NORTH EASTERN RLY
CAO-C-NER-
ELECTRICAL
Office of
CEE/CON/GKP,
CAO/Construction
Office, Mohaddipur,
N.E. RAILWAY,
GORAKHPUR
GORAKHPUR,
273012
Uttar Pradesh, India
Letter No: CAO-C-NER-ELECTRICAL / OT-01-2025
Dated: 04/07/2025
/ 11151150133090
M/s SHUKLA ENTERPRISES-GORKAHPUR
C 119/551 AFAQ BHAVAN
SOUTH JATEPUR DHARAMSALA
GORKAHPUR- 273007
Uttar Pradesh, India
Sub: Letter Of Acceptance
Ref: 1. Tender No. OT-01-2025 closing date 12-06-2025 15:00
for Shifting of 11 KV underground cabling and Street
lighting (Going from 33 KV Sub-station to Gorakhpur
Workshop, Outdoor etc) falling in alignment of under
construction road, wall and new track in connection with
Domingarh - Gorakhpur Cantt - Gorakhpur Third line
Project
2. Your bid ID 18490961 dated 12/06/2025 09:55
The Competent Authority has accepted your offered rates in
connection with the subject work. The total cost of the work at the
accepted rates works out to Rs. 22671221.05 (Rupees Two Crore
Twenty-Six Lakh Seventy-One Thousand Two Hundred And Twenty-
One Rupees And Five Paise Only)
A sum of Rs.296300 deposited as Earnest Money vide IREPS
reference ID PE841526809009 has been retained towards initial
Security Money for due and faithful fulfillment of the contract, and the
balance Security Money will be recovered from the progressive bills @
6 % of the bill amount till it reaches 5 % of the contract value in terms
of clause 16 (1) of GCC 2022.
You are requested to submit Performance Guarantee in the form as
given in Clause 16 (4) of GCC 2022 equivalent to 5 % of the contract
value amounting to Rs. 1133561.05 (Rupees Eleven Lakh Thirty-Three
Thousand Five Hundred And Sixty-One Rupees And Five Paise Only)
within 21 days from the date of issue of Letter of Acceptance, valid up
to stipulated date of completion plus 60 days so that contract agreement
can be executed. However, a penal interest of 12% per annum shall be
charged for the delay beyond21 (Twenty one) days, i.e. from 22nd day
after the date of issue of LOA. Further, if the 60th day happens to be a
declared holiday in the concerned office of the Railway, submission of
PG can be accepted on the next working day. In all other cases, if the
Contractor fails to submit the requisite PG even after 60 days from the
date of issue of LOA, the contract is liable to be terminated. In case
contract is terminated railway shall be entitled to forfeit Earnest Money
Deposit and other dues payable against that contract. In case a tenderer
has not submitted Earnest Money Deposit on the strength of their
registration as a Startup recognized by Department of Industrial Policy
and Promotion (DIPP) under Ministry of Commerce and Industry, DIPP
shall be informed to this effect. The failed Contractor shall be debarred
from participating in re-tender for that work. In case of Bank Guarantee,
the performance bank guarantee should be executed on non-judicial
stamp paper of Rs 5/- per thousand, maximum of Rs 10,000/-.
The entire work shall be completed within 6 month from the date of
issue of Letter of Acceptance.
Restriction: The rates of this LOA should not be taken for future
estimation andLAR comparison.
Scope of work: The work shall be carried out as per technical
specification, explanatory notes and special conditions contains in
tender document.
Technical Compliance: Contractor will ensure the updation of Labour
data on theIndian Railways website
www.shramikkalyan.indianrailways.gov.in, no billing willbe done
without updation of labour data
General Condition: The prices mentioned above are inclusive of GST,
all taxes,duties and levies
Note-1: The error if any in the acceptance letter will be corrected at the
time ofexecution of contract agreement
Note-2: Please contact to DyCEE/CON/GKP or AEE/CON/GKP and
start the work early. Till a formal agreement is prepared and executed,
this letter of acceptance shall remain enforce and shall be binding
contract between us.
