XU97-P01-03020-FI-0001 - 0 Budget Tracker 15 April 2025 - Reforecast
XU97-P01-03020-FI-0001 - 0 Budget Tracker 15 April 2025 - Reforecast
N 230417 - Updated "Proposal Est Roles" Tab to reflect Proposal Estimate Template Rev 2023 A.1
"Pricing Schedule Submitted" Tab - fixed calc erros in Column I
O 231212 - Added logic to "Tracker" Tab to check to see if there is a Cost Rate change. See column H.
If there has been a Cost Rate Change this can assist in finding who and when.
Additional columns will be needed to be added to split this if required and user will be required to update the "Cost by Week" Logic to split between
previous cost rate and current cost rate logic.
Q "Reports Now S&E" Tab updated. Column moves and Error checking logic added for TE Status and GL Posting
New Tab "Disbursements" Using JDE Cost Dissection Report (Improvement from Acadman)
Revision: 0 - 08/12/2025
924553805.xlsx/Revision Page 1 of 59
General Information
The Budget Tracker was created by Paul Andrews.
The Budget Tracker is intended for INTERNAL USE ONLY. The only exception is the "Progress Claim" which should be PDF'd for issue as supporting evidence
The following information and steps have been provided to assist users in how to establish, modify and manage the Budget Tracker throughout their Study.
The Budget Tracker is intended to supplement the "Global Cost Tracker" that is managed by Study & Eng Cost Control and provides additional level of detail and tracking beyond the functionality of the "Global Cost Tracker.
The Budget Tracker should align to the overarching metrics of the "Global Cost Tracker".
The Budget Tracker is macro free and requires the user to have a fundamental grounding in the use of the following Excel Functions:
SUMIF( , , ), SUMIFS( , , ), XLOOKUP( , , ), LEFT ( , ), SUBTOTAL( , , )
Assumption is that the Study/Design Manager has a working knowledge of the following SAP Transactions:
CAT2 - Time Sheet: Maintain Times
CATS_DA - Display Working Times
CJ20N - Project Builder
CN41N - Project Structure Overview
Note: This Template provides an initial set up and generic Budget Tracker.
Modifications to the Workbook for additional functionality (i.e. Multi WBS reporting, Subconsultant tracking and exchange rate quarterly changes) is the responsibility of the Responsible Person.
Overview of Spreadsheet
Colour Coding
The Budget Tracker has been established using the Sedgman Excel Workbook template
The following specific colour codes have been used to assist the user:
Data Data Input Required
1,000 Calculation/Output
Tab Overview
Revision: 0 - 08/12/2025
924553805.xlsx/Instructions Page 2 of 59
Initial Set up
To assist in configuring/modifying the Budget Tracker to the specifics of the Study the following questions need to be understood prior to creating specific Budget Tracker:
1. Has the Proposal been developed in accordance with the "Proposal Estimating Template" available from the SMS > Development > Proposals, Studies & Tenders > Tools?
2. What Consultancy Agreement / Contract has been executed and what are the Payment Terms and Invoicing requirements (15/30/60 days, Single Line invoice with supporting Progress Claim, Invoice by Role, other)
3. Has the SAP WBS been set up using the "Development SAP Template" or "Study specific SAP WBS Created (Refer to Study & Eng Cost Control for assistance)?
4. What project controls reporting is required (Weekly/Monthly, By Role, by Person, By SAP WBS Timesheet Code)?
5. Are you using the "Study Weekly Report" available from the SMS > Development > Proposals, Studies & Tenders > Tools?
DocHub
Download a copy and save in the following Job Directory:
AxxxDxx > 03 Project Controls > 03020 Budgets.
TAB - Lookups
Exchange Rates (For Multi-region Offices):
1. Obtain Exchange Rates from ESy or from Study & Eng Cost Control
2. Enter the Exchange rates for the different offices in for thecurrent Quarter (refer to JDE for approved exchange rates). Each Quater needs update rates, and the associated logic must be updated.
Note: Modification to the Workbook will be required for multi-currency reporting (in particular if Lead Project is CAD/USD with child project in AU or CAD reporting in USD, etc. Review with S&ECC
Tabs that will require logic/function update includes "Tracker" - Disbursements, "PO Reconciliation"
TAB - PO Reconciliation
Obtain copy of the PO for the study. The PO should have been saved in the following DocHub Directory:
AxxxDxx > 02 Client Management > 02010 Phase Contract PO.
AxxxPxx > 02 Client Management > 02010 Head Contract.
Revision: 0 - 08/12/2025
924553805.xlsx/Instructions Page 3 of 59
TAB - TRACKER
Column H - Functionality Added to highlight if there has been a cost rate change for the personnel (This typically occurs in April, but can be dependent on promotion cycles also).
If highlighted the SUMIFS functions for the hours and Weekly Cost will need to be modified to reflect the change in cost rate. The modifications can include additional cost rate column (if looking to maintain accurate margin/profit position).
Go to Cell DY1 and update the Input cells for the Period allocation (i.e. 1-12)
Go to Cell DY5 and set to the starting month/Period. Check Other periods align with contracting strategy.
Column B is Used for Multiple WBS breakdown (i.e. Specific WBS created by Study Manager)
This should reflect the Code from "CATS_DA" Tab Column B.
Set as required.
Note: This Column is critical for reporting against multiple WBS timesheet codes.
If using Standard SAP template it is not critical other than AxxxDxxNNN (i.e. A904D07BNE)
If using Standard JDE WBS Template it is not critical other than AxxxDxxR (i.e. A904D07A)
Revision: 0 - 08/12/2025
924553805.xlsx/Instructions Page 4 of 59
Overview: Tab - CATS_DA Timesheets
NOTE: SAP CATS_DA Layout must be established as per the columns listed. Refer to below for required SAP CATS_DA Layout selections.
Revision: 0 - 08/12/2025
924553805.xlsx/Instructions Page 5 of 59
Overview: Tab - Resource Allocate
Revision: 0 - 08/12/2025
924553805.xlsx/Instructions Page 6 of 59
Overview: Tab - Tracker 1 of 2
Revision: 0 - 08/12/2025
924553805.xlsx/Instructions Page 7 of 59
Overview: Tab - Tracker 2 of 2
Revision: 0 - 08/12/2025
924553805.xlsx/Instructions Page 8 of 59
If hours do not appear by Role. Check that the WBS Level 3 is correctin C54-94.
Revision: 0 - 08/12/2025
924553805.xlsx/Instructions Page 9 of 59
Overview: Tabs - Invoice & Progress Claim
Revision: 0 - 08/12/2025
924553805.xlsx/Instructions Page 10 of 59
Weekly Data Dump & Analysis - SAP
Run SAP CATS_DA report for Period - Commencement to Sunday date
Copy Export Spreadsheet Data to "CATS_DA Timesheet" Tab Cell E3 and replace all the data.
Check to make sure Subtotal hours matches hours from Export.
Review "CATS_DA Timesheet" Tab Column A for "ALLOCATION REQUIRED" and Column C for incorrect Activity Type.
If "ALLOCATION REQUIRED" copy Name and paste in "Resource Allocate" TAb Column A, select Role/Description from Drop Down List in Column B in "Resource Allocate" Tab.
If Incorrect Activity Type - Investigate with Study & Eng Cost Control for Resolution
"Tracker Tab" Add Resource Name to Column C.
"Tracker" Tab Check that Role/Discipline is auotmatically assigned per name in Column D.
"Tracker Tab" Assign PO Code to resource in Column F in "Tracker" Tab.
"Tracker" Tab - Check Profit per person in Column J and confirm that appropriate. If Red check with B&PD Manager re Charge rate for person.
"Tracker" Tab - Check Total Hours in Column BN and they match the total hours in "CATS_DA Timesheet"
"Tracker" Tab - Review resource usage for previous week. Check for movement from other prior weeks and investigate.
"Tracker" Tab - Check that "Hours by Name by Week" align to "Hours by Role by Week".
If errors check logic and investigate
"Tracker" Tab - Check Charge and Monthly Totals
If known expenses/disbursements have been booked for the week/month run JDE Cost Dissection Report.CSV and update Expenses disbursements in "Tracker" for given month. - REFER to OVERVIEW - Disbursements Tab above for more information
Refer to "JDE Resources" Page on SharePoint for instructions - https://sedgmanlimited.sharepoint.com/sites/ICTTransition/SitePages/JDE-Training-Resources.aspx
JDE Resources Page > Studies & Projects > 06_Reports & Inquiries > Run Job Dissection Report_CSV
OR
JDE Resources Page > Studies & Projects > "Manage Studies Combined QRG.PDF"
Revision: 0 - 08/12/2025
924553805.xlsx/Instructions Page 11 of 59
EOM - Invoice
Create Copies of "Invoice x" and "Progress Claim" tabs.
Check "Progress Claim" Tab E2 Function is to "Invoice x"
Note where Deferrals have occurred, the Study Manager should be seeking to ensure all hours are recovered in subsequent months.
Revision: 0 - 08/12/2025
924553805.xlsx/Instructions Page 12 of 59
Cost Tracking - Multiple WBS reporting
If requirement for additional tracking by specific WBS (i.e. Process, Structural, and Variations) please review with Paul Andrews for conceptual ideas.
However, this is project specific and will require the Study/Design Manager to modify and adapt the Budget Tracker.
You need to think about the reporting requirements and also how the SAP WBS has been structured.
There will be a need to modify the Tracker, PO Reconciliation, Invoice and Progress Claim tabs to suite each study.
The by role summary in "Tracker" can be copied should there be a requirement to report/invoice against specific buckets/WBS for a client.
Revision: 0 - 08/12/2025
924553805.xlsx/Instructions Page 13 of 59
Proposal Ref: A009-D00-02091-PR-0010_1 Charge Scale Base Currency
Proposal Budget Ref: A009-D00-02091-PR-0010_1 Stanmore AUD Simple Forecast
Contract Reference: LEG_010101-CO-0079_0005_1
Resource Title Cost Rate Charge Rate Indicative Hours Cost ($) Charge ($) Hours to Date Cost to Date Charge to Date Cost Remaining Charge Forecast hours Forecast Cost Forecast COST Forecast Charge Forecast Charge Forecast Check / Orig +
Remaining TO Complete TO Complete @ Completion TO Complete @ Completion Approved Variations
Administration Senior $92.00 $109.45 72.00 $6,624.00 $7,880.48 - $0.00 $0.00 $6,624.00 $7,880.48 10.00 $920.00 $920.00 $1,094.51 $1,094.51
Administration Standard $57.00 $83.39 42.00 $2,394.00 $3,502.44 12.16 $693.12 $1,014.04 $1,700.88 $2,488.40 47.00 $2,679.00 $3,372.12 $3,919.39 $4,933.43 Potential Over Budget
Document Control Manager $0.00 $0.00 - $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Document Control Senior $104.00 $145.93 100.00 $10,400.00 $14,593.49 2.00 $208.00 $291.87 $10,192.00 $14,301.62 40.00 $4,160.00 $4,368.00 $5,837.40 $6,129.27
Document Control Standard $100.00 $109.45 100.00 $10,000.00 $10,945.12 15.23 $1,523.00 $1,666.94 $8,477.00 $9,278.18 58.00 $5,800.00 $7,323.00 $6,348.17 $8,015.11
General Manager Standard $0.00 $401.32 - $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Project Development Manager $300.54 $349.20 - $0.00 $0.00 1.00 $300.54 $349.20 -$300.54 -$349.20 10.00 $3,005.40 $3,305.94 $3,492.01 $3,841.21 Potential Over Budget
BD Manager Senior $0.00 $0.00 - $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
BD Manager Standard $0.00 $0.00 - $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Group Manager Standard $292.00 $317.93 40.00 $11,680.00 $12,717.18 - $0.00 $0.00 $11,680.00 $12,717.18 28.00 $8,176.00 $8,176.00 $8,902.03 $8,902.03
Study Manager Senior $229.00 $271.02 300.00 $68,700.00 $81,306.59 - $0.00 $0.00 $68,700.00 $81,306.59 - $0.00 $0.00 $0.00 $0.00
Study Manager Standard $0.00 $208.48 - $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Design Manager Senior $210.00 $234.54 634.00 $133,140.00 $148,697.24 363.95 $76,429.50 $85,360.19 $56,710.50 $63,337.05 400.00 $84,000.00 $160,429.50 $93,815.29 $179,175.48 Potential Over Budget
Design Manager Standard $179.98 $218.90 - $0.00 $0.00 47.50 $8,549.05 $10,397.86 -$8,549.05 -$10,397.86 67.00 $12,058.66 $20,607.71 $14,666.46 $25,064.32 Potential Over Budget
Discipline Manager $235.64 $281.45 96.00 $22,621.00 $27,018.80 7.00 $1,649.45 $1,970.12 $20,971.55 $25,048.68 20.00 $4,712.71 $6,362.16 $5,628.92 $7,599.04
Engineer Consultant $315.88 $375.26 - $0.00 $0.00 1.00 $315.88 $375.26 -$315.88 -$375.26 - $0.00 $315.88 $0.00 $375.26 Potential Over Budget
Engineer Principal $231.33 $265.81 369.00 $85,360.00 $98,083.89 314.00 $72,636.96 $83,464.34 $12,723.04 $14,619.55 280.00 $64,771.82 $137,408.78 $74,426.80 $157,891.14 Potential Over Budget
Engineer Senior $172.93 $208.48 1,927.00 $333,243.00 $401,737.93 800.90 $138,502.50 $166,970.37 $194,740.50 $234,767.55 1,116.00 $192,993.87 $331,496.37 $232,661.92 $399,632.29
Engineer Intermediate $0.00 $0.00 - $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Engineer Standard $127.24 $145.93 1,030.00 $131,057.00 $150,312.94 182.20 $23,183.09 $26,589.34 $107,873.91 $123,723.61 261.00 $33,209.59 $56,392.68 $38,089.01 $64,678.35
Engineer Graduate $82.00 $104.24 115.00 $9,430.00 $11,987.51 105.00 $8,610.00 $10,945.12 $820.00 $1,042.39 102.00 $8,364.00 $16,974.00 $10,632.40 $21,577.52 Potential Over Budget
Engineer Undergraduate $51.96 $83.39 - $0.00 $0.00 71.60 $3,720.34 $5,970.82 -$3,720.34 -$5,970.82 - $0.00 $3,720.34 $0.00 $5,970.82 Potential Over Budget
Draftsperson Principal $179.00 $224.11 61.00 $10,919.00 $13,670.97 - $0.00 $0.00 $10,919.00 $13,670.97 - $0.00 $0.00 $0.00 $0.00
Draftsperson Lead $0.00 $0.00 - $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Draftsperson Senior $137.78 $171.99 756.00 $104,162.00 $130,027.99 506.05 $69,723.78 $87,037.92 $34,438.22 $42,990.08 800.00 $110,224.34 $179,948.12 $137,595.76 $224,633.68 Potential Over Budget
Draftsperson Standard $109.53 $145.93 610.00 $66,815.00 $89,020.29 220.70 $24,173.89 $32,207.83 $42,641.11 $56,812.46 400.00 $43,813.11 $67,987.00 $58,373.96 $90,581.79 Potential Over Budget
Draftsperson Cadet $0.00 $78.18 - $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Eng Support Standard $128.01 $145.93 - $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Procurement Senior $181.00 $198.05 246.00 $44,526.00 $48,721.41 $47,136.97 415.00 $75,115.00 $82,192.62 -$30,589.00 -$33,471.21 277.00 $50,137.00 $125,252.00 $54,861.10 $137,053.72 Potential Over Budget
Procurement Standard $0.00 $140.72 - $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Project Director $0.00 $349.20 - $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Project Manager Senior $307.00 $333.57 120.00 $36,840.00 $40,027.86 $6,671.31 - $0.00 $0.00 $36,840.00 $40,027.86 - $0.00 $0.00 $0.00 $0.00
Project Manager Standard $0.00 $260.60 - $0.00 $0.00 36.40 $0.00 $9,485.77 $0.00 -$9,485.77 190.00 $0.00 $0.00 $49,513.63 $58,999.39 Potential Over Budget
Senior Project Engineer $206.00 $208.48 180.00 $37,080.00 $37,526.12 $12,508.71 93.20 $19,199.20 $19,430.19 $17,880.80 $18,095.93 218.00 $44,908.00 $64,107.20 $45,448.30 $64,878.49 Potential Over Budget
Project Engineer $134.00 $145.93 140.00 $18,760.00 $20,430.89 $8,756.09 7.00 $938.00 $1,021.54 $17,822.00 $19,409.34 10.00 $1,340.00 $2,278.00 $1,459.35 $2,480.89
Commissioning Manager Standard $0.00 $0.00 - $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Construction Manager Standard $289.00 $333.57 20.00 $5,780.00 $6,671.31 7.60 $2,196.40 $2,535.10 $3,583.60 $4,136.21 19.00 $5,491.00 $7,687.40 $6,337.74 $8,872.84 Potential Over Budget
HSE Manager $0.00 $0.00 - $0.00 $0.00 $141.05 - $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
HSE Senior $177.00 $213.69 20.00 $3,540.00 $4,273.81 76.00 $13,452.00 $16,240.47 -$9,912.00 -$11,966.66 95.00 $16,815.00 $30,267.00 $20,300.59 $36,541.06 Potential Over Budget
HSE Standard $0.00 $182.42 - $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Supervisor $0.00 $265.81 - $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Cost Controller Manager $0.00 $265.81 - $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Project Controls Senior $0.00 $187.63 - $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Project Controls Standard $0.00 $156.36 - $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Planner Principal $0.00 $229.33 - $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Planner Senior $193.00 $224.11 180.00 $34,740.00 $40,340.58 144.40 $27,869.20 $32,362.11 $6,870.80 $7,978.47 49.40 $9,534.20 $37,403.40 $11,071.25 $43,433.35 Potential Over Budget
Planner Standard $0.00 $0.00 - $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Estimator Senior $211.00 $234.54 80.00 $16,880.00 $18,763.06 5.25 $1,107.75 $1,231.33 $15,772.25 $17,531.73 209.00 $44,099.00 $45,206.75 $49,018.49 $50,249.82 Potential Over Budget
Estimator Standard $0.00 $213.69 - $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Innovation Manager $0.00 $0.00 - $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Innovation Senior $0.00 $0.00 - $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Innovation Standard $0.00 $0.00 - $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Innovation Graduate $0.00 $0.00 - $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Contracts Admin Senior $0.00 $0.00 - $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Contracts Admin Standard $0.00 $0.00 - $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Environmental Manager $0.00 $0.00 - $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Environmental Principal Consultant $0.00 $0.00 - $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Environmental Senior Consultant $0.00 $0.00 - $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Environmental Consultant $0.00 $0.00 - $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Spare Category 13 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Spare Category 14 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Spare Category 10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Spare Category 11 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Spare Category 12 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Spare Category 13 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Spare Category 14 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Spare Category 10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Spare Category 11 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Spare Category 12 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Spare Category 13 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Spare Category 14 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0.00
Subtotal manhours 7,238.00 $1,204,691.00 $1,418,257.88 3,435.14 $570,096.65 $679,110.34 $739,147.54 4,706.40 $751,212.70 $1,321,309.35 $933,494.46 $1,612,604.80
Gross Margin based on Cost 17.73% SDM Method Gross Margin based on Cost 19.12% SDM Method Gross Margin based on Cost 22.05% SDM Method
Gross Margin based on Revenue 15.06%
Expenses/Disbursements Allowance Rate Qty Approved Charge (A$)
Mark Up TOTAL Hours (Forecast + To Date) 8,141.54
Return Airfares 1,300.00 15.00 10.0% $21,450.00
Vehicle Hire 300.00 6.00 10.0% $1,980.00 Remaining - 903.54
Vehicle Fuel Allowance 100.00 6.00 10.0% $660.00
Meals Allowance 50.00 15.00 10.0% $825.00 $194,346.92
Transfers per site visit 100.00 15.00 10.0% $1,650.00 717.0892307692
Accommodation 150.00 15.00 10.0% $2,475.00
10.0% $0.00
Subtotal manhours $29,040.00
Contingency $0.00
Revision: 0 - 08/12/2025
924553805.xlsx/Pricing Schedule Submitted Page 14 of 59
JDE EOM 1 2 3 4 5 6 7 8 9 10 11 12
Payment Days 30
Purchase Order LEG_010101-CO-0079_0005_1 PO Reconciliation Sedgman Cumulative Charge per period
Item QTY Unit Description Unit Price (AUD) Total Price (AUD) Total Hours to Date Total Charge to Date PO Item Check Dec-24 Jan-25 Feb-25 Mar-25 Apr-25 May-25 Jun-25 Jul-25 Aug-25 Sep-25 Oct-25 Nov-25 Remaining Charge
10.01 1 ea Subtotal Engineering $1,418,257.88 $1,418,257.88 3,435.14 679,105.46 Ok $ 23,656.50 $ 82,952.99 $ 172,835.17 $ 210,512.22 $ 189,148.57 $ - $ - $ - $ - $ - $ - $ - $739,152.42
10.02 1 ea Disbursements Allowance $29,040.00 $29,040.00 0 $2,989.88 Ok $ - $ - $ 2,319.35 $ 280.55 $ - $ - $ - $ - $ - $ - $ - $ - $26,440.10
10.03 1 ea Vendor Data $110,000.00 $110,000.00 Ok $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $110,000.00
$0.00 Ok $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $0.00
$0.00 Ok $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $0.00
$0.00 Ok $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $0.00
$0.00 Ok $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $0.00
$0.00 Ok $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $0.00
$0.00 Ok $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $0.00
PO TOTAL $1,557,297.88 $682,095.34 Ok Per Period $23,656.50 $82,952.99 $175,154.52 $210,792.77 $189,148.57 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $875,592.52
Cumulative $23,656.50 $106,609.50 $281,764.02 $492,556.79 $681,705.36 $681,705.36 $681,705.36 $681,705.36 $681,705.36 $681,705.36 $681,705.36 $681,705.36
Revision: 0 - 08/12/2025
924553805.xlsx/PO Reconciliation Page 15 of 59
Resource Title Charge Rate Budget Hours Budget Charge Cumulative Cumulative Forecast hours Forecast Charge Forecast Charge
($) Hours to Date Charge to Date To Complete To Complete @ Completion
Subtotal Labour Hours 7,238.00 $1,418,258 3,435 $679,105.46 4,706 $933,489 $1,612,595 903.54
