Meinhardt Singapore Pte Ltd.
Plot No. 1 & 2, Tower A,
4th Floor, Sector – 125,
Noida – 201303
Ref No : MSPL/BD/IR/2025/05 Uttar Pradesh, India
Date : 26.03.2025
T: +911202516165
[email protected]
To, www.meinhardtgroup.com
Chief Engineer/Construction/IV
N. F. Railway Construction, Maligaon
Guwahati, Assam, 786001
Ref.: Letter No:- NFR-CONST HQ-ENGINEERING / CE-CON-MP-PMS-2023-04 /
10609680102280 – Dated- 02.05.2024, Appointment of Project Management Services
Agency for providing project management services for Construction of New BG Railway
Line Project from Murkongselek station in the state of Assam (Ch: 0.780 Km) to proposed
Pasighat station in the state of Arunachal Pradesh (Ch: 27.062 Km) including Electrical
(General), Signal and Telecommunication works on Engineering, Procurement and
Construction (EPC) basis.
Sub.: “Regarding Approval of Personnel’s.”
Dear Sir,
With reference to the above subject, kindly find the enclosed CVs for the mentioned below position:
S. No Designation Name of Key Personnel Remarks
1. Replacement of Mr.
Sr. Manager/MEPF Mr. Atanu Bhattacharjee
Shailendra Yadav
2. Design Engineer - Electrical Mr. SK Masiur Ali Shah New CV
Request you to kindly accept the CV’s and approve at your earliest possible.
Thanking you and assuring you best of our services.
Yours truly,
For and on Behalf of MSPL and GIPL JV
Authorized Signatory
Rajesh Srivastava
Country Director (India)
Meinhardt Singapore Pte Ltd.
Abu Dhabi •Adelaide •Bahrain • Bangkok • Beijing • Brisbane •Chennai • Danang • Doha • Dubai • Hanoi • Ho Chi Minh City • Hong Kong • Jakarta • Jeddah
Karachi • Kuala Lumpur • Kuwait • Lahore • London • Macau • Manila • Melbourne • Muscat • New Delhi • Riyadh • Shanghai • Shenzhen • Singapore •
Sydney •Tripoli
Form – 11: Abstract of Eligible Assignments of Key Personnel
(Refer Clause 3.2.2&3.1.3)
Name of Key Personnel: Atanu Bhattacharjee Designation: Sr. Manager/MEPF
S. Name of Project Name of Client Payment (in Name of firm for Designation of Date of Man days Estimated
No. Rs) for the which the Key the Completion spent Capital Cost
project Personnel worked Key Personnel of Project
on
the project
(1) (2) (3) (4) (5) (6) (7) (8) (9)
1. Barwadhi 3rd line project under RVNL Ranchi NA AECOM Asia OHE Expert Nov 2024 702 days ₹900 Cr
RVNL Ranchi company Ltd
2. KGP-ADTP 3rd Line Rail Project RVNL- NA AECOM Asia Pvt. OHE Expert May-2022 1401 days ₹1200 Cr
(RVNL) at Kharagpur Kolkata Ltd.
3. Khurja to Kanpur (DFCC Project) Northern NA Alstom System India Sr. supervisor July 2018 427 days ₹50,000 Cr.
Railway Pvt. Ltd.
4. Jaroli to Basantapur (Doubling) East coast NA Bright Power Project Project Engineer May2017 182 days ₹150 Cr.
RVNL Project on Keonjhar site Railway (I) Pvt. Ltd
5. Dengkil, Malaysia, as a project Malaysian NA Intelligent essence sdn project manager October 640 days ₹30,000 Cr.
manager KL eco city & Kagenj 2 Railway bhd 2016
modification project
6. Aligarh- Ghaziabad Rail Project, Northern NA Ircon International Ltd Technical expert December 1127 days ₹1,00,000
Lucknow- Mughal Sarai Railway 2014 Cr.
electrification project & SGDET
project in Malaysia
7. Noyamundi yard electrification South eastern NA Premco Rail Engineers Site Supervisor September 183 days ₹10 Cr.
project & Buardwan to Karjona Railway Ltd 2011
electrification project in India
8. maintenance project under Sealdah Eastern NA J.P Electricals Site Supervisor November 1036 days ₹3 Cr.