All Other terms and conditions, as stipulated in the tender
documents shall be applicable.
AMIT KUMAR
DEE/chg/gkp
Digitally Signed
View Signature Details
Awarded Quantities And Rates
Item Item Desc Item Item Qty Unit Escl. Advt.Value Bid Bid Amount
Sno. Code Qty Unit Rate(Rs) (%) (Rs) Rate/ (Rs)
Unit
Rate
Schedule 001-Shifting of 11 KV underground cabling and
Street lighting (Going from 33 KV Sub-station to Gorakhpur
Workshop, Outdoor etc) falling in alignment of under
29253188.45
construction road, wall and new track in connection with
Domingarh - Gorakhpur Cantt - Gorakhpur Third line Project
(Item Directory - Not Applicable)
01 Supply & erection of ELE01 4 Numbers 29908.28 At Par 119633.12 0.00 % 119633.12
steel tubular pole 10 M At
long hot deep Par
galvanized and swaged
type steel Tubular pole
comprising of bottom
5.2 Mtr. , middle 2.4
Mtr. & top 2.4 Mtr.,
approx. weight 208 Kg.
(Designation 410SP-
46) IS:2713 Pt-1 to 3
/1980 (latest version)
in cement concrete
1:3:6 (1 cement: 3
coarse sand: 6 graded
stone aggregate 40mm
nominal size)
foundation, including,
excavation & refilling,
dressing up of the
plinth etc. in all respect
as required.
Earthing with G.I. earth
pipe 4.5 metre long, 40
mm dia including
accessories, and
providing masonry
enclosure with cover %
02 plate having locking ELE02 14 Numbers 3503.54 At Par 49049.56 0.00 At 49049.56
arrangement and Par
watering pipe etc with
charcoal/ coke and salt
as required. (On Each
feeder Pillar-12 Nos +2
Nos for lighting Pole)
Supply, fixing &
grouting of cable route
marker on stone as per
Attached Drg, No. %
03 DY.CEE/W/LJN/2011/01 ELE03 18 Numbers 341.59 At Par 6148.62 0.00 At 6148.62
complete in all respect. Par
(11 KV Cable-12 Nos
+6 Nos for lighting
Pole)
Supply, fixing, Testing
& Commissioning of 11
KV HT Feeder Pillar
consisting of 2 mm
thick powder coated
CRCA sheet body and %
04 80x10 mm aluminum ELE04 12 Numbers 60000.00 At Par 720000.00 0.00 At 720000.00
bus-bar conforming to Par
IP-55 and IEC-61432
as per technical
specification attached
with all accessories &
Plinth.
Cutting of CC work of
road/wall etc &
covering/ plastering of
cutted CC work under
or side of road/wall by
cement & sand mortal %
05 after laying of ELE05 80 cum 1197.83 At Par 95826.40 0.00 At 95826.40
cable/fixing of Par
pole/laying of HDPE
pipe/GI pipe or for
making new cable
trench work Complete
in all respect.
06 Supply & erecting 11KV ELE06 12 Numbers 624.79 At Par 7497.48 0.00 % 7497.48
clevis & tongue type At
strain insulator set on Par
pole comprising of
cross arm straps &
clevis type disc
insulator 16mm dia
cotter pin strain type
strain clamps 16mm
dia 170mm long bolts
with nuts, spring
washers, split pin 5mm
dia plain washers etc.
The strain insulator set
should be as per
Sketch No.
DY.CEE/Con/BG/GKP/
STD/1/ 0492.