Disbursements $29,040.00 $2,989.88 $26,050.12
Vendor Data $110,000.00 $0.00 $110,000.00
Total Project $1,557,297.88 $682,095.34 $1,751,634.68
Revision: 0 - 08/12/2025
924553805.xlsx/Fortnightly Report Page 16 of 59
Resource Title Budget Hours Budget Charge Hours Previous Actual Hours Charge last Cumulative Cumulative Filter
($) Week last week week ($) Hours to Date Charge to Date
Revision: 0 - 08/12/2025
924553805.xlsx/Weekly minutes Page 17 of 59
3,435.14 Subtotal Hours 16
$ 580,619.71 Subtotal Amount - TE Status Error
Role Allocation JDE WBS Role Employee Name Work Date WBS Hours Leave Hours Hrly Rate Job Typ Amount Explanation -Remark- Charge to BU Description WBS Description Position Title GL Process Status Date Updated HCM Location Description
Administration Standard XU97P01A XU97P01A.01.D.DMDM.PART1 ADMAD 3.1 51.00 Cassandra McCoy 1180062 12/9/2024 XU97P01A 01.D.DMDM.PART1 3.00 0 51 AUD ADMAD 3.1 153.00 Approved Tfr from A009D10A Australia East Red Mountain Tails Pump ECI Prelim Design - Mgmt & Admin Business Unit Administr1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Administration Standard XU97P01A XU97P01A.01.D.DMDM.PART1 ADMAD 3.1 51.00 Cassandra McCoy 1180062 12/10/2024 XU97P01A 01.D.DMDM.PART1 2.00 0 51 AUD ADMAD 3.1 102.00 Approved Tfr from A009D10A Australia East Red Mountain Tails Pump ECI Prelim Design - Mgmt & Admin Business Unit Administr1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Administration Standard XU97P01A XU97P01A.01.D.DMDM.PART1 ADMAD 3.1 51.00 Cassandra McCoy 1180062 12/11/2024 XU97P01A 01.D.DMDM.PART1 1.08 0 51 AUD ADMAD 3.1 55.08 Approved Tfr from A009D10A Australia East Red Mountain Tails Pump ECI Prelim Design - Mgmt & Admin Business Unit Administr1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Administration Standard XU97P01A XU97P01A.01.D.DMDM.PART1 ADMAD 3.1 51.00 Cassandra McCoy 1180062 12/16/2024 XU97P01A 01.D.DMDM.PART1 3.00 0 51 AUD ADMAD 3.1 153.00 Approved Tfr from A009D10A Australia East Red Mountain Tails Pump ECI Prelim Design - Mgmt & Admin Business Unit Administr1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Administration Standard XU97P01A XU97P01A.01.D.DMDM.PART1 ADMAD 3.1 51.00 Cassandra McCoy 1180062 12/17/2024 XU97P01A 01.D.DMDM.PART1 2.00 0 51 AUD ADMAD 3.1 102.00 Approved Tfr from A009D10A Australia East Red Mountain Tails Pump ECI Prelim Design - Mgmt & Admin Business Unit Administr1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Administration Standard XU97P01A XU97P01A.01.D.DMDM.PART1 ADMAD 3.1 51.00 Cassandra McCoy 1180062 12/18/2024 XU97P01A 01.D.DMDM.PART1 1.08 0 51 AUD ADMAD 3.1 55.08 Approved Tfr from A009D10A Australia East Red Mountain Tails Pump ECI Prelim Design - Mgmt & Admin Business Unit Administr1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Project Development Manager XU97P01A XU97P01A.01.D.DMDM.PART1 BIDZZ 6 300.54 Jared Armstead 1147747 12/10/2024 XU97P01A 01.D.DMDM.PART1 1.00 0 300.54 AUD BIDZZ 6 300.54 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Mgmt & Admin Manager Business & Pro 1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Estimator Senior XU97P01A XU97P01A.03.P.PMES.PART3 BIDES 4 207.30 Roy Kneale 1147770 4/2/2025 XU97P01A 03.P.PMES.PART3 0.50 0 207.3 AUD BIDES 4 103.65 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI ECI - Estimating Senior Estimator 1_Processed to GL 4/4/2025 210019 RKNEALE1 SAU01 SDM AU Brisbane Head Office
Estimator Senior XU97P01A XU97P01A.03.P.PMES.PART3 BIDES 4 207.30 Roy Kneale 1147770 4/11/2025 XU97P01A 03.P.PMES.PART3 1.25 0 207.3 AUD BIDES 4 259.13 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI ECI - Estimating Senior Estimator 1_Processed to GL 4/11/2025 210018 RKNEALE1 SAU01 SDM AU Brisbane Head Office
Estimator Senior XU97P01A XU97P01A.03.P.PMES.PART3 BIDES 4 207.30 Karyn Morgan 1147771 2/21/2025 XU97P01A 03.P.PMES.PART3 1.00 0 207.3 AUD BIDES 4 207.30 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI ECI - Estimating Senior Estimator 1_Processed to GL 2/21/2025 210008 KMORGAN1SAU01 SDM AU Brisbane Head Office
Estimator Senior XU97P01A XU97P01A.03.P.PMES.PART3 BIDES 4 207.30 Karyn Morgan 1147771 4/2/2025 XU97P01A 03.P.PMES.PART3 0.50 0 207.3 AUD BIDES 4 103.65 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI ECI - Estimating Senior Estimator 1_Processed to GL 4/4/2025 210019 KMORGAN1SAU01 SDM AU Brisbane Head Office
Estimator Senior XU97P01A XU97P01A.03.P.PMES.PART3 BIDES 4 207.30 Karyn Morgan 1147771 4/4/2025 XU97P01A 03.P.PMES.PART3 0.50 0 207.3 AUD BIDES 4 103.65 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI ECI - Estimating Senior Estimator 1_Processed to GL 4/4/2025 210019 KMORGAN1SAU01 SDM AU Brisbane Head Office
Estimator Senior XU97P01A XU97P01A.03.P.PMES.PART3 BIDES 4 207.30 Karyn Morgan 1147771 4/9/2025 XU97P01A 03.P.PMES.PART3 1.00 0 207.3 AUD BIDES 4 207.30 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI ECI - Estimating Senior Estimator 1_Processed to GL 4/11/2025 210018 KMORGAN1SAU01 SDM AU Brisbane Head Office
Estimator Senior XU97P01A XU97P01A.03.P.PMES.PART3 BIDES 4 207.30 Karyn Morgan 1147771 4/10/2025 XU97P01A 03.P.PMES.PART3 0.50 0 207.3 AUD BIDES 4 103.65 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI ECI - Estimating Senior Estimator 1_Processed to GL 4/11/2025 210018 KMORGAN1SAU01 SDM AU Brisbane Head Office
Engineer Consultant XU97P01A XU97P01A.01.D.PRPR.PART1 ENGPS 6 315.88 Dale Hoffmann 1147789 1/10/2025 XU97P01A 01.D.PRPR.PART1 1.00 0 315.88 AUD ENGPS 6 315.88 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Process Principal Consultant 1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 5 246.31 Sean Stringer 1147541 12/3/2024 XU97P01A 01.D.CVCV.PART1 1.00 0 246.31 AUD ENGCV 5 246.31 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Principal Civil Engineer 1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 5 246.31 Sean Stringer 1147541 12/4/2024 XU97P01A 01.D.CVCV.PART1 1.00 0 246.31 AUD ENGCV 5 246.31 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Principal Civil Engineer 1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 5 246.31 Sean Stringer 1147541 12/5/2024 XU97P01A 01.D.CVCV.PART1 3.00 0 246.31 AUD ENGCV 5 738.93 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Principal Civil Engineer 1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 5 246.31 Sean Stringer 1147541 12/6/2024 XU97P01A 01.D.CVCV.PART1 1.00 0 246.31 AUD ENGCV 5 246.31 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Principal Civil Engineer 1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 5 246.31 Sean Stringer 1147541 12/10/2024 XU97P01A 01.D.CVCV.PART1 2.00 0 246.31 AUD ENGCV 5 492.62 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Principal Civil Engineer 1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 5 246.31 Sean Stringer 1147541 12/11/2024 XU97P01A 01.D.CVCV.PART1 2.00 0 246.31 AUD ENGCV 5 492.62 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Principal Civil Engineer 1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 5 246.31 Sean Stringer 1147541 12/12/2024 XU97P01A 01.D.CVCV.PART1 1.00 0 246.31 AUD ENGCV 5 246.31 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Principal Civil Engineer 1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 5 246.31 Sean Stringer 1147541 12/16/2024 XU97P01A 01.D.CVCV.PART1 2.00 0 246.31 AUD ENGCV 5 492.62 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Principal Civil Engineer 1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 5 246.31 Sean Stringer 1147541 12/17/2024 XU97P01A 01.D.CVCV.PART1 2.00 0 246.31 AUD ENGCV 5 492.62 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Principal Civil Engineer 1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 5 246.31 Sean Stringer 1147541 12/18/2024 XU97P01A 01.D.CVCV.PART1 2.00 0 246.31 AUD ENGCV 5 492.62 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Principal Civil Engineer 1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 5 246.31 Sean Stringer 1147541 12/19/2024 XU97P01A 01.D.CVCV.PART1 1.00 0 246.31 AUD ENGCV 5 246.31 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Principal Civil Engineer 1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 5 246.31 Sean Stringer 1147541 1/9/2025 XU97P01A 01.D.CVCV.PART1 3.60 0 246.31 AUD ENGCV 5 886.72 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Principal Civil Engineer 1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 5 246.31 Sean Stringer 1147541 1/10/2025 XU97P01A 01.D.CVCV.PART1 2.60 0 246.31 AUD ENGCV 5 640.41 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Principal Civil Engineer 1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 5 246.31 Sean Stringer 1147541 1/13/2025 XU97P01A 01.D.CVCV.PART1 3.60 0 246.31 AUD ENGCV 5 886.72 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Principal Civil Engineer 1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 5 246.31 Sean Stringer 1147541 1/16/2025 XU97P01A 01.D.CVCV.PART1 3.60 0 246.31 AUD ENGCV 5 886.72 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Principal Civil Engineer 1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 5 246.31 Sean Stringer 1147541 1/17/2025 XU97P01A 01.D.CVCV.PART1 2.00 0 246.31 AUD ENGCV 5 492.62 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Principal Civil Engineer 1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 5 246.31 Sean Stringer 1147541 1/20/2025 XU97P01A 01.D.CVCV.PART1 2.50 0 246.31 AUD ENGCV 5 615.78 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Principal Civil Engineer 1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 5 246.31 Sean Stringer 1147541 1/21/2025 XU97P01A 01.D.CVCV.PART1 3.00 0 246.31 AUD ENGCV 5 738.93 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Principal Civil Engineer 1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 5 246.31 Sean Stringer 1147541 1/24/2025 XU97P01A 01.D.CVCV.PART1 2.00 0 246.31 AUD ENGCV 5 492.62 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Principal Civil Engineer 1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 5 246.31 Sean Stringer 1147541 1/28/2025 XU97P01A 01.D.CVCV.PART1 4.50 0 246.31 AUD ENGCV 5 1,108.40 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Principal Civil Engineer 1_Processed to GL 2/4/2025 210016 SSTRINGERSAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 5 246.31 Sean Stringer 1147541 1/31/2025 XU97P01A 01.D.CVCV.PART1 3.60 0 246.31 AUD ENGCV 5 886.72 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Principal Civil Engineer 1_Processed to GL 2/4/2025 210016 SSTRINGERSAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 5 222.44 Sean Stringer 1147541 2/4/2025 XU97P01A 01.D.CVCV.PART1 3.00 0 222.44 AUD ENGCV 5 667.32 Approved Design of pipeline vertical Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Principal Civil Engineer 1_Processed to GL 2/7/2025 210009 SSTRINGERSAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 5 222.44 Sean Stringer 1147541 2/5/2025 XU97P01A 01.D.CVCV.PART1 3.00 0 222.44 AUD ENGCV 5 667.32 Approved Design of pipeline vertical Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Principal Civil Engineer 1_Processed to GL 2/7/2025 210009 SSTRINGERSAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 5 222.44 Sean Stringer 1147541 2/6/2025 XU97P01A 01.D.CVCV.PART1 3.00 0 222.44 AUD ENGCV 5 667.32 Approved Design of pipeline vertical Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Principal Civil Engineer 1_Processed to GL 2/7/2025 210009 SSTRINGERSAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 5 222.44 Sean Stringer 1147541 2/11/2025 XU97P01A 01.D.CVCV.PART1 3.50 0 222.44 AUD ENGCV 5 778.54 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Principal Civil Engineer 1_Processed to GL 2/16/2025 210009 SSTRINGERSAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 5 222.44 Sean Stringer 1147541 2/13/2025 XU97P01A 01.D.CVCV.PART1 4.60 0 222.44 AUD ENGCV 5 1,023.22 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Principal Civil Engineer 1_Processed to GL 2/16/2025 210009 SSTRINGERSAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 5 222.44 Sean Stringer 1147541 2/14/2025 XU97P01A 01.D.CVCV.PART1 3.60 0 222.44 AUD ENGCV 5 800.78 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Principal Civil Engineer 1_Processed to GL 2/16/2025 210009 SSTRINGERSAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 5 222.44 Sean Stringer 1147541 3/4/2025 XU97P01A 02.D.CVCV.PART2 3.00 0 222.44 AUD ENGCV 5 667.32 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Detail Design - Civil Principal Civil Engineer 1_Processed to GL 3/7/2025 210014 SSTRINGERSAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 5 222.44 Sean Stringer 1147541 3/5/2025 XU97P01A 02.D.CVCV.PART2 4.00 0 222.44 AUD ENGCV 5 889.76 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Detail Design - Civil Principal Civil Engineer 1_Processed to GL 3/7/2025 210014 SSTRINGERSAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 5 222.44 Sean Stringer 1147541 3/6/2025 XU97P01A 02.D.CVCV.PART2 2.00 0 222.44 AUD ENGCV 5 444.88 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Detail Design - Civil Principal Civil Engineer 1_Processed to GL 3/7/2025 210014 SSTRINGERSAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 5 222.44 Sean Stringer 1147541 3/7/2025 XU97P01A 02.D.CVCV.PART2 3.00 0 222.44 AUD ENGCV 5 667.32 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Detail Design - Civil Principal Civil Engineer 1_Processed to GL 3/7/2025 210014 SSTRINGERSAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 5 222.44 Sean Stringer 1147541 3/10/2025 XU97P01A 02.D.CVCV.PART2 3.00 0 222.44 AUD ENGCV 5 667.32 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Detail Design - Civil Principal Civil Engineer 1_Processed to GL 3/14/2025 210009 SSTRINGERSAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 5 222.44 Sean Stringer 1147541 3/11/2025 XU97P01A 02.D.CVCV.PART2 4.00 0 222.44 AUD ENGCV 5 889.76 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Detail Design - Civil Principal Civil Engineer 1_Processed to GL 3/14/2025 210009 SSTRINGERSAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 5 222.44 Sean Stringer 1147541 3/14/2025 XU97P01A 02.D.CVCV.PART2 3.00 0 222.44 AUD ENGCV 5 667.32 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Detail Design - Civil Principal Civil Engineer 1_Processed to GL 3/14/2025 210009 SSTRINGERSAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 5 222.44 Sean Stringer 1147541 3/17/2025 XU97P01A 02.D.CVCV.PART2 3.00 0 222.44 AUD ENGCV 5 667.32 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Detail Design - Civil Principal Civil Engineer 1_Processed to GL 3/21/2025 210019 SSTRINGERSAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 5 222.44 Sean Stringer 1147541 3/18/2025 XU97P01A 02.D.CVCV.PART2 3.00 0 222.44 AUD ENGCV 5 667.32 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Detail Design - Civil Principal Civil Engineer 1_Processed to GL 3/21/2025 210019 SSTRINGERSAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 5 222.44 Sean Stringer 1147541 3/19/2025 XU97P01A 02.D.CVCV.PART2 3.00 0 222.44 AUD ENGCV 5 667.32 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Detail Design - Civil Principal Civil Engineer 1_Processed to GL 3/21/2025 210019 SSTRINGERSAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 5 222.44 Sean Stringer 1147541 3/20/2025 XU97P01A 02.D.CVCV.PART2 3.00 0 222.44 AUD ENGCV 5 667.32 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Detail Design - Civil Principal Civil Engineer 1_Processed to GL 3/21/2025 210019 SSTRINGERSAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 5 222.44 Sean Stringer 1147541 3/21/2025 XU97P01A 02.D.CVCV.PART2 3.00 0 222.44 AUD ENGCV 5 667.32 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Detail Design - Civil Principal Civil Engineer 1_Processed to GL 3/21/2025 210019 SSTRINGERSAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 5 222.44 Sean Stringer 1147541 3/24/2025 XU97P01A 02.D.CVCV.PART2 3.00 0 222.44 AUD ENGCV 5 667.32 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Detail Design - Civil Principal Civil Engineer 1_Processed to GL 3/28/2025 210022 SSTRINGERSAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 5 222.44 Sean Stringer 1147541 3/25/2025 XU97P01A 02.D.CVCV.PART2 2.00 0 222.44 AUD ENGCV 5 444.88 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Detail Design - Civil Principal Civil Engineer 1_Processed to GL 3/28/2025 210022 SSTRINGERSAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 5 222.44 Sean Stringer 1147541 3/26/2025 XU97P01A 02.D.CVCV.PART2 2.00 0 222.44 AUD ENGCV 5 444.88 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Detail Design - Civil Principal Civil Engineer 1_Processed to GL 3/28/2025 210022 SSTRINGERSAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 5 222.44 Sean Stringer 1147541 3/27/2025 XU97P01A 02.D.CVCV.PART2 3.00 0 222.44 AUD ENGCV 5 667.32 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Detail Design - Civil Principal Civil Engineer 1_Processed to GL 3/28/2025 210022 SSTRINGERSAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 5 222.44 Sean Stringer 1147541 3/28/2025 XU97P01A 02.D.CVCV.PART2 3.00 0 222.44 AUD ENGCV 5 667.32 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Detail Design - Civil Principal Civil Engineer 1_Processed to GL 3/28/2025 210022 SSTRINGERSAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 5 222.44 Sean Stringer 1147541 4/7/2025 XU97P01A 02.D.CVCV.PART2 1.00 0 222.44 AUD ENGCV 5 222.44 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Detail Design - Civil Principal Civil Engineer 1_Processed to GL 4/7/2025 210020 SSTRINGERSAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 5 222.44 Sean Stringer 1147541 4/9/2025 XU97P01A 02.D.CVCV.PART2 2.00 0 222.44 AUD ENGCV 5 444.88 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Detail Design - Civil Principal Civil Engineer 1_Processed to GL 4/9/2025 210022 SSTRINGERSAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 5 222.44 Sean Stringer 1147541 4/11/2025 XU97P01A 02.D.CVCV.PART2 1.00 0 222.44 AUD ENGCV 5 222.44 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Detail Design - Civil Principal Civil Engineer 1_Processed to GL 4/11/2025 210018 SSTRINGERSAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.STST.PART1 ENGST 5 223.73 Leslie Westray 1147545 12/2/2024 XU97P01A 01.D.STST.PART1 1.00 0 223.73 AUD ENGST 5 223.73 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Structural Principal Structural Engi1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.STST.PART1 ENGST 5 223.73 Leslie Westray 1147545 12/3/2024 XU97P01A 01.D.STST.PART1 1.00 0 223.73 AUD ENGST 5 223.73 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Structural Principal Structural Engi1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.STST.PART1 ENGST 5 223.73 Leslie Westray 1147545 12/4/2024 XU97P01A 01.D.STST.PART1 2.00 0 223.73 AUD ENGST 5 447.46 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Structural Principal Structural Engi1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.STST.PART1 ENGST 5 223.73 Leslie Westray 1147545 12/9/2024 XU97P01A 01.D.STST.PART1 1.00 0 223.73 AUD ENGST 5 223.73 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Structural Principal Structural Engi1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.STST.PART1 ENGST 5 223.73 Leslie Westray 1147545 12/12/2024 XU97P01A 01.D.STST.PART1 1.00 0 223.73 AUD ENGST 5 223.73 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Structural Principal Structural Engi1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.STST.PART1 ENGST 5 223.73 Leslie Westray 1147545 12/17/2024 XU97P01A 01.D.STST.PART1 2.00 0 223.73 AUD ENGST 5 447.46 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Structural Principal Structural Engi1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.STST.PART1 ENGST 5 223.73 Leslie Westray 1147545 12/18/2024 XU97P01A 01.D.STST.PART1 2.00 0 223.73 AUD ENGST 5 447.46 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Structural Principal Structural Engi1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.STST.PART1 ENGST 5 223.73 Leslie Westray 1147545 12/19/2024 XU97P01A 01.D.STST.PART1 2.00 0 223.73 AUD ENGST 5 447.46 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Structural Principal Structural Engi1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.STST.PART1 ENGST 5 223.73 Leslie Westray 1147545 12/20/2024 XU97P01A 01.D.STST.PART1 2.00 0 223.73 AUD ENGST 5 447.46 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Structural Principal Structural Engi1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.STST.PART1 ENGST 5 223.73 Leslie Westray 1147545 1/17/2025 XU97P01A 01.D.STST.PART1 2.00 0 223.73 AUD ENGST 5 447.46 Approved Scope Review Australia East Red Mountain Tails Pump ECI Prelim Design - Structural Principal Structural Engi1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.STST.PART1 ENGST 5 223.73 Leslie Westray 1147545 1/21/2025 XU97P01A 01.D.STST.PART1 2.00 0 223.73 AUD ENGST 5 447.46 Approved Scope Review Australia East Red Mountain Tails Pump ECI Prelim Design - Structural Principal Structural Engi1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.STST.PART1 ENGST 5 223.73 