Wael Mohamed Farghaly Diab is an experienced project manager from Egypt with a background in civil engineering and extensive experience in managing large-scale construction projects across various countries. He holds a BSc in Civil Engineering and a PMP diploma, and has worked on diverse projects including residential compounds, hotels, and infrastructure works. His key strengths include managing multiethnic teams, problem-solving, and maintaining deadlines under pressure.

Uploaded by

HR abdelrahman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views2 pages

CV Wael Diab

Wael Mohamed Farghaly Diab is an experienced project manager from Egypt with a background in civil engineering and extensive experience in managing large-scale construction projects across various countries. He holds a BSc in Civil Engineering and a PMP diploma, and has worked on diverse projects including residential compounds, hotels, and infrastructure works. His key strengths include managing multiethnic teams, problem-solving, and maintaining deadlines under pressure.

Uploaded by

HR abdelrahman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Wael Mohamed Farghaly Diab

( +201013745705, +2 01557358362 ), Egypt, Giza, 6th October City.


( [email protected] ) ( [email protected] ).
Birth Date: 20 March 1966, Marital Status: Married, Nationality: Egypt.
*Objective: Directing the project management of projects assigned within approved project parameters cost, time-lines functionality
and quality in order to meet the set objectives in parallel with acquiring resources, coordinating efforts of team members and
vendors, subcontractors, stakeholders to deliver projects according to the plan.
*Key Strengths: Ability to manage (multiethnic and multidiscipline staff team)and(Identify problems and work to resolution as
required)
Able to (perform and maintain deadlines under pressure)and(Occasional travels, loyal, honest, dedicated, patient and listener)
*Education: BSc of Civil Engineer {May 1988 Good} Soil Mechanics and Foundation. / Faculty of Engineering (El-Mansoura
University).
*Training: Project management professional diploma (PMP Diploma), (Primavera, Word, Excel, AutoCAD 2D).
*Language: Arabic, English (Conversational, Read, Write).
*Work Experience: I have a Long term of experience in managing and accomplishing large scale projects (Water and Sewage
Treatments Plants, Malls, Residential Community Compounds, Hotels and Touristic Resorts, High rise buildings, Infrastructure,
Marines and Factories)in different countries (Egypt, UAE, Qatar and Algeria)
Al-Joman Construction & Real Estate Investment Co. (Owner Representative), (Sept. 2015 Till Apr. 2025, 9.5 Years) Egypt
(Projects Manager).
1_ Sedrah Community Compound (October gardens area), 6th of October, total area (81300m2), Consists of
* Mall with total area 25500 m2 = 2 floors Include(Shopping Spaces, Car Show Rooms, Gym Halls, Entertainment Places, Food Court
Area, Different Spaces for retail.
* 29 Bls., each Plan (types A=540 m2 & types B=612 m2) flats and duplex each (Basement, GF, 5 Typical F, 25% Roof), Mall, Service
Bls., and landscape.

Sarl KOU.G.C Engineering Construction Co. (Main Contractor), (May. 2011 Till August 2015, 4 years) Algeria
(Projects Manager) for Infrastructure Projects (Transfer water from dam to another dam) between (state of Mila, state of ohm al
bawaqi) 30 km length, 2 Line Pipes, with total value= 350,000,000 EUR.
*(Excavation + Shifting output soil Q = 1,350,000 m3), dewatering system for places that need drying.
*Supplying, applying (Interior & Exterior) welding for No. 4777 Steel pipes each L=12.53m, D =2400mm, thick = 12.70mm, (air vents,
drains as clean out, RC-inspection chambers, Sand bed under Pipes with h = 1 m (Q= 245000m3) + backfilling over all around the
pipe line with pure sand h= 0.50m over top Pipe (Q= 750000m2), backfilling with graded Stone size 5 cm with h= 1.00 m (Q= 390000
m3) supplied from crushers, backfilling with normal soil from excavation product (Q = 235,000 m3).
*Execution 6 horizontal directional drilling for tunnels under enter sectional (International and main roads along pipe line).
*Lifting zone pump station (substation power plant) [A=25000 m2]
*Construction for administration buildings & 4 house building, all related (infrastructure and fire fitting) works.
Owner: Minister Des Resources En Eau (Agency National Des Barrages Et Transfers).

Al-Safwa Trading Construction Co. (Main Contractor), from (May 2009 Till April 2011, 2 years) Egypt, Suez, Al-ain el-sokhna
Project Manager Project XD-EGY MAC (Transformer units factory), total value = 250,000,000 EGP
total (area =150 000 m2), (transformer building, GIS building, work shop building, administration building all related infrastructure
work).

