0% found this document useful (0 votes)
17 views2 pages

Template Task Sheet 3.1-5 - Training Plan (Template)

The document outlines a training plan for the qualification of Computer Systems Servicing NC II, detailing the competencies, training activities, and assessment methods. It includes specific tasks such as configuring user access on a network operating system and performing testing and documentation procedures. The training is scheduled to take place from August 20 to August 24, 2025, under the supervision of Mr. Joseph Pepito at Pepito Corp in Taytay, Rizal.

Uploaded by

Emelda
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views2 pages

Template Task Sheet 3.1-5 - Training Plan (Template)

The document outlines a training plan for the qualification of Computer Systems Servicing NC II, detailing the competencies, training activities, and assessment methods. It includes specific tasks such as configuring user access on a network operating system and performing testing and documentation procedures. The training is scheduled to take place from August 20 to August 24, 2025, under the supervision of Mr. Joseph Pepito at Pepito Corp in Taytay, Rizal.

Uploaded by

Emelda
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

TRAINING PLAN

Qualification: COMPUTER SYSTEMS SERVICING NC II


Trainees’ Training Facilities/Tools and Assessment Date and
Training Activity/Task Mode of Training Staff Venue
Requirements Equipment Method Time
These are the
These are the These are the These are the
These are the competencies
These are the competencies These are the competencies competencies
competencies or or learning
competencies or or learning competencies or or learning or learning
learning outcomes outcomes that
learning outcomes outcomes that learning outcomes outcomes that outcomes that
that the trainees the trainees Schedule
that the trainees the trainees that the trainees the trainees the trainees
need to learn based need to learn of the
need to learn based need to learn need to learn based need to learn need to learn
on the results of the based on the training
on the results of the based on the on the results of the based on the based on the
training needs results of the
training needs results of the training needs results of the results of the
assessment. training needs
assessment. training needs assessment. training needs training needs
assessment.
assessment. assessment. assessment.
SET-UP
COMPUTER
SERVERS

create user folder in


accordance with network PC or workstation network
operating system (NOS) and server
August 20-
Mr. Joseph Pepito Network operating system
CONFIGURE USER Pepito, Corp. Observation of Oral 24 2025
Set-up user access DTS (NOS)
ACCESS LEVEL ON technician/ network Questioning
Network printer (Taytay, Rizal) (8:00am to
NETWORK OPERATING administrator
Tools and test instruments 4:00pm)
SYSTEM (NOS) Appropriate software
applications/programs

PC or workstation network August 20-


Mr. Joseph Pepito
and server Pepito, Corp. Observation of Oral 24 2025
Configure network Normal functions of the DTS technician/ network Network operating system
(Taytay, Rizal) Questioning
services server are checked in administrator (NOS) (8:00am to
accordance with Network printer 4:00pm
manufacturer’s instructions
Required modules /add-ons
are installed/updated based
on NOS installation
procedures
2.3. Network services to be
configured are confirmed
based on user/system Tools and test instruments
requirements Appropriate software
2.4. Operation of network applications/programs
services are checked based
on user/system
requirements
2.5. Unplanned events or
conditions are responded to
in accordance with
established procedures
Pre-deployment procedures
is undertaken based on
enterprise policies and
PC or workstation network
procedures
and server
Perform testing, 3.2. Operation and security Network operating system August 20-
Mr. Joseph Pepito
documentation and check are undertaken (NOS) Pepito, Corp. Observation of Oral 24 2024
DTS technician/ network
predeployment based on end-user Network printer (Taytay, Rizal) Questioning (8:00am to
procedures requirements administrator Tools and test instruments 4:00pm
Appropriate software
3.3. Reports are
applications/programs
prepared/completed
according to enterprise
policies and procedures.

Prepared by: Approved by: Conformed by:

Emelda A. Reyes Anselmo A. Ramos Jr.


Trainer Administrator Owner

You might also like