Leslie Westray 1147545 1/24/2025 XU97P01A 01.D.STST.PART1 2.00 0 223.73 AUD ENGST 5 447.46 Approved Scope Review Australia East Red Mountain Tails Pump ECI Prelim Design - Structural Principal Structural Engi1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.STST.PART1 ENGST 5 223.73 Leslie Westray 1147545 1/29/2025 XU97P01A 01.D.STST.PART1 1.00 0 223.73 AUD ENGST 5 223.73 Approved Meetings Australia East Red Mountain Tails Pump ECI Prelim Design - Structural Principal Structural Engi1_Processed to GL 1/31/2025 210011 LWESTRAY SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.STST.PART1 ENGST 5 223.73 Leslie Westray 1147545 1/30/2025 XU97P01A 01.D.STST.PART1 2.00 0 223.73 AUD ENGST 5 447.46 Approved Meetings Australia East Red Mountain Tails Pump ECI Prelim Design - Structural Principal Structural Engi1_Processed to GL 1/31/2025 210011 LWESTRAY SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.STST.PART1 ENGST 5 223.73 Leslie Westray 1147545 1/31/2025 XU97P01A 01.D.STST.PART1 4.00 0 223.73 AUD ENGST 5 894.92 Approved Specs and Standards Australia East Red Mountain Tails Pump ECI Prelim Design - Structural Principal Structural Engi1_Processed to GL 1/31/2025 210011 LWESTRAY SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.STST.PART1 ENGST 5 220.91 Leslie Westray 1147545 2/3/2025 XU97P01A 01.D.STST.PART1 2.00 0 220.91 AUD ENGST 5 441.82 Approved Design Criteria, F001 & E Australia East Red Mountain Tails Pump ECI Prelim Design - Structural Principal Structural Engi1_Processed to GL 2/7/2025 210009 LWESTRAY SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.STST.PART1 ENGST 5 220.91 Leslie Westray 1147545 2/7/2025 XU97P01A 01.D.STST.PART1 4.00 0 220.91 AUD ENGST 5 883.64 Approved Design Criteria, F001 & E Australia East Red Mountain Tails Pump ECI Prelim Design - Structural Principal Structural Engi1_Processed to GL 2/7/2025 210009 LWESTRAY SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.STST.PART1 ENGST 5 220.91 Leslie Westray 1147545 2/10/2025 XU97P01A 01.D.STST.PART1 2.00 0 220.91 AUD ENGST 5 441.82 Approved Pipe Bridge Design Australia East Red Mountain Tails Pump ECI Prelim Design - Structural Principal Structural Engi1_Processed to GL 2/14/2025 210013 LWESTRAY SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.STST.PART1 ENGST 5 220.91 Leslie Westray 1147545 2/11/2025 XU97P01A 01.D.STST.PART1 2.00 0 220.91 AUD ENGST 5 441.82 Approved Pipe Bridge Design Australia East Red Mountain Tails Pump ECI Prelim Design - Structural Principal Structural Engi1_Processed to GL 2/14/2025 210013 LWESTRAY SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.STST.PART1 ENGST 5 220.91 Leslie Westray 1147545 2/14/2025 XU97P01A 01.D.STST.PART1 2.00 0 220.91 AUD ENGST 5 441.82 Approved Pipe Bridge Design Australia East Red Mountain Tails Pump ECI Prelim Design - Structural Principal Structural Engi1_Processed to GL 2/14/2025 210013 LWESTRAY SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.STST.PART1 ENGST 5 220.91 Leslie Westray 1147545 2/17/2025 XU97P01A 01.D.STST.PART1 2.00 0 220.91 AUD ENGST 5 441.82 Approved Pipe Bridge Design,MeetinAustralia East Red Mountain Tails Pump ECI Prelim Design - Structural Principal Structural Engi1_Processed to GL 2/21/2025 210008 LWESTRAY SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.STST.PART1 ENGST 5 220.91 Leslie Westray 1147545 2/18/2025 XU97P01A 01.D.STST.PART1 1.00 0 220.91 AUD ENGST 5 220.91 Approved Pipe Bridge Design,MeetinAustralia East Red Mountain Tails Pump ECI Prelim Design - Structural Principal Structural Engi1_Processed to GL 2/21/2025 210008 LWESTRAY SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.STST.PART1 ENGST 5 220.91 Leslie Westray 1147545 2/19/2025 XU97P01A 01.D.STST.PART1 1.00 0 220.91 AUD ENGST 5 220.91 Approved Pipe Bridge Design,MeetinAustralia East Red Mountain Tails Pump ECI Prelim Design - Structural Principal Structural Engi1_Processed to GL 2/21/2025 210008 LWESTRAY SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.STST.PART1 ENGST 5 220.91 Leslie Westray 1147545 2/20/2025 XU97P01A 01.D.STST.PART1 1.00 0 220.91 AUD ENGST 5 220.91 Approved Pipe Bridge Design,MeetinAustralia East Red Mountain Tails Pump ECI Prelim Design - Structural Principal Structural Engi1_Processed to GL 2/21/2025 210008 LWESTRAY SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.STST.PART1 ENGST 5 220.91 Leslie Westray 1147545 2/21/2025 XU97P01A 01.D.STST.PART1 1.00 0 220.91 AUD ENGST 5 220.91 Approved Pipe Bridge Design,MeetinAustralia East Red Mountain Tails Pump ECI Prelim Design - Structural Principal Structural Engi1_Processed to GL 2/21/2025 210008 LWESTRAY SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.STST.PART1 ENGST 5 220.91 Leslie Westray 1147545 2/24/2025 XU97P01A 01.D.STST.PART1 2.00 0 220.91 AUD ENGST 5 441.82 Approved Pipe Bridge Design,MeetinAustralia East Red Mountain Tails Pump ECI Prelim Design - Structural Principal Structural Engi1_Processed to GL 2/28/2025 210014 LWESTRAY SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.STST.PART1 ENGST 5 220.91 Leslie Westray 1147545 2/26/2025 XU97P01A 01.D.STST.PART1 2.00 0 220.91 AUD ENGST 5 441.82 Approved Pipe Bridge Design,MeetinAustralia East Red Mountain Tails Pump ECI Prelim Design - Structural Principal Structural Engi1_Processed to GL 2/28/2025 210014 LWESTRAY SAU01 SDM AU Brisbane Head Office
Draftsperson Standard XU97P01A XU97P01A.01.D.PRPR.PART1 TECPR 3 109.02 Ashley Rose 1147569 2/28/2025 XU97P01A 01.D.PRPR.PART1 3.00 0 109.02 AUD TECPR 3 327.06 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Process Senior Process Designe1_Processed to GL 2/28/2025 210014 ACATHCARTSAU01 SDM AU Brisbane Head Office
Draftsperson Standard XU97P01A XU97P01A.02.D.PRPR.PART2 TECPR 3 109.02 Ashley Rose 1147569 3/18/2025 XU97P01A 02.D.PRPR.PART2 7.60 0 109.02 AUD TECPR 3 828.55 Approved SPEC CREATION Australia East Red Mountain Tails Pump ECI Detail Design - Process Senior Process Designe1_Processed to GL 3/21/2025 210019 ACATHCARTSAU01 SDM AU Brisbane Head Office
Draftsperson Standard XU97P01A XU97P01A.02.D.PRPR.PART2 TECPR 3 109.02 Ashley Rose 1147569 3/19/2025 XU97P01A 02.D.PRPR.PART2 7.60 0 109.02 AUD TECPR 3 828.55 Approved SPEC CREATION Australia East Red Mountain Tails Pump ECI Detail Design - Process Senior Process Designe1_Processed to GL 3/21/2025 210019 ACATHCARTSAU01 SDM AU Brisbane Head Office
Draftsperson Senior XU97P01A XU97P01A.01.D.ELEL.PART1 TECEL 3.3 143.21 Elizabeth Blaszczyk 1147605 2/26/2025 XU97P01A 01.D.ELEL.PART1 4.00 0 143.21 AUD TECEL 3.3 572.84 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Electrical Senior Electrical & Cont1_Processed to GL 2/28/2025 210014 EBLASZCZYSAU01 SDM AU Brisbane Head Office
Draftsperson Senior XU97P01A XU97P01A.01.D.ELEL.PART1 TECEL 3.3 143.21 Elizabeth Blaszczyk 1147605 2/27/2025 XU97P01A 01.D.ELEL.PART1 4.00 0 143.21 AUD TECEL 3.3 572.84 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Electrical Senior Electrical & Cont1_Processed to GL 2/28/2025 210014 EBLASZCZYSAU01 SDM AU Brisbane Head Office
Draftsperson Senior XU97P01A XU97P01A.02.D.ELEL.PART2 TECEL 3.3 143.21 Elizabeth Blaszczyk 1147605 3/13/2025 XU97P01A 02.D.ELEL.PART2 7.60 0 143.21 AUD TECEL 3.3 1,088.40 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Detail Design - Electrical Senior Electrical & Cont1_Processed to GL 3/14/2025 210009 EBLASZCZYSAU01 SDM AU Brisbane Head Office
Draftsperson Senior XU97P01A XU97P01A.02.D.ELEL.PART2 TECEL 3.3 143.21 Elizabeth Blaszczyk 1147605 3/14/2025 XU97P01A 02.D.ELEL.PART2 4.00 0 143.21 AUD TECEL 3.3 572.84 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Detail Design - Electrical Senior Electrical & Cont1_Processed to GL 3/14/2025 210009 EBLASZCZYSAU01 SDM AU Brisbane Head Office
Draftsperson Senior XU97P01A XU97P01A.02.D.ELEL.PART2 TECEL 3.3 143.21 Elizabeth Blaszczyk 1147605 3/17/2025 XU97P01A 02.D.ELEL.PART2 0.60 0 143.21 AUD TECEL 3.3 85.93 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Detail Design - Electrical Senior Electrical & Cont1_Processed to GL 3/21/2025 210019 EBLASZCZYSAU01 SDM AU Brisbane Head Office
Project Engineer XU97P01A XU97P01A.01.D.DMDM.PART1 TECDI 3 128.01 Cynthia Wallace 1147618 2/24/2025 XU97P01A 01.D.DMDM.PART1 2.00 0 128.01 AUD TECDI 3 256.02 Approved S-Curve Setup Australia East Red Mountain Tails Pump ECI Prelim Design - Mgmt & Admin Digital Engineer 1_Processed to GL 3/2/2025 210009 CWALLACE1SAU01 SDM AU Brisbane Head Office
Project Engineer XU97P01A XU97P01A.01.D.DMDM.PART1 TECDI 3 128.01 Cynthia Wallace 1147618 2/25/2025 XU97P01A 01.D.DMDM.PART1 1.00 0 128.01 AUD TECDI 3 128.01 Approved S-Curve Setup Australia East Red Mountain Tails Pump ECI Prelim Design - Mgmt & Admin Digital Engineer 1_Processed to GL 3/2/2025 210009 CWALLACE1SAU01 SDM AU Brisbane Head Office
Draftsperson Senior XU97P01A XU97P01A.01.D.DMDM.PART1 TECST 99 148.20 Johann Grobler 1147628 2/19/2025 XU97P01A 01.D.DMDM.PART1 7.00 0 148.2 AUD TECST 99 1,037.40 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Mgmt & Admin Senior Structural Design1_Processed to GL 2/21/2025 210008 JGROBLER1SAU01 SDM AU Brisbane Head Office
Document Control Senior XU97P01A XU97P01A.02.D.DMDM.PART2 RCADC 3.2 113.04 Charis Simper 1147636 4/9/2025 XU97P01A 02.D.DMDM.PART2 1.00 0 113.04 AUD RCADC 3.2 113.04 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Detail Design - Mgmt & Admin Senior Document Control 1_Processed to GL 4/11/2025 210018 CSIMPER SAU01 SDM AU Brisbane Head Office
Document Control Senior XU97P01A XU97P01A.02.D.DMDM.PART2 RCADC 3.2 113.04 Charis Simper 1147636 4/10/2025 XU97P01A 02.D.DMDM.PART2 1.00 0 113.04 AUD RCADC 3.2 113.04 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Detail Design - Mgmt & Admin Senior Document Control 1_Processed to GL 4/11/2025 210018 CSIMPER SAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.01.D.PRPR.PART1 ENGPR 4 176.30 Craig Grimmond 1147638 12/3/2024 XU97P01A 01.D.PRPR.PART1 1.00 0 176.3 AUD ENGPR 4 176.30 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Process Senior Process Enginee1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.01.D.PRPR.PART1 ENGPR 4 176.30 Craig Grimmond 1147638 12/4/2024 XU97P01A 01.D.PRPR.PART1 5.60 0 176.3 AUD ENGPR 4 987.28 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Process Senior Process Enginee1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.01.D.PRPR.PART1 ENGPR 4 176.30 Craig Grimmond 1147638 12/5/2024 XU97P01A 01.D.PRPR.PART1 4.00 0 176.3 AUD ENGPR 4 705.20 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Process Senior Process Enginee1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.01.D.PRPR.PART1 ENGPR 4 176.30 Craig Grimmond 1147638 12/6/2024 XU97P01A 01.D.PRPR.PART1 2.60 0 176.3 AUD ENGPR 4 458.38 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Process Senior Process Enginee1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.01.D.PRPR.PART1 ENGPR 4 176.30 Craig Grimmond 1147638 12/9/2024 XU97P01A 01.D.PRPR.PART1 0.60 0 176.3 AUD ENGPR 4 105.78 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Process Senior Process Enginee1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.01.D.PRPR.PART1 ENGPR 4 176.30 Craig Grimmond 1147638 12/11/2024 XU97P01A 01.D.PRPR.PART1 7.60 0 176.3 AUD ENGPR 4 1,339.88 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Process Senior Process Enginee1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.01.D.PRPR.PART1 ENGPR 4 176.30 Craig Grimmond 1147638 12/12/2024 XU97P01A 01.D.PRPR.PART1 5.60 0 176.3 AUD ENGPR 4 987.28 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Process Senior Process Enginee1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.01.D.PRPR.PART1 ENGPR 4 176.30 Craig Grimmond 1147638 12/13/2024 XU97P01A 01.D.PRPR.PART1 5.60 0 176.3 AUD ENGPR 4 987.28 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Process Senior Process Enginee1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.01.D.PRPR.PART1 ENGPR 4 176.30 Craig Grimmond 1147638 12/20/2024 XU97P01A 01.D.PRPR.PART1 6.60 0 176.3 AUD ENGPR 4 1,163.58 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Process Senior Process Enginee1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.01.D.PRPR.PART1 ENGPR 4 176.30 Craig Grimmond 1147638 1/7/2025 XU97P01A 01.D.PRPR.PART1 1.00 0 176.3 AUD ENGPR 4 176.30 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Process Senior Process Enginee1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.01.D.PRPR.PART1 ENGPR 4 176.30 Craig Grimmond 1147638 1/14/2025 XU97P01A 01.D.PRPR.PART1 6.60 0 176.3 AUD ENGPR 4 1,163.58 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Process Senior Process Enginee1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.01.D.PRPR.PART1 ENGPR 4 176.30 Craig Grimmond 1147638 1/15/2025 XU97P01A 01.D.PRPR.PART1 7.60 0 176.3 AUD ENGPR 4 1,339.88 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Process Senior Process Enginee1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.01.D.PRPR.PART1 ENGPR 4 176.30 Craig Grimmond 1147638 1/16/2025 XU97P01A 01.D.PRPR.PART1 12.00 0 176.3 AUD ENGPR 4 2,115.60 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Process Senior Process Enginee1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.01.D.PRPR.PART1 ENGPR 4 176.30 Craig Grimmond 1147638 1/17/2025 XU97P01A 01.D.PRPR.PART1 12.00 0 176.3 AUD ENGPR 4 2,115.60 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Process Senior Process Enginee1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.01.D.PRPR.PART1 ENGPR 4 176.30 Craig Grimmond 1147638 1/20/2025 XU97P01A 01.D.PRPR.PART1 3.60 0 176.3 AUD ENGPR 4 634.68 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Process Senior Process Enginee1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.01.D.PRPR.PART1 ENGPR 4 176.30 Craig Grimmond 1147638 1/21/2025 XU97P01A 01.D.PRPR.PART1 3.60 0 176.3 AUD ENGPR 4 634.68 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Process Senior Process Enginee1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.01.D.PRPR.PART1 ENGPR 4 176.30 Craig Grimmond 1147638 1/22/2025 XU97P01A 01.D.PRPR.PART1 4.00 0 176.3 AUD ENGPR 4 705.20 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Process Senior Process Enginee1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.01.D.PRPR.PART1 ENGPR 4 176.30 Craig Grimmond 1147638 1/23/2025 XU97P01A 01.D.PRPR.PART1 4.00 0 176.3 AUD ENGPR 4 705.20 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Process Senior Process Enginee1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.01.D.PRPR.PART1 ENGPR 4 176.30 Craig Grimmond 1147638 1/24/2025 XU97P01A 01.D.PRPR.PART1 7.60 0 176.3 AUD ENGPR 4 1,339.88 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Process Senior Process Enginee1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.01.D.PRPR.PART1 ENGPR 4 176.30 Craig Grimmond 1147638 1/30/2025 XU97P01A 01.D.PRPR.PART1 7.60 0 176.3 AUD ENGPR 4 1,339.88 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Process Senior Process Enginee1_Processed to GL 1/31/2025 210011 CGRIMMONSAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.01.D.PRPR.PART1 ENGPR 4 176.30 Craig Grimmond 1147638 1/31/2025 XU97P01A 01.D.PRPR.PART1 4.00 0 176.3 AUD ENGPR 4 705.20 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Process Senior Process Enginee1_Processed to GL 1/31/2025 210011 CGRIMMONSAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.01.D.PRPR.PART1 ENGPR 4 174.64 Craig Grimmond 1147638 2/3/2025 XU97P01A 01.D.PRPR.PART1 3.60 0 174.64 AUD ENGPR 4 628.70 Approved Tech sheets/pump calcs, lAustralia East Red Mountain Tails Pump ECI Prelim Design - Process Senior Process Enginee1_Processed to GL 2/9/2025 210013 CGRIMMONSAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.01.D.PRPR.PART1 ENGPR 4 174.64 Craig Grimmond 1147638 2/4/2025 XU97P01A 01.D.PRPR.PART1 7.60 0 174.64 AUD ENGPR 4 1,327.26 Approved Tech sheets/pump calcs, lAustralia East Red Mountain Tails Pump ECI Prelim Design - Process Senior Process Enginee1_Processed to GL 2/9/2025 210013 CGRIMMONSAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.01.D.PRPR.PART1 ENGPR 4 174.64 Craig Grimmond 1147638 2/5/2025 XU97P01A 01.D.PRPR.PART1 7.60 0 174.64 AUD ENGPR 4 1,327.26 Approved Tech sheets/pump calcs, lAustralia East Red Mountain Tails Pump ECI Prelim Design - Process Senior Process Enginee1_Processed to GL 2/9/2025 210013 CGRIMMONSAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.01.D.PRPR.PART1 ENGPR 4 174.64 Craig Grimmond 1147638 2/6/2025 XU97P01A 01.D.PRPR.PART1 5.60 0 174.64 AUD ENGPR 4 977.98 Approved Tech sheets/pump calcs, lAustralia East Red Mountain Tails Pump ECI Prelim Design - Process Senior Process Enginee1_Processed to GL 2/9/2025 210013 CGRIMMONSAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.01.D.PRPR.PART1 ENGPR 4 174.64 Craig Grimmond 1147638 2/10/2025 XU97P01A 01.D.PRPR.PART1 5.60 0 174.64 AUD ENGPR 4 977.98 Approved Layouts, DC, P&ID revie Australia East Red Mountain Tails Pump ECI Prelim Design - Process Senior Process Enginee1_Processed to GL 2/17/2025 210012 CGRIMMONSAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.01.D.PRPR.PART1 ENGPR 4 174.64 Craig Grimmond 1147638 2/11/2025 XU97P01A 01.D.PRPR.PART1 3.60 0 174.64 AUD ENGPR 4 628.70 Approved Layouts, DC, P&ID revie Australia East Red Mountain Tails Pump ECI Prelim Design - Process Senior Process Enginee1_Processed to GL 2/17/2025 210012 CGRIMMONSAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.01.D.PRPR.PART1 ENGPR 4 174.64 Craig Grimmond 1147638 2/12/2025 XU97P01A 01.D.PRPR.PART1 3.60 0 174.64 AUD ENGPR 4 628.70 Approved Layouts, DC, P&ID revie Australia East Red Mountain Tails Pump ECI Prelim Design - Process Senior Process Enginee1_Processed to GL 2/17/2025 210012 CGRIMMONSAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.01.D.PRPR.PART1 ENGPR 4 174.64 Craig Grimmond 1147638 2/14/2025 XU97P01A 01.D.PRPR.PART1 7.60 0 174.64 AUD ENGPR 4 1,327.26 Approved Layouts, DC, P&ID revie Australia East Red Mountain Tails Pump ECI Prelim Design - Process Senior Process Enginee1_Processed to GL 2/17/2025 210012 CGRIMMONSAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.01.D.PRPR.PART1 ENGPR 4 174.64 Craig Grimmond 1147638 2/17/2025 XU97P01A 01.D.PRPR.PART1 6.60 0 174.64 AUD ENGPR 4 1,152.62 Approved Design criteria, layout, proAustralia East Red Mountain Tails Pump ECI Prelim Design - Process Senior Process Enginee1_Processed to GL 2/21/2025 210008 CGRIMMONSAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.01.D.PRPR.PART1 ENGPR 4 174.64 Craig Grimmond 1147638 2/18/2025 XU97P01A 01.D.PRPR.PART1 5.60 0 174.64 AUD ENGPR 4 977.98 Approved Design criteria, layout, proAustralia East Red Mountain Tails Pump ECI Prelim Design - Process Senior Process Enginee1_Processed to GL 2/21/2025 210008 CGRIMMONSAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.01.D.PRPR.PART1 ENGPR 4 174.64 Craig Grimmond 1147638 2/19/2025 XU97P01A 01.D.PRPR.PART1 7.60 0 174.64 AUD ENGPR 4 1,327.26 Approved Design criteria, layout, proAustralia East Red Mountain Tails Pump ECI Prelim Design - Process Senior Process Enginee1_Processed to GL 2/21/2025 210008 CGRIMMONSAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.01.D.PRPR.PART1 ENGPR 4 174.64 Craig Grimmond 1147638 2/20/2025 XU97P01A 01.D.PRPR.PART1 6.60 0 174.64 AUD ENGPR 4 1,152.62 Approved Design criteria, layout, proAustralia East Red Mountain Tails Pump ECI Prelim Design - Process Senior Process Enginee1_Processed to GL 2/21/2025 210008 CGRIMMONSAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.01.D.PRPR.PART1 ENGPR 4 174.64 Craig Grimmond 1147638 2/21/2025 XU97P01A 01.D.PRPR.PART1 5.00 0 174.64 AUD ENGPR 4 873.20 Approved Design criteria, layout, proAustralia East Red Mountain Tails Pump ECI Prelim Design - Process Senior Process Enginee1_Processed to GL 2/21/2025 210008 CGRIMMONSAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.01.D.PRPR.PART1 ENGPR 4 174.64 Craig Grimmond 1147638 2/24/2025 XU97P01A 01.D.PRPR.PART1 7.60 0 174.64 AUD ENGPR 4 1,327.26 Approved Tender review, lists, desigAustralia East Red Mountain Tails Pump ECI Prelim Design - Process Senior Process Enginee1_Processed to GL 2/28/2025 210014 CGRIMMONSAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.01.D.DMME.PART1 ENGPR 4 174.64 Craig Grimmond 1147638 2/25/2025 XU97P01A 01.D.DMME.PART1 3.00 0 174.64 AUD ENGPR 4 523.92 Approved 30% design review inc. preAustralia East Red Mountain Tails Pump ECI Prelim Design - Client Meetings Senior Process Enginee1_Processed to GL 2/28/2025 210014 CGRIMMONSAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.01.D.PRPR.PART1 ENGPR 4 174.64 Craig Grimmond 1147638 2/25/2025 XU97P01A 01.D.PRPR.PART1 3.60 0 174.64 AUD ENGPR 4 628.70 Approved Tender review, lists, desigAustralia East Red Mountain Tails Pump ECI Prelim Design - Process Senior Process Enginee1_Processed to GL 2/28/2025 210014 CGRIMMONSAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.01.D.PRPR.PART1 ENGPR 4 174.64 Craig Grimmond 1147638 2/26/2025 XU97P01A 01.D.PRPR.PART1 3.60 0 174.64 AUD ENGPR 4 628.70 Approved Tender review, lists, desigAustralia East Red Mountain Tails Pump ECI Prelim Design - Process Senior Process Enginee1_Processed to GL 2/28/2025 210014 CGRIMMONSAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.01.D.PRPR.PART1 ENGPR 4 174.64 Craig Grimmond 1147638 2/27/2025 XU97P01A 01.D.PRPR.PART1 7.60 0 174.64 AUD ENGPR 4 1,327.26 Approved Tender review, lists, desigAustralia East Red Mountain Tails Pump ECI Prelim Design - Process Senior Process Enginee1_Processed to GL 2/28/2025 210014 CGRIMMONSAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.01.D.PRPR.PART1 ENGPR 4 174.64 Craig Grimmond 1147638 2/28/2025 XU97P01A 01.D.PRPR.PART1 6.10 0 174.64 AUD ENGPR 4 1,065.30 Approved Tender review, lists, desigAustralia East Red Mountain Tails Pump ECI Prelim Design - Process Senior Process Enginee1_Processed to GL 2/28/2025 210014 CGRIMMONSAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.02.D.PRPR.PART2 ENGPR 4 174.64 Craig Grimmond 1147638 3/3/2025 XU97P01A 02.D.PRPR.PART2 5.60 0 174.64 AUD ENGPR 4 977.98 Approved Tndr revs, pipe spec, drg lAustralia East Red Mountain Tails Pump ECI Detail Design - Process Senior Process Enginee1_Processed to GL 3/7/2025 210014 CGRIMMONSAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.02.D.PRPR.PART2 ENGPR 4 174.64 Craig Grimmond 1147638 3/4/2025 XU97P01A 02.D.PRPR.PART2 4.60 0 174.64 AUD ENGPR 4 803.34 Approved Tndr revs, pipe spec, drg lAustralia East Red Mountain Tails Pump ECI Detail Design - Process Senior Process Enginee1_Processed to GL 3/7/2025 210014 CGRIMMONSAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.02.D.PRPR.PART2 ENGPR 4 174.64 Craig Grimmond 1147638 3/5/2025 XU97P01A 02.D.PRPR.PART2 3.60 0 174.64 AUD ENGPR 4 628.70 Approved Tndr revs, pipe spec, drg lAustralia East Red Mountain Tails Pump ECI Detail Design - Process Senior Process Enginee1_Processed to GL 3/7/2025 210014 CGRIMMONSAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.02.D.PRPR.PART2 ENGPR 4 174.64 Craig Grimmond 1147638 3/6/2025 XU97P01A 02.D.PRPR.PART2 4.60 0 174.64 AUD ENGPR 4 803.34 Approved Tndr revs, pipe spec, drg lAustralia East Red Mountain Tails Pump ECI Detail Design - Process Senior Process Enginee1_Processed to GL 3/7/2025 210014 CGRIMMONSAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.02.D.PRPR.PART2 ENGPR 4 174.64 Craig Grimmond 1147638 3/7/2025 XU97P01A 02.D.PRPR.PART2 6.60 0 174.64 AUD ENGPR 4 1,152.62 Approved Tndr revs, pipe spec, drg lAustralia East Red Mountain Tails Pump ECI Detail Design - Process Senior Process Enginee1_Processed to GL 3/7/2025 210014 CGRIMMONSAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.02.D.PRPR.PART2 ENGPR 4 174.64 Craig Grimmond 1147638 3/11/2025 XU97P01A 02.D.PRPR.PART2 6.60 0 174.64 AUD ENGPR 4 1,152.62 Approved Piping design, valve list, Australia East Red Mountain Tails Pump ECI Detail Design - Process Senior Process Enginee1_Processed to GL 3/16/2025 210030 CGRIMMONSAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.02.D.PRPR.PART2 ENGPR 4 174.64 Craig Grimmond 1147638 3/12/2025 XU97P01A 02.D.PRPR.PART2 7.60 0 174.64 AUD ENGPR 4 1,327.26 Approved Piping design, valve list, Australia East Red Mountain Tails Pump ECI Detail Design - Process Senior Process Enginee1_Processed to GL 3/16/2025 210030 CGRIMMONSAU01 SDM AU Brisbane Head Office
