Penthouse Estimate 2025 Bungalow

The document outlines the costs associated with various stages of building construction, emphasizing the importance of a strong foundation for legacy. It details the materials and labor required for each stage, including the foundation, ground floor, decking, first floor, concrete parapet, roofing, electrical, and plumbing work, totaling N46,491,200. The author encourages careful planning and foresight to avoid the dangers of delay and to build a lasting legacy for future generations.

Uploaded by

owens agbonkpolo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
90 views18 pages

Penthouse Estimate 2025 Bungalow

The document outlines the costs associated with various stages of building construction, emphasizing the importance of a strong foundation for legacy. It details the materials and labor required for each stage, including the foundation, ground floor, decking, first floor, concrete parapet, roofing, electrical, and plumbing work, totaling N46,491,200. The author encourages careful planning and foresight to avoid the dangers of delay and to build a lasting legacy for future generations.

Uploaded by

owens agbonkpolo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 18

s

COST OF
BUILDING
FOUNDATION LEVEL :
Where Kings Begin or Fail

Before a king ascends, he must go underground.


Foundations are not seen… but they carry everything.
Most people fear the unseen cost — but legacy starts in the dirt.
If you skip this stage, you won’t last the storm. 🔥 Lay it right. Or lose it later.

JAY SAM ARCHITECT

S/N NO DESCRIPTION UNIT (N) TOTAL (N)


1 38 Lengths of 16mm rods 20,000 760,000
for starter pillars
2 88 Lengths of 12mm rods 9,500 836,000
3 34 Lengths of 8mm rods 5,500 187,000

4 Half roll Of binding wire 18,000 18,000


5 7 Trips of sand 45,000 315,000

6 laterite 1,075,000
25 trips 43,000
7 30 tons Of chippings 3/4 1 tons@ 18,000 560,000

8 150 Lengths of planks 1 by


12 4,500 675,000

2 by 2 wood 40 pieces for profile 1,700 68,000


Pegging

Pegs 4 bundles 3,000 12,000

9 Cement 150 bags 10,500 1,575,000


10 1 Bags of 3” nails 40,000 40,000
11 1 Bag of 2 ” nails 40,000 40,000

12 2,500,000 pcs of blocks : 9 or 6 550 1,375,000


inches

3 inches thickness with 60 10,500 630,000


14 German flooring
bags of cement

TOTAL:=
8,166,000

COST OF
BUILDING
GROUND FLOOR BUILDING-
Where Dreams Take Form

This is where your future touches the earth.


Every block you raise is a line in the story your children will inherit.
Don’t build fast. Build wise. ✊ This is not decoration — it’s declaration.

JAY SAM ARCHITECT

S/N NO DESCRIPTION UNIT (N) TOTAL (N)


1 51 Lengths of 16mm rods 20,000 1,020,000
Pillar continuation
2 70 Lengths of 12mm rods 9,500 665,000
ground floor lintel
3 48 Lengths of 8mm rods for 5,500 266,200
rings
4 1 roll Of binding wire 36,000 36,000

5 7 Trips of sand 45,000 315,000

7 25 tons Of chippings 3/4 467,500 467,500


8 100 Lengths of planks 1 by
12 for boarding 4,500 450,000

60 Pieces of 1 by 9 wood 4,800 144,000


for lintel or 1 by 6

4,000 blocks 550 2,200,000

10 Cement 120 bags 10,500 1,260,000


11 1 Bags of 3” nails 40,000 40,000
12 1 Bag of 2 ” nails 40,000 40,000

13

14 TOTAL:= 6,903,700

COST OF
BUILDING
DECKING LEVEL-
The Weight of Responsibility

Decking is not sexy. It’s not beautiful.


But it’s where weight is tested…
Just like life — if your structure can’t carry pressure, it will collapse later.

🛡️The legacy will press on you before it rests on you.

JAY SAM ARCHITECT

S/N NO DESCRIPTION UNIT (N) TOTAL (N)


1 50 Lengths of 16mm rods 20,000 1,000,000

2 268 Lengths of 12mm rods 9,500 2,546,000

3 60 Lengths of 8mm rods for 5,500 330,000


rings
4 1 roll Of binding wire 36,000 36,000
5 7 Trips of sand 45,000 315,000

7 30 tons Of chippings 3/4 560,000 560,000

8 350 Lengths of planks 1 by


12 for boarding 4,500 1,575,000

40 Pieces of 1 by 6 wood 4,800 192,000

120 pieces of 2 by 3 wood 2,600 312,000

250 pieces of bamboo 1000 250,000

9 Water proof

10 Cement 150 bags 10,500 1,575,000

11 1 Bags of 3” nails 40,000 40,000


12 1 Bag of 2 ” nails 40,000 40,000

TOTAL:= 8,771,000

S/N NO DESCRIPTION UNIT (N) TOTAL (N)


1 2 Lengths of 16mm rods 20,000 40,000

2 10 Lengths of 12mm rods 9,500 95,000


3 5 Lengths of 8mm rods for 5,500 27,500
rings COST OF
4 BUILDING
FIRST
15 bags FLOOR
of BUILDING –
Cement 10,500 157,500
Rise Like a Visionary
5
Here’s where kings rise.
Most people stay on the ground floor of life — safe,TOTAL:
STAIRCASE small, scared. 320,000
But if you’ve come this far, you are not most people.