Division& RITES Project Railway 2010
Form – 12: Curriculum Vitae (CV) for Proposed Key Personnel
1. Proposed position: Sr. Manager MEPF
2. Name of firm: M/s Pureways Infra Pvt. Ltd.
3. Name of Staff: Atanu Bhattacharjee
4. Date of birth: 11/04/1981
5. Nationality: Indian
Education: • B.E (Electrical) from Pacific Institute of Engineering Management in
6.
2014
Membership of NIL
7.
Professional Associations:
8. Other Training: Nil
Countries of Work
9. India
Experience:
Proficiency (good/ fair/ poor)
Language
Speaking Reading Writing
10. Languages
English Good Good Good
Hindi Good Good Good
11. Employment Record:
From [Year]: To [Year] Employer: Positions held:
Dec 2024 Till Date Bureau Veritas RE- Electrical
Dec 2022 Nov 2024 AECOM Asia company Ltd OHE Expert
Sept 2022 Nov 2022 GR Infra project Ltd. Assistant Manager
May 2022 Sept 2022 KEC International Limited Sr. Engineer
July 2018 May 2022 AECOM Asia Pvt. Ltd. OHE Expert
May 2017 July 2018 Alstom System India Pvt. Ltd. Sr. Supervisor
Dec 2016 May2017 Bright Power Project (I) Pvt. Ltd Project Engineer
Jan 2015 Oct 2016 Intelligent essence SDN BHD Project Manager
Nov 2011 Dec 2014 Ircon International Ltd. Technical Expert
Apr 2011 Sept 2011 Premco Rail Engineers Ltd. Site Supervisor
Dec 2010 Mar 2011 BCPL Railway infrastructure Ltd. Site Supervisor
Jan 2008 Nov 2010 J.P Electricals Site Supervisor
Jan 2005 Dec 2007 M/s Tulip Enterprise Sales Executive
Detailed • Overseeing the review and approval of designs for Mechanical, Electrical, Plumbing,
Tasks and Fire Safety systems in new construction projects or refurbishments. Ensuring
Assigned designs align with the client’s requirements, industry standards, and regulatory codes.
• Working with architects, structural engineers, and other consultants to ensure that the
MEPF systems are well-integrated into the building design.
• Assisting with the development of project budgets and cost estimates for MEPF
12. systems, ensuring that the systems are designed and implemented within financial
constraints.
• Leading and managing a team of MEPF engineers, technicians, and contractors.
Ensuring effective coordination across all disciplines to achieve project goals.
• Ensuring the timely and accurate installation of MEPF systems (HVAC, electrical
wiring, plumbing, fire safety systems, etc.). Overseeing the work of contractors and
ensuring compliance with project schedules.
13 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned
1. Name of assignment/job or project: Sr.DEE/ TRD & GS/ LMG. Foot by foot survey, drawing checking,
estimate, work planning, execution & work certification Client- NFER
Year: Dec-24- Till Date
Location: Various Locations
Employer: Bureau Veritas
Main project features: Sr.DEE/ TRD & GS/ LMG. Foot by foot survey, drawing checking, estimate, work
planning, execution & work certification
Positions held: RE- Electrical
Activities performed:
• Foot by foot survey,
• drawing checking,
• estimate,
• work planning,
• execution & work certification,
• Contractor handling,
• Materials assessment
Cost of Project: ₹50 Cr.
2. Name of assignment/job or project: Barwadhi 3rd line project under RVNL Ranchi Client- RVNL Ranchi
Year: Dec 2022- Nov 2024
Location: Bihar
Employer: AECOM Asia company Ltd
Main project features: Barwadhi 3rd line project under RVNL Ranchi
Positions held: OHE Expert
Activities performed:
• ensures the optimal design for the overhead electrification system that meets technical, safety, and
operational requirements.
• Conducting surveys of the track to determine the necessary infrastructure for the OHE system, including
supporting poles, transformers, and related equipment
• Collaborating with power supply and transmission teams to ensure adequate power availability and
distribution.