Engi
Revision: 0 - 08/12/2025
924553805.xlsx/Reports Now S&E WIP Page 18 of 59
Engineer Senior XU97P01A XU97P01A.02.D.ELEL.PART2 ENGEL 4 170.45 Victor Umanzor 1180048 3/4/2025 XU97P01A 02.D.ELEL.PART2 7.60 0 170.45 AUD ENGEL 4 1,295.42 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Detail Design - Electrical Senior Electrical Engine1_Processed to GL 3/7/2025 210014 VUMANZOR1SAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.02.D.ELEL.PART2 ENGEL 4 170.45 Victor Umanzor 1180048 3/5/2025 XU97P01A 02.D.ELEL.PART2 5.20 0 170.45 AUD ENGEL 4 886.34 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Detail Design - Electrical Senior Electrical Engine1_Processed to GL 3/7/2025 210014 VUMANZOR1SAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.02.D.ELEL.PART2 ENGEL 4 170.45 Victor Umanzor 1180048 3/6/2025 XU97P01A 02.D.ELEL.PART2 7.60 0 170.45 AUD ENGEL 4 1,295.42 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Detail Design - Electrical Senior Electrical Engine1_Processed to GL 3/7/2025 210014 VUMANZOR1SAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.02.D.ELEL.PART2 ENGEL 4 170.45 Victor Umanzor 1180048 3/11/2025 XU97P01A 02.D.ELEL.PART2 4.60 0 170.45 AUD ENGEL 4 784.07 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Detail Design - Electrical Senior Electrical Engine1_Processed to GL 3/14/2025 210009 VUMANZOR1SAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.02.D.ELEL.PART2 ENGEL 4 170.45 Victor Umanzor 1180048 3/14/2025 XU97P01A 02.D.ELEL.PART2 7.60 0 170.45 AUD ENGEL 4 1,295.42 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Detail Design - Electrical Senior Electrical Engine1_Processed to GL 3/14/2025 210009 VUMANZOR1SAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.02.D.ELEL.PART2 ENGEL 4 170.45 Victor Umanzor 1180048 3/18/2025 XU97P01A 02.D.ELEL.PART2 1.00 0 170.45 AUD ENGEL 4 170.45 Approved Weekly Coordination MeetiAustralia East Red Mountain Tails Pump ECI Detail Design - Electrical Senior Electrical Engine1_Processed to GL 3/21/2025 210019 VUMANZOR1SAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.02.D.ELEL.PART2 ENGEL 4 170.45 Victor Umanzor 1180048 3/20/2025 XU97P01A 02.D.ELEL.PART2 3.00 0 170.45 AUD ENGEL 4 511.35 Approved Electrical MTO Australia East Red Mountain Tails Pump ECI Detail Design - Electrical Senior Electrical Engine1_Processed to GL 3/21/2025 210019 VUMANZOR1SAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.02.D.ELEL.PART2 ENGEL 4 170.45 Victor Umanzor 1180048 3/21/2025 XU97P01A 02.D.ELEL.PART2 4.00 0 170.45 AUD ENGEL 4 681.80 Approved Electrical MTO Australia East Red Mountain Tails Pump ECI Detail Design - Electrical Senior Electrical Engine1_Processed to GL 3/21/2025 210019 VUMANZOR1SAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.02.D.ELEL.PART2 ENGEL 4 170.45 Victor Umanzor 1180048 3/25/2025 XU97P01A 02.D.ELEL.PART2 4.60 0 170.45 AUD ENGEL 4 784.07 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Detail Design - Electrical Senior Electrical Engine1_Processed to GL 3/28/2025 210022 VUMANZOR1SAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.02.D.ELEL.PART2 ENGEL 4 170.45 Victor Umanzor 1180048 3/26/2025 XU97P01A 02.D.ELEL.PART2 1.00 0 170.45 AUD ENGEL 4 170.45 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Detail Design - Electrical Senior Electrical Engine1_Processed to GL 3/28/2025 210022 VUMANZOR1SAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.02.D.ELEL.PART2 ENGEL 4 170.45 Victor Umanzor 1180048 3/28/2025 XU97P01A 02.D.ELEL.PART2 7.60 0 170.45 AUD ENGEL 4 1,295.42 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Detail Design - Electrical Senior Electrical Engine1_Processed to GL 3/28/2025 210022 VUMANZOR1SAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.02.D.ELEL.PART2 ENGEL 4 170.45 Victor Umanzor 1180048 4/1/2025 XU97P01A 02.D.ELEL.PART2 4.60 0 170.45 AUD ENGEL 4 784.07 Approved Tender Reviews - MCC - Australia East Red Mountain Tails Pump ECI Detail Design - Electrical Senior Electrical Engine1_Processed to GL 4/4/2025 210019 VUMANZOR1SAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.02.D.ELEL.PART2 ENGEL 4 170.45 Victor Umanzor 1180048 4/2/2025 XU97P01A 02.D.ELEL.PART2 7.40 0 170.45 AUD ENGEL 4 1,261.33 Approved Tender Reviews - MCC - Australia East Red Mountain Tails Pump ECI Detail Design - Electrical Senior Electrical Engine1_Processed to GL 4/4/2025 210019 VUMANZOR1SAU01 SDM AU Brisbane Head Office
Engineer Senior XU97P01A XU97P01A.02.D.ELEL.PART2 ENGEL 4 170.45 Victor Umanzor 1180048 4/8/2025 XU97P01A 02.D.ELEL.PART2 1.00 0 170.45 AUD ENGEL 4 170.45 Approved Internal Weekly Meeting Australia East Red Mountain Tails Pump ECI Detail Design - Electrical Senior Electrical Engine1_Processed to GL 4/11/2025 210018 VUMANZOR1SAU01 SDM AU Brisbane Head Office
Document Control Standard XU97P01A XU97P01A.02.D.DMDM.PART2 RCADC 3.1 97.44 Narmina Tilley 1180107 4/8/2025 XU97P01A 02.D.DMDM.PART2 1.00 0 97.44 AUD RCADC 3.1 97.44 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Detail Design - Mgmt & Admin Document Controller 1_Processed to GL 4/11/2025 210018 NTILLEY1 SAU01 SDM AU Brisbane Head Office
Document Control Standard XU97P01A XU97P01A.02.D.DMDM.PART2 RCADC 3.1 97.44 Naomi Te Kiri 1180201 3/21/2025 XU97P01A 02.D.DMDM.PART2 0.08 0 97.44 AUD RCADC 3.1 7.80 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Detail Design - Mgmt & Admin Document Controller 1_Processed to GL 3/21/2025 210019 NTEKRI SAU01 SDM AU Brisbane Head Office
Document Control Standard XU97P01A XU97P01A.02.D.DMDM.PART2 RCADC 3.1 97.44 Naomi Te Kiri 1180201 4/4/2025 XU97P01A 02.D.DMDM.PART2 0.75 0 97.44 AUD RCADC 3.1 73.08 Approved Sync Confirmation / IssueAustralia East Red Mountain Tails Pump ECI Detail Design - Mgmt & Admin Document Controller 1_Processed to GL 4/4/2025 210019 NTEKRI SAU01 SDM AU Brisbane Head Office
Draftsperson Standard XU97P01A XU97P01A.01.D.CVCV.PART1 TECCV 3 119.45 Sarah Norton 1180202 1/29/2025 XU97P01A 01.D.CVCV.PART1 1.40 0 119.45 AUD TECCV 3 167.23 Approved Drawings for layouts Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Civil Designer 1_Processed to GL 1/31/2025 210011 SNORTON SAU01 SDM AU Brisbane Head Office
Draftsperson Standard XU97P01A XU97P01A.01.D.CVCV.PART1 TECCV 3 119.45 Sarah Norton 1180202 1/30/2025 XU97P01A 01.D.CVCV.PART1 5.60 0 119.45 AUD TECCV 3 668.92 Approved Drawings for layouts Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Civil Designer 1_Processed to GL 1/31/2025 210011 SNORTON SAU01 SDM AU Brisbane Head Office
Draftsperson Standard XU97P01A XU97P01A.01.D.CVCV.PART1 TECCV 3 119.45 Sarah Norton 1180202 1/31/2025 XU97P01A 01.D.CVCV.PART1 5.60 0 119.45 AUD TECCV 3 668.92 Approved Drawings for layouts Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Civil Designer 1_Processed to GL 1/31/2025 210011 SNORTON SAU01 SDM AU Brisbane Head Office
Draftsperson Standard XU97P01A XU97P01A.01.D.CVCV.PART1 TECCV 3 89.42 Sarah Norton 1180202 2/3/2025 XU97P01A 01.D.CVCV.PART1 4.00 0 89.42 AUD TECCV 3 357.68 Approved Drawings for layouts Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Civil Designer 1_Processed to GL 2/7/2025 210009 SNORTON SAU01 SDM AU Brisbane Head Office
Draftsperson Standard XU97P01A XU97P01A.01.D.CVCV.PART1 TECCV 3 89.42 Sarah Norton 1180202 2/4/2025 XU97P01A 01.D.CVCV.PART1 4.00 0 89.42 AUD TECCV 3 357.68 Approved Drawings for layouts Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Civil Designer 1_Processed to GL 2/7/2025 210009 SNORTON SAU01 SDM AU Brisbane Head Office
Draftsperson Standard XU97P01A XU97P01A.01.D.CVCV.PART1 TECCV 3 89.42 Sarah Norton 1180202 2/5/2025 XU97P01A 01.D.CVCV.PART1 2.00 0 89.42 AUD TECCV 3 178.84 Approved Drawings for layouts Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Civil Designer 1_Processed to GL 2/7/2025 210009 SNORTON SAU01 SDM AU Brisbane Head Office
Draftsperson Standard XU97P01A XU97P01A.01.D.CVCV.PART1 TECCV 3 89.42 Sarah Norton 1180202 2/6/2025 XU97P01A 01.D.CVCV.PART1 5.00 0 89.42 AUD TECCV 3 447.10 Approved Drawings for layouts Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Civil Designer 1_Processed to GL 2/7/2025 210009 SNORTON SAU01 SDM AU Brisbane Head Office
Draftsperson Standard XU97P01A XU97P01A.01.D.CVCV.PART1 TECCV 3 89.42 Sarah Norton 1180202 2/7/2025 XU97P01A 01.D.CVCV.PART1 4.60 0 89.42 AUD TECCV 3 411.33 Approved Drawings for layouts Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Civil Designer 1_Processed to GL 2/7/2025 210009 SNORTON SAU01 SDM AU Brisbane Head Office
Draftsperson Standard XU97P01A XU97P01A.01.D.CVCV.PART1 TECCV 3 89.42 Sarah Norton 1180202 2/10/2025 XU97P01A 01.D.CVCV.PART1 5.60 0 89.42 AUD TECCV 3 500.75 Approved Updating the Drawings Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Civil Designer 1_Processed to GL 2/14/2025 210013 SNORTON SAU01 SDM AU Brisbane Head Office
Draftsperson Standard XU97P01A XU97P01A.01.D.CVCV.PART1 TECCV 3 89.42 Sarah Norton 1180202 2/11/2025 XU97P01A 01.D.CVCV.PART1 4.60 0 89.42 AUD TECCV 3 411.33 Approved Updating the Drawings Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Civil Designer 1_Processed to GL 2/14/2025 210013 SNORTON SAU01 SDM AU Brisbane Head Office
Draftsperson Standard XU97P01A XU97P01A.01.D.CVCV.PART1 TECCV 3 89.42 Sarah Norton 1180202 2/12/2025 XU97P01A 01.D.CVCV.PART1 3.00 0 89.42 AUD TECCV 3 268.26 Approved Updating the Drawings Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Civil Designer 1_Processed to GL 2/14/2025 210013 SNORTON SAU01 SDM AU Brisbane Head Office
Draftsperson Standard XU97P01A XU97P01A.01.D.CVCV.PART1 TECCV 3 89.42 Sarah Norton 1180202 2/13/2025 XU97P01A 01.D.CVCV.PART1 2.60 0 89.42 AUD TECCV 3 232.49 Approved Updating the Drawings Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Civil Designer 1_Processed to GL 2/14/2025 210013 SNORTON SAU01 SDM AU Brisbane Head Office
Draftsperson Standard XU97P01A XU97P01A.01.D.CVCV.PART1 TECCV 3 89.42 Sarah Norton 1180202 2/17/2025 XU97P01A 01.D.CVCV.PART1 7.60 0 89.42 AUD TECCV 3 679.59 Approved Layout Drawings Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Civil Designer 1_Processed to GL 2/21/2025 210008 SNORTON SAU01 SDM AU Brisbane Head Office
Draftsperson Standard XU97P01A XU97P01A.01.D.CVCV.PART1 TECCV 3 89.42 Sarah Norton 1180202 2/18/2025 XU97P01A 01.D.CVCV.PART1 7.60 0 89.42 AUD TECCV 3 679.59 Approved Layout Drawings Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Civil Designer 1_Processed to GL 2/21/2025 210008 SNORTON SAU01 SDM AU Brisbane Head Office
Draftsperson Standard XU97P01A XU97P01A.01.D.CVCV.PART1 TECCV 3 89.42 Sarah Norton 1180202 2/19/2025 XU97P01A 01.D.CVCV.PART1 2.00 0 89.42 AUD TECCV 3 178.84 Approved Layout Drawings Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Civil Designer 1_Processed to GL 2/21/2025 210008 SNORTON SAU01 SDM AU Brisbane Head Office
Draftsperson Standard XU97P01A XU97P01A.01.D.CVCV.PART1 TECCV 3 89.42 Sarah Norton 1180202 2/24/2025 XU97P01A 01.D.CVCV.PART1 2.60 0 89.42 AUD TECCV 3 232.49 Approved Tailings Pipeline Drawings Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Civil Designer 1_Processed to GL 3/2/2025 210009 SNORTON SAU01 SDM AU Brisbane Head Office
Draftsperson Standard XU97P01A XU97P01A.01.D.CVCV.PART1 TECCV 3 89.42 Sarah Norton 1180202 2/25/2025 XU97P01A 01.D.CVCV.PART1 2.60 0 89.42 AUD TECCV 3 232.49 Approved Tailings Pipeline Drawings Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Civil Designer 1_Processed to GL 3/2/2025 210009 SNORTON SAU01 SDM AU Brisbane Head Office
Document Control Standard XU97P01A XU97P01A.01.D.DMDM.PART1 RCADC 3.1 97.44 Ying Ge 1180273 2/5/2025 XU97P01A 01.D.DMDM.PART1 1.00 0 97.44 AUD RCADC 3.1 97.44 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Mgmt & Admin Document Controller 1_Processed to GL 2/7/2025 210009 EGE SAU01 SDM AU Brisbane Head Office
Document Control Standard XU97P01A XU97P01A.01.D.DMDM.PART1 RCADC 3.1 97.44 Ying Ge 1180273 2/6/2025 XU97P01A 01.D.DMDM.PART1 1.00 0 97.44 AUD RCADC 3.1 97.44 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Mgmt & Admin Document Controller 1_Processed to GL 2/7/2025 210009 EGE SAU01 SDM AU Brisbane Head Office
Document Control Standard XU97P01A XU97P01A.01.D.DMDM.PART1 RCADC 3.1 97.44 Ying Ge 1180273 2/13/2025 XU97P01A 01.D.DMDM.PART1 0.60 0 97.44 AUD RCADC 3.1 58.46 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Mgmt & Admin Document Controller 1_Processed to GL 2/14/2025 210013 EGE SAU01 SDM AU Brisbane Head Office
Document Control Standard XU97P01A XU97P01A.01.D.DMDM.PART1 RCADC 3.1 97.44 Ying Ge 1180273 2/14/2025 XU97P01A 01.D.DMDM.PART1 0.60 0 97.44 AUD RCADC 3.1 58.46 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Mgmt & Admin Document Controller 1_Processed to GL 2/14/2025 210013 EGE SAU01 SDM AU Brisbane Head Office
Document Control Standard XU97P01A XU97P01A.01.D.DMDM.PART1 RCADC 3.1 97.44 Ying Ge 1180273 2/19/2025 XU97P01A 01.D.DMDM.PART1 1.00 0 97.44 AUD RCADC 3.1 97.44 Approved Issue SOW, Memo, TS toAustralia East Red Mountain Tails Pump ECI Prelim Design - Mgmt & Admin Document Controller 1_Processed to GL 2/21/2025 210008 EGE SAU01 SDM AU Brisbane Head Office
Document Control Standard XU97P01A XU97P01A.01.D.DMDM.PART1 RCADC 3.1 97.44 Ying Ge 1180273 2/20/2025 XU97P01A 01.D.DMDM.PART1 1.00 0 97.44 AUD RCADC 3.1 97.44 Approved Issue SOW, Memo, TS toAustralia East Red Mountain Tails Pump ECI Prelim Design - Mgmt & Admin Document Controller 1_Processed to GL 2/21/2025 210008 EGE SAU01 SDM AU Brisbane Head Office
Document Control Standard XU97P01A XU97P01A.01.D.DMDM.PART1 RCADC 3.1 97.44 Ying Ge 1180273 2/21/2025 XU97P01A 01.D.DMDM.PART1 0.80 0 97.44 AUD RCADC 3.1 77.95 Approved Issue SOW, Memo, TS toAustralia East Red Mountain Tails Pump ECI Prelim Design - Mgmt & Admin Document Controller 1_Processed to GL 2/21/2025 210008 EGE SAU01 SDM AU Brisbane Head Office
Document Control Standard XU97P01A XU97P01A.01.D.DMDM.PART1 RCADC 3.1 97.44 Ying Ge 1180273 2/24/2025 XU97P01A 01.D.DMDM.PART1 0.60 0 97.44 AUD RCADC 3.1 58.46 Approved issue NW, Design Review Australia East Red Mountain Tails Pump ECI Prelim Design - Mgmt & Admin Document Controller 1_Processed to GL 3/2/2025 210009 EGE SAU01 SDM AU Brisbane Head Office
Document Control Standard XU97P01A XU97P01A.01.D.DMDM.PART1 RCADC 3.1 97.44 Ying Ge 1180273 2/26/2025 XU97P01A 01.D.DMDM.PART1 0.60 0 97.44 AUD RCADC 3.1 58.46 Approved issue NW, Design Review Australia East Red Mountain Tails Pump ECI Prelim Design - Mgmt & Admin Document Controller 1_Processed to GL 3/2/2025 210009 EGE SAU01 SDM AU Brisbane Head Office
Document Control Standard XU97P01A XU97P01A.01.D.DMDM.PART1 RCADC 3.1 97.44 Ying Ge 1180273 2/28/2025 XU97P01A 01.D.DMDM.PART1 1.00 0 97.44 AUD RCADC 3.1 97.44 Approved issue NW, Design Review Australia East Red Mountain Tails Pump ECI Prelim Design - Mgmt & Admin Document Controller 1_Processed to GL 3/2/2025 210009 EGE SAU01 SDM AU Brisbane Head Office
Document Control Standard XU97P01A XU97P01A.02.D.DMDM.PART2 RCADC 3.1 97.44 Ying Ge 1180273 3/14/2025 XU97P01A 02.D.DMDM.PART2 0.60 0 97.44 AUD RCADC 3.1 58.46 Approved issue SOW Australia East Red Mountain Tails Pump ECI Detail Design - Mgmt & Admin Document Controller 1_Processed to GL 3/15/2025 210015 EGE SAU01 SDM AU Brisbane Head Office
Document Control Standard XU97P01A XU97P01A.02.D.DMDM.PART2 RCADC 3.1 97.44 Ying Ge 1180273 3/18/2025 XU97P01A 02.D.DMDM.PART2 1.00 0 97.44 AUD RCADC 3.1 97.44 Approved issue drgs, upload specs Australia East Red Mountain Tails Pump ECI Detail Design - Mgmt & Admin Document Controller 1_Processed to GL 3/21/2025 210019 EGE SAU01 SDM AU Brisbane Head Office
Document Control Standard XU97P01A XU97P01A.02.D.DMDM.PART2 RCADC 3.1 97.44 Ying Ge 1180273 3/19/2025 XU97P01A 02.D.DMDM.PART2 0.60 0 97.44 AUD RCADC 3.1 58.46 Approved issue drgs, upload specs Australia East Red Mountain Tails Pump ECI Detail Design - Mgmt & Admin Document Controller 1_Processed to GL 3/21/2025 210019 EGE SAU01 SDM AU Brisbane Head Office
Document Control Standard XU97P01A XU97P01A.02.D.DMDM.PART2 RCADC 3.1 97.44 Ying Ge 1180273 3/21/2025 XU97P01A 02.D.DMDM.PART2 2.00 0 97.44 AUD RCADC 3.1 194.88 Approved issue drgs, upload specs Australia East Red Mountain Tails Pump ECI Detail Design - Mgmt & Admin Document Controller 1_Processed to GL 3/21/2025 210019 EGE SAU01 SDM AU Brisbane Head Office
