0% found this document useful (0 votes)
4 views6 pages

प्रदेश लोक सेवा आयोग लुम्बिनि प्रदेश

The document outlines a competitive written examination for civil sub-engineer and assistant sub-engineer positions, detailing various technical questions related to civil engineering practices. It includes questions on contouring methods, vehicle overturning prevention, material properties, and construction processes. The exam is structured to assess knowledge in engineering principles and practices relevant to the field.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views6 pages

प्रदेश लोक सेवा आयोग लुम्बिनि प्रदेश

The document outlines a competitive written examination for civil sub-engineer and assistant sub-engineer positions, detailing various technical questions related to civil engineering practices. It includes questions on contouring methods, vehicle overturning prevention, material properties, and construction processes. The exam is structured to assess knowledge in engineering principles and practices relevant to the field.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 6

Civil Sub-Enginee  प्रदेश लोक सेवा आयोग

लुम्बिनि प्रदेशइन्जिनियरà¤
¿à¤™à¥à¤— सेवा सिà¤à¤¿à¤² समुह, सहायकस्à¤
¤à¤° पाँचौ तह, सव-इन्जिनियर पदको
खुल्लाप्रतियोगितात्मक लिखà¤
¿à¤¤ परीक्षामितिः २०८१-१२-०५KEY
[B]चरणः प्रथम समयः
४५ मिनेट पुर्à¤
£à¤¾à¤™à¥à¤•ः १००बिषयः सेवा
सम्बन्धी1. Which of the following methods of contouring is most
suitable for a hilly terrain? A. Direct method B. Square method C. Cross-
sections method D. Tachometric method 2. Overturning of vehicles on a curve can
be avoided by using A. compound curve B. vertical curve C. reverse curve D.
transition curve 3. Closed contours, with higher value inwards, represent a
A. depression B. hillock C. plain surface D.none of the above 4. Height
of instrument method of levelling is A. more accurate than d fall method B. less
accurate than rise and fall method C. quicker and less tedious for large number of
intermediate sights D. none of the above 5. Initial setting time of cement for
asbestos cement products should be not less than A. 30 minutes B. 50 minutes C.
75 minutes D. 90 minutes 6. The minimum compressive strength of 2nd class
bricks should be A. 75 kg/cm2 B. 90 kg/cm2 C. 100 kg/cm2 D. 120 kg/cm2 7.
Hydraulic lime is obtained by A.Burning of lime stone B. Burning of
kankar C. Adding water to quick lime D. Calcination of pure clay 8. Sagging,
the bending moment occurs at the _____ of the beam. A. At supports B. Mid
span C. Point of contraflexure D. Point of emergence 9. The relation between
slope and maximum bending moment is A. Directly proportion B. Inversely
proportion C. Relative proportion D. Mutual incidence 10. Which stress comes
when there is an eccentric load applied? A. Shear str

complete solution for Civil sub-engineer and assistant sub-engineer


प्रदेश लोक सेवा आयोग लुम्बिनि प्रदेश

,
इन्जिनियरिङ्ग सेवा सिभिल समुह सहायकस्तर पाँचौ

तह , - सव

प्रतियोगितात्मक लिखित परीक्षा


इन्जिनियर पदको खुल्ला

मितिः २०८१-१२-०५
KEY [B]
चरणः प्रथम समयः ४५ मिनेट
पुर्णाङ्कः १००
बिषयः सेवा सम्बन्धी

A. Direct method
B. Square method
C. Cross-sections method
उत्तरपुस्तिकामा प्रश्नपत्रको KEY
1. Which of the following methods of contouring is most suitable for a hilly terrain?