Cost of Project: ₹900 Cr.
3. Name of assignment/job or project: KCK railway project Client- NFER
Year: Sept 2022- Nov 2022
Location: Various Location
Employer: KEC International Limited.
Main project features: KCK railway project
Positions held: assistant manager
Activities performed:
• Ensuring that the electrical design (including signaling systems, power supply, OHE, lighting, etc.) meets
the project specifications, safety standards, and regulatory requirements
• Helping in the allocation of resources (personnel, equipment, materials) for electrical work and ensuring
that all required resources are available when needed.
• Assisting in preparing detailed work schedules for electrical activities, ensuring milestones and deadlines
are met on time.
Cost of Project: ₹500 Cr.
4. Name of assignment/job or project: Lumding– Tinsukia electrification project Client- NFER
Year: May 2022- Sept 2022
Location: Various Location
Employer: KEC International Limited.
Main project features: Lumding– Tinsukia electrification project
Positions held: Sr. Engineer
Activities performed:
• OHE foundation, Mast erection,
• wiring, tower checking & material assessment,
• Project billing,
• Planning and
• client handling
Cost of Project: ₹600 Cr.
5. Name of assignment/job or project: KGP-ADTP 3rd Line Rail Project (RVNL) at Kharagpur Client-
RVNL-Kolkata
Year: Jul-2018- May-2022
Location: Kharagpur
Employer: AECOM Asia Pvt. Ltd.
Main project features: KGP-ADTP 3rd Line Rail Project (RVNL) at Kharagpur
Positions held: OHE Expert
Activities performed:
• OHE foundation,
• Foundation erection,
• wiring, tower checking & material assessment,
• Project billing and Planning.
Cost of Project: ₹1200 Cr.
6. Name of assignment/job or project: Khurja to Kanpur (DFCC Project) Client-Northern Railway
Year: May 2017 to July 2018
Location: U.P
Employer: Alstom System India Pvt. Ltd.
Main project features: Khurja to Kanpur (DFCC Project)
Positions held: Sr. supervisor
Activities performed:
• Supervising the installation of electrical systems like power supply infrastructure, electrical equipment for
stations, trackside signaling systems, and overhead electrification (OHE) for the dedicated freight corridor.
• Leading and managing a team of electricians, technicians, and junior engineers to carry out electrical
installations. Ensuring that the team follows all electrical safety protocols and standards.
• Ensuring the timely execution of electrical work by scheduling and coordinating daily activities,
identifying potential delays, and resolving them proactively.
Cost of Project: ₹50,000 Cr.
7. Name of assignment/job or project: Jaroli to Basantapur (Doubling) RVNL Project on Keonjhar site Client-
East coast Railway
Year: December 2016 to May2017
Location: Keonjhar
Employer: Bright Power Project (I) Pvt. Ltd
Main project features: Jaroli to Basantapur (Doubling) RVNL Project on Keonjhar site
Positions held: Project Engineer
Activities performed:
• Reviewing and ensuring the electrical design and layouts for the project are accurate, feasible, and
compliant with national standards and project specifications. This could include overhead electrification,
signaling systems, power supply, station electrification, and more.
• Developing and monitoring detailed schedules for electrical installations and other electrical activities,
ensuring that the work is completed on time, within scope, and in accordance with project timelines.
• Coordinating the allocation of resources such as materials, manpower, and equipment required for
electrical tasks, ensuring the availability and efficient utilization of resources
Cost of Project: ₹150 Cr.
8. Name of assignment/job or project: Dengkil, Malaysia, as a project manager KL eco city & Kagenj 2
modification project Client- Malaysian Railway
Year: January 2015 to October 2016
Location: Malaysia
Employer: intelligent essence SDN BHD
Main project features: Dengkil, Malaysia, as a project manager KL eco city & Kagenj 2 modification project
Positions held: project manager
Activities performed:
• planning project work, new canopy, drop tube,
• cantilever erection, new OCS wiring & adjustment,
• old OCS & mast dismantle.
Cost of Project: ₹30,000 Cr.
9. Name of assignment/job or project: Aligarh- Ghaziabad Rail Project, Lucknow- Mughal Sarai electrification
project & SGDET project in Malaysia Client- Northern Railway
Year: November 2011 to December 2014
Location: Ghaziabad, Lucknow, Malaysia
Employer: Ircon International Ltd
Main project features: Aligarh- Ghaziabad Rail Project, Lucknow- Mughal Sarai electrification project &
SGDET project
Positions held: Technical expert
Activities performed:
• Foundation, mast, portal erection,
• cantilever erection, new OCS wiring & adjustment, tower checking.
Cost of Project: ₹1,00,000 Cr.
10. Name of assignment/job or project: Noyamundi yard electrification project & Buardwan to Karjona
electrification project in India Client- Southeastern Railway
Year: April 2011 to September 2011
Location: India
Employer: Premco Rail Engineers Ltd
Main project features: Noyamundi yard electrification project & Buardwan to Karjona electrification project
in India
Positions held: site supervisor
Activities performed:
• Foundation, mast, portal erection,
• cantilever erection, new OCS wiring & adjustment, tower checking.
Cost of Project: ₹10 Cr.
11. Name of assignment/job or project: maintenance project under Sealdah Division Client- Eastern Railway
Year: December 2010 to March 2011
Location: India
Employer: BCPL Railway infrastructure Ltd
Main project features: maintenance project under Sealdah Division
Positions held: site supervisor
Activities performed:
• Foundation, mast, portal erection,
• cantilever erection, new OCS wiring & adjustment, tower checking.
Cost of Project: ₹55 Cr.
12. Name of assignment/job or project: maintenance project under Sealdah Division& RITES Project Client-
Eastern Railway
Year: January 2008 to November 2010
Location: India
Employer: J.P Electricals
Main project features: maintenance project under Sealdah Division& RITES Project
Positions held: site supervisor
Activities performed:
• Foundation, mast, portal erection,
• cantilever erection, new OCS wiring & adjustment, tower checking.
Cost of Project: ₹3 Cr.
13. Name of assignment/job or project: Sealdah, Howrah, Asansol, Kharagpur, Chakradharpur, Dhanbad,
Nagpur, Ranchi Division & also working with Eastern & South Eastern Railway HQ Client- Eastern
Railway
Year: January 2005 to December 2007
Location: India
Employer: M/s Tulip Enterprise
Main project features: Sealdah, Howrah, Asansol, Kharagpur, Chakradharpur, Dhanbad, Nagpur, Ranchi
Division& also working with Eastern & South Eastern Railway HQ
Positions held: sales executive
Activities performed:
• Identifying and targeting potential clients within the railway sector, including contractors, suppliers, and
other stakeholders across multiple railway divisions and HQs.
• Actively seeking and securing new business opportunities related to railway infrastructure projects,
electrical works, signaling, equipment supplies, and other relevant services in Sealdah, Howrah, Asansol,
Kharagpur, Chakradharpur, Dhanbad, Nagpur, and Ranchi divisions.
Cost of Project: ₹10 Cr.
(i) I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly
14. Certification
describes myself, my qualifications, and my experience. I understand that any willful
misstatement described herein may lead to my disqualification or dismissal, if engaged.
(ii) I further undertake that my CV is being proposed for this project by M/s Pureways
Infra Pvt. Ltd. (formally known as Growever Infra Pvt Ltd.) and I have not given
consent to any other consultant(s) to propose my CV for any position for this project.
(iii) I undertake that I have no objection in uploading/hosting of my credentials by Authority
in public domain.
(iv) I am willing to undertake the assignment and ensure my availability for the duration of
the assignment.
(v) I have no history of involvement in Vigilance/CBI/Police Case, resulting in major
penalty punishment of removal/dismissal/compulsory retirement or conviction.
(vi) I have never been debarred from providing consultancy services by any government
authority/PSU or I was debarred from providing consultancy services by
…………………… for …………. Years from ……./……./…….. to ……./……./……..
and period of debarment is now over.