Document Control Standard XU97P01A XU97P01A.02.D.DMDM.PART2 RCADC 3.1 97.44 Ying Ge 1180273 3/28/2025 XU97P01A 02.D.DMDM.PART2 1.00 0 97.44 AUD RCADC 3.1 97.44 Approved sow, specs Australia East Red Mountain Tails Pump ECI Detail Design - Mgmt & Admin Document Controller 1_Processed to GL 3/28/2025 210022 EGE SAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 1 51.96 Beau Brooker 1180314 1/9/2025 XU97P01A 01.D.CVCV.PART1 2.00 0 51.96 AUD ENGCV 1 103.92 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Graduate Civil Engineer 1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 1 51.96 Beau Brooker 1180314 1/10/2025 XU97P01A 01.D.CVCV.PART1 2.00 0 51.96 AUD ENGCV 1 103.92 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Graduate Civil Engineer 1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 1 51.96 Beau Brooker 1180314 1/13/2025 XU97P01A 01.D.CVCV.PART1 2.50 0 51.96 AUD ENGCV 1 129.90 Approved Pre design, mtngs, site visAustralia East Red Mountain Tails Pump ECI Prelim Design - Civil Graduate Civil Engineer 1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 1 51.96 Beau Brooker 1180314 1/16/2025 XU97P01A 01.D.CVCV.PART1 7.60 0 51.96 AUD ENGCV 1 394.90 Approved Pre design, mtngs, site visAustralia East Red Mountain Tails Pump ECI Prelim Design - Civil Graduate Civil Engineer 1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 1 51.96 Beau Brooker 1180314 1/17/2025 XU97P01A 01.D.CVCV.PART1 7.60 0 51.96 AUD ENGCV 1 394.90 Approved Pre design, mtngs, site visAustralia East Red Mountain Tails Pump ECI Prelim Design - Civil Graduate Civil Engineer 1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 1 51.96 Beau Brooker 1180314 1/21/2025 XU97P01A 01.D.CVCV.PART1 4.00 0 51.96 AUD ENGCV 1 207.84 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Graduate Civil Engineer 1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 1 51.96 Beau Brooker 1180314 1/22/2025 XU97P01A 01.D.CVCV.PART1 3.00 0 51.96 AUD ENGCV 1 155.88 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Graduate Civil Engineer 1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 1 51.96 Beau Brooker 1180314 1/23/2025 XU97P01A 01.D.CVCV.PART1 2.00 0 51.96 AUD ENGCV 1 103.92 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Graduate Civil Engineer 1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 1 51.96 Beau Brooker 1180314 1/24/2025 XU97P01A 01.D.CVCV.PART1 3.60 0 51.96 AUD ENGCV 1 187.06 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Graduate Civil Engineer 1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 1 51.96 Beau Brooker 1180314 1/28/2025 XU97P01A 01.D.CVCV.PART1 5.60 0 51.96 AUD ENGCV 1 290.98 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Graduate Civil Engineer 1_Processed to GL 1/31/2025 210011 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 1 51.96 Beau Brooker 1180314 1/31/2025 XU97P01A 01.D.CVCV.PART1 2.60 0 51.96 AUD ENGCV 1 135.10 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Graduate Civil Engineer 1_Processed to GL 1/31/2025 210011 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 1 51.96 Beau Brooker 1180314 2/3/2025 XU97P01A 01.D.CVCV.PART1 2.00 0 51.96 AUD ENGCV 1 103.92 Approved ECW & LiDAR, initial desi Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Graduate Civil Engineer 1_Processed to GL 2/7/2025 210009 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 1 51.96 Beau Brooker 1180314 2/4/2025 XU97P01A 01.D.CVCV.PART1 1.00 0 51.96 AUD ENGCV 1 51.96 Approved ECW & LiDAR, initial desi Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Graduate Civil Engineer 1_Processed to GL 2/7/2025 210009 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 1 51.96 Beau Brooker 1180314 2/5/2025 XU97P01A 01.D.CVCV.PART1 2.00 0 51.96 AUD ENGCV 1 103.92 Approved ECW & LiDAR, initial desi Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Graduate Civil Engineer 1_Processed to GL 2/7/2025 210009 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 1 51.96 Beau Brooker 1180314 2/6/2025 XU97P01A 01.D.CVCV.PART1 2.00 0 51.96 AUD ENGCV 1 103.92 Approved ECW & LiDAR, initial desi Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Graduate Civil Engineer 1_Processed to GL 2/7/2025 210009 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 2 89.42 Beau Brooker 1180314 2/10/2025 XU97P01A 01.D.CVCV.PART1 1.00 0 89.42 AUD ENGCV 2 89.42 Approved Civil pipeline design review Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Graduate Civil Engineer 1_Processed to GL 2/13/2025 210010 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 2 89.42 Beau Brooker 1180314 2/13/2025 XU97P01A 01.D.CVCV.PART1 1.00 0 89.42 AUD ENGCV 2 89.42 Approved Civil pipeline design review Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Graduate Civil Engineer 1_Processed to GL 2/13/2025 210010 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 2 89.42 Beau Brooker 1180314 2/17/2025 XU97P01A 01.D.CVCV.PART1 7.00 0 89.42 AUD ENGCV 2 625.94 Approved Cvl dsgn criteria + surv Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Graduate Civil Engineer 1_Processed to GL 2/21/2025 210008 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 2 89.42 Beau Brooker 1180314 2/18/2025 XU97P01A 01.D.CVCV.PART1 1.00 0 89.42 AUD ENGCV 2 89.42 Approved Internal meeting Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Graduate Civil Engineer 1_Processed to GL 2/21/2025 210008 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 2 89.42 Beau Brooker 1180314 2/19/2025 XU97P01A 01.D.CVCV.PART1 2.00 0 89.42 AUD ENGCV 2 178.84 Approved Geotech brief Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Graduate Civil Engineer 1_Processed to GL 2/21/2025 210008 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 2 89.42 Beau Brooker 1180314 2/20/2025 XU97P01A 01.D.CVCV.PART1 1.00 0 89.42 AUD ENGCV 2 89.42 Approved Civil DWGs - 30% review Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Graduate Civil Engineer 1_Processed to GL 2/21/2025 210008 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 2 89.42 Beau Brooker 1180314 2/21/2025 XU97P01A 01.D.CVCV.PART1 4.50 0 89.42 AUD ENGCV 2 402.39 Approved Civil DWGs - 30% review Australia East Red Mountain Tails Pump ECI Prelim Design - Civil Graduate Civil Engineer 1_Processed to GL 2/21/2025 210008 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 2 89.42 Beau Brooker 1180314 2/27/2025 XU97P01A 01.D.CVCV.PART1 2.00 0 89.42 AUD ENGCV 2 178.84 Approved 30% review catch up/GEOAustralia East Red Mountain Tails Pump ECI Prelim Design - Civil Graduate Civil Engineer 1_Processed to GL 2/28/2025 210014 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.01.D.CVCV.PART1 ENGCV 2 89.42 Beau Brooker 1180314 2/28/2025 XU97P01A 01.D.CVCV.PART1 2.00 0 89.42 AUD ENGCV 2 178.84 Approved 30% review catch up/GEOAustralia East Red Mountain Tails Pump ECI Prelim Design - Civil Graduate Civil Engineer 1_Processed to GL 2/28/2025 210014 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 2 89.42 Beau Brooker 1180314 3/3/2025 XU97P01A 02.D.CVCV.PART2 3.00 0 89.42 AUD ENGCV 2 268.26 Approved Civil drawings update Australia East Red Mountain Tails Pump ECI Detail Design - Civil Graduate Civil Engineer 1_Processed to GL 3/7/2025 210014 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 2 89.42 Beau Brooker 1180314 3/4/2025 XU97P01A 02.D.CVCV.PART2 4.50 0 89.42 AUD ENGCV 2 402.39 Approved Meetings-INT/Survey/SeaAustralia East Red Mountain Tails Pump ECI Detail Design - Civil Graduate Civil Engineer 1_Processed to GL 3/7/2025 210014 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 2 89.42 Beau Brooker 1180314 3/5/2025 XU97P01A 02.D.CVCV.PART2 1.00 0 89.42 AUD ENGCV 2 89.42 Approved Meetings-INT/Survey/SeaAustralia East Red Mountain Tails Pump ECI Detail Design - Civil Graduate Civil Engineer 1_Processed to GL 3/7/2025 210014 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 2 89.42 Beau Brooker 1180314 3/5/2025 XU97P01A 02.D.CVCV.PART2 2.00 0 89.42 AUD ENGCV 2 178.84 Approved Civil drawings update Australia East Red Mountain Tails Pump ECI Detail Design - Civil Graduate Civil Engineer 1_Processed to GL 3/7/2025 210014 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 2 89.42 Beau Brooker 1180314 3/6/2025 XU97P01A 02.D.CVCV.PART2 4.00 0 89.42 AUD ENGCV 2 357.68 Approved Geo SoW + eastings/northAustralia East Red Mountain Tails Pump ECI Detail Design - Civil Graduate Civil Engineer 1_Processed to GL 3/7/2025 210014 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 2 89.42 Beau Brooker 1180314 3/7/2025 XU97P01A 02.D.CVCV.PART2 1.50 0 89.42 AUD ENGCV 2 134.13 Approved Meetings-INT/Survey/SeaAustralia East Red Mountain Tails Pump ECI Detail Design - Civil Graduate Civil Engineer 1_Processed to GL 3/7/2025 210014 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 2 89.42 Beau Brooker 1180314 3/7/2025 XU97P01A 02.D.CVCV.PART2 2.00 0 89.42 AUD ENGCV 2 178.84 Approved Geo SoW + eastings/northAustralia East Red Mountain Tails Pump ECI Detail Design - Civil Graduate Civil Engineer 1_Processed to GL 3/7/2025 210014 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 2 89.42 Beau Brooker 1180314 3/11/2025 XU97P01A 02.D.CVCV.PART2 3.60 0 89.42 AUD ENGCV 2 321.91 Approved Meetings & pipeline alignmAustralia East Red Mountain Tails Pump ECI Detail Design - Civil Graduate Civil Engineer 1_Processed to GL 3/14/2025 210009 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 2 89.42 Beau Brooker 1180314 3/12/2025 XU97P01A 02.D.CVCV.PART2 4.60 0 89.42 AUD ENGCV 2 411.33 Approved Meetings & pipeline alignmAustralia East Red Mountain Tails Pump ECI Detail Design - Civil Graduate Civil Engineer 1_Processed to GL 3/14/2025 210009 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 2 89.42 Beau Brooker 1180314 3/13/2025 XU97P01A 02.D.CVCV.PART2 1.00 0 89.42 AUD ENGCV 2 89.42 Approved Meetings & pipeline alignmAustralia East Red Mountain Tails Pump ECI Detail Design - Civil Graduate Civil Engineer 1_Processed to GL 3/14/2025 210009 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 2 89.42 Beau Brooker 1180314 3/13/2025 XU97P01A 02.D.CVCV.PART2 3.00 0 89.42 AUD ENGCV 2 268.26 Approved Prelim Drawings Australia East Red Mountain Tails Pump ECI Detail Design - Civil Graduate Civil Engineer 1_Processed to GL 3/14/2025 210009 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 2 89.42 Beau Brooker 1180314 3/14/2025 XU97P01A 02.D.CVCV.PART2 5.60 0 89.42 AUD ENGCV 2 500.75 Approved Prelim Drawings Australia East Red Mountain Tails Pump ECI Detail Design - Civil Graduate Civil Engineer 1_Processed to GL 3/14/2025 210009 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 2 89.42 Beau Brooker 1180314 3/17/2025 XU97P01A 02.D.CVCV.PART2 4.00 0 89.42 AUD ENGCV 2 357.68 Approved Prelim drawing set Australia East Red Mountain Tails Pump ECI Detail Design - Civil Graduate Civil Engineer 1_Processed to GL 3/21/2025 210019 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 2 89.42 Beau Brooker 1180314 3/18/2025 XU97P01A 02.D.CVCV.PART2 2.00 0 89.42 AUD ENGCV 2 178.84 Approved Weekly int mtng + civil mtAustralia East Red Mountain Tails Pump ECI Detail Design - Civil Graduate Civil Engineer 1_Processed to GL 3/21/2025 210019 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 2 89.42 Beau Brooker 1180314 3/20/2025 XU97P01A 02.D.CVCV.PART2 1.00 0 89.42 AUD ENGCV 2 89.42 Approved Weekly int mtng + civil mtAustralia East Red Mountain Tails Pump ECI Detail Design - Civil Graduate Civil Engineer 1_Processed to GL 3/21/2025 210019 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 2 89.42 Beau Brooker 1180314 3/20/2025 XU97P01A 02.D.CVCV.PART2 6.60 0 89.42 AUD ENGCV 2 590.17 Approved Prelim drawing set Australia East Red Mountain Tails Pump ECI Detail Design - Civil Graduate Civil Engineer 1_Processed to GL 3/21/2025 210019 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 2 89.42 Beau Brooker 1180314 3/21/2025 XU97P01A 02.D.CVCV.PART2 3.00 0 89.42 AUD ENGCV 2 268.26 Approved Prelim drawing set Australia East Red Mountain Tails Pump ECI Detail Design - Civil Graduate Civil Engineer 1_Processed to GL 3/21/2025 210019 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 2 89.42 Beau Brooker 1180314 3/24/2025 XU97P01A 02.D.CVCV.PART2 1.00 0 89.42 AUD ENGCV 2 89.42 Approved Civil + wkly internal mtng Australia East Red Mountain Tails Pump ECI Detail Design - Civil Graduate Civil Engineer 1_Processed to GL 3/28/2025 210022 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 2 89.42 Beau Brooker 1180314 3/24/2025 XU97P01A 02.D.CVCV.PART2 4.50 0 89.42 AUD ENGCV 2 402.39 Approved Civil standard specificationAustralia East Red Mountain Tails Pump ECI Detail Design - Civil Graduate Civil Engineer 1_Processed to GL 3/28/2025 210022 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 2 89.42 Beau Brooker 1180314 3/26/2025 XU97P01A 02.D.CVCV.PART2 1.00 0 89.42 AUD ENGCV 2 89.42 Approved Civil + wkly internal mtng Australia East Red Mountain Tails Pump ECI Detail Design - Civil Graduate Civil Engineer 1_Processed to GL 3/28/2025 210022 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 2 89.42 Beau Brooker 1180314 3/26/2025 XU97P01A 02.D.CVCV.PART2 4.00 0 89.42 AUD ENGCV 2 357.68 Approved Civil MTO Australia East Red Mountain Tails Pump ECI Detail Design - Civil Graduate Civil Engineer 1_Processed to GL 3/28/2025 210022 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 2 89.42 Beau Brooker 1180314 3/27/2025 XU97P01A 02.D.CVCV.PART2 3.00 0 89.42 AUD ENGCV 2 268.26 Approved Prelim drawings Australia East Red Mountain Tails Pump ECI Detail Design - Civil Graduate Civil Engineer 1_Processed to GL 3/28/2025 210022 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 2 89.42 Beau Brooker 1180314 3/28/2025 XU97P01A 02.D.CVCV.PART2 2.00 0 89.42 AUD ENGCV 2 178.84 Approved Civil standard specificationAustralia East Red Mountain Tails Pump ECI Detail Design - Civil Graduate Civil Engineer 1_Processed to GL 3/28/2025 210022 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 2 89.42 Beau Brooker 1180314 3/28/2025 XU97P01A 02.D.CVCV.PART2 3.00 0 89.42 AUD ENGCV 2 268.26 Approved Civil MTO Australia East Red Mountain Tails Pump ECI Detail Design - Civil Graduate Civil Engineer 1_Processed to GL 3/28/2025 210022 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 2 89.42 Beau Brooker 1180314 3/28/2025 XU97P01A 02.D.CVCV.PART2 2.00 0 89.42 AUD ENGCV 2 178.84 Approved Prelim drawings Australia East Red Mountain Tails Pump ECI Detail Design - Civil Graduate Civil Engineer 1_Processed to GL 3/28/2025 210022 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 2 89.42 Beau Brooker 1180314 3/31/2025 XU97P01A 02.D.CVCV.PART2 2.60 0 89.42 AUD ENGCV 2 232.49 Approved Drawings - tender issue Australia East Red Mountain Tails Pump ECI Detail Design - Civil Graduate Civil Engineer 1_Processed to GL 4/4/2025 210019 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 2 89.42 Beau Brooker 1180314 4/1/2025 XU97P01A 02.D.CVCV.PART2 3.00 0 89.42 AUD ENGCV 2 268.26 Approved Drawings - tender issue Australia East Red Mountain Tails Pump ECI Detail Design - Civil Graduate Civil Engineer 1_Processed to GL 4/4/2025 210019 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 2 89.42 Beau Brooker 1180314 4/1/2025 XU97P01A 02.D.CVCV.PART2 1.00 0 89.42 AUD ENGCV 2 89.42 Approved Meetings Australia East Red Mountain Tails Pump ECI Detail Design - Civil Graduate Civil Engineer 1_Processed to GL 4/4/2025 210019 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 2 89.42 Beau Brooker 1180314 4/2/2025 XU97P01A 02.D.CVCV.PART2 3.00 0 89.42 AUD ENGCV 2 268.26 Approved Drawings - tender issue Australia East Red Mountain Tails Pump ECI Detail Design - Civil Graduate Civil Engineer 1_Processed to GL 4/4/2025 210019 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 2 89.42 Beau Brooker 1180314 4/2/2025 XU97P01A 02.D.CVCV.PART2 1.00 0 89.42 AUD ENGCV 2 89.42 Approved Meetings Australia East Red Mountain Tails Pump ECI Detail Design - Civil Graduate Civil Engineer 1_Processed to GL 4/4/2025 210019 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 2 89.42 Beau Brooker 1180314 4/3/2025 XU97P01A 02.D.CVCV.PART2 0.50 0 89.42 AUD ENGCV 2 44.71 Approved Drawings - tender issue Australia East Red Mountain Tails Pump ECI Detail Design - Civil Graduate Civil Engineer 1_Processed to GL 4/4/2025 210019 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 2 89.42 Beau Brooker 1180314 4/3/2025 XU97P01A 02.D.CVCV.PART2 1.00 0 89.42 AUD ENGCV 2 89.42 Approved ESy Australia East Red Mountain Tails Pump ECI Detail Design - Civil Graduate Civil Engineer 1_Processed to GL 4/4/2025 210019 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 2 89.42 Beau Brooker 1180314 4/7/2025 XU97P01A 02.D.CVCV.PART2 0.50 0 89.42 AUD ENGCV 2 44.71 Approved Meetings Australia East Red Mountain Tails Pump ECI Detail Design - Civil Graduate Civil Engineer 1_Processed to GL 4/11/2025 210018 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 2 89.42 Beau Brooker 1180314 4/8/2025 XU97P01A 02.D.CVCV.PART2 1.50 0 89.42 AUD ENGCV 2 134.13 Approved Meetings Australia East Red Mountain Tails Pump ECI Detail Design - Civil Graduate Civil Engineer 1_Processed to GL 4/11/2025 210018 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 2 89.42 Beau Brooker 1180314 4/8/2025 XU97P01A 02.D.CVCV.PART2 3.00 0 89.42 AUD ENGCV 2 268.26 Approved Scope of work document Australia East Red Mountain Tails Pump ECI Detail Design - Civil Graduate Civil Engineer 1_Processed to GL 4/11/2025 210018 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 2 89.42 Beau Brooker 1180314 4/9/2025 XU97P01A 02.D.CVCV.PART2 2.00 0 89.42 AUD ENGCV 2 178.84 Approved Meetings Australia East Red Mountain Tails Pump ECI Detail Design - Civil Graduate Civil Engineer 1_Processed to GL 4/11/2025 210018 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 2 89.42 Beau Brooker 1180314 4/9/2025 XU97P01A 02.D.CVCV.PART2 3.00 0 89.42 AUD ENGCV 2 268.26 Approved ESy Australia East Red Mountain Tails Pump ECI Detail Design - Civil Graduate Civil Engineer 1_Processed to GL 4/11/2025 210018 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 2 89.42 Beau Brooker 1180314 4/10/2025 XU97P01A 02.D.CVCV.PART2 2.00 0 89.42 AUD ENGCV 2 178.84 Approved Scope of work document Australia East Red Mountain Tails Pump ECI Detail Design - Civil Graduate Civil Engineer 1_Processed to GL 4/11/2025 210018 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 2 89.42 Beau Brooker 1180314 4/10/2025 XU97P01A 02.D.CVCV.PART2 2.00 0 89.42 AUD ENGCV 2 178.84 Approved ESy Australia East Red Mountain Tails Pump ECI Detail Design - Civil Graduate Civil Engineer 1_Processed to GL 4/11/2025 210018 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Graduate XU97P01A XU97P01A.02.D.CVCV.PART2 ENGCV 2 89.42 Beau Brooker 1180314 4/11/2025 XU97P01A 02.D.CVCV.PART2 2.00 0 89.42 AUD ENGCV 2 178.84 Approved Scope of work document Australia East Red Mountain Tails Pump ECI Detail Design - Civil Graduate Civil Engineer 1_Processed to GL 4/11/2025 210018 BBROOKERSAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.COCO.PART1 ENGCO 5 236.35 Ivan Heigan 1180541 2/14/2025 XU97P01A 01.D.COCO.PART1 1.10 0 236.35 AUD ENGCO 5 259.99 Approved Network Design Australia East Red Mountain Tails Pump ECI Prelim Design - Controls Principal Controls Engin1_Processed to GL 2/14/2025 210013 IHEIGAN SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.COCO.PART1 ENGCO 5 236.35 Ivan Heigan 1180541 2/19/2025 XU97P01A 01.D.COCO.PART1 1.80 0 236.35 AUD ENGCO 5 425.43 Approved Network Design Australia East Red Mountain Tails Pump ECI Prelim Design - Controls Principal Controls Engin1_Processed to GL 2/21/2025 210008 IHEIGAN SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.COCO.PART1 ENGCO 5 236.35 Ivan Heigan 1180541 2/20/2025 XU97P01A 01.D.COCO.PART1 1.10 0 236.35 AUD ENGCO 5 259.99 Approved Network Design Australia East Red Mountain Tails Pump ECI Prelim Design - Controls Principal Controls Engin1_Processed to GL 2/21/2025 210008 IHEIGAN SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.COCO.PART1 ENGCO 5 236.35 Ivan Heigan 1180541 2/21/2025 XU97P01A 01.D.COCO.PART1 1.10 0 236.35 AUD ENGCO 5 259.99 Approved Network Design Australia East Red Mountain Tails Pump ECI Prelim Design - Controls Principal Controls Engin1_Processed to GL 2/21/2025 210008 IHEIGAN SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.COCO.PART1 ENGCO 5 236.35 Ivan Heigan 1180541 2/24/2025 XU97P01A 01.D.COCO.PART1 0.70 0 236.35 AUD ENGCO 5 165.45 Approved Network Design Australia East Red Mountain Tails Pump ECI Prelim Design - Controls Principal Controls Engin1_Processed to GL 2/28/2025 210014 IHEIGAN SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.COCO.PART1 ENGCO 5 236.35 Ivan Heigan 1180541 2/25/2025 XU97P01A 01.D.COCO.PART1 1.10 0 236.35 AUD ENGCO 5 259.99 Approved Network Design Australia East Red Mountain Tails Pump ECI Prelim Design - Controls Principal Controls Engin1_Processed to GL 2/28/2025 210014 IHEIGAN SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.01.D.COCO.PART1 ENGCO 5 236.35 Ivan Heigan 1180541 2/26/2025 XU97P01A 01.D.COCO.PART1 1.80 0 236.35 AUD ENGCO 5 425.43 Approved Network Design Australia East Red Mountain Tails Pump ECI Prelim Design - Controls Principal Controls Engin1_Processed to GL 2/28/2025 210014 IHEIGAN SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.02.D.COCO.PART2 ENGCO 5 236.35 Ivan Heigan 1180541 3/17/2025 XU97P01A 02.D.COCO.PART2 1.10 0 236.35 AUD ENGCO 5 259.99 Approved Comms managment Australia East Red Mountain Tails Pump ECI Detail Design - Controls Principal Controls Engin1_Processed to GL 3/21/2025 210019 IHEIGAN SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.02.D.COCO.PART2 ENGCO 5 236.35 Ivan Heigan 1180541 3/18/2025 XU97P01A 02.D.COCO.PART2 2.10 0 236.35 AUD ENGCO 5 496.34 Approved Comms managment Australia East Red Mountain Tails Pump ECI Detail Design - Controls Principal Controls Engin1_Processed to GL 3/21/2025 210019 IHEIGAN SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.02.D.COCO.PART2 ENGCO 5 236.35 Ivan Heigan 1180541 3/19/2025 XU97P01A 02.D.COCO.PART2 1.60 0 236.35 AUD ENGCO 5 378.16 Approved Comms managment Australia East Red Mountain Tails Pump ECI Detail Design - Controls Principal Controls Engin1_Processed to GL 3/21/2025 210019 IHEIGAN SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.02.D.COCO.PART2 ENGCO 5 236.35 Ivan Heigan 1180541 3/20/2025 XU97P01A 02.D.COCO.PART2 1.00 0 236.35 AUD ENGCO 5 236.35 Approved Comms managment Australia East Red Mountain Tails Pump ECI Detail Design - Controls Principal Controls Engin1_Processed to GL 3/21/2025 210019 IHEIGAN SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.02.D.COCO.PART2 ENGCO 5 236.35 Ivan Heigan 1180541 3/24/2025 XU97P01A 02.D.COCO.PART2 1.10 0 236.35 AUD ENGCO 5 259.99 Approved Comms managment Australia East Red Mountain Tails Pump ECI Detail Design - Controls Principal Controls Engin1_Processed to GL 3/28/2025 210022 IHEIGAN SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.02.D.COCO.PART2 ENGCO 5 236.35 Ivan Heigan 1180541 3/25/2025 XU97P01A 02.D.COCO.PART2 1.20 0 236.35 AUD ENGCO 5 283.62 Approved Comms managment Australia East Red Mountain Tails Pump ECI Detail Design - Controls Principal Controls Engin1_Processed to GL 3/28/2025 210022 IHEIGAN SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.02.D.COCO.PART2 ENGCO 5 236.35 Ivan Heigan 1180541 3/26/2025 XU97P01A 02.D.COCO.PART2 1.10 0 236.35 AUD ENGCO 5 259.99 Approved Comms managment Australia East Red Mountain Tails Pump ECI Detail Design - Controls Principal Controls Engin1_Processed to GL 3/28/2025 210022 IHEIGAN SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.02.D.COCO.PART2 ENGCO 5 236.35 Ivan Heigan 1180541 3/27/2025 XU97P01A 02.D.COCO.PART2 0.50 0 236.35 AUD ENGCO 5 118.18 Approved Comms managment Australia East Red Mountain Tails Pump ECI Detail Design - Controls Principal Controls Engin1_Processed to GL 3/28/2025 210022 IHEIGAN SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.02.D.COCO.PART2 ENGCO 5 236.35 Ivan Heigan 1180541 3/31/2025 XU97P01A 02.D.COCO.PART2 1.10 0 236.35 AUD ENGCO 5 259.99 Approved Comms managment Australia East Red Mountain Tails Pump ECI Detail Design - Controls Principal Controls Engin1_Processed to GL 3/31/2025 210023 IHEIGAN SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.02.D.COCO.PART2 ENGCO 5 236.35 Ivan Heigan 1180541 4/1/2025 XU97P01A 02.D.COCO.PART2 2.20 0 236.35 AUD ENGCO 5 519.97 Approved Spec Review Australia East Red Mountain Tails Pump ECI Detail Design - Controls Principal Controls Engin1_Processed to GL 4/4/2025 210019 IHEIGAN SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.02.D.COCO.PART2 ENGCO 5 236.35 Ivan Heigan 1180541 4/3/2025 XU97P01A 02.D.COCO.PART2 1.60 0 236.35 AUD ENGCO 5 378.16 Approved Spec Review Australia East Red Mountain Tails Pump ECI Detail Design - Controls Principal Controls Engin1_Processed to GL 4/4/2025 210019 IHEIGAN SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.02.D.COCO.PART2 ENGCO 5 236.35 Ivan Heigan 1180541 4/7/2025 XU97P01A 02.D.COCO.PART2 1.10 0 236.35 AUD ENGCO 5 259.99 Approved Comms managment Australia East Red Mountain Tails Pump ECI Detail Design - Controls Principal Controls Engin1_Processed to GL 4/9/2025 210022 IHEIGAN SAU01 SDM AU Brisbane Head Office
Engineer Principal XU97P01A XU97P01A.02.D.COCO.PART2 ENGCO 5 236.35 Ivan Heigan 1180541 4/9/2025 XU97P01A 02.D.COCO.PART2 3.40 0 236.35 AUD ENGCO 5 803.59 Approved Comms managment Australia East Red Mountain Tails Pump ECI Detail Design - Controls Principal Controls Engin1_Processed to GL 4/9/2025 210022 IHEIGAN SAU01 SDM AU Brisbane Head Office
Engineer Undergraduate XU97P01A XU97P01A.01.D.ELEL.PART1 ENGEL 1 51.96 Bradley Mikkelsen 3354265 1/22/2025 XU97P01A 01.D.ELEL.PART1 4.60 0 51.96 AUD ENGEL 1 239.02 Approved Transformer Loading SheeAustralia East Red Mountain Tails Pump ECI Prelim Design - Electrical Undergraduate Electrica1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Design Manager Standard XU97P01A XU97P01A.01.D.DMDM.PART1 ENGPR 3 138.02 Ella Janssen 3354437 2/3/2025 XU97P01A 01.D.DMDM.PART1 1.00 0 138.02 AUD ENGPR 3 138.02 Approved Spec and Reg Compiling Australia East Red Mountain Tails Pump ECI Prelim Design - Mgmt & Admin Design Manager 1_Processed to GL 2/7/2025 210009 EJANSSEN SAU01 SDM AU Brisbane Head Office
Design Manager Standard XU97P01A XU97P01A.01.D.DMDM.PART1 ENGPR 3 138.02 Ella Janssen 3354437 2/5/2025 XU97P01A 01.D.DMDM.PART1 1.00 0 138.02 AUD ENGPR 3 138.02 Approved Spec and Reg Compiling Australia East Red Mountain Tails Pump ECI Prelim Design - Mgmt & Admin Design Manager 1_Processed to GL 2/7/2025 210009 EJANSSEN SAU01 SDM AU Brisbane Head Office
Design Manager Standard XU97P01A XU97P01A.01.D.DMDM.PART1 ENGPR 3 138.02 Ella Janssen 3354437 2/6/2025 XU97P01A 01.D.DMDM.PART1 2.00 0 138.02 AUD ENGPR 3 276.04 Approved Spec and Reg Compiling Australia East Red Mountain Tails Pump ECI Prelim Design - Mgmt & Admin Design Manager 1_Processed to GL 2/7/2025 210009 EJANSSEN SAU01 SDM AU Brisbane Head Office
Design Manager Standard XU97P01A XU97P01A.02.D.DMDM.PART2 ENGDM 4 164.70 Ella Janssen 3354437 3/18/2025 XU97P01A 02.D.DMDM.PART2 0.50 0 164.7 AUD ENGDM 4 82.35 Approved Document Formatting Australia East Red Mountain Tails Pump ECI Detail Design - Mgmt & Admin Design Manager 1_Processed to GL 3/21/2025 210019 EJANSSEN SAU01 SDM AU Brisbane Head Office
Design Manager Standard XU97P01A XU97P01A.02.D.DMDM.PART2 ENGDM 4 164.70 Ella Janssen 3354437 4/10/2025 XU97P01A 02.D.DMDM.PART2 1.00 0 164.7 AUD ENGDM 4 164.70 Approved Briefing and document updAustralia East Red Mountain Tails Pump ECI Detail Design - Mgmt & Admin Design Manager 1_Processed to GL 4/11/2025 210018 EJANSSEN SAU01 SDM AU Brisbane Head Office
Design Manager Standard XU97P01A XU97P01A.02.D.DMDM.PART2 ENGDM 4 164.70 Ella Janssen 3354437 4/11/2025 XU97P01A 02.D.DMDM.PART2 3.00 0 164.7 AUD ENGDM 4 494.10 Approved Briefing and document updAustralia East Red Mountain Tails Pump ECI Detail Design - Mgmt & Admin Design Manager 1_Processed to GL 4/11/2025 210018 EJANSSEN SAU01 SDM AU Brisbane Head Office
Draftsperson Standard XU97P01A XU97P01A.02.D.CVCV.PART2 TECCV 3 89.42 Dorcas Ogunshola 3354456 3/25/2025 XU97P01A 02.D.CVCV.PART2 5.10 0 89.42 AUD TECCV 3 456.04 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Detail Design - Civil Civil Designer 1_Processed to GL 3/31/2025 210023 DOGUNSHOSAU01 SDM AU Brisbane Head Office
Draftsperson Standard XU97P01A XU97P01A.02.D.CVCV.PART2 TECCV 3 89.42 Dorcas Ogunshola 3354456 3/26/2025 XU97P01A 02.D.CVCV.PART2 2.00 0 89.42 AUD TECCV 3 178.84 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Detail Design - Civil Civil Designer 1_Processed to GL 3/31/2025 210023 DOGUNSHOSAU01 SDM AU Brisbane Head Office
Draftsperson Standard XU97P01A XU97P01A.02.D.CVCV.PART2 TECCV 3 89.42 Dorcas Ogunshola 3354456 4/1/2025 XU97P01A 02.D.CVCV.PART2 5.00 0 89.42 AUD TECCV 3 447.10 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Detail Design - Civil Civil Designer 1_Processed to GL 4/7/2025 210020 DOGUNSHOSAU01 SDM AU Brisbane Head Office
Draftsperson Standard XU97P01A XU97P01A.02.D.CVCV.PART2 TECCV 3 89.42 Dorcas Ogunshola 3354456 4/1/2025 XU97P01A 02.D.CVCV.PART2 1.00 0 89.42 AUD TECCV 3 89.42 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Detail Design - Civil Civil Designer 1_Processed to GL 4/6/2025 210025 DOGUNSHOSAU01 SDM AU Brisbane Head Office
Design Manager Standard XU97P01A XU97P01A.01.D.DMDM.PART1 ENGDM 4 179.98 Alexandros Kamitsis 3354472 12/19/2024 XU97P01A 01.D.DMDM.PART1 7.60 0 179.98 AUD ENGDM 4 1,367.85 Approved DM handovers Australia East Red Mountain Tails Pump ECI Prelim Design - Mgmt & Admin Design Manager 1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Design Manager Standard XU97P01A XU97P01A.01.D.DMDM.PART1 ENGDM 4 179.98 Alexandros Kamitsis 3354472 1/6/2025 XU97P01A 01.D.DMDM.PART1 7.60 0 179.98 AUD ENGDM 4 1,367.85 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Mgmt & Admin Design Manager 1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Design Manager Standard XU97P01A XU97P01A.01.D.DMDM.PART1 ENGDM 4 179.98 Alexandros Kamitsis 3354472 1/7/2025 XU97P01A 01.D.DMDM.PART1 7.60 0 179.98 AUD ENGDM 4 1,367.85 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Mgmt & Admin Design Manager 1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Design Manager Standard XU97P01A XU97P01A.01.D.DMDM.PART1 ENGDM 4 179.98 Alexandros Kamitsis 3354472 1/10/2025 XU97P01A 01.D.DMDM.PART1 3.00 0 179.98 AUD ENGDM 4 539.94 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Mgmt & Admin Design Manager 1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Design Manager Standard XU97P01A XU97P01A.01.D.DMDM.PART1 ENGDM 4 179.98 Alexandros Kamitsis 3354472 1/13/2025 XU97P01A 01.D.DMDM.PART1 7.60 0 179.98 AUD ENGDM 4 1,367.85 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Mgmt & Admin Design Manager 1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Design Manager Standard XU97P01A XU97P01A.01.D.DMDM.PART1 ENGDM 4 179.98 Alexandros Kamitsis 3354472 1/14/2025 XU97P01A 01.D.DMDM.PART1 7.60 0 179.98 AUD ENGDM 4 1,367.85 Approved Regular Sdg Australia East Red Mountain Tails Pump ECI Prelim Design - Mgmt & Admin Design Manager 1_Processed to GL 1/29/2025 210011 KBEDDOES SAU01 SDM AU Brisbane Head Office
Design Manager Standard XU97P01A XU97P01A.01.D.DMDM.PART1 ENGDM 4 179.98 Alexandros Kamitsis 3354472 1/15/2025 XU97P01A 01.D.DMDM.PART1 2.00 0 179.98 AUD ENGDM 4 359.96 Approved Regular Sdg
Revision: 0 - 08/12/2025
924553805.xlsx/Reports Now S&E WIP Page 19 of 59
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
Revision: 0 - 08/12/2025
924553805.xlsx/Reports Now S&E WIP Page 20 of 59
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
RESOURCE ALLOCATE REQ'D -
Revision: 0 - 08/12/2025
924553805.xlsx/Reports Now S&E WIP Page 21 of 59
Summary Hours by Person
2-Dec-24 9-Dec-24 16-Dec-24 23-Dec-24 30-Dec-24 6-Jan-25 13-Jan-25 20-Jan-25 27-Jan-25 3-Feb-25 10-Feb-25 17-Feb-25 24-Feb-25 3-Mar-25 10-Mar-25 17-Mar-25 24-Mar-25 31-Mar-25 7-Apr-25 14-Apr-25 21-Apr-25 28-Apr-25 5-May-25 12-May-25 19-May-25 26-May-25 2-Jun-25 9-Jun-25 16-Jun-25 23-Jun-25 30-Jun-25 7-Jul-25 14-Jul-25 21-Jul-25 28-Jul-25 4-Aug-25 11-Aug-25 18-Aug-25 25-Aug-25 1-Sep-25 8-Sep-25 15-Sep-25 22-Sep-25 29-Sep-25 6-Oct-25 13-Oct-25 20-Oct-25 27-Oct-25 3-Nov-25 10-Nov-25 17-Nov-25 24-Nov-25 1-Dec-25
Resource Name Role/Discipline 8-Dec-24 15-Dec-24 22-Dec-24 29-Dec-24 5-Jan-25 12-Jan-25 19-Jan-25 26-Jan-25 2-Feb-25 9-Feb-25 16-Feb-25 23-Feb-25 2-Mar-25 9-Mar-25 16-Mar-25 23-Mar-25 30-Mar-25 6-Apr-25 13-Apr-25 20-Apr-25 27-Apr-25 4-May-25 11-May-25 18-May-25 25-May-25 1-Jun-25 8-Jun-25 15-Jun-25 22-Jun-25 29-Jun-25 6-Jul-25 13-Jul-25 20-Jul-25 27-Jul-25 3-Aug-25 10-Aug-25 17-Aug-25 24-Aug-25 31-Aug-25 7-Sep-25 14-Sep-25 21-Sep-25 28-Sep-25 5-Oct-25 12-Oct-25 19-Oct-25 26-Oct-25 2-Nov-25 9-Nov-25 16-Nov-25 23-Nov-25 30-Nov-25 7-Dec-25
Peter Johannessen Design Manager Senior 17.10 11.00 12.10 - - - - 34.50 28.90 33.50 24.40 31.00 31.40 26.90 17.40 23.40 15.80 27.00 26.55 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 360.95
Kate Beddoes Administration Senior - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Cassandra McCoy Administration Standard - 6.08 6.08 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 12.16
Christina De Jager Administration Standard - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Yi Chen Discipline Manager - - 3.00 - - - - - - - - - - 2.00 - - - - 2.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 7.00
Jared Armstead Project Development Manager - 1.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1.00
Nicolette Doherty Procurement Senior 4.60 - - - - - 20.20 17.80 25.40 30.80 35.40 30.40 33.00 36.00 29.40 38.00 38.00 38.00 38.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 415.00
Mark Woodall Planner Principal - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Sean Stringer Engineer Principal 6.00 5.00 7.00 - - 6.20 9.20 7.50 8.10 9.00 11.70 - - 12.00 10.00 15.00 13.00 - 4.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 123.70
Leslie Westray Engineer Principal 4.00 2.00 8.00 - - - 2.00 4.00 7.00 6.00 6.00 6.00 4.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 49.00
Stephen De Andrade Planner Senior - 7.60 - - - - - 22.80 11.60 - 5.60 8.60 3.00 17.60 19.80 16.20 9.60 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 122.40
Luke Wilkinson Engineer Principal 2.00 2.00 2.00 - - 1.00 25.00 1.00 1.00 1.00 - - - 2.70 1.00 2.00 1.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 41.70
Bernard Hayes Engineer Senior - 4.60 5.80 - - - 1.60 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 12.00
Andrew Tanner Draftsperson Senior 1.00 0.50 2.50 - - - - 11.10 11.10 6.00 8.00 36.00 18.50 33.70 1.00 5.60 2.25 2.00 2.50 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 141.75
Craig Grimmond Engineer Senior 13.20 19.40 6.60 - - 1.00 38.20 22.80 11.60 24.40 20.40 31.40 31.50 25.00 27.40 32.00 21.00 6.60 16.80 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 349.30
Bevan Hall Design Manager Senior - - - - - - 1.50 1.50 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3.00
Christopher Reis Engineer Principal - - 2.00 - - - 2.00 - 2.00 2.00 1.00 1.00 4.20 3.20 4.00 2.00 - - 3.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 26.40
Beau Brooker Engineer Graduate - - - - - 4.00 17.70 12.60 8.20 7.00 2.00 15.50 4.00 18.00 17.80 16.60 20.50 12.10 16.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 172.00
Alexandros Kamitsis Design Manager Standard - - 7.60 - - 18.20 17.20 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 43.00
Dale Hoffmann Engineer Consultant - - - - - 1.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1.00
Zaquan Alizan Engineer Standard - - - - - - - 16.20 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 16.20
Bradley Mikkelsen Engineer Undergraduate - - - - - - - 4.60 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 4.60
Tyson Buhagiar Engineer Standard - - - - - - - 22.70 10.70 28.60 10.70 2.40 4.50 13.60 0.60 3.70 - 29.40 11.20 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 138.10
Victor Umanzor Engineer Senior - - - - - - - - 12.30 18.90 20.20 22.40 22.40 27.40 12.20 8.00 13.20 12.00 1.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 170.00
Sarah Norton Draftsperson Standard - - - - - - - - 12.60 19.60 15.80 17.20 5.20 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 70.40
Alan Grieve Draftsperson Senior - - - - - - - - 18.80 22.80 38.00 34.00 35.40 38.00 29.80 36.40 36.40 38.00 6.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 333.60
Ying Ge Document Control Standard - - - - - - - - - 2.00 1.20 2.80 2.20 - 0.60 3.60 1.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 13.40
Ella Janssen Design Manager Standard - - - - - - - - - 4.00 - - - - - 0.50 - - 4.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 8.50
Michael Kairouz Engineer Standard - - - - - - - - - - 27.90 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 27.90
Wei Cao Engineer Senior - - - - - - - - - - 4.00 28.80 32.40 34.20 34.00 34.00 34.00 34.40 28.80 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 264.60
Ivan Heigan Engineer Principal - - - - - - - - - - 1.10 4.00 3.60 - - 5.80 3.90 4.90 4.50 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 27.80
Karyn Morgan Estimator Senior - - - - - - - - - - - 1.00 - - - - - 1.00 1.50 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3.50
Johann Grobler Draftsperson Senior - - - - - - - - - - - 7.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 7.00
Cameron Burns Engineer Principal - - - - - - - - - - - 1.00 8.20 5.00 6.00 7.00 1.60 2.60 14.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 45.40
Ashley Rose Draftsperson Standard - - - - - - - - - - - - 3.00 - - 15.20 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 18.20
Elizabeth Blaszczyk Draftsperson Senior - - - - - - - - - - - - 8.00 - 11.60 0.60 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 20.20
Cynthia Wallace Project Engineer - - - - - - - - - - - - 3.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3.00
Russell Butt Engineer Senior - - - - - - - - - - - - 2.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2.00
Anthony Loof Engineer Senior - - - - - - - - - - - - 3.00 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3.00
Daniel Brown Senior Project Engineer - - - - - - - - - - - - - - 6.00 - 15.20 38.00 30.40 - -
Revision: 0 - 08/12/2025
924553805.xlsx/Resource Allocate Page 22 of 59
Study Manhours and Cost Tracking Sheet 1 1 2 2 2 2 2 2 3 3 3 3 4 4 4 4 5 5 5 5 6 6 1 1 2 2 2 2 2 2 3 3 3 3 4 4 4 4 5 5 5 5 6 6 6 6 7 7 7 7 7 8 8 8 8 9 9 9 9 10 10 10 10 10 11 11 11 11 12 12 12 12 12 13 13 JDE EOM Allocate
Workhours by Week Charge by Week CHARGE by Period 1 2 3 4 5 6 7 8 9 10 11 12
Project: XU97P01 Red Mountain CHPP Tailings 1 2 3 4 5 6 7 8 9 10 11 12
SAP WBS: n/a Week Commencing
JDE: XU97P01A JDE Contract: Mon 2-Dec-24 9-Dec-24 16-Dec-24 23-Dec-24 30-Dec-24 6-Jan-25 13-Jan-25 20-Jan-25 27-Jan-25 3-Feb-25 10-Feb-25 17-Feb-25 24-Feb-25 3-Mar-25 10-Mar-25 17-Mar-25 24-Mar-25 31-Mar-25 7-Apr-25 14-Apr-25 21-Apr-25 28-Apr-25 2-Dec-24 9-Dec-24 16-Dec-24 23-Dec-24 30-Dec-24 6-Jan-25 13-Jan-25 20-Jan-25 27-Jan-25 3-Feb-25 10-Feb-25 17-Feb-25 24-Feb-25 3-Mar-25 10-Mar-25 17-Mar-25 24-Mar-25 31-Mar-25 7-Apr-25 14-Apr-25 21-Apr-25 28-Apr-25 5-May-25 12-May-25 19-May-25 26-May-25 2-Jun-25 9-Jun-25 16-Jun-25 23-Jun-25 30-Jun-25 7-Jul-25 14-Jul-25 21-Jul-25 28-Jul-25 4-Aug-25 11-Aug-25 18-Aug-25 25-Aug-25 1-Sep-25 8-Sep-25 15-Sep-25 22-Sep-25 29-Sep-25 6-Oct-25 13-Oct-25 20-Oct-25 27-Oct-25 3-Nov-25 10-Nov-25 17-Nov-25 24-Nov-25 1-Dec-25 TOTAL COST TOTAL CHARGE PO Code Resource Name Dec-24 Jan-25 Feb-25 Mar-25 Apr-25 May-25 Jun-25 Jul-25 Aug-25 Sep-25 Oct-25 Nov-25 Cumulative
Job Number SAP Level WBS Resource Name Role/Discipline Hours Charge Hours Charge Hours Charge Hours Charge Hours Charge Hours Charge Hours Charge Hours Charge Hours Charge Hours Charge Hours Charge Hours Charge
Sun 08-Dec-24 15-Dec-24 22-Dec-24 29-Dec-24 05-Jan-25 12-Jan-25 19-Jan-25 26-Jan-25 02-Feb-25 09-Feb-25 16-Feb-25 23-Feb-25 02-Mar-25 09-Mar-25 16-Mar-25 23-Mar-25 30-Mar-25 06-Apr-25 13-Apr-25 20-Apr-25 27-Apr-25 04-May-25 08-Dec-24 15-Dec-24 22-Dec-24 29-Dec-24 05-Jan-25 12-Jan-25 19-Jan-25 26-Jan-25 02-Feb-25 09-Feb-25 16-Feb-25 23-Feb-25 02-Mar-25 09-Mar-25 16-Mar-25 23-Mar-25 30-Mar-25 06-Apr-25 13-Apr-25 20-Apr-25 27-Apr-25 04-May-25 11-May-25 18-May-25 25-May-25 01-Jun-25 08-Jun-25 15-Jun-25 22-Jun-25 29-Jun-25 06-Jul-25 13-Jul-25 20-Jul-25 27-Jul-25 03-Aug-25 10-Aug-25 17-Aug-25 24-Aug-25 31-Aug-25 07-Sep-25 14-Sep-25 21-Sep-25 28-Sep-25 05-Oct-25 12-Oct-25 19-Oct-25 26-Oct-25 02-Nov-25 09-Nov-25 16-Nov-25 23-Nov-25 30-Nov-25 07-Dec-25 Hours Charge
$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - - $ -
XU97P01A XU97P01A Peter Johannessen Design Manager Senior 2.41% 17.10 11.00 12.10 - - - - 34.50 28.90 33.50 24.40 31.00 31.40 26.90 17.40 23.40 15.80 27.00 26.55 - - - 360.95 $ 4,010.63 $ 2,579.94 $ 2,837.93 $ - $ - $ - $ - $ 8,091.63 $ 6,778.21 $ 7,857.09 $ 5,722.78 $ 7,270.74 $ 7,364.56 $ 6,309.13 $ 4,081.00 $ 5,488.24 $ 3,705.73 $ 6,332.58 $ 6,227.04 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 82,661.16 $ 84,657.21 10.01 Peter Johannessen 28.10 $ 6,590.57 46.60 $ 10,929.56 117.80 $ 27,628.81 99.10 $ 23,242.91 69.35 $ 16,265.35 - $ - - $ - - $ - - $ - - $ - - $ - - $ - 360.95 $ 84,657.21
XU97P01A XU97P01A Kate Beddoes Administration Senior - - - - - - - - - - - - - - - - - - - - - - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 10.01 Kate Beddoes - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ -
XU97P01A XU97P01A Cassandra McCoy Administration Standard 63.51% - 6.08 6.08 - - - - - - - - - - - - - - - - - - - 12.16 $ - $ 507.01 $ 507.01 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 620.16 $ 1,014.02 10.01 Cassandra McCoy 6.08 $ 507.01 6.08 $ 507.01 - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - 12.16 $ 1,014.02
XU97P01A XU97P01A Christina De Jager Administration Standard - - - - - - - - - - - - - - - - - - - - - - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 10.01 Christina De Jager - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ -
XU97P01A XU97P01A Bevan Hall Design Manager Senior 11.53% - - - - - - 1.50 1.50 - - - - - - - - - - - - - - 3.00 $ - $ - $ - $ - $ - $ - $ 351.81 $ 351.81 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 630.90 $ 703.62 10.01 Bevan Hall - $ - 3.00 $ 703.62 - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - 3.00 $ 703.62
XU97P01A XU97P01A Alexandros Kamitsis Design Manager Standard 21.62% - - 7.60 - - 18.20 17.20 - - - - - - - - - - - - - - - 43.00 $ - $ - $ 1,663.64 $ - $ - $ 3,983.98 $ 3,765.08 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 7,739.14 $ 9,412.70 10.01 Alexandros Kamitsis - $ - 43.00 $ 9,412.70 - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - 43.00 $ 9,412.70
XU97P01A XU97P01A Jared Armstead Project Development Manager 16.19% - 1.00 - - - - - - - - - - - - - - - - - - - - 1.00 $ - $ 349.20 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 300.54 $ 349.20 10.01 Jared Armstead 1.00 $ 349.20 - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - 1.00 $ 349.20
XU97P01A XU97P01A Ella Janssen Design Manager Standard 32.91% - - - - - 0.50 - - 4.00 - - - 4.50 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 109.45 $ - $ - $ 875.60 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 741.15 $ 985.05 10.01 Ella Janssen - $ - - $ - - $ - 0.50 $ 109.45 4.00 $ 875.60 - $ - - $ - - $ - - $ - - $ - - $ - - $ - 4.50 $ 985.05
XU97P01A XU97P01A Todd Welsh Construction Manager Standard 13.81% - - - - - - - - - - - - - - - - - - 7.60 - - - 7.60 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 2,535.13 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 2,227.48 $ 2,535.13 10.01 Todd Welsh - $ - - $ - - $ - - $ - 7.60 $ 2,535.13 - $ - - $ - - $ - - $ - - $ - - $ - - $ - 7.60 $ 2,535.13
XU97P01A XU97P01A Ying Ge Document Control Standard 12.33% - - - - - - - - - 2.00 1.20 2.80 2.20 - 0.60 3.60 1.00 - - - - - 13.40 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 218.90 $ 131.34 $ 306.46 $ 240.79 $ - $ 65.67 $ 394.02 $ 109.45 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 1,305.70 $ 1,466.63 10.01 Ying Ge - $ - - $ - 6.00 $ 656.70 6.40 $ 700.48 1.00 $ 109.45 - $ - - $ - - $ - - $ - - $ - - $ - - $ - 13.40 $ 1,466.63
