IRAQ GATES CONTRACTING CO.
Hydraulic Hand Riveter Inspection Checklist
BU: Location: Date: WEEKDAYS
REMARKS
Reg No: Model: Document No: 1 2 3 4 5 6 7
1. General Condition
☐ Check for any visible damage (cracks, dents, wear).
☐ Ensure no missing or loose parts (fasteners, handles).
☐ Ensure the riveter is free of rust or corrosion.
☐ Verify that all labels and markings are intact and legible.
2. Hydraulic System
☐ Inspect hydraulic hose for leaks, cracks, or wear.
☐ Check fluid level in the hydraulic reservoir (if applicable).
☐ Test for smooth operation of hydraulic action (no jerks or delays).
☐ Ensure the hydraulic pressure gauge (if equipped) is functional and accurate.
3. Jaw Assembly
☐ Inspect the jaws for wear or damage.
☐ Check that the jaws grip rivets firmly and release them properly after installation.
☐ Verify the jaw housing is clean and free of debris.
4. Trigger and Handle
☐ Check the trigger for smooth operation (no sticking or stiffness).
☐ Ensure the handle grips are secure and undamaged.
☐ Test the trigger spring mechanism for proper tension and responsiveness.
5. Nozzle/Head Inspection
☐ Ensure the rivet nozzle is the correct size and in good condition.
☐ Verify the nozzle is securely attached to the tool.
☐ Check the condition of the nozzle thread for damage or wear.
6. Rivet Functionality
☐ Test the tool by installing a rivet to ensure proper functionality.
☐ Confirm that the rivet is inserted fully and securely.
☐ Check the spent mandrel is ejected cleanly.
7. Safety Requierments
☐ Verify that all safety features are in place and functioning.
☐ Ensure that the tool has no sharp edges or points that could cause injury.
☐ Confirm the tool’s safety mechanisms (if applicable) work correctly.
8. Lubrication
☐ Check lubrication points (if applicable) for adequate grease or oil.
☐ Ensure that moving parts are lubricated and move freely.
9. Storage and Maintenance
☐ Ensure the tool is stored in a clean, dry place when not in use.
☐ Record the date of last maintenance or inspection in a logbook.
Inspector Name & Signature: Date: NOTES:
Supervisor Name & Signature: Date: