0% found this document useful (0 votes)
90 views13 pages

Drawing Approval Guideline For Private Residential and Industrial Buildings

The Drawing Approval Guideline for Private Residential & Industrial Developments outlines the procedures and requirements for construction projects in Hulhumalé and Thilafushi, ensuring compliance with government regulations. It details the roles and responsibilities of developers, licensed designers, and checkers, as well as submission requirements and review processes. The guideline aims to safeguard public health and property through adherence to planning controls and environmental assessments.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
90 views13 pages

Drawing Approval Guideline For Private Residential and Industrial Buildings

The Drawing Approval Guideline for Private Residential & Industrial Developments outlines the procedures and requirements for construction projects in Hulhumalé and Thilafushi, ensuring compliance with government regulations. It details the roles and responsibilities of developers, licensed designers, and checkers, as well as submission requirements and review processes. The guideline aims to safeguard public health and property through adherence to planning controls and environmental assessments.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 13

Drawing Approval Guideline for

Private Residential & Industrial


Developments

Created by:
Urban Planning Department

Created on:
15th June 2025
Doc ID: UBP-2025-GDL-070
Drawing Approval Guideline for Private Version: 1.1

Residential & Industrial Developments Classification: Public


Effective Date: 17th June 2025

Record of revisions

Revision Page
# Version Revisions made Approved by
Approval Date number
1 - 1.0 Initial Document - Ahmed Zinaf
2 17th June 2025 1.1 Revised Document 2-13 Ahmed Zinaf

Page 2 of 13
Doc ID: UBP-2025-GDL-070
Drawing Approval Guideline for Private Version: 1.1

Residential & Industrial Developments Classification: Public


Effective Date: 17th June 2025

Table of Contents

1. Purpose..................................................................................................................................................................... 4

2. Scope ......................................................................................................................................................................... 4

3. Terms & Definitions .......................................................................................................................................... 4

4. References ............................................................................................................................................................. 5

5. Guideline Details ................................................................................................................................................ 5

6. Roles & Responsibilities .............................................................................................................................. 10

7. Review ..................................................................................................................................................................... 10

8. Annexures ............................................................................................................................................................... 11

Page 3 of 13
Doc ID: UBP-2025-GDL-070
Drawing Approval Guideline for Private Version: 1.1

Residential & Industrial Developments Classification: Public


Effective Date: 17th June 2025

1. Purpose

This guideline aims to ensure that all the construction projects carried out in

Hulhumalé and Thilafushi comply with government regulations including planning

& development controls set by this corporation. These development controls aim

to safeguard the life, health, and property of people.

2. Scope

This guideline applies to development drawings submitted for approval for all

private residential developments in Hulhumalé, as well as industrial developments

in both Hulhumalé and Thilafushi.

3. Terms & Definitions

POA: Power of Attorney – in case of multiple owners for single plot, assigning one

owner on behalf of all the owners.

Developer: The party contracted to carry out the development works.

Professional Verification: The process of verifying the Licensed Designers,

Architectural/Structural Checkers of the submitted development drawings through

the online portal.

Licensed Designers: a licensed architect, and a licensed engineer enlisted in

ministry’s registry, who prepares the development drawings and are registered

under Practitioner’s regulation of Maldives.

Architectural/Structural Checkers: A licensed checker registered under

Practitioner’s regulation of Maldives, who is responsible for checking the

architectural and structural details as per the planning regulations.

Building Consent Authority (BCA): Any authority registered under the regulation

to give construction related approvals. The authority referred to in this guideline as

the BCA is the Housing Development Corporation (HDC).

Page 4 of 13
Doc ID: UBP-2025-GDL-070
Drawing Approval Guideline for Private Version: 1.1

Residential & Industrial Developments Classification: Public


Effective Date: 17th June 2025

Environmental Impact Assessment (EIA): A process used to assess the potential

environmental effects of a proposed development before work begins, ensuring

informed and sustainable decision-making.

4. References

Hulhumalé Phase 2 Planning and Development Guidelines (Document ID: UBP-

2024-GDL060)

Guidelines for Industrial Developments in Hulhumalé (Document ID: UBP-2022-

GDL026)

Setback Plans Hulhumalé 1 and 2

Planning and development guidelines for industrial lands allocated in Thilafushi

Phase 1 (Document ID: UBP-2023-GLD031)

Planning and development guidelines for industrial lands allocated in Thilafushi

Phase 2 (Document ID: UBP-2023-PRC029)

Construction Industry Practitioners Regulation (Document ID: R-39/2024)

Construction Administrative Regulation (Document ID: R-24/2023)

Building Code (Document ID: R-21/2024)

5. Guideline Details

5.1. Roles and Responsibilities of Owner, Developer, Licensed Designers and

Architectural/ Structural Checkers

5.1.1. The developer/owner shall submit the necessary documents of

development drawing for HDC's approval prior to commencement of

construction work.