XU97P01A XU97P01A Karyn Morgan Estimator Senior 13.14% - - - - - - - - - - - 1.00 - - - - - 1.00 1.50 - - - 3.50 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 234.54 $ - $ - $ - $ - $ - $ 234.54 $ 351.81 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 725.55 $ 820.89 10.01 Karyn Morgan - $ - - $ - 1.00 $ 234.54 - $ - 2.50 $ 586.35 - $ - - $ - - $ - - $ - - $ - - $ - - $ - 3.50 $ 820.89
XU97P01A XU97P01A Cynthia Wallace Project Engineer 14.00% - - - - - - - - - - - - 3.00 - - - - - - - - - 3.00 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 437.79 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 384.03 $ 437.79 10.01 Cynthia Wallace - $ - - $ - - $ - 3.00 $ 437.79 - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - 3.00 $ 437.79
XU97P01A XU97P01A Daniel Brown Senior Project Engineer 4.22% - - - - - - - - - - - - - - 6.00 - 15.20 38.00 30.40 - - - 89.60 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 1,250.88 $ - $ 3,168.90 $ 7,922.24 $ 6,337.79 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 17,923.58 $ 18,679.81 10.01 Daniel Brown - $ - - $ - - $ - 6.00 $ 1,250.88 83.60 $ 17,428.93 - $ - - $ - - $ - - $ - - $ - - $ - - $ - 89.60 $ 18,679.81
XU97P01A XU97P01A Michael Alford-Jones Project Manager Standard 30.27% - - - - - - - - - - - - - - - 4.00 2.00 15.20 15.20 - - - 36.40 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 1,042.40 $ 521.20 $ 3,961.12 $ 3,961.12 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 7,281.46 $ 9,485.84 10.01 Michael Alford-Jones - $ - - $ - - $ - 4.00 $ 1,042.40 32.40 $ 8,443.44 - $ - - $ - - $ - - $ - - $ - - $ - - $ - 36.40 $ 9,485.84
XU97P01A XU97P01A Naomi Te Kiri Document Control Standard 12.33% - - - - - - - - - - - - - - - 0.08 - 0.75 - - - - 0.83 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 8.76 $ - $ 82.09 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 80.88 $ 90.84 10.01 Naomi Te Kiri - $ - - $ - - $ - 0.08 $ 8.76 0.75 $ 82.09 - $ - - $ - - $ - - $ - - $ - - $ - - $ - 0.83 $ 90.84
XU97P01A XU97P01A Roy Kneale Estimator Senior 13.14% - - - - - - - - - - - - - - - - - 0.50 1.25 - - - 1.75 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 117.27 $ 293.18 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 362.78 $ 410.45 10.01 Roy Kneale - $ - - $ - - $ - - $ - 1.75 $ 410.45 - $ - - $ - - $ - - $ - - $ - - $ - - $ - 1.75 $ 410.45
XU97P01A XU97P01A Tahir Rehan Senior Project Engineer 4.22% - - - - - - - - - - - - - - - - 1.00 2.60 - - - - 3.60 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 208.48 $ 542.05 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 720.14 $ 750.53 10.01 Tahir Rehan - $ - - $ - - $ - - $ - 3.60 $ 750.53 - $ - - $ - - $ - - $ - - $ - - $ - - $ - 3.60 $ 750.53
XU97P01A XU97P01A Kieron Kelly HSE Senior 5.19% - - - - - - - - - - - - - - - - - 38.00 38.00 - - - 76.00 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 8,120.22 $ 8,120.22 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 15,439.40 $ 16,240.44 10.01 Kieron Kelly - $ - - $ - - $ - - $ - 76.00 $ 16,240.44 - $ - - $ - - $ - - $ - - $ - - $ - - $ - 76.00 $ 16,240.44
XU97P01A XU97P01A Charis Simper Document Control Senior 29.10% - - - - - - - - - - - - - - - - - - 2.00 - - - 2.00 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 291.86 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 226.08 $ 291.86 10.01 Charis Simper - $ - - $ - - $ - - $ - 2.00 $ 291.86 - $ - - $ - - $ - - $ - - $ - - $ - - $ - 2.00 $ 291.86
XU97P01A XU97P01A Narmina Tilley Document Control Standard 12.33% - - - - - - - - - - - - - - - - - - 1.00 - - - 1.00 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 109.45 $ - $ - $ - $
Revision: 0 - 08/12/2025
924553805.xlsx/TRACKER Page 23 of 59
Study Manhours and Cost Tracking Sheet 1 1 2 2 2 2 2 2 3 3 3 3 4 4 4 4 5 5 5 5 6 6 1 1 2 2 2 2 2 2 3 3 3 3 4 4 4 4 5 5 5 5 6 6 6 6 7 7 7 7 7 8 8 8 8 9 9 9 9 10 10 10 10 10 11 11 11 11 12 12 12 12 12 13 13 JDE EOM Allocate
Workhours by Week Charge by Week CHARGE by Period 1 2 3 4 5 6 7 8 9 10 11 12
Project: XU97P01 Red Mountain CHPP Tailings 1 2 3 4 5 6 7 8 9 10 11 12
SAP WBS: n/a Week Commencing
JDE: XU97P01A JDE Contract: Mon 2-Dec-24 9-Dec-24 16-Dec-24 23-Dec-24 30-Dec-24 6-Jan-25 13-Jan-25 20-Jan-25 27-Jan-25 3-Feb-25 10-Feb-25 17-Feb-25 24-Feb-25 3-Mar-25 10-Mar-25 17-Mar-25 24-Mar-25 31-Mar-25 7-Apr-25 14-Apr-25 21-Apr-25 28-Apr-25 TOTAL 2-Dec-24 9-Dec-24 16-Dec-24 23-Dec-24 30-Dec-24 6-Jan-25 13-Jan-25 20-Jan-25 27-Jan-25 3-Feb-25 10-Feb-25 17-Feb-25 24-Feb-25 3-Mar-25 10-Mar-25 17-Mar-25 24-Mar-25 31-Mar-25 7-Apr-25 14-Apr-25 21-Apr-25 28-Apr-25 5-May-25 12-May-25 19-May-25 26-May-25 2-Jun-25 9-Jun-25 16-Jun-25 23-Jun-25 30-Jun-25 7-Jul-25 14-Jul-25 21-Jul-25 28-Jul-25 4-Aug-25 11-Aug-25 18-Aug-25 25-Aug-25 1-Sep-25 8-Sep-25 15-Sep-25 22-Sep-25 29-Sep-25 6-Oct-25 13-Oct-25 20-Oct-25 27-Oct-25 3-Nov-25 10-Nov-25 17-Nov-25 24-Nov-25 1-Dec-25 TOTAL COST TOTAL CHARGE PO Code Resource Name Dec-24 Jan-25 Feb-25 Mar-25 Apr-25 May-25 Jun-25 Jul-25 Aug-25 Sep-25 Oct-25 Nov-25 Cumulative
Gross Margin HOURS
Job Number SAP Level WBS Resource Name Role/Discipline (on Cost) Hours Charge Hours Charge Hours Charge Hours Charge Hours Charge Hours Charge Hours Charge Hours Charge Hours Charge Hours Charge Hours Charge Hours Charge
per Person Sun 08-Dec-24 15-Dec-24 22-Dec-24 29-Dec-24 05-Jan-25 12-Jan-25 19-Jan-25 26-Jan-25 02-Feb-25 09-Feb-25 16-Feb-25 23-Feb-25 02-Mar-25 09-Mar-25 16-Mar-25 23-Mar-25 30-Mar-25 06-Apr-25 13-Apr-25 20-Apr-25 27-Apr-25 04-May-25 08-Dec-24 15-Dec-24 22-Dec-24 29-Dec-24 05-Jan-25 12-Jan-25 19-Jan-25 26-Jan-25 02-Feb-25 09-Feb-25 16-Feb-25 23-Feb-25 02-Mar-25 09-Mar-25 16-Mar-25 23-Mar-25 30-Mar-25 06-Apr-25 13-Apr-25 20-Apr-25 27-Apr-25 04-May-25 11-May-25 18-May-25 25-May-25 01-Jun-25 08-Jun-25 15-Jun-25 22-Jun-25 29-Jun-25 06-Jul-25 13-Jul-25 20-Jul-25 27-Jul-25 03-Aug-25 10-Aug-25 17-Aug-25 24-Aug-25 31-Aug-25 07-Sep-25 14-Sep-25 21-Sep-25 28-Sep-25 05-Oct-25 12-Oct-25 19-Oct-25 26-Oct-25 02-Nov-25 09-Nov-25 16-Nov-25 23-Nov-25 30-Nov-25 07-Dec-25 Hours Charge
Dec-24 Jan-25 Feb-25 Mar-25 Apr-25 May-25 Jun-25 Jul-25 Aug-25 Sep-25 Oct-25 Nov-25 Cumulative
JDE Charge BU SAP Project No. Role/Discipline Role/Discipline Hours Charge Hours Charge Hours Charge Hours Charge Hours Charge Hours Charge Hours Charge Hours Charge Hours Charge Hours Charge Hours Charge Hours Charge Hours Charge
XU97P01A XU97P01A Administration Senior - - - - - - - - - - - - - - - - - - - - - - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - - Administration Senior - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ -
XU97P01A XU97P01A Administration Standard - 6.08 6.08 - - - - - - - - - - - - - - - - - - - 12.16 $ - $ 507.01 $ 507.01 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 1,014.02 Administration Standard 6.08 $ 507.01 6.08 $ 507.01 - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - 12.16 $ 1,014.02
XU97P01A XU97P01A Document Control Manager - - - - - - - - - - - - - - - - - - - - - - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - - Document Control Manager - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ -
XU97P01A XU97P01A Document Control Senior - - - - - - - - - - - - - - - - - - 2.00 - - - 2.00 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 291.86 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 291.86 Document Control Senior - $ - - $ - - $ - - $ - 2.00 $ 291.86 - $ - - $ - - $ - - $ - - $ - - $ - - $ - 2.00 $ 291.86
XU97P01A XU97P01A Document Control Standard - - - - - - - - - 2.00 1.20 2.80 2.20 - 0.60 3.68 1.00 0.75 1.00 - - - 15.23 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 218.90 $ 131.34 $ 306.46 $ 240.79 $ - $ 65.67 $ 402.78 $ 109.45 $ 82.09 $ 109.45 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 1,666.92 Document Control Standard - $ - - $ - 6.00 $ 656.70 6.48 $ 709.24 2.75 $ 300.99 - $ - - $ - - $ - - $ - - $ - - $ - - $ - 15.23 $ 1,666.92
XU97P01A XU97P01A General Manager Standard - - - - - - - - - - - - - - - - - - - - - - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - - General Manager Standard - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ -
XU97P01A XU97P01A Project Development Manager - 1.00 - - - - - - - - - - - - - - - - - - - - 1.00 $ - $ 349.20 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 349.20 Project Development Manager 1.00 $ 349.20 - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - 1.00 $ 349.20
XU97P01A XU97P01A BD Manager Senior - - - - - - - - - - - - - - - - - - - - - - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - - BD Manager Senior - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ -
XU97P01A XU97P01A BD Manager Standard - - - - - - - - - - - - - - - - - - - - - - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - - BD Manager Standard - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ -
XU97P01A XU97P01A Group Manager Standard - - - - - - - - - - - - - - - - - - - - - - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - - Group Manager Standard - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ -
XU97P01A XU97P01A Study Manager Senior - - - - - - - - - - - - - - - - - - - - - - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - - Study Manager Senior - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ -
XU97P01A XU97P01A Study Manager Standard - - - - - - - - - - - - - - - - - - - - - - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - - Study Manager Standard - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ -
XU97P01A XU97P01A Design Manager Senior 17.10 11.00 12.10 - - - 1.50 36.00 28.90 33.50 24.40 31.00 31.40 26.90 17.40 23.40 15.80 27.00 26.55 - - - 363.95 $ 4,010.63 $ 2,579.94 $ 2,837.93 $ - $ - $ - $ 351.81 $ 8,443.44 $ 6,778.21 $ 7,857.09 $ 5,722.78 $ 7,270.74 $ 7,364.56 $ 6,309.13 $ 4,081.00 $ 5,488.24 $ 3,705.73 $ 6,332.58 $ 6,227.04 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 85,360.83 Design Manager Senior 28.10 $ 6,590.57 49.60 $ 11,633.18 117.80 $ 27,628.81 99.10 $ 23,242.91 69.35 $ 16,265.35 - $ - - $ - - $ - - $ - - $ - - $ - - $ - 363.95 $ 85,360.83
XU97P01A XU97P01A Design Manager Standard - - 7.60 - - 18.20 17.20 - - - - - - - - 0.50 - - 4.00 - - - 47.50 $ - $ - $ 1,663.64 $ - $ - $ 3,983.98 $ 3,765.08 $ - $ - $ - $ - $ - $ - $ - $ - $ 109.45 $ - $ - $ 875.60 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 10,397.75 Design Manager Standard - $ - 43.00 $ 9,412.70 - $ - 0.50 $ 109.45 4.00 $ 875.60 - $ - - $ - - $ - - $ - - $ - - $ - - $ - 47.50 $ 10,397.75
XU97P01A XU97P01A Discipline Manager - - 3.00 - - - - - - - - - - 2.00 - - - - 2.00 - - - 7.00 $ - $ - $ 844.35 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 562.90 $ - $ - $ - $ - $ 562.90 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 1,970.15 Discipline Manager - $ - 3.00 $ 844.35 - $ - 2.00 $ 562.90 2.00 $ 562.90 - $ - - $ - - $ - - $ - - $ - - $ - - $ - 7.00 $ 1,970.15
XU97P01A XU97P01A Engineer Consultant - - - - - 1.00 - - - - - - - - - - - - - - - - 1.00 $ - $ - $ - $ - $ - $ 375.26 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 375.26 Engineer Consultant - $ - 1.00 $ 375.26 - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - 1.00 $ 375.26
XU97P01A XU97P01A Engineer Principal 12.00 9.00 19.00 - - 7.20 38.20 12.50 18.10 18.00 19.80 12.00 20.00 22.90 21.00 31.80 19.50 7.50 25.50 - - - 314.00 $ 3,189.72 $ 2,392.29 $ 5,050.39 $ - $ - $ 1,913.83 $ 10,153.94 $ 3,322.63 $ 4,811.16 $ 4,784.58 $ 5,263.04 $ 3,189.72 $ 5,316.20 $ 6,087.05 $ 5,582.01 $ 8,452.76 $ 5,183.30 $ 1,993.58 $ 6,778.16 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 83,464.34 Engineer Principal 21.00 $ 5,582.01 76.90 $ 20,440.79 67.90 $ 18,048.50 95.70 $ 25,438.02 52.50 $ 13,955.03 - $ - - $ - - $ - - $ - - $ - - $ - - $ - 314.00 $ 83,464.34
XU97P01A XU97P01A Engineer Senior 13.20 24.00 12.40 - - 1.00 39.80 22.80 23.90 43.30 44.60 82.60 91.30 86.60 73.60 74.00 68.20 53.00 46.60 - - - 800.90 $ 2,751.94 $ 5,003.52 $ 2,585.15 $ - $ - $ 208.48 $ 8,297.50 $ 4,753.34 $ 4,982.67 $ 9,027.18 $ 9,298.21 $ 17,220.45 $ 19,034.22 $ 18,054.37 $ 15,344.13 $ 15,427.52 $ 14,218.34 $ 11,049.44 $ 9,715.17 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 166,971.63 Engineer Senior 37.20 $ 7,755.46 76.00 $ 15,844.48 194.40 $ 40,528.51 325.50 $ 67,860.24 167.80 $ 34,982.94 - $ - - $ - - $ - - $ - - $ - - $ - - $ - 800.90 $ 166,971.63
XU97P01A XU97P01A Engineer Intermediate - - - - - - - - - - - - - - - - - - - - - - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - - Engineer Intermediate - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ - - $ -
XU97P01A XU97P01A Engineer Standard - - - - - - - 38.90 10.70 28.60 38.60 2.40 4.50 13.60 0.60 3.70 - 29.40 11.20 - - - 182.20 $ - $ - $ - $ - $ - $ - $ - $ 5,676.68 $ 1,561.45 $ 4,173.60 $ 5,632.90 $ 350.23 $ 656.69 $ 1,984.65 $ 87.56 $ 539.94 $ - $ 4,290.34 $ 1,634.42 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 26,588.45 Engineer Standard - $
Total Project by Role
Revision: 0 - 08/12/2025
924553805.xlsx/TRACKER Page 24 of 59
Labour Forecast Sheet JDE EOM Allocate 1 1 2 2 2 2 2 2 3 3 3 3 4 4 4 4 5 5 5 5 6 6 6 6 7 7 7 7 7 8 8 8 8 9 9
Forecast FTE by Week
Project: XU97P01 Red Mountain CHPP Tailings
Project Number: XU97P01A Week Commencing
Hours per week 38 CATS_DA Mon 2-Dec-24 9-Dec-24 16-Dec-24 23-Dec-24 30-Dec-24 6-Jan-25 13-Jan-25 20-Jan-25 27-Jan-25 3-Feb-25 10-Feb-25 17-Feb-25 24-Feb-25 3-Mar-25 10-Mar-25 17-Mar-25 24-Mar-25 31-Mar-25 7-Apr-25 14-Apr-25 21-Apr-25 28-Apr-25 5-May-25 12-May-25 19-May-25 26-May-25 2-Jun-25 9-Jun-25 16-Jun-25 23-Jun-25 30-Jun-25 7-Jul-25 14-Jul-25 21-Jul-25 28-Jul-25
Discipline Resource Name Role/Discipline Pers Num Act Type Cost Rate Charge Rate Sun 08-Dec-24 15-Dec-24 22-Dec-24 29-Dec-24 05-Jan-25 12-Jan-25 19-Jan-25 26-Jan-25 02-Feb-25 09-Feb-25 16-Feb-25 23-Feb-25 02-Mar-25 09-Mar-25 16-Mar-25 23-Mar-25 30-Mar-25 06-Apr-25 13-Apr-25 20-Apr-25 27-Apr-25 04-May-25 11-May-25 18-May-25 25-May-25 01-Jun-25 08-Jun-25 15-Jun-25 22-Jun-25 29-Jun-25 06-Jul-25 13-Jul-25 20-Jul-25 27-Jul-25 03-Aug-25
Management
Management Peter Johannessen Design Manager Senior 1179958 $ 234.54 0.80 0.80 0.80 0.80 0.80 0.80 0.80 1.00 1.00 0.80 0.80 0.80 1.00 0.80 0.50 467.40 #VALUE! $ 109,624.00
Management Cassandra McCoy Administration Standard 1180062 $ 83.39 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 57.00 #VALUE! $ 4,753.23
Management 0 0 $ - - - - - - - - - - - - - - - - - #VALUE! $ -
Management 0 0 $ - - - - - - - - - - - - - - - - - #VALUE! $ -
Management Jared Armstead Project Development Manager 1147747 $ 349.20 0.03 0.03 0.03 0.03 0.35 0.35 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 39.60 #VALUE! $ 13,828.32
Management 0 0 $ - - #VALUE! $ -
Management Karyn Morgan Estimator Senior 1147771 $ 234.54 0.20 0.60 0.60 0.60 0.20 0.20 0.10 95.00 #VALUE! $ 22,281.30
Management Naomi Te Kiri Document Control Standard 1180201 $ 109.45 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 - - 98.80 #VALUE! $ 10,813.66
Management Roy Kneale Estimator Senior 1147770 $ 234.54 0.50 1.00 1.00 0.50 114.00 #VALUE! $ 26,737.56
Management 0 0 $ - - #VALUE! $ -
Management Stephen De Andrade Planner Senior 5543990 $ 224.11 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 49.40 #VALUE! $ 11,071.03
Management Nicolette Doherty Procurement Senior 5640790 $ 198.05 1.00 1.20 1.20 1.20 1.20 1.00 0.50 277.40 #VALUE! $ 54,939.07
Management #NAME? $ - - $ - $ -
Management 0 0 $ - - #VALUE! $ -
Management Kieron Kelly HSE Senior 1180583 $ 213.69 1.00 0.50 0.25 0.25 0.50 95.00 #VALUE! $ 20,300.55
Management Daniel Brown Senior Project Engineer 1179885 $ 208.48 1.00 1.00 1.00 1.00 1.00 1.00 228.00 #VALUE! $ 47,533.44
Management Michael Alford-Jones Project Manager Standard 1147426 $ 260.60 0.50 0.50 0.50 0.50 1.00 1.00 0.50 0.50 190.00 #VALUE! $ 49,514.00
Management Todd Welsh Construction Manager Standard 1147430 $ 333.57 0.50 19.00 #VALUE! $ 6,337.83
Management 0 0 $ - $ - - $ - $ -
Management Project Manager Project Manager Standard 0 $ 234.54 $ 260.60 10.00% - $ - $ -
Management Discipline Type: CM Weekly Forecast Total (hrs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 206.20 229.00 219.50 200.50 188.10 180.50 88.40 111.20 54.20 46.60 46.60 46.60 54.20 35.20 23.80 0.00 1730.60 #VALUE! $ 377,733.99
Disciplines: AD Cumulative Data Hours Charge Weekly Actual (hrs) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.0
ES Baseline hours and rates 2274.0 $ 218.29 Weekly Baseline (hrs) 26.0 52.0 45.0 0.0 0.0 50.0 70.0 50.0 40.0 71.0 53.0 74.0 80.0 89.0 81.0 81.0 80.0 80.0 80.0 64.0 55.0 100.0 80.0 80.0 80.0 80.0 80.0 80.0 80.0 80.0 80.0 71.0 69.0 69.0 13.0 2263.0
PL Forceast remaining 1730.6 $377,734 Weekly Variation (hrs) 0.0
PM Actual to date 4.0 $584 Weekly Forecast ($) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $44,238 $49,704 $47,674 $43,218 $42,413 $40,908 $19,085 $26,611 $11,262 $9,480 $9,480 $9,480 $11,262 $7,796 $5,122 $0 $377,734
DC Total (Forecast + Actual) 1734.6 $378,318 Weekly Actual ($) $0 $0 $0 $0 $0 $0 $0 $0 $0 $584 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $584
ZZ Baseline 2263.0 $493,996 Weekly Baseline ($) $5,676 $11,351 $9,823 $0 $0 $10,915 $15,280 $10,915 $8,732 $15,499 $11,570 $16,154 $17,463 $19,428 $17,682 $17,682 $17,463 $17,463 $17,463 $13,971 $12,006 $21,829 $17,463 $17,463 $17,463 $17,463 $17,463 $17,463 $17,463 $17,463 $17,463 $15,499 $15,062 $15,062 $2,838 $493,996
DM Variation 0.0 $0 Weekly Variation ($) $0
PO Over / Under to Baseline+Var 528.4 $115,679 Cumulative Over/Under to Baseline ($) $5,676 $17,027 $26,850 $26,850 $26,850 $37,765 $53,045 $63,960 $72,691 $87,607 $99,176 $115,330 $132,793 $152,221 $169,903 $187,585 $205,048 $222,511 $239,975 $209,707 $172,009 $146,164 $120,409 $95,460 $72,015 $70,393 $61,245 $67,446 $75,430 $83,414 $91,398 $95,635 $102,901 $112,841 $115,679 $115,679
DI
SF
PE
Management
Electrical
Electrical #NAME? $ - - - #VALUE! $ -
Electrical #NAME? $ - - #VALUE! $ -
Electrical #NAME? $ - - #VALUE! $ -
Electrical #NAME? $ - - #VALUE! $ -
Electrical #NAME? $ - - #VALUE! $ -
Electrical #NAME? $ - - #VALUE! $ -
Electrical #NAME? $ - - #VALUE! $ -
Electrical 0 0 $ - - #VALUE! $ -
Electrical 0 0 $ - - #VALUE! $ -
Electrical 0 0 $ - - #VALUE! $ -
Electrical 0 0 $ - - #VALUE! $ -
Electrical 0 0 $ - - #VALUE! $ -
Electrical 0 0 $ - - #VALUE! $ -
Electrical 0 0 $ - - #VALUE! $ -
Electrical Engineer Principal 0 $ 231.33 $ 265.81 12.97% 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 34.20 $ 7,911.41 $ 9,090.70
Electrical Engineer Senior 0 $ 172.93 $ 208.48 17.05% 0.20 0.20 0.50 0.50 0.50 0.50 0.50 0.50 0.60 0.80 0.80 0.80 0.80 0.50 0.50 311.60 $ 53,886.10 $ 64,962.37
Electrical Engineer Standard 0 $ 127.24 $ 145.93 12.81% - $ - $ -
Electrical Engineer Graduate 0 $ 82.00 $ 104.24 21.34% - $ - $ -
Electrical Draftsperson Senior 0 $ 137.78 $ 171.99 19.89% - - - - 0.25 0.25 - - 0.50 0.50 1.00 1.00 1.21 1.32 0.71 - 256.00 $ 35,271.79 $ 44,029.44
Electrical Draftsperson Standard 0 $ 109.53 $ 145.93 24.94% - $ - $ -
Electrical Discipline Type: - EL Weekly Forecast Total (hrs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.60 11.40 22.80 28.50 28.50 19.00 19.00 41.80 45.60 72.20 72.20 80.20 84.20 49.80 19.00 0.00 601.80 #VALUE! $ 118,082.51
Cumulative Data Hours Charge Weekly Actual (hrs) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Baseline hours and rates 1246 $ 173.86 Weekly Baseline (hrs) 6.0 9.0 9.0 0.0 0.0 6.0 26.0 6.0 5.0 14.0 47.0 49.0 74.0 94.0 39.0 23.0 33.0 38.0 33.0 23.0 19.0 33.0 15.0 15.0 17.0 18.0 21.0 26.0 66.0 69.0 97.0 130.0 151.0 35.0 1246.0
Forceast remaining 601.8 $118,083 Weekly Variation (hrs) 0.0 0.0
Actual to date 0.0 $0 Weekly Forecast ($) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,584 $2,595 $4,971 $5,595 $5,595 $3,961 $3,961 $8,239 $9,031 $13,883 $13,883 $15,259 $15,947 $9,615 $3,961 $0 $118,083
Total (Forecast + Actual) 601.8 $118,083 Weekly Actual ($) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Baseline 1246.0 $216,630 Weekly Baseline ($) $1,043 $1,565 $1,565 $0 $0 $1,043 $4,520 $1,043 $869 $2,434 $8,171 $8,519 $12,866 $16,343 $6,781 $3,999 $5,737 $6,607 $5,737 $3,999 $3,303 $5,737 $2,608 $2,608 $2,956 $3,129 $3,651 $4,520 $11,475 $11,996 $16,864 $22,602 $26,253 $6,085 $0 $216,630
Variation 0.0 $0 Weekly Variation ($) $0
Over / Under to Baseline+Var 644.2 $98,547 Cumulative Over/Under to Baseline ($) $1,043 $2,608 $4,173 $4,173 $4,173 $5,216 $9,736 $10,779 $11,649 $14,083 $22,254 $30,773 $43,639 $59,982 $66,762 $70,761 $76,499 $83,105 $88,843 $91,257 $91,966 $92,732 $89,745 $86,758 $85,752 $84,921 $80,333 $75,822 $73,413 $71,526 $73,131 $79,785 $96,423 $98,547 $98,547 $98,547
Electrical
Materials Handling
Process
Process #NAME? $ - - #VALUE! $ -
Process #NAME? $ - - #VALUE! $ -
Process #NAME? $ - - #VALUE! $ -
Process #NAME? $ - - #VALUE! $ -
Process #NAME? $ - - #VALUE! $ -
Process #NAME? $ - - #VALUE! $ -
Process #NAME? $ - - #VALUE! $ -
Process #NAME? $ - - #VALUE! $ -
Process #NAME? $ - - #VALUE! $ -
Process #NAME? $ - - #VALUE! $ -
Process #NAME? $ - - #VALUE! $ -
Process 0 0 $ - - #VALUE! $ -
Process 0 0 $ - - #VALUE! $ -
