Supplier Billing Address Delivery Address
M/S SS FOUNDATION M/S ONTRACK PROJECTS INDIA PRIVATE LIMITED M/S RESIL CHEMICALS PVT.LTD
(PILE FOUNDATION CONTRACTOR & 1st Floor, No 140, 5th Main Behind Sai Baba Temple, Plot No.53-57,4th phase,KIADB
CONSTRUCTION ENGINEERS) Ground floor, No.300, Padmanabhanagar, Bengaluru, Bengaluru Urban, Bommasandra Industrial Area Anekal Taluk
Sampige Road (2nd main road),17thCross, Near Karnataka 560070 bangalore -560099
Sidashrama ,Malleshwaram, GSTIN - 29AADCO9316R1ZL Contact Person - Mr. RATANJAY
Bangalore- 560003 Contact No - +91 7892922241
GST NO:29CKAPS0524 F1ZB
CONTACT NO - 9980855316
WO No : Ontrack/ 27 PAYMENT TERMS: Rs. 100000/- ADVANCE ALONG WITH Supplier Reference :
WO Date : 31/07/2025 WO BALANCE AFTER 15 PILE WORK COMPLETION Mail Reference Date : 31/07/2025
WORK ORDER
Sl No Item Description Quantity UOM Rate Amount
Mobilize / Demobilize of equipment
including all charges for bringing
1 the equipments along with necessary tools 1 Ring 20000 20000.00
and tackles to site and
taking back.
Bored cost in situ pile drilling bore holes by
DMC or auger system for all types of soil and
2 weathered rock only up to 8 m depth or 240 rmt 1000 240000.00
refusal strata whichever is earlier 450 mm
dia pile (24 pile x 10m = 240 m)
Concrete the pile using Tromie system as per
3 standard specification (All Labour rate 240 rmt 250 60000.00
material supply is your scope)
Steel Bar bending and erecting in bore hole.
4 (All Labour rate material supply is your 240 rmt 250 60000.00
scope)
Note -Retention policy 5% Applicable
Loading Charges NA
Transportation NA
Project Name - RESIL , Projects,
Bommasandra
Total 380000.00
CGST 09% 34200.00
SGST 09% 34200.00
Grand Total Including Tax 448400
Amount in words : FOUR LAKHS FOURTY EIGHT THOUSAND FOUR HUNDRED RUPEES ONLY
NOTE - Without site confirmation seal and signature we will not accept any invoices for Payments
Prepared signature Verified signature Approved
Terms and Conditions - Work Order NO 27 Date 31/07/2025
1 Acceptance : The supplier shall accept the order in writing within two working days, otherwise will be considerd as the PO accepted by the Supplier.
Price : Prices as mentioned the Purchase order is final and will remain firm till the execution and delivery of this Order. No Modifications will be
2
accepted without a specific agreement in writing signed by Buyer.
3 Quality : Subject to applicabale national standards, All goods shall be supplied strictly in accordance with the specification as per the Order.
Delivery : Time is essence of this Order, if not supplied in accordance with the order, this PO shall be subject to cancellation at Buyers option and
4
sellers risk.
Warranty/ Gaurantee: Warranty Shall survive inspection and testing by Buyer, All Material test cerificate shall be send by Supplier along with the
5
goods delivery.
6 Weighment : Weighment at Buyer Permises will be considered as final billing.
Payment : The payment will be made as per the actual weight or qunatity received by Buyer. Buyer shall make the payment - Rs. 100000/-
7
ADVANCE ALONG WITH WO BALANCE AFTER 15 PILE WORK COMPLETION , Against the bills on reciept of material in good condition.
Termination/ Cancellation : The Buyer reserve the right to cancel/terminate in whole or in part, due to change in specification/ modification of the
8
requirement or due to any other reason which is beyond buyers control.
Order Completion: Order shall not deemed completed until all required materials as well as requested test data, drawings, operating manuals and instruction
9
book have been furnishedto the satisfaction of the Buyer.A11:B12
Prepared signature Verified signature Approved