The document is a risk assessment sheet for the navigation operation group, focusing on VDR (Voyage Data Recorder) failure. It outlines potential hazards, existing control measures, and risk rankings for various scenarios, including legal implications and equipment failure. The assessment includes a risk matrix to evaluate consequences and likelihood, along with spaces for responsible personnel to fill in details.

Uploaded by

Gokul Ramu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
324 views3 pages

VDR Failure

The document is a risk assessment sheet for the navigation operation group, focusing on VDR (Voyage Data Recorder) failure. It outlines potential hazards, existing control measures, and risk rankings for various scenarios, including legal implications and equipment failure. The assessment includes a risk matrix to evaluate consequences and likelihood, along with spaces for responsible personnel to fill in details.

Uploaded by

Gokul Ramu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

RISK ASSESSMENT SHEET

Operation Group: NAVIGATION (NAV)

Activity: VDR Failure

Checklist(s):
Vessel Name:

Emergency Checklist(s):

Existing Controls Measures Existing Risk Final Risk


PIC implmenting

Consequences

Consequences
Residual Risk

Residual Risk
Additional Control Measures
existing / additional

Likelihood

Likelihood
Sl
Hazard Consequences control measures
No. (To be completed where applicable and for H and VH
Precautions to be Taken risk ranking)
Name / Date

1 Voyage records not saved on VDR Legal Implications, Detention, Delays All the Log Books/ check list to be properly maintained. Voyage By Whom
data also recorded in ECDIS.

Medium

Medium
Unlikely

Unlikely
Major

Major
By When

2 Records of Equipment failure not Equipment failure does not get recorded All Navigation equipment to be maintained as per PMS and By Whom
available manufacturer's instructions. Any equipment failure to be recorded

Medium

Medium
Unlikely

Unlikely
Major

Major
in the bridge log book.
By When

3 Records of bridge activities not saved Bridge data not available in case of an Log Books to be properly maintained. In case of an emergency all By Whom

Appreciable

Appreciable
Possible

Possible
Medium

Medium
in VDR investigation log books, check list/ ECDIS data to be preserved.
By When

TEC 42 15-Jun-2021 1 of 3
Existing Controls Measures Existing Risk Final Risk
PIC implmenting

Consequences

Consequences
Residual Risk

Residual Risk
Additional Control Measures
existing / additional

Likelihood

Likelihood
Sl
Hazard Consequences control measures
No. (To be completed where applicable and for H and VH
Precautions to be Taken risk ranking)
Name / Date

In what conditions should work be stopped? :

Risk Assessed By: ________________________ Officer In-Charge of Job: _________________________ Officer In-Charge of Safety: _________________________
Date:____________________________________

TEC 42 15-Jun-2021 2 of 3
ANGLO-EASTERN

RISK MATRIX
Consequences Minor Appreciable Major Severe Catastrophic
Medical Treatment Case
Permanent Total Disability Multiple fatalities
First Aid Cases E.g., Cuts / Restricted Work Case Permanent Partial Disability
Fatality Severe illness to multiple
People wounds / bruises. Lost Workday Case. Work-related health
Severe / Life shortening personnel
Minor discomfort or ill health Short-term work-related disorder
diseases.
illness
Medium impact on
Inconsequential impact on Long Term impact on
No impact on environment environment Major Long-Term impact on
environment environment
Environment Spills contained on board
Spills contained on board of
Spills contained on board
Spills in water of 7 M3 to
environment
Risk Table <5L
5 L - 1 M3
>1 M3
700 M3
Spills in water > 700 M3
Spills in water <7 M3
Financial Loss US$5,000 - Financial loss US$100,000 - Financial loss US$2 million - Financial loss >US$20
Assets Financial Loss < US$ 5,000
US$100,000 US$ 2 million US$20 million million
Severe threat to the
Minor effect on commercial Loss to commercial venture Threat to future commercial company
No effect on commercial venture Some local public reaction business Prolonged international
Reputation* venture Minor local public reaction Minor media coverage Major media coverage media coverage, public
outcry

Has not occurred in the


Remote company in last 8 years. Very Low Very Low Low Low Medium

Has not occurred in the


Unlikely company in last 3 years. Very Low Low Medium Medium High
Likelihood

Has occurred in the


Possible company in the last year. Low Medium High High Very High

Occurs several times per


Likely year in the company. Low Medium High Very High Very High