(vii) I have been deployed for minimum [365] days on the Eligible Assignments claimed by
me for the purposes of the evaluation under this RFP.
Date: 26 March 2025
Place: New Delhi
Atanu Bhattacharjee
For and on behalf of MSPL-GIPL
Authorized Signatory
Rajesh Srivastava
Country Director India
Form – 14: Eligible Assignment of Key Personnel
Name of Key Personnel: ATANU BHATTACHARJEE
Designation of Key Personnel: OHE Expert
Name of the Project: • Barwadhi 3rd line project under RVNL Ranchi
Name of Firm where employed: AECOM Asia company Ltd
Description of services performed by the Key • ensures the optimal design for the overhead electrification
Personnel (including designation): system that meets technical, safety, and operational
requirements.
• Conducting surveys of the track to determine the necessary
infrastructure for the OHE system, including supporting
poles, transformers, and related equipment
• Collaborating with power supply and transmission teams
to ensure adequate power availability and distribution.
Designation: OHE Expert
Type of Project As per Cl. 3.1.3) Railways
Name of client and Address: RVNL Ranchi
(Indicate whether public or private)
Professional Fee received (in Rs cr.) N.A.
Estimated capital Cost (in Rs Cr) ₹900 Cr
Start date and finish date of the services
Dec 2022- Nov 2024
(month/ year)
No. of days spent on the project 702 days
Brief description of the project:
• Barwadhi 3rd line project under RVNL Ranchi
It is certified that the aforesaid information is true and correct to the best of my knowledge and belief.
Date: 26 March 2025 ATANU BHATTACHARJEE
Form – 14: Eligible Assignment of Key Personnel
Name of Key Personnel: ATANU BHATTACHARJEE
Designation of Key Personnel: OHE Expert
Name of the Project: • KGP-ADTP 3rd Line Rail Project (RVNL) at Kharagpur
Name of Firm where employed: AECOM Asia Pvt. Ltd.
Description of services performed by the Key • OHE foundation,
Personnel (including designation): • Foundation erection,
• wiring, tower checking & material assessment,
• Project billing and Planning.
Designation: OHE Expert
Type of Project As per Cl. 3.1.3) Railway
Name of client and Address: RVNL-Kolkata
(Indicate whether public or private)
Professional Fee received (in Rs cr.) N.A.
Estimated capital Cost (in Rs Cr) ₹1200 Cr
Start date and finish date of the services
Jul-2018- May-2022
(month/ year)
No. of days spent on the project 1401 days
Brief description of the project:
• KGP-ADTP 3rd Line Rail Project (RVNL) at Kharagpur
It is certified that the aforesaid information is true and correct to the best of my knowledge and belief.
Date: 26 March 2025 ATANU BHATTACHARJEE
Form – 14: Eligible Assignment of Key Personnel
Name of Key Personnel: ATANU BHATTACHARJEE
Designation of Key Personnel: Sr. supervisor
Name of the Project: Khurja to Kanpur (DFCC Project)
Name of Firm where employed: Alstom System India Pvt. Ltd.
Description of services performed by the Key • Supervising the installation of electrical systems like power
Personnel (including designation): supply infrastructure, electrical equipment for stations,
trackside signaling systems, and overhead electrification
(OHE) for the dedicated freight corridor.
• Leading and managing a team of electricians, technicians,
and junior engineers to carry out electrical installations.
Ensuring that the team follows all electrical safety protocols
and standards.
• Ensuring the timely execution of electrical work by
scheduling and coordinating daily activities, identifying
potential delays, and resolving them proactively.
Designation: Sr. supervisor
Type of Project As per Cl. 3.1.3) Railway
Name of client and Address: Northern Railway
(Indicate whether public or private)
Professional Fee received (in Rs cr.) N.A.
Estimated capital Cost (in Rs Cr) ₹50,000 Cr.
Start date and finish date of the services
May 2017 to July 2018
(month/ year)
No. of days spent on the project 427 days
Brief description of the project: Khurja to Kanpur (DFCC Project)
It is certified that the aforesaid information is true and correct to the best of my knowledge and belief.