Page 5 of 13
Doc ID: UBP-2025-GDL-070
Drawing Approval Guideline for Private Version: 1.1

Residential & Industrial Developments Classification: Public


Effective Date: 17th June 2025

5.1.2. The developer/ owner shall adhere to laws/regulations and planning

guidelines/controls set for the following specific aspects of

development.

5.1.3. Planning guidelines/ controls in this guideline comprise of:

a. Plot Location, Size and Usage

b. Footprint

c. GFA

d. Setback

e. Building height and envelope

f. Parking requirement(s)

5.1.4. The developer/owner shall engage a Licensed Designers and

Architectural/Structural Checkers to prepare the required development

drawings.

a. The developer/owner shall ensure if the assigned Licensed

Designers and Architectural/Structural Checkers is registered and

if the license is active. If the mentioned professional is not

registered, the drawings shall be rejected.

5.1.5. Development drawing Approval is provided by HDC based on

Architectural/Structural Checkers stamp and it is the responsibility of the

Checkers to make sure the drawing is in accordance with

laws/regulations and planning guideline/controls set by HDC and

relevant authorities.

5.1.6. Building Usage Permit shall be given if the building is constructed in

accordance with laws/regulations and planning guidelines/controls set

Page 6 of 13
Doc ID: UBP-2025-GDL-070
Drawing Approval Guideline for Private Version: 1.1

Residential & Industrial Developments Classification: Public


Effective Date: 17th June 2025

by HDC and relevant authorities as well as the approved drawings. If the

building is constructed in violation of the aforementioned guidelines,

regulations and approved drawings, HDC shall withhold the Building

Usage Permit and shall not be liable for any losses.

5.1.7. The Licensed Designers shall prepare architectural and structural

drawings respectively, in accordance with the planning regulations and

guidelines. These drawings shall then be reviewed by an Architectural

Checker and Structural Checker. Once confirmed to be compliant to the

Professional’s Checklist (Annex 8.1.: Professionals Checklist – Detail

Drawing, Document ID: UBP-2025-FMT-016) the drawings shall be

stamped by the Architectural Checker and Structural Checker

accordingly.

5.1.8. After the drawings are stamped, the developer/owner shall submit the

stamped drawings to HDC through the online portal or via email.

5.1.9. All private residential development drawings shall be submitted through

the online portal by plot owner’s Efaas login.

5.1.10. Industrial development drawings should be emailed to [email protected].

5.1.11. Documents submitted shall adhere to the following requirements:

a. All the drawing files submitted shall be in English.

b. Drawings shall be submitted in both PDF and CAD format.

c. All drawings submitted shall allocate an empty space in the

drawing for the approval stamp at the bottom left corner of every

page of the PDF file (2 x 2 inches).

d. All PDF files shall be of a resolution not less than 200 DPI.

Page 7 of 13
Doc ID: UBP-2025-GDL-070
Drawing Approval Guideline for Private Version: 1.1

Residential & Industrial Developments Classification: Public


Effective Date: 17th June 2025

e. All drawings shall adhere to the conventional unit systems as

stated in the regulations.

f. All lines and texts in the drawing shall be in black and white unless

stated otherwise.

g. All drawings shall be stamped and signed by the assigned

Architectural and Structural checker.

h. All digital stamps shall be scanned and in actual scale and size of

the checker’s stamp.

5.1.12. The following documents shall be submitted for any new submission or

amendment:

a. Complete drawing PDF file

b. Complete drawing CAD file

c. Architectural Checker Certificate

d. Structural Checker Certificate

e. Foundation Protection Method

f. Visual Soil Inspection Report

g. EIA Report, if applicable

h. Structural Calculations (for new submissions and if applicable for

amendments)

i. Plot Registry/ Plot agreement

j. Owner National ID

k. POA

l. Signed declaration by the architectural and structural checker.

