplier
Consultant:
Commissioning Report for Earthing and Lightning Protection System
Cluster No.: Site No.:
Building Name: Location:
Earth Pit/LA Tag: Inspection Date:
Electrode to Earth Resistance Test (≤10 ohm)
Electrode to Electrode to
Avg. Resistance
Electrode No. Potential Spike - Current Spike - Notes
Measurement
Meters Meters
Tool Name Serial No. Model Calibration Date Calibration Due Date
Performed by: Witnessed and verified by:
Company Company
Evolution AECOM ESTD
Name Name
Contractor Supplier CxA PMC
Name
Signature
Date
Sindalah Island Project
Client: Project Management Cx Authority (CxA): Contractor: Supplier
Consultant:
Commissioning Report for Earthing and Lightning Protection System
Cluster No.: Site No.:
Building Name: Location:
Earth Pit/LA Tag: Inspection Date:
Individual Electrode to Earth Resistance Test
Electrode to Electrode to
Avg. Resistance
Electrode No. Potential Spike - Current Spike - Notes
Measurement
Meters Meters
Performed by: Witnessed and verified by:
Company Company
Evolution AECOM ESTD
Name Name
Contractor Supplier CxA PMC
Name
Signature
Date