Date: 26 March 2025 ATANU BHATTACHARJEE
Form – 14: Eligible Assignment of Key Personnel
Name of Key Personnel: ATANU BHATTACHARJEE
Designation of Key Personnel: Project Engineer
Name of the Project: • Jaroli to Basantapur (Doubling) RVNL Project on
Keonjhar site
Name of Firm where employed: Bright Power Project (I) Pvt. Ltd
Description of services performed by the Key • Reviewing and ensuring the electrical design and layouts
Personnel (including designation): for the project are accurate, feasible, and compliant with
national standards and project specifications. This could
include overhead electrification, signaling systems, power
supply, station electrification, and more.
• Developing and monitoring detailed schedules for
electrical installations and other electrical activities,
ensuring that the work is completed on time, within scope,
and in accordance with project timelines.
• Coordinating the allocation of resources such as materials,
manpower, and equipment required for electrical tasks,
ensuring the availability and efficient utilization of
resources
Designation: Project Engineer
Type of Project As per Cl. 3.1.3) Railway
Name of client and Address: East coast Railway
(Indicate whether public or private)
Professional Fee received (in Rs cr.) N.A.
Estimated capital Cost (in Rs Cr) ₹150 Cr.
Start date and finish date of the services
December 2016 to May2017
(month/ year)
No. of days spent on the project 182 days
Brief description of the project:
• Jaroli to Basantapur (Doubling) RVNL Project on Keonjhar site
It is certified that the aforesaid information is true and correct to the best of my knowledge and belief.
Date: 26 March 2025 ATANU BHATTACHARJEE
Form – 14: Eligible Assignment of Key Personnel
Name of Key Personnel: ATANU BHATTACHARJEE
Designation of Key Personnel: project manager
Name of the Project: Dengkil, Malaysia, as a project manager KL eco city & Kagenj
2 modification project
Name of Firm where employed: Intelligent essence sdn bhd
Description of services performed by the Key • planning project work, new canopy, drop tube,
Personnel (including designation): • cantilever erection, new OCS wiring & adjustment,
• old OCS & mast dismantle.
Designation: project manager
Type of Project As per Cl. 3.1.3) Railway
Name of client and Address: Malaysian Railway
(Indicate whether public or private)
Professional Fee received (in Rs cr.) N.A.
Estimated capital Cost (in Rs Cr) ₹30,000 Cr.
Start date and finish date of the services January 2015 to October 2016
(month/ year)
No. of days spent on the project 640 days
Brief description of the project: Dengkil, Malaysia, as a project manager KL eco city & Kagenj 2 modification
project
It is certified that the aforesaid information is true and correct to the best of my knowledge and belief.
Date: 26 March 2025 ATANU BHATTACHARJEE
Form – 14: Eligible Assignment of Key Personnel
Name of Key Personnel: ATANU BHATTACHARJEE
Designation of Key Personnel: Technical expert
Name of the Project: Aligarh- Ghaziabad Rail Project, Lucknow- Mughal Sarai
electrification project & SGDET project in Malaysia
Name of Firm where employed: Ircon International Ltd
Description of services performed by the Key • Foundation, mast, portal erection,
Personnel (including designation): • cantilever erection, new OCS wiring & adjustment, tower
checking.
Designation: Technical expert
Type of Project As per Cl. 3.1.3) Railway
Name of client and Address: Northern Railway
(Indicate whether public or private)
Professional Fee received (in Rs cr.) N.A.
Estimated capital Cost (in Rs Cr) ₹1,00,000 Cr.
Start date and finish date of the services November 2011 to December 2014
(month/ year)
No. of days spent on the project 1127 days
Brief description of the project: Aligarh- Ghaziabad Rail Project, Lucknow- Mughal Sarai electrification
project & SGDET project in Malaysia
It is certified that the aforesaid information is true and correct to the best of my knowledge and belief.
