0% found this document useful (0 votes)
24 views1 page

Filipino SMB Freelancer Invoice in Green Black White Casual Corporate Style PH Business Document

Shreejee Enterprises has provided a quotation for partition wall labor charges using Siporex blocks for a project in Malad Malvani, Mumbai. The labor rate is set at 30 Rs per square foot, with total costs depending on the actual work done, and additional charges may apply for high-rise work. Payment terms include a 20% advance and bi-weekly payments, with materials supplied by the builder's contractor.

Uploaded by

Soham Pawaskar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views1 page

Filipino SMB Freelancer Invoice in Green Black White Casual Corporate Style PH Business Document

Shreejee Enterprises has provided a quotation for partition wall labor charges using Siporex blocks for a project in Malad Malvani, Mumbai. The labor rate is set at 30 Rs per square foot, with total costs depending on the actual work done, and additional charges may apply for high-rise work. Payment terms include a 20% advance and bi-weekly payments, with materials supplied by the builder's contractor.

Uploaded by

Soham Pawaskar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SHREEJEE ENTERPRISES

Bharat Industrial Eastate, Gala no 12, MG Road, Hindustan Naka, Mumbai 67


+91 9702032624 , [email protected]

Date - 02 / 08 / 2025
Reference No -
From :
Mr. Deepak Dhupkar,
Shreejee Enterprises.

To:
Bhagwan Shukla,
R. K Enterprises.

Subject - Quotation for Partition wall Labour Charges in Siporex blocks .


Data

Project Details -
Location: Malad Malvani, Mumbai
Building Height: G+22 floors
Scope of Work: Partition walls work using Siporex blocks
Start Date :

Labour Charges -

Description Thickness Unit Rate

Internal Partition wall 4“ sq ft Per sq ft 30 /- rs

Total amount - Depends upon actual work done.

Note - 1) Material like Siporex blocks sand,cement,chemical,water to pe supplied by


Builder’s contractor ( R. K Enterprises).
2) High rise work usually has extra charges for height around 10 to 15 % extra
per 5-7 floors.

Terms & Conditions -


Payment terms : Advance(20% if applicable) and Labour work payment should be
given in every 15 days.
Working Hours : 9 am - 6 pm.
GST extra is applicable. N
Any design changes must be communicated in advance.
W