EV & HP Application
Application Form for the Installation of Low Carbon Technologies
This application form must be completed and sent by the installer to the DNO directly when installing an Electric Vehicle Charge Point
or Heat Pump. This form should be used for premises with an existing DNO connection. For new DNO connections, this form should be
used in addition to a new electricity connection application. To ensure the safety and security of the Electricity Networks, depending on
the size, type and location of the installation, you may need to apply for a connection with the DNO prior to installation of the device.
To determine if you need to apply to the DNO for a connection prior to installation or not, please ensure you read and understand the
connection processes for Electric Vehicles and Heat Pumps on the ENA website here:
http://www.energynetworks.org/electricity/futures/electric-vehicles-and-heat-pumps.html
For help identifying the correct DNO and their contact details please visit:
http://www.energynetworks.org/assets/files/electricity/futures/Electric%20Vehicles%20and%20Heat%20Pumps/dno_info_for_ev&hp_31
0818.pdf
Please note that:
• One form must be submitted per device per premises. For multiple devices (including multiple devices under one controller) or
multiple properties, please use the multiple installations spreadsheet, also available on the ENA website here:
http://www.energynetworks.org/electricity/futures/electric-vehicles-and-heat-pumps.html
• An ‘adequacy of the supply’ assessment is required prior to any Electric Vehicle Charge Point or Heat Pump installation. This
requires a load survey to calculate the new Maximum Demand (MD), including the device to be installed.
• The DNO must be contacted in advance of installation where there is an identified issue with adequacy or safety concern
with the premises existing service equipment, where the new MD is greater than the cut-out rating, where the new MD is >60A
(13.8kVA single phase) for residential properties or the devices do not meet the required standards.* Depending on the size
and/or number of devices being connected, the DNO may ask for additional information to be supplied.
• In certain circumstances, for example if the total MD of the premises is ≤60A and adequacy of the connection is known*, the
DNO shall be notified within 28 days of the installation.
• Any reinforcement costs associated with this installation may be recharged to the customer.
Providing that this form is fully and correctly completed, the following timeframes are applicable:
• Properties with new MD ≤60A and meeting all other relevant requirements* - installers can connect their device(s) and shall
notify the DNO by filling in this form within 28 days of the installation
• Properties with new MD between 60A and 100A inclusive (and not CT metered) - the installer must apply for a connection
prior to installation by filling in this form and the DNO will assess the supply capacity within 10 working days
• Properties with new MD >100A (and not CT metered) - the installer must apply for a connection prior to installation by filling in
this form. Timescales as per the Electricity Distribution Licence, Electricity (Guaranteed Standards of Performance)
Regulations 2010: https://www.ofgem.gov.uk/ofgem-publications/47616/connections-gsop-guidance-sept0809.pdf. See local
DNO connections Guaranteed Standards of Service for specific response timescales in your area.
* All devices must comply with the process described on the ENA website here: http://www.energynetworks.org/electricity/futures/electric-vehicles-and-heat-pumps.html
Installer Contact Details
Name
Company
Address line 1
Address line 2
Town
Postcode
Contact Number
Email
Customer Contact Details
Name
Address line 1
Address line 2
1
EV & HP Application
Town
Postcode
Contact Number
Installation Location Address (if different from Customer Address)
Name
Address line 1
Address line 2
Town
Postcode
Contact Number
Electrical Installation Details
Type of Installation ☐ Electric Vehicle Charge Point
Please note that one technology per form should be used ☐ Heat Pump
MPAN (11 digit MPRN if Northern Ireland)
See http://www.energynetworks.org/electricity/futures/electric-vehicles-and-
__–___–___-__–____–____–___
heat-pumps.html for details. If the supply is unmetered, the ‘Apply to
Connect’ process is applicable and the local DNO must be contacted.
☐ Single Phase
Number of Phases ☐ Split/two Phase
☐ Three Phase
Declared Voltage at Connection Point ……………….. Volts
Maximum Demand (MD) of premises
Including proposed installation, concluded from a Load Survey, as well as ………………. Amps (per phase)
any import or load limiting devices.