Date: 26 March 2025 ATANU BHATTACHARJEE
Form – 14: Eligible Assignment of Key Personnel
Name of Key Personnel: ATANU BHATTACHARJEE
Designation of Key Personnel: Site Supervisor
Name of the Project: • Noyamundi yard electrification project & Buardwan to
Karjona electrification project in India
Name of Firm where employed: Premco Rail Engineers Ltd
Description of services performed by the Key • Foundation, mast, portal erection,
Personnel (including designation): • cantilever erection, new OCS wiring & adjustment, tower
checking.
Designation: Site Supervisor
Type of Project As per Cl. 3.1.3) Railway
Name of client and Address: Southeastern Railway
(Indicate whether public or private)
Professional Fee received (in Rs cr.) N.A.
Estimated capital Cost (in Rs Cr) ₹10 Cr.
Start date and finish date of the services April 2011 to September 2011
(month/ year)
No. of days spent on the project 183 days
Brief description of the project:
• Noyamundi yard electrification project & Buardwan to Karjona electrification project in India
It is certified that the aforesaid information is true and correct to the best of my knowledge and belief.
Date: 26 March 2025 ATANU BHATTACHARJEE
Form – 14: Eligible Assignment of Key Personnel
Name of Key Personnel: ATANU BHATTACHARJEE
Designation of Key Personnel: Site Supervisor
Name of the Project: • maintenance project under Sealdah Division& RITES
Project
Name of Firm where employed:
Description of services performed by the Key • Foundation, mast, portal erection,
Personnel (including designation): • cantilever erection, new OCS wiring & adjustment, tower
checking.
Designation: Site Supervisor
Type of Project As per Cl. 3.1.3) Railway
Name of client and Address: Eastern Railway
(Indicate whether public or private)
Professional Fee received (in Rs cr.) N.A.
Estimated capital Cost (in Rs Cr) ₹3 Cr.
Start date and finish date of the services January 2008 to November 2010
(month/ year)
No. of days spent on the project 1036 days
Brief description of the project:
• maintenance project under Sealdah Division& RITES Project
It is certified that the aforesaid information is true and correct to the best of my knowledge and belief.
Date: 26 March 2025 ATANU BHATTACHARJEE
Form – 12: Curriculum Vitae (CV) for Proposed Key Personnel
1. Proposed position: Design Engineer- Electrical
2. Name of firm: M/s Pureways Infra Pvt. Ltd.
3. Name of Staff: SK Masiur Ali Shah
4. Date of birth: 24/06/1997
5. Nationality: Indian
Education: • B. Tech in Mechanical Engineer from College of Engineering and
6.
Management, Kolaghat in 2019
Membership of NIL
7.
Professional Associations:
8. Other Training: Nil
Countries of Work
9. India
Experience:
Proficiency (good/ fair/ poor)
Language
Speaking Reading Writing
10. Languages
English Good Good Good
Hindi Good Good Good
11. Employment Record:
From [Year]: To [Year] Employer: Positions held:
Apr 2024 Till Date Bureau Veritas India Pvt Ltd Site Engineer
Feb 2020 Mar 2024 Vedanta Aluminum LTD Maintenance Engineer
Detailed • Developing initial design concepts based on project requirements, client specifications,
Tasks and industry standards. This includes creating innovative solutions for mechanical
Assigned systems and components.
• Using Computer-Aided Design (CAD) software (like AutoCAD, SolidWorks, CATIA,
or Inventor) to create 2D and 3D models of mechanical components, assemblies, and
systems.
• Designing prototypes of mechanical components or systems and overseeing their testing
12. to evaluate performance, identify issues, and refine designs.
• Finite Element Analysis (FEA): Conducting simulations (FEA, CFD, etc.) to analyze
the behavior of materials and systems under various conditions, such as stress, thermal,
or fluid dynamics analysis.
• Evaluating the mechanical strength, fatigue life, and durability of components to ensure
they can withstand real-world operating conditions.
• performing thermal analysis or designing systems that handle heat transfer, HVAC, or
fluid dynamics (in the case of pumps, turbines, or heat exchangers).