🏛️Legacies are built above average. Literally.

JAY SAM ARCHITECT


S/N NO DESCRIPTION UNIT (N) TOTAL (N)
1 xx Lengths of 16mm rods 20,000 xx

2 100 Lengths of 12mm rods 10,500 1,050,000

3 40 Lengths of 8mm rods for 5,500 220,000


rings
4 1 roll Of binding wire 40,000 40,000

5 7 Trips of sand 45,000 315, 000

7 25 tons Of chippings 3/4 467,500 467,500

8 100 Lengths of planks 1 by


12 for boarding 4,500 450,000

20 Pieces of 1 by 9 wood 4,800 96,000

2,500 blocks 550 1,375,000


9

10 Cement 150 10,500 1,575,000

11 1 Bags of 3” nails 40,000 40,000


12 1 Bag of 2 ” nails 40,000 40,000

13 miscellaneous / 800,000 800,000


Transportation

TOTAL = 6,468,500
COST OF
BUILDING
CONCRETE PARAPET-
Guarding the Future

The parapet is protection.


It keeps water out. It guards the top. It finishes the silhouette of the building.

In legacy, this is where you protect the future with foresight.


Not every roof must leak before it’s fixed.

🧠 You’re not just building walls — you’re building wisdom.

JAY SAM ARCHITECT

S/N NO DESCRIPTION UNIT (N) TOTAL (N)


1 xx Lengths of 16mm rods 20,000 xx

2 60 Lengths of 12mm rods 9,500 570,000

3 40 Lengths of 8mm rods for 5,500 220,000


rings
4 1 roll Of binding wire 40,000 40,000

5 5 Trips of sand 45,000 225, 000

6 15 tons Of ¾ stone dust chippings 270,000 270,000

7 20 tons Of chippings 3/4 467,500 360,000


8 100 Lengths of planks 1 by
12 for boarding / 3 step 4,800 480,000
parapet forming.

60 Pieces of 2 by 3 wood 162,000


2,700

cement 60 bags 10,500 630,000

TOTAL: 2,957,000

The Crown of Kings –

This is not just iron sheets and woodwork. This is the crown.
It’s what people see first.
It’s what protects everyone inside.

And it’s what most people delay till the rains come.

👑 Build before the storm. Don’t wait to react — reign.

S/N NO DESCRIPTION UNIT (N) TOTAL (N)


1 MATERIALS ELECTRICAL PIPINGS 1,500,000 1,500,000
AND LABOUR FOR THE CARCASS
2
3 “ PLUMBING PIPINGS 1,300,000 1,300,000
FOR THE CARCASS
4
10 bags Cement 10,500 105,000

5 Roofing Stone coated roofing sheets


materials/ labour. 12,000,000 10,000,000
.

S/N STAGE TOTAL (N)


1 FOUNDATION 8,166,000

2 GROUND FLOOR 6,903,700


BUILDING
3 DECKING + 8,771,000 + 320,000
STAIRCASE
4
FIRST FLOOR 6,468,500
BUILDING

5 CONCRETE 2,957,500
PARAPET
6 ROOFING 10,000

1,500,000
7
ELECTRICAL
PIPING AND
LABOUR

8 PLUMBING 1,300,000
PIPINGS

GRAND TOTAL N46,491,200

Delay Is Dangerous. Resistance Is Real. But Legacy Must Be Built

Resistance is everywhere:

 Rising costs
 Distractions
 Lack of clarity
 Fear of making a mistake

But what’s the price of doing nothing?

That is what this guide truly shows you. Not just how much it costs to build —
but how much it will cost if you don’t.

📽️WATCH what building with vision looks like:


https://youtu.be/xwx2z2UwOMA

📲 JOIN the Legacy Builders (Direct support & plan drops):


https://chat.whatsapp.com/Cwg2X6HsS1TFxEax41AUZk

✊ You are not just building a house.


You are building the story your children will walk into.

🔱 Legacy Over Luxury.


Brick by Brick. Block by Block.
We build the future.

You might also like