Target Engineering Construction Co. (Subcontractor), (Mar 2006 till April 2009, 3 years) Qatar
(Projects Manager) for work Marines on, off Shore Projects
Project No (1) New water plant project RAF A1., Ras abu fontas, Al wakrah, Qatar
*Sea water intake pipe pines GRP pipe 1line, each pipe D= 2000mm, L=12 m, total No. of pipes (166 Pipe, 4 GRP Riser pipe), 4 Precast
concrete manholes), Cause way L=600m, W=14m, Temporary Jetty L=60 m).
*Dewatering well system (submergible network water pumps) all around the intake pumps room
Project value(our scope): Qrs., 135 000000 , M/S : Fisia italimpianti
Consultant : Parsons brinkerhoof, client : Qatar electricity and water authority
Project No(2) Q-Chem2 ethylene derivatives project client: Petrochemical Complex , masayeed industrial city, Qatar, project
value[our scope]: Qrs 50,000,000 project includes: Marine works (temporary Jetty, 3 HDP Pipe lines each 80 M)
*Civil works (temporary cofferdam (sheet piles), dewatering well system (submergible network water pumps), fixing system all
around the intake pumps room
*Waste water treatment equipment, pipe rack, boiler feed equipment), Main Contractor: Tecnimont, Daewoo.
Proj. No (3) Qatalum (aluminum plant), earth work, infrastructure, foundations for substation, storages building.
Main Contractor: SNC-Lavilange. project value (our scope): Qrs 25,000,000
Robust Contracting Co. (Feb. 2003 Till Feb. 2006, 3 years) El Sheikh Zayed Road, Dubai, UAE
Project Manager For Fast Track Building Project (High Rise Building) Al Hutton Building total value = 152,000,000 DHS CLIENT:
Firas Ali Al Sugair, project includes: concrete piles, basement, GF, 33 typical floor, swimming pool, GYM, mechanical room,
Consultant: ECG (Engineering Consultant Group).

AL ETHADIA Engineering Construction Co. (April 1998 Till Jan. 2003, 5 years) Al Dokki, Giza, Egypt.
1_Project Manager Project: Renovation of Saffeer Hotel CLIENT: Saffeer Hotel Group, Project value (our scope): total value =
60,000,000 EGP Demolitions for old structure building, renovation for (basement, Gf, mezzanine, 12 typical floor), extension building
include concrete piles work, concrete body work (basement, Gf, 4 typical fL, swimming pool, GYM, mechanical room), steel structure
building 4th Floors.
2_Site Manager project: Palm Hills Compounds, 6 October City, Giza my Scope Resp. Value = 210,000,000 EGP
CLIENT: Palm Hills Group, Position: Site manager for phase III, 100 Villas
*Concrete body-work (Foundations, G F, l st fL, pent house, swimming pool).
*Sewage networks (pvc Pipe Lines 200mm dia, inspection champers, man halls, septic sedimentation tanks)
*Domestic water networks (pvc Pipe Lines 160mm dia., RC dry inspection champers for valves, butter fly valves).
*Fire fitting water networks (black steel pipe lines 160mm dia., butter fly valves, regulators valve pressure).
3_Site Manager project: Soma bay resort, gulf abu soma, Saffaga City, Red-Sea, Project Includes: 6 Hotels 5*, 25 Villas, 8 cascades,
12 swimming pools, 18 golf play grounds, horses-track. CLIENT: Soma Bay Group
my duty scope site manager for marina hotel (288 rooms,22 sweets, No. 3 swimming pool, marina, and all related infrastructure
works.
_Sewage networks (pvc Pipe Lines 300mm dia., inspection champers, man halls, septic sedimentation tanks)
_Domestic water networks (pvc pipe lines 160mm dia, RC dry inspection champers for valves, butter fly valves)
_Fire fitting water networks(black steel pipe lines 160mm dia., butter fly valves, regulators valve pressure).

MEDCO CIAD Company Group [ Apr. 1995 Till Mar. 1998 / 36 Month ], Egypt 1- Project: {Gardenia Sharm Hotel} Sharm Al Sheikh
City, Red Sea Project Engineer Project Includes:400 Rooms+3 Swimming pools+100 suites _All Related Infrastructure Works) [My
Scope]: 150,000,000 EGP _Sewage Networks (pvc Pipe Lines 300mm dia _Inspection Champers _ Man Halls _ Septic Sedimentation
Tanks) _ Domestic Water Networks (pvc Pipe Lines 160mm dia _ RC Dry Inspection Champers for valves _ Butter Fly Valves)
_Fire Fitting Water Networks(Black Steel Pipe Lines 160mm dia _ Butter Fly Valves _ Regulators Valve Pressure

AL PASSEL Engineering CO. Project: {Sultan Gardens} [ Apr. 1992 Till Mar. 1995 / 36 Month ], CLIENT: AL PASSEL Group
Project Engineer Project Includes: Hotels 5* (550 Room,15 Villas+4 Swimming Pools + Infrastructure Works) 250,000,000 EGP

CARE SERVICE CO. [May. 1989 till Mar. 1992 / 36 Month]. Egypt
1- Project: {Scrap Storage} Suez & CLIENT: MINISTRY OF SUEZ CANAL & Position: Project Eng. Project Includes: Multiple Storage(5
FL)+Open Storage Precast Concrete for Scraps(4A)+Pascal Balance (150 ton). 15,000,000 EGP
2- Project: {AL Jazzier Tower Building} Al Mansoura City, & CLIENT: SALAMAH Group & Project Value= 8, 000,000 EGY &Position:
Site Engineer {Basement&GF&16 Typical FL & Swimming Pool & GYM & Mechanical Room} 8,000,000 EGP