Our Youtube channel and Facebook page name: Civil Sub-engineer Prepared by Civil Sub-Engineer Pro अनिवार्य
D. Tachometric method
2. Overturning of vehicles on a curve can be avoided by using
A. compound curve
B. vertical curve
C. reverse curve
D. transition curve
3. Closed contours, with higher value inwards, represent a
A. depression
B. hillock
C. plain surface
D. none of the above
4. Height of instrument method of levelling is A. more accurate than rise and fall method
B. less accurate than rise and fall method
C. quicker and less tedious for large number of intermediate sights
D. none of the above
5. Initial setting time of cement for asbestos cement products should be not less than
A. 30 minutes
B. 50 minutes
C. 75 minutes
D. 90 minutes
6. The minimum compressive strength of 2nd class bricks should be
A. 75 kg/cm2
B. 90 kg/cm2
C. 100 kg/cm2
D. 120 kg/cm2
7. Hydraulic lime is obtained by
A. Burning of lime stone
B. Burning of kankar
C. Adding water to quick lime
D. Calcination of pure clay
8. Sagging, the bending moment occurs at the _____ of the beam.
A. At supports
B. Mid span
C. Point of contraflexure
D. Point of emergence
9. The relation between slope and maximum bending moment is
A. Directly proportion
B. Inversely proportion
C. Relative proportion
D. Mutual incidence
10. Which stress comes when there is an eccentric load applied?
A. Shear stress
B. Bending stress
Our Youtube channel and Facebook page name: Civil Sub-engineer Prepared by Civil Sub-Engineer Pro
C. Tensile stress
D. Thermal stress
11. If 850 kg liquid occupies volume of one cubic meter, men 0.85 represents its
A. specific weight
B. specific mass
C. specific gravity
D. specific density
12. Free surface of a liquid tends to contract to the smallest possible area due to force of
A. surface tension
B. viscosity
C. friction
D. cohesion
13. The resultant of all normal pressures acts
A. at e.g. of body
B. at center of pressure
C. vertically upwards
D. at metacentre
14.Terzaghi’s bearing capacity factors Nc, Nq and Nr are functions of
A. cohesion only
B. angle of internal friction only
C. both cohesion and angle of internal friction
D. none of the above
15.If the natural water content of soil mass lies between its liquid limit and plastic limit, the
soil mass is said to be in
A. liquid state
B. plastic state
C. semi-solid state
D. solid state
16. At the neutral axis, bending stress is
A. Minimum
B. Maximum
C. Zero
D. Constant
17. What are the units of flexural rigidity?
A. Nm2
B. Nm
C. N/m
D. m/N3
18. The filler used in plastic bitumen, is
A. Shale powder
B. Talc powder
C. Asbestos powder

Our Youtube channel and Facebook page name: Civil Sub-engineer Prepared by Civil Sub-Engineer Pro
D. Plastic powder
19. The process of mixing clay, water and other ingredients to make brick is known as
A. Kneading
B. Moulding
C. Pugging
D. Drying
20. Acidity in water is caused due to
A. Mineral acids
B. Free CO2
C. Aluminium sulphate
D. All the above
21. Turbidity of raw water is a measure of
A. Suspended solids
B. Acidity of water
C. B.O.D
D. None of these
22.A hydroelectric scheme operating under a head of 80 m will be classified as
A. low head scheme
B. medium head scheme
C. high head scheme
D. none of the above
23.The downstream expansion head of a guide bank is extended to subtend an angle at the
centre, equal to
A. 30°
B. 45°
C. 60°
D. 90°
24. The most suitable equipment for compacting clayey soils is a
A. smooth wheeled roller
B. pneumatic tyred roller
C. sheep foot roller
D. vibrator
25. Camber in the road is provided for
A. effective drainage
B. counteracting the centrifugal force
C. having proper sight distance
D. none of the above
26. For the construction of buildings, the subheads of the estimate are
A. Earthwork, Concrete work, Brick work
B. Brickwork, Stone work, Roofing
C. Brickwork Flooring, Wood work, Steel work
D. All the above
27. The damp proof course (D.P.C.) is measured in
Our Youtube channel and Facebook page name: Civil Sub-engineer Prepared by Civil Sub-Engineer Pro
A. Cub. m
B. Sq. m
C. Meters
D. None of these
28. A construction schedule is prepared after collecting
A. Number of operations
B. Output of labour
C. Output of machinery
D. All the above
29. Bar charts are suitable for
A. Minor works
B. Major works
C. Large projects
D. All the Above
30.The first stage of a construction, is
A. Preparation of estimate
B. Survey of the site
C. Initiation of proposal
D. Preparation of tender

Our Youtube channel and Facebook page name: Civil Sub-engineer Prepared by Civil Sub-Engineer Pro

You might also like