☐ Yes
Does this premises include an import or load limiting device?
☐ No
Maximum Current Demand the proposed EV/HP can draw
Include any associated immersion elements. The maximum simultaneous ☐ Single Phase
† …………… Amps
demand must be stated . Additional equipment/reconfiguration not included ☐ Three Phase
in this application is not permitted after installation
☐Yes – Reference Number / Date, if applicable:
Has the DNO been contacted about this installation and confirmed the
.…………………………………………………………
Premises Supply Capacity?
Supply Capacity: ……………………A
Essential if new MD >60A. Tick one as appropriate
☐ No
Premises Cut-out Rating*
………………. Amps
If known. See ENA website for guidance.
Final or Proposed Earthing Arrangements ☐ TN-C-S (PME)
as per BS 7671 and the IET Code of Practice: ☐ TN-S (SNE)
https://www.theiet.org/resources/standards/cop-electric.cfm ☐ TT (Direct)
☐ Yes
Is the service looped?
☐ No
Tick one as appropriate
☐ Don’t know
☐ Domestic
Type of installation ☐ Non-domestic
Tick one as appropriate ☐ Other - Please detail:
………………………………………………………….
☐ Yes - Please detail:
Have you identified any issues with adequacy of the existing supply
……………………………….....................................
equipment?
................................................................................
Tick one as appropriate
☐ No
Date of Installation (if ‘connect and notify’ applicable) DD/MM/YYYY
2
EV & HP Application
†
The installer must ensure no other parallel devices can run simultaneously. If the installation is one controller but multiple
devices, please use the multiple installations spreadsheet
* If the cut-out rating is unknown or uncertain, it can be established by raising an enquiry with the DNO. If the supply capacity
still cannot be established, the ‘Apply to Connect’ process must be followed and the aforementioned timeframes are applicable.
Please note that one should not open the cut out. Guidance on cut-out ratings is available on the ENA website. If the cut-out
rating is unknown, a picture can be provided to the DNO.
†
Power Quality Declaration - Heat Pumps Only
Heat Pump Manufacturer
Heat Pump Model
How will the Heat Pump be used? ☐ The Heat Pump model stated will provide HEATING ONLY
Please tick one of the following options ☐ The Heat Pump model stated will provide HEATING & COOLING
Does the Heat Pump have a Backup, Boost or Immersion Element installed? ☐Yes - Rating: …............Amps
If yes, please provide Immersion Element rating ☐ No
Is this model in the ENA Heat Pump Type Register Database and is the information in the
☐Yes - Register No: ……............
Database correct?
☐ No
See register here. If yes, please proceed to ‘Declaration’ section.
If no, please fill in the following additional Power Quality details required for non-registered Heat Pump Models
Datasheet and other Power Quality documentation for the Heat Pump attached to this
application?
☐Yes ☐ No
Must be provided. It is the installer’s responsibility to ensure all information required to populate
the Heat Pump Type Register Database is provided.
Does the installation meet the Microgeneration Certificate Scheme* Product Requirements? ☐Yes ☐ No
Harmonics
☐Yes ☐ No
Does the proposed installation comply with the technical requirements of BS EN/IEC 61000-3-2?
Harmonics
☐Yes ☐ No
Does the proposed installation comply with BS EN/IEC 61000-3-12?
Flicker
☐Yes ☐ No
Does the proposed installation comply with the technical requirements of BS EN/IEC 61000-3-3?
Flicker
☐Yes ☐ No
Does the proposed installation comply with BS EN/IEC 61000-3-11?
† Please refer to the Manufacturers Declaration of Conformity, device type test certificate and datasheet. If using the multiple
installations spreadsheet, the confirmation of standards compliance should refer to the whole installation, i.e. at the point of
common coupling.
* https://www.microgenerationcertification.org/mcs-standards/product-standards/heat-pumps/
Declaration
I confirm that the information I have given in this form is true to the best of my knowledge for the electrical installation noted above. The
customer at the above address has been advised that commissioning of the installation may only take place when the Network Operator
has completed any reinforcement works the supply network requires.
Name Signed Date