13 Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned
1. Name of assignment/job or project: Amrit Bharat Project (Gati Shakti Unit) under Lumding Division Sr.
Den / TRD and GS/LMG in state of Assam Client- Dalmia NFR
Year: Apr-24- Till Date
Location: Assam
Employer: Bureau Veritas India Pvt Ltd
Main project features: Amrit Bharat Project (Gati Shakti Unit) under Lumding Division Sr. Den / TRD and
GS/LMG in state of Assam
Positions held: Site Engineer
Activities performed:
• Working as an OHE design Engineer in 25kv electrification project.
• Worked in Auto CAD for drawing production which is an added advantage
• Responsible for design and also looking after execution works of 25kv flexible OHE.
• Design and drawing preparation of pegging plans, layout plans, Cross section drawing, Structure erection
drawing, clearance study.
• Application and understanding of standards relevant to Railway Electrification.
• Basic knowledge of civil and signaling required for OHE design.
• Coordination with client for taking approvals and also with sit for receiving inputs in time.
Cost of Project: ₹50 Cr.
2. Name of assignment/job or project: Vedanta Aluminum Maintenance project Client- Vedanta Aluminum
Ltd
Year: Apr 2023- Mar 2024
Location: Various Location
Employer: Vedanta Aluminum LTD
Main project features: Vedanta Aluminum Maintenance project
Positions held: Maintenance Engineer
Activities performed:
• Analyze manufacturing processes and identify areas for improvement.
• Supervise team of mechanical engineers to oversee and service day-to-day operations.
• Design and implement machinery upgrades, overhauls, and replacements.
• Evaluate processes for operational and cost efficiency.
• Troubleshoot processes to reduce rates of errors, breakages, and sub-standard production. Lead cross
functional team in implementing across-the-board improvements to production process.
• Create protocols for regular maintenance, inspection, and service to optimize machinery function and to
avoid breakdowns.
• Compose reports setting forth results of assessments and evaluations, as well as a plan for further
indicated action.
• Train engineering team in applicable health and safety standards and procedures
Cost of Project: ₹300 Cr.
3. Name of assignment/job or project: Managing pot line Operations for 1344 pot cells (eight pot room Client-
Vedanta Aluminum LTD
Year: Feb 2020- Mar 2023
Location: Orissa
Employer: Vedanta Aluminum LTD, Jharsuguda, Orissa
Main project features: Managing pot line Operations for 1344 pot cells (eight pot
Positions held: Site Incharge
Activities performed:
• Responsible for operational activities as Anode Change, Metal tapping, Beam Raising and Process
• parameters like Current Efficiency, Metal Purity, and specific power consumption.
• Pot room manpower handling along with their skill development and training to enhance their operational
• efficiency and competitiveness.
• Maintaining safety standards at workplace and ensuring compliance of Standard Operating Practices at
the shop floor.
• Responsible for preparing and conducting revision of SOP of operations with risk mitigation and Safety,
Health and Environment compliance of each procedure.
Cost of Project: ₹300 Cr.
(i) I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly
14. Certification
describes myself, my qualifications, and my experience. I understand that any willful
misstatement described herein may lead to my disqualification or dismissal, if engaged.
(ii) I further undertake that my CV is being proposed for this project by M/s Pureways
Infra Pvt. Ltd. (formally known as Growever Infra Pvt Ltd.) and I have not given
consent to any other consultant(s) to propose my CV for any position for this project.
(iii) I undertake that I have no objection in uploading/hosting of my credentials by Authority
in public domain.
(iv) I am willing to undertake the assignment and ensure my availability for the duration of
the assignment.
(v) I have no history of involvement in Vigilance/CBI/Police Case, resulting in major
penalty punishment of removal/dismissal/compulsory retirement or conviction.
(vi) I have never been debarred from providing consultancy services by any government
authority/PSU or I was debarred from providing consultancy services by
…………………… for …………. Years from ……./……./…….. to ……./……./……..
and period of debarment is now over.
(vii) I have been deployed for minimum days on the Eligible Assignments claimed by me for
the purposes of the evaluation under this RFP.
Date: 26 March 2025
Place: New Delhi
SK Masiur Ali Shah
For and on behalf of MSPL-GIPL
Authorized Signatory
Rajesh Srivastava
Country Director India