Supply &
mounting/fixing of heat
shrinkable type 11KV
outdoor cable end
termination jointing kit,
confirming to
IS:13573/1992(Latest %
07 version) suitable for ELE07 48 Numbers 14372.70 At Par 689889.60 0.00 At 689889.60
185-240 mm sq. 3 core Par
XLPE alumn conductor
cable and connecting
with cable complete in
all respect. (16 nos on
each feeder Pillar x3
nos)
Supply & laying of
Cross linked
polyethylene insulated
11 KV cable Aluminium
conductor with
extruded
semiconducting
compound screened
and copper tape laid up
with extruded inner
sheath of plastic tape
with filler at interstices,
galvanized round
wire/steel strip
armoured and over all %
08 PVC sheathed cable ELE08 400 Metre 1389.59 At Par 555836.00 0.00 At 555836.00
confirming to Is : Par
7098/Pt.-II/2011 with
latest amendment size
3 core 240 sq. mm
make - KEI, Polycab,
Havells, Finolex,
Universal, Gloster, CCI,
RR Cabel, SBEE in open
air/ along the
Pole/Pillar/ Pucca
trench with clamping
arrangement as
required. Cable laying
work shall be governed
by IS:1255/1983.
09 Supply & laying of ELE09 240 Metre 1595.20 At Par 382848.00 0.00 % 382848.00
Cross linked At
polyethylene insulated Par
11 KV cable Aluminium
conductor with
extruded
semiconducting
compound screened
and copper tape laid up
with extruded inner
sheath of plastic tape
with filler at interstices,
galvanized round
wire/steel strip
armoured and over all
PVC sheathed cable
confirming to Is :
7098/Pt.-II/2011 with
latest amendment, size
3 core 240 sq. mm,
make- KEI, Polycab,
Havells, Finolex,
Universal, Gloster, CCI,
RR Cabel, SBEE direct
in ground at a depth of
1M. Below ground level
including excavation,
sand cushioning,
protective covering
with bricks as per IS
1255/1983(Latest
version) complete in all
respect (as a loop).
10 Supply & laying of ELE10 10560 Metre 2345.34 At Par 24766790.40 0.00 % 24766790.40
Cross linked At
polyethylene insulated Par
11 KV cable Aluminium
conductor with
extruded
semiconducting
compound screened
and copper tape laid up
with extruded inner
sheath of plastic tape
with filler at interstices,
galvanized round
wire/steel strip
armoured and over all
PVC sheathed cable
confirming to Is :
7098/Pt.-II/2011 with
latest amendment, size
3 core 240 sq. mm,
make- KEI, Polycab,
Havells, Finolex,
Universal, Gloster, CCI,
RR Cabel, SBEE with all
work pertaining to
Horizontal Directional
drilling (HDD/Boring
and trenchless cable it
includes supply
transportation and
insertion of self
lubricated HDPE pipe of
IS: 4984/1995 and
laying of cable in
boring under the
track/road by using
different sizes of pipe
depending on total
number of cable will be
crossed. The depth of
Horizontal boring
should be minimum
1.65 Mtr. from road
level. Note: By using
self lubricated HDPE
pipe of 117 mm inner
dia and 125 mm outer
dia in the bore and the
laying of cable in the
bore under the
track/road as per
direction of Engineer in
charge.
Laying of LT cable 1100
volt upto 4 core of
sizes upto 300 mm sq.
direct in ground at a
depth of 1M. with 1 No
Additional cable Below
ground level including %
11 excavation, sand ELE11 1280 Metre 266.85 At Par 341568.00 0.00 At 341568.00
cushioning, protective Par
brick covering as per IS
1255/1983(Latest
version) complete in all
respect. (Cable will
supplied by railway)(for
street light)
Laying of LT cable of
required size in open
air/ along the Pole with
clamping arrangement
as required. Cable %
12 laying work shall be ELE12 160 Metre 18.94 At Par 3030.40 0.00 At 3030.40
governed by Par
IS:1255/1983.(cable
will supplied by
railway)(for street
light)
Making support for
cable by GI Pipe 150
%
mm dia B class on
13 ELE13 48 Numbers 1295.84 At Par 62200.32 0.00 At 62200.32
pole/wall, conforming
Par
to IS:1239 complete in
all respect
Concrete for foundation
and plinth in other than
hard soil and rock for
%
making foundation of
14 ELE14 20 cum 7320.52 At Par 146410.40 0.00 At 146410.40
pole/feeder pillar, if
Par
there is a need for
extra apart from the
schedule item.