(Annex 8.1.: Professionals Checklist – Detail Drawing, Document ID:

UBP-2025-FMT-016)

Page 8 of 13
Doc ID: UBP-2025-GDL-070
Drawing Approval Guideline for Private Version: 1.1

Residential & Industrial Developments Classification: Public


Effective Date: 17th June 2025

5.2. Submission Types

5.2.1. New Application: Any initial submission or amendment shall be treated

and reviewed as a new application. Amendments are changes made to

an existing approved drawing. New applications are categorized as

follows:

a. New submission

b. Architectural and Structural amendment

c. Architectural amendment

d. Structural amendment

5.2.2. Revision: Revisions are updated drawings submitted in response to

HDC’s comments on new applications or amendments.

a. Revisions shall be submitted within 30 calendar days. If there is no

submission within the timeframe, the initial drawing application

shall be closed and the next drawing submission shall be submitted

as a new application.

5.3. Duration: All drawings submitted via portal shall be checked within working

10 days from the date of Professional Verification.

5.4. Duration: All drawings submitted via portal shall be checked within working

10 days from the date of Professional Verification.

5.5. Review and Rejection: HDC shall review the submitted drawings for

compliance with planning guidelines/controls. (Refer to clause 5.1.3. and

Annex 8.2. Development Control Checklist, Document ID: UBP-2025-FMT-017) If

the drawings meet the necessary requirements, HDC shall issue an approval.

If not, the applicant shall be requested to revise the drawings according to the

comments provided by HDC or provide additional information. If rejected, the

Page 9 of 13
Doc ID: UBP-2025-GDL-070
Drawing Approval Guideline for Private Version: 1.1

Residential & Industrial Developments Classification: Public


Effective Date: 17th June 2025

applicant shall need to re-submit the application. Drawings shall be rejected

if any significant non-compliances are identified, or if the drawings are

missing relevant informationn.

5.6. If any violations of the laws/regulations and planning guidelines/controls set

by HDC and relevant authorities are identified, HDC shall request the Ministry

of Construction, Housing and Infrastructure to impose a fine and necessary

actions on the checkers, architects and engineers in accordance with Article

24 of the Construction Practitioners’ Regulation. If the Licensed Designers and

Architectural/Structural Checkers fail to pay the fine, to suspend/revoke the

license in accordance with Article 25 of the above-mentioned regulation.

6. Roles & Responsibilities

6.1. Urban Planning Department:

6.1.1. To create policies in accordance to the relevant regulations and

guidelines, and review them when necessary to ensure relevance and

accuracy.

6.2. Municipal Department:

6.2.1. To check and review whether the submitted drawings adhere to the

Hulhumalé and Thilafushi planning guidelines/controls (Refer to clause

5.1.3.)

7. Review

HDC shall review this guideline annually, if and when necessary, to ensure

relevance, accuracy, and fitness for purpose.

Page 10 of 13
Doc ID: UBP-2025-GDL-070
Drawing Approval Guideline for Private Version: 1.1

Residential & Industrial Developments Classification: Public


Effective Date: 17th June 2025

8. Annexures

Annex 8.1. Professionals Checklist – Detail Drawing (UBP-2025-FMT-016)

Annex 8.2. Development Control Checklist (UBP-2025-FMT-017)

Annex 8.3. Stages of Drawing Approval

Step 1:
Engage Licensed Designers
and Architectural/Structural
Checkers

Step 2:
Prepare stamped architectural
and structural drawing set

Step 3:
Submit application to HDC via
online portal or email

Step 4:
Check for compliance against
Hulhumalé and Thilafushi
planning guidelines/controls

COMPLIANT NON-COMPLIANT

Request for revision or additional


Issue drawing approval information

Reject, request for re-submission

Page 11 of 13
Doc ID: UBP-2025-GDL-070
Drawing Approval Guideline for Private Version: 1.1

Residential & Industrial Developments Classification: Public


Effective Date: 17th June 2025

Annex 8.4. Responsibility Matrix

Developer/ Architectural Structural


BCA
Document / Task Owner/
Designer Checker Designer Checker (HDC)
POA

All stamped drawings X X


and documents
relevant to
Architectural Design
All stamped drawings X X
and documents
relevant to Structural
Design
Structural calculation X X
set
Adherence to planning X X X X X
regulations and
building codes
Adherence to Land X X X X X
Usage guidelines
Drawing approval X
application
Check for compliance X
against Hulhumalé
and Thilafushi
planning guidelines/
controls

Page 12 of 13
Doc ID: UBP-2025-GDL-070
Drawing Approval Guideline for Private Version: 1.1

Residential & Industrial Developments Classification: Public


Effective Date: 17th June 2025

Reviewed by

# Name Designation Department Date Sign

Urban
1 Shahid Ahmed Waheed Director 17th June 2025
Planning

Approved by

# Name Designation Department Date Sign

Chief Planning

1 Ahmed Zinaf Planning Division 17th June 2025

Officer

Page 13 of 13

You might also like