Supply, fabricating &
erecting of top rolled
steel channel of size,
100mmx50mmx6mm
with MS clamp, MS %
15 flats of size ELE15 10 Metre 554.58 At Par 5545.80 0.00 At 5545.80
50mmx6mm clamps, Par
bolts & nuts suitable
for double pole
structure complete in
all respect.
Supply of paint and
painting (double coat
paint & primer) (AS per %
16 IS: 5613) of proposed ELE16 8 Numbers 247.01 At Par 1976.08 0.00 At 1976.08
"H" pole structure upto Par
full length as per drg.
enclosed.
17 Excavation of trench to ELE17 2200 cum 333.00 At Par 732600.00 0.00 % 732600.00
dismantle existing/old At
laid cable under Par
infringement of under
construction
engineering work or
unsystematically laid,
should be remove
Safely from machine
(JCB & Hydra) or
required manpower
and placed it to an
appropriate place in all
respect as required.
Supply, installation,
testing &
commissioning of 60
Watt street light LED %
18 luminiar fittings with 5 ELE18 32 Numbers 4426.73 At Par 141655.36 0.00 At 141655.36
year warranty as per Par
detailed specification
attached. Complete in
all respect.
Shifting of existing
Octagonal /Tubular
pole by its complete
digging and re-erection
at new alignment in
cement concrete 1:3:6
(1 cement: 3 coarse %
19 sand: 6 graded stone ELE19 16 Numbers 2565.58 At Par 41049.28 0.00 At 41049.28
aggregate 40mm Par
nominal size)
foundation, including,
excavation & refilling,
dressing up of the
plinth etc. in all respect
as required.
Carting of LT/HT cable
(released) or scrap
%
material from
20 ELE20 12500 MT-Km 11.43 At Par 142875.00 0.00 At 142875.00
SSE/E/Con/GKP/E store
Par
to site and/or back
from site to store.
Supply and
commissioning of
Straight through heat
shrinkable cable %
21 jointing kit complete ELE21 4 Numbers 15451.25 At Par 61805.00 0.00 At 61805.00
with all accessories Par
suitable for 240-300
sqmm, 3 core 11KV HT
Cable.
Transportation charges
of cable route Locator/
route Tracer suitable %
22 for detecting all types ELE22 2 Per Day 20000.00 At Par 40000.00 0.00 At 40000.00
of underground Par
Electrical cable on hire
basis.
Cable route Locator/
route Tracer suitable
%
for detecting all types
23 ELE23 4 Per Day 8000.00 At Par 32000.00 0.00 At 32000.00
of underground
Par
Electrical cable on hire
basis.
Supply & fixing of 0.4
KV,11 KV& 33 KV
Danger board 250x
300x 3mm thick G.I.
sheet duly inscripted & %
24 painted & ELE24 12 Numbers 58.57 At Par 702.84 0.00 At 702.84
mounting/fixing on Par
pole complete in all
respect as per sketch
attached .(on each
feeder pillar)
Supply, fabricating &
erecting of MS
angle/tray, 50x6mm %
25 MS flats, clamps, bolts ELE25 340 Kg 94.75 At Par 32215.00 0.00 At 32215.00
& nuts, etc wherever is Par
welding required to be
done by contractor.
Supply and fixing of
50x50mm, 8 gauge G.I
chain link fencing 1.8M
high including fixing to
vertical posts
horizontal runners with
10mm dia 40mm long,
nuts and washers
complete with all
material, labour and %
26 T&P etc required for ELE26 96 Sqm 744.00 At Par 71424.00 0.00 At 71424.00
proper completion of Par
work. Chain link of 8
gauge shall be
galvanized by hot
dipped method as per
relevant IS Code.
(required angle etc will
be covered vide item
23) (for feeder piller
fencing)
Supply, fixing, testing
& commissioning of 16
Amp. 4 pole MCCB, %
27 breaking capacity 10 ELE27 1 Numbers 2611.79 At Par 2611.79 0.00 At 2611.79
KA Complete in all Par
respect.(for light
control)
Schedule Totals 29253188.45
Total Value 29253188.45 29253188.45
Rebate on Total
22.50
Value (%)
Net Bid Value 22671221.05
Item Breakup
No break up item added