Process 0 0 $ - - #VALUE! $ -
Process Engineer Principal 0 $ 231.33 $ 265.81 12.97% 0.25 0.10 0.10 0.10 0.25 30.40 $ 7,032.37 $ 8,080.62
Process Engineer Senior 0 $ 172.93 $ 208.48 17.05% 0.55 0.60 1.00 1.00 1.00 0.60 0.60 1.00 1.00 0.60 0.60 0.60 1.00 1.00 0.40 439.00 $ 75,917.84 $ 91,522.72
Process Engineer Standard 0 $ 127.24 $ 145.93 12.81% - $ - $ -
Process Draftsperson Principal 0 $ 179.00 $ 224.11 20.13% - $ - $ -
Process Draftsperson Senior 0 $ 137.78 $ 171.99 19.89% 0.95 1.00 1.00 1.00 1.00 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00 0.50 473.00 $ 65,170.14 $ 81,351.27
Process Draftsperson Standard 0 $ 109.53 $ 145.93 24.94% - $ - $ -
Process Discipline Type: PS PR Weekly Forecast Total (hrs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 57.00 60.80 76.00 76.00 76.00 41.80 41.80 66.50 57.00 64.60 64.60 64.60 85.50 76.00 34.20 0.00 942.40 #VALUE! $ 180,954.61
Cumulative Data Hours Charge Weekly Actual (hrs) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Baseline hours and rates 1627 $ 182.84 Weekly Baseline (hrs) 9.0 18.0 22.0 0.0 0.0 19.0 48.0 28.0 16.0 73.0 49.0 42.0 104.0 109.0 84.0 72.0 70.0 82.0 96.0 44.0 31.0 33.0 16.0 19.0 11.0 11.0 14.0 27.0 48.0 52.0 50.0 39.0 138.0 130.0 23.0 1627.0
Forceast remaining 942.4 $180,955 Weekly Variation (hrs) 0.0
Actual to date 0.0 $0 Weekly Forecast ($) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $10,570 $11,289 $14,458 $14,458 $14,458 $8,021 $8,021 $13,715 $11,190 $12,299 $12,299 $12,299 $16,983 $14,458 $6,437 $0 $180,955
Total (Forecast + Actual) 942.4 $180,955 Weekly Actual ($) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Baseline 1627.0 $297,488 Weekly Baseline ($) $1,646 $3,291 $4,023 $0 $0 $3,474 $8,777 $5,120 $2,926 $13,348 $8,959 $7,679 $19,016 $19,930 $15,359 $13,165 $12,799 $14,993 $17,553 $8,045 $5,668 $6,034 $2,926 $3,474 $2,011 $2,011 $2,560 $4,937 $8,777 $9,508 $9,142 $7,131 $25,233 $23,770 $4,205 $297,488
Variation 0.0 $0 Weekly Variation ($) $0
Over / Under to Baseline+Var 684.6 $116,534 Cumulative Over/Under to Baseline ($) $1,646 $4,937 $8,959 $8,959 $8,959 $12,433 $21,210 $26,330 $29,255 $42,603 $51,562 $59,242 $78,258 $98,188 $113,547 $126,711 $139,510 $154,504 $172,057 $169,532 $163,912 $155,488 $143,955 $132,971 $126,962 $120,952 $109,796 $103,543 $100,020 $97,229 $94,073 $84,220 $94,995 $112,328 $116,534 $116,534
Process
Structural
Structural #NAME? $ - - #VALUE! $ -
Structural #NAME? $ - - #VALUE! $ -
Structural #NAME? $ - - #VALUE! $ -
Structural #NAME? $ - - #VALUE! $ -
Structural 0 0 $ - - #VALUE! $ -
Structural 0 0 $ - - #VALUE! $ -
Structural 0 0 $ - - #VALUE! $ -
Structural 0 0 $ - - #VALUE! $ -
Structural 0 0 $ - - #VALUE! $ -
Structural 0 0 $ - - #VALUE! $ -
Structural 0 0 $ - - #VALUE! $ -
Structural 0 0 $ - - #VALUE! $ -
Structural 0 0 $ - - #VALUE! $ -
Structural 0 0 $ - - #VALUE! $ -
Structural 0 0 $ - - #VALUE! $ -
Structural Engineer Principal 0 $ 231.33 $ 265.81 12.97% - $ - $ -
Structural Engineer Senior 0 $ 172.93 $ 208.48 17.05% 0.50 0.50 0.60 1.00 1.00 0.60 0.60 0.60 0.60 0.70 0.60 0.60 0.60 0.60 0.34 358.80 $ 62,048.57 $ 74,802.62
Structural Engineer Standard 0 $ 127.24 $ 145.93 12.81% - $ - $ -
Structural Draftsperson Senior 0 $ 137.78 $ 171.99 19.89% - - - - 0.40 0.60 0.60 0.60 0.60 0.60 0.53 0.50 0.50 0.53 0.53 0.53 0.74 0.16 281.20 $ 38,743.86 $ 48,363.59
Structural Draftsperson Standard 0 $ 109.53 $ 145.93 24.94% - $ - $ -
Structural Discipline Type: - ST Weekly Forecast Total (hrs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19.00 34.20 45.60 60.80 60.80 45.60 45.60 42.80 41.80 45.60 42.80 42.80 42.80 50.80 19.00 0.00 640.00 #VALUE! $ 123,166.21
Cumulative Data Hours Charge Weekly Actual (hrs) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Baseline hours and rates 783 $ 181.34 Weekly Baseline (hrs) 1.0 2.0 2.0 0.0 0.0 2.0 2.0 2.0 2.0 2.0 2.0 8.0 9.0 42.0 48.0 54.0 31.0 67.0 54.0 2.0 5.0 11.0 29.0 35.0 37.0 39.0 42.0 15.0 31.0 35.0 39.0 40.0 75.0 18.0 783.0
Forceast remaining 640.0 $123,166 Weekly Variation (hrs) 0.0
Actual to date 0.0 $0 Weekly Forecast ($) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,961 $6,575 $8,675 $11,844 $11,844 $8,675 $8,675 $8,193 $8,021 $8,813 $8,193 $8,193 $8,193 $9,569 $3,742 $0 $123,166
Total (Forecast + Actual) 640.0 $123,166 Weekly Actual ($) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Baseline 783.0 $141,989 Weekly Baseline ($) $181 $363 $363 $0 $0 $363 $363 $363 $363 $363 $363 $1,451 $1,632 $7,616 $8,704 $9,792 $5,622 $12,150 $9,792 $363 $907 $1,995 $5,259 $6,347 $6,710 $7,072 $7,616 $2,720 $5,622 $6,347 $7,072 $7,254 $13,601 $3,264 $0 $141,989
Variation 0.0 $0 Weekly Variation ($) $0
Over / Under to Baseline+Var 143.0 $18,823 Cumulative Over/Under to Baseline ($) $181 $544 $907 $907 $907 $1,269 $1,632 $1,995 $2,357 $2,720 $3,083 $4,534 $6,166 $13,782 $22,486 $32,279 $37,900 $50,050 $59,842 $56,244 $50,575 $43,895 $37,310 $31,814 $29,849 $28,246 $27,669 $22,368 $19,176 $17,330 $16,209 $15,270 $19,301 $18,823 $18,823 $18,823
Structural
Controls
Controls #NAME? $ - - #VALUE! $ -
Controls #NAME? $ - 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.60 0.60 0.60 0.60 0.60 1.00 0.40 0.35 432.90 #VALUE! $ -
Controls #NAME? $ - - #VALUE! $ -
Controls 0 0 $ - - #VALUE! $ -
Controls 0 0 $ - - #VALUE! $ -
Controls 0 0 $ - - #VALUE! $ -
Controls 0 0 $ - - #VALUE! $ -
Controls 0 0 $ - - #VALUE! $ -
Controls 0 0 $ - - #VALUE! $ -
Controls 0 0 $ - - #VALUE! $ -
Controls 0 0 $ - - #VALUE! $ -
Controls 0 0 $ - - #VALUE! $ -
Controls 0 0 $ - - #VALUE! $ -
Controls 0 0 $ - - #VALUE! $ -
Controls 0 0 $ - - #VALUE! $ -
Controls 0 0 $ - - #VALUE! $ -
Controls Discipline Manager 0 $ 235.64 $ 281.45 16.28% - $ - $ -
Controls Engineer Principal 0 $ 231.33 $ 265.81 12.97% - $ - $ -
Controls Engineer Senior 0 $ 172.93 $ 208.48 17.05% - $ - $ -
Controls Engineer Standard 0 $ 127.24 $ 145.93 12.81% - $ - $ -
Controls Discipline Type: - CO Weekly Forecast Total (hrs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 36.10 36.10 36.10 36.10 36.00 36.00 36.00 22.80 22.80 22.80 22.80 22.80 38.00 15.20 13.30 0.00 432.90 #VALUE! $ -
Cumulative Data Hours Charge Weekly Actual (hrs) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Baseline hours and rates 714 $ 219.70 Weekly Baseline (hrs) 3.0 5.0 5.0 0.0 0.0 4.0 4.0 4.0 3.0 8.0 4.0 4.0 5.0 18.0 11.0 33.0 40.0 24.0 20.0 16.0 20.0 34.0 32.0 35.0 35.0 36.0 36.0 36.0 36.0 20.0 46.0 46.0 38.0 52.0 1.0 714.0
Forceast remaining 432.9 $0 Weekly Variation (hrs) 0.0
Actual to date 0.0 $0 Weekly Forecast ($) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Total (Forecast + Actual) 432.9 $0 Weekly Actual ($) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Baseline 714.0 $156,864 Weekly Baseline ($) $659 $1,098 $1,098 $0 $0 $879 $879 $879 $659 $1,758 $879 $879 $1,098 $3,955 $2,417 $7,250 $8,788 $5,273 $4,394 $3,515 $4,394 $7,470 $7,030 $7,689 $7,689 $7,909 $7,909 $7,909 $7,909 $4,394 $10,106 $10,106 $8,349 $11,424 $220 $156,864
Variation 0.0 $0 Weekly Variation ($) $0
Over / Under to Baseline+Var 281.1 $156,864 Cumulative Over/Under to Baseline ($) $659 $1,758 $2,856 $2,856 $2,856 $3,735 $4,614 $5,492 $6,152 $7,909 $8,788 $9,667 $10,765 $14,720 $17,136 $24,386 $33,174 $38,447 $42,841 $46,356 $50,750 $58,220 $65,250 $72,940 $80,629 $88,538 $96,447 $104,357 $112,266 $116,660 $126,766 $136,872 $145,220 $156,645 $156,864 $156,864
Controls
Civil
Civil #NAME? $ - 0.10 0.10 0.10 0.10 0.10 0.10 0.10 1.00 0.10 0.10 72.20 #VALUE! $ -
Civil #NAME? $ - 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 102.60 #VALUE! $ -
Civil #NAME? $ - 0.50 1.00 1.00 0.50 1.00 1.00 190.00 #VALUE! $ -
Civil #NAME? $ - - #VALUE! $ -
Civil #NAME? $ - - #VALUE! $ -
Civil #NAME? $ - - #VALUE! $ -
Civil 0 0 $ - - #VALUE! $ -
Civil 0 0 $ - - #VALUE! $ -
Civil 0 0 $ - - #VALUE! $ -
Civil 0 0 $ - - #VALUE! $ -
Civil 0 0 $ - - #VALUE! $ -
Civil 0 0 $ - - #VALUE! $ -
Civil 0 0 $ - - #VALUE! $ -
Civil Discipline Manager 0 $ 235.64 $ 281.45 16.28% - $ - $ -
Civil Engineer Principal 0 $ 231.33 $ 265.81 12.97% - $ - $ -
Civil Engineer Senior 0 $ 172.93 $ 208.48 17.05% - $ - $ -
Civil Engineer Standard 0 $ 127.24 $ 145.93 12.81% - $ - $ -
Civil Engineer Graduate 0 $ 82.00 $ 104.24 21.34% - $ - $ -
Civil Draftsperson Senior 0 $ 137.78 $ 171.99 19.89% - $ - $ -
Civil Draftsperson Standard 0 $ 109.53 $ 145.93 24.94% - $ - $ -
Civil Discipline Type: - CV Weekly Forecast Total (hrs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.20 34.20 53.20 53.20 34.20 15.20 15.20 87.40 53.20 3.80 0.00 0.00 0.00 0.00 0.00 0.00 364.80 #VALUE! $ -
Cumulative Data Hours Charge Weekly Actual (hrs) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Baseline hours and rates 594 $ 183.31 Weekly Baseline (hrs) 3.0 5.0 4.0 0.0 0.0 1.0 21.0 1.0 1.0 40.0 50.0 52.0 53.0 47.0 49.0 34.0 13.0 10.0 13.0 8.0 12.0 10.0 43.0 54.0 19.0 10.0 7.0 4.0 4.0 4.0 4.0 4.0 7.0 6.0 1.0 594.0
Forceast remaining 364.8 $0 Weekly Variation (hrs) 0.0
Actual to date 0.0 $0 Weekly Forecast ($) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Total (Forecast + Actual) 364.8 $0 Weekly Actual ($) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Baseline 594.0 $108,888 Weekly Baseline ($) $550 $917 $733 $0 $0 $183 $3,850 $183 $183 $7,333 $9,166 $9,532 $9,716 $8,616 $8,982 $6,233 $2,383 $1,833 $2,383 $1,467 $2,200 $1,833 $7,882 $9,899 $3,483 $1,833 $1,283 $733 $733 $733 $733 $733 $1,283 $1,100 $183 $108,888
Variation 0.0 $0 Weekly Variation ($) $0
Over / Under to Baseline+Var 229.2 $108,888 Cumulative Over/Under to Baseline ($) $550 $1,467 $2,200 $2,200 $2,200 $2,383 $6,233 $6,416 $6,599 $13,932 $23,098 $32,630 $42,345 $50,961 $59,944 $66,176 $68,559 $70,392 $72,776 $74,242 $76,442 $78,275 $86,157 $96,056 $99,539 $101,372 $102,656 $103,389 $104,122 $104,855 $105,589 $106,322 $107,605 $108,705 $108,888 $108,888
Civil
195.94610113 7238 1418257.88 45 85 85 - - 86 159 86 158 215 212 304 324 323 319 272 299 288 244 166 109 270 208 243 215 203 207 191 242 274 307 323 462 270 45 7,238.00
8,754.68 16,616.02 16,616.02 - - 16,794.69 31,088.04 16,794.69 30,909.37 42,165.39 41,629.39 59,496.08 63,426.75 63,248.08 62,533.42 53,242.74 58,602.74 56,458.74 47,882.73 32,517.38 21,440.03 52,885.40 40,736.05 47,704.06 42,165.39 39,842.72 40,557.39 37,341.38 47,346.73 53,778.74 60,210.75 63,248.08 90,584.12 52,885.40 8,754.68 1,418,258
145.93 Baseline 49.00 92.00 88.00 82.00 172.00 92.00 67.00 208.00 205.00 230.00 324.00 399.00 313.00 295.00 266.00 301.00 296.00 157.00 144.00 221.00 216.00 238.00 198.00 193.00 198.00 187 264 260 316 330 478 315 43 7,237.00
Baseline 9,601.36 18,027.04 17,243.26 - - 16,067.58 33,702.73 18,027.04 13,128.39 40,756.79 40,168.95 45,067.60 63,486.54 78,182.49 61,331.13 57,804.10 52,121.66 58,979.78 58,000.05 30,763.54 28,216.24 43,304.09 42,324.36 46,635.17 38,797.33 37,817.60 38,797.33 36,641.92 51,729.77 50,945.99 61,918.97 64,662.21 93,662.24 61,723.02 8,425.68 1,418,062
Revision: 0 - 08/12/2025
924553805.xlsx/Forecast Page 25 of 59
Full Time Equivalents per Week
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Week Commencing
2-Dec-24 9-Dec-24 16-Dec-24 23-Dec-24 30-Dec-24 6-Jan-25 13-Jan-25 20-Jan-25 27-Jan-25 3-Feb-25
08-Dec-24 15-Dec-24 22-Dec-24 29-Dec-24 05-Jan-25 12-Jan-25 19-Jan-25 26-Jan-25 02-Feb-25 09-Feb-25
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Week Commencing
2-Dec-24 9-Dec-24 16-Dec-24 23-Dec-24 30-Dec-24 6-Jan-25 13-Jan-25 20-Jan-25 27-Jan-25 3-Feb-25
08-Dec-24 15-Dec-24 22-Dec-24 29-Dec-24 05-Jan-25 12-Jan-25 19-Jan-25 26-Jan-25 02-Feb-25 09-Feb-25
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Week Commencing
2-Dec-24 9-Dec-24 16-Dec-24 23-Dec-24 30-Dec-24 6-Jan-25 13-Jan-25 20-Jan-25 27-Jan-25 3-Feb-25
08-Dec-24 15-Dec-24 22-Dec-24 29-Dec-24 05-Jan-25 12-Jan-25 19-Jan-25 26-Jan-25 02-Feb-25 09-Feb-25
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10-Feb-25 17-Feb-25 24-Feb-25 3-Mar-25 10-Mar-25 17-Mar-25 24-Mar-25 31-Mar-25 7-Apr-25 14-Apr-25
16-Feb-25 23-Feb-25 02-Mar-25 09-Mar-25 16-Mar-25 23-Mar-25 30-Mar-25 06-Apr-25 13-Apr-25 20-Apr-25
300.00 251.00 171.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 300.00 251.00 171.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 11400.00 9538.00 6498.00
10-Feb-25 17-Feb-25 24-Feb-25 3-Mar-25 10-Mar-25 17-Mar-25 24-Mar-25 31-Mar-25 7-Apr-25 14-Apr-25
16-Feb-25 23-Feb-25 02-Mar-25 09-Mar-25 16-Mar-25 23-Mar-25 30-Mar-25 06-Apr-25 13-Apr-25 20-Apr-25
- - - - - - - ### 9,538.00 6,498.00
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
0.00 0.00 0.00 0.00 0.00 0.00 0.00 300.00 251.00 171.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 11400.00 9538.00 6498.00
10-Feb-25 17-Feb-25 24-Feb-25 3-Mar-25 10-Mar-25 17-Mar-25 24-Mar-25 31-Mar-25 7-Apr-25 14-Apr-25
16-Feb-25 23-Feb-25 02-Mar-25 09-Mar-25 16-Mar-25 23-Mar-25 30-Mar-25 06-Apr-25 13-Apr-25 20-Apr-25
- - - - - - - 8.21 7.89 6.58
- - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.21 7.89 6.58
0.00 0.00 0.00 0.00 0.00 0.00 0.00 312.00 300.00 250.00
10-Feb-25 17-Feb-25 24-Feb-25 3-Mar-25 10-Mar-25 17-Mar-25 24-Mar-25 31-Mar-25 7-Apr-25 14-Apr-25
16-Feb-25 23-Feb-25 02-Mar-25 09-Mar-25 16-Mar-25 23-Mar-25 30-Mar-25 06-Apr-25 13-Apr-25 20-Apr-25
312.00 300.00 250.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.21 7.89 6.58
0.00 0.00 0.00 0.00 0.00 0.00 0.00 312.00 300.00 250.00
21-Apr-25 28-Apr-25 5-May-25 12-May-25 19-May-25 26-May-25 2-Jun-25 9-Jun-25 16-Jun-25
27-Apr-25 04-May-25 11-May-25 18-May-25 25-May-25 01-Jun-25 08-Jun-25 15-Jun-25 22-Jun-25
110.00 280.00 215.00 253.00 220.00 209.00 212.00 193.00 250.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
25-Aug-25 1-Sep-25 8-Sep-25 15-Sep-25 22-Sep-25 29-Sep-25 6-Oct-25 13-Oct-25 20-Oct-25 27-Oct-25
31-Aug-25 07-Sep-25 14-Sep-25 21-Sep-25 28-Sep-25 05-Oct-25 12-Oct-25 19-Oct-25 26-Oct-25 02-Nov-25
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
25-Aug-25 1-Sep-25 8-Sep-25 15-Sep-25 22-Sep-25 29-Sep-25 6-Oct-25 13-Oct-25 20-Oct-25 27-Oct-25
31-Aug-25 07-Sep-25 14-Sep-25 21-Sep-25 28-Sep-25 05-Oct-25 12-Oct-25 19-Oct-25 26-Oct-25 02-Nov-25
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
25-Aug-25 1-Sep-25 8-Sep-25 15-Sep-25 22-Sep-25 29-Sep-25 6-Oct-25 13-Oct-25 20-Oct-25 27-Oct-25
31-Aug-25 07-Sep-25 14-Sep-25 21-Sep-25 28-Sep-25 05-Oct-25 12-Oct-25 19-Oct-25 26-Oct-25 02-Nov-25
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3-Nov-25 10-Nov-25 17-Nov-25 24-Nov-25 1-Dec-25
09-Nov-25 16-Nov-25 23-Nov-25 30-Nov-25 07-Dec-25
Revision: 0 - 08/12/2025
924553805.xlsx/Disbursements Page 40 of 59
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
Revision: 0 - 08/12/2025
924553805.xlsx/Disbursements Page 41 of 59
1 1 2 2 2 2 2 2 3 3 3 3 4 4 4 4 5 5 5 5 6 6 6 6 7 7 7 7 7 8 8 8 8 9 9 9 9 10 10 10 10 10 11 11
02-Dec-24 09-Dec-24 16-Dec-24 23-Dec-24 30-Dec-24 06-Jan-25 13-Jan-25 20-Jan-25 27-Jan-25 03-Feb-25 10-Feb-25 17-Feb-25 24-Feb-25 03-Mar-25 10-Mar-25 17-Mar-25 24-Mar-25 31-Mar-25 07-Apr-25 14-Apr-25 21-Apr-25 28-Apr-25 05-May-25 12-May-25 19-May-25 26-May-25 02-Jun-25 09-Jun-25 16-Jun-25 23-Jun-25 30-Jun-25 07-Jul-25 14-Jul-25 21-Jul-25 28-Jul-25 04-Aug-25 11-Aug-25 18-Aug-25 25-Aug-25 01-Sep-25 08-Sep-25 15-Sep-25 22-Sep-25 29-Sep-25
Baseline
BASELINE - Weekly Manhours Cost (Mid) $ 1,418,061.93 $ 9,601 $ 18,027 $ 17,243 $ - $ - $ 16,068 $ 33,703 $ 18,027 $ 13,128 $ 40,757 $ 40,169 $ 45,068 $ 63,487 $ 78,182 $ 61,331 $ 57,804 $ 52,122 $ 58,980 $ 58,000 $ 30,764 $ 28,216 $ 43,304 $ 42,324 $ 46,635 $ 38,797 $ 37,818 $ 38,797 $ 36,642 $ 51,730 $ 50,946 $ 61,919 $ 64,662 $ 93,662 $ 61,723 $ 8,426
BASELINE - Weekly Expenses $ -
BASELINE - Weekly Cost $ 1,418,061.93 $ 9,601 $ 18,027 $ 17,243 $ - $ - $ 16,068 $ 33,703 $ 18,027 $ 13,128 $ 40,757 $ 40,169 $ 45,068 $ 63,487 $ 78,182 $ 61,331 $ 57,804 $ 52,122 $ 58,980 $ 58,000 $ 30,764 $ 28,216 $ 43,304 $ 42,324 $ 46,635 $ 38,797 $ 37,818 $ 38,797 $ 36,642 $ 51,730 $ 50,946 $ 61,919 $ 64,662 $ 93,662 $ 61,723 $ 8,426 $ - $ - $ - $ - $ - $ - $ - $ - $ -
BASELINE - Cumulative Cost (Mid) $ 1,418,061.93 $ 9,601 $ 27,628 $ 44,872 $ 44,872 $ 44,872 $ 60,939 $ 94,642 $ 112,669 $ 125,797 $ 166,554 $ 206,723 $ 251,791 $ 315,277 $ 393,460 $ 454,791 $ 512,595 $ 564,717 $ 623,696 $ 681,696 $ 712,460 $ 740,676 $ 783,980 $ 826,305 $ 872,940 $ 911,737 $ 949,555 $ 988,352 $ 1,024,994 $ 1,076,724 $ 1,127,670 $ 1,189,589 $ 1,254,251 $ 1,347,913 $ 1,409,636 $ 1,418,062 $ 1,418,062 $ 1,418,062 $ 1,418,062 $ 1,418,062 $ 1,418,062 $ 1,418,062 $ 1,418,062 $ 1,418,062 $ 1,418,062
PO Value
Baseline $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258
Approved Variations
Total PO Value $ 1,418,257.88 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258 $ 1,418,258
Actual
ACTUAL - Weekly Cost (Original) $ 11,035 $ 12,621 $ 13,918 $ - $ - $ 6,815 $ 28,045 $ 34,174 $ 33,429 $ 41,142 $ 44,698 $ 53,566 $ 52,518 $ 58,280 $ 45,819 $ 53,895 $ 53,503 $ 69,858 $ 65,788
ACTUAL - Weekly Cost Expenses
ACTUAL - Weekly Cost (Variations)
ACTUAL - Weekly Cost $ 11,035 $ 12,621 $ 13,918 $ - $ - $ 6,815 $ 28,045 $ 34,174 $ 33,429 $ 41,142 $ 44,698 $ 53,566 $ 52,518 $ 58,280 $ 45,819 $ 53,895 $ 53,503 $ 69,858 $ 65,788
CUMULATIVE - Actual Weekly Cost (Original) $ 11,035 $ 23,657 $ 37,575 $ 37,575 $ 37,575 $ 44,390 $ 72,435 $ 106,609 $ 140,038 $ 181,180 $ 225,879 $ 279,445 $ 331,963 $ 390,243 $ 436,062 $ 489,957 $ 543,460 $ 613,318 $ 679,105
CUMULATIVE - Actual Weekly Expenses $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
CUMULATIVE - Actual Weekly Cost (Variations) $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
CUMULATIVE - Actual Total Cost $ 11,035 $ 23,657 $ 37,575 $ 37,575 $ 37,575 $ 44,390 $ 72,435 $ 106,609 $ 140,038 $ 181,180 $ 225,879 $ 279,445 $ 331,963 $ 390,243 $ 436,062 $ 489,957 $ 543,460 $ 613,318 $ 679,105
Forecast
Forecast - Weekly Spend $ 70,078 $ 83,156 $ 92,038 $ 91,375 $ 89,272 $ 73,259 $ 49,446 $ 79,337 $ 52,992 $ 50,239 $ 48,609 $ 49,984 $ 60,308 $ 44,607 $ 22,035
Forecast - Weekly Spend (Variations)
Forecast - FUDGE FACTORING
FORECAST - Spend per week $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 70,078 $ 83,156 $ 92,038 $ 91,375 $ 89,272 $ 73,259 $ 49,446 $ 79,337 $ 52,992 $ 50,239 $ 48,609 $ 49,984 $ 60,308 $ 44,607 $ 22,035 $ -
FORECAST - Spend $ 1,635,839 $ 679,105 $ 749,183 $ 832,339 $ 924,377 $ 1,015,752 $ 1,105,024 $ 1,178,283 $ 1,227,729 $ 1,307,066 $ 1,360,058 $ 1,410,296 $ 1,458,905 $ 1,508,889 $ 1,569,197 $ 1,613,804 $ 1,635,839 $ 1,635,839
$100,000
RMI Tailings - S-Curve Cost $1,800,000
$90,000
$1,600,000
$60,000
Cumulative Cost
$1,000,000
Weekly Cost
$50,000
$800,000
$40,000
$600,000
$30,000
$400,000
$20,000
$200,000
$10,000
$- $-
02- 09- 16- 23- 30- 06- 13- 20- 27- 03- 10- 17- 24- 03- 10- 17- 24- 31- 07-Apr- 14-Apr- 21-Apr- 28-Apr- 05- 12- 19- 26- 02- 09- 16- 23- 30- 07-Jul- 14-Jul- 21-Jul- 28-Jul- 04-
Dec-24 Dec-24 Dec-24 Dec-24 Dec-24 Jan-25 Jan-25 Jan-25 Jan-25 Feb-25 Feb-25 Feb-25 Feb-25 Mar-25 Mar-25 Mar-25 Mar-25 Mar-25 25 25 25 25 May-25 May-25 May-25 May-25 Jun-25 Jun-25 Jun-25 Jun-25 Jun-25 25 25 25 25 Aug-25
Week Commencing
Period Invoice Month Date From Date To Actual Forecast Forecast CummulPlanned
1 August 08-Aug-22 28-Aug-22 $ 37,575 $ 37,575 $ 27,628
2 September 29-Aug-22 25-Sep-22 $ - $ 37,575 $ 112,669
3 October 26-Sep-22 23-Oct-22 $ - $ 37,575 $ 251,791
4 November 24-Oct-22 20-Nov-22 $ - $ 37,575 $ 512,595
5 December 21-Nov-22 18-Dec-22 $ 70,078 $ 107,653 $ 712,460
6 January 19-Dec-22 22-Jan-23 $ 355,840 $ 463,493 $ 872,940
7 February 23-Jan-23 19-Feb-23 $ 305,273 $ 768,766 $ 1,076,724
8 March 20-Feb-23 26-Mar-23 $ 203,508 $ 972,274 $ 1,347,913 $ 1,635,839
check
Revision: 0 - 08/12/2025
924553805.xlsx/Cashflow - Simple Page 42 of 59
Updated from Revision April 2024 of Proposal Estimate Template Charge Scale Qtr 1 2024 Qtr 2 2024 Qtr 3 2024 Qtr 4 2024
Charge Scale Lookup Role Look Up Stanmore Exchange Rates AUD:AUD 1.00000 1.00000 1.00000 1.00000 AUD BNE or PER
Charge Scale (Rates by Role) SDM Role Charge Rate Invoice Status Discipline CNY:AUD 1.00000 1.00000 1.00000 1.00000 CNY SHA
CSC Administration Senior $109.45 Outstanding AD Admin USD:AUD 1.00000 1.00000 1.00000 1.00000 USD USA
CSB Administration Standard $83.39 Paid CO Controls CAD:AUD 1.00000 1.00000 1.00000 1.00000 CAD VAN
CSA Document Control Manager $0.00 Deferred CV Civil CAD:USD 1.00000 1.00000 1.00000 1.00000 CAD USA
CSA+ Document Control Senior $145.93 EL Electrical
Tender (Cost) Document Control Standard $109.45 ES Estimate
MANUAL ENTRY General Manager Standard $401.32 ME Mechanical
BHP (Standing Agreement) Project Development Manager $349.20 MH Materials Handling
Glencore (Standing Agreement) BD Manager Senior $0.00 PL Planning
AngloAmerican (Standing Agreement) BD Manager Standard $0.00 PM Projects
Stanwell (Tarong) Group Manager Standard $317.93 PR Process
YanCoal (Standing Agreement) Study Manager Senior $271.02 SM Study Manage
MachEnergy (Standing Agreement) Study Manager Standard $208.48 ST Structural
Boggabri Coal Operations Pty Ltd (Agreement) Design Manager Senior $234.54 ZZ Bid
Thiess Lake Vermont Design Manager Standard $218.90
Kestrel Coal Resources Discipline Manager $281.45
Stanmore Engineer Consultant $375.26
Foxleigh Engineer Principal $265.81
QCOAL Engineer Senior $208.48
NHG - New Acland Engineer Intermediate $0.00
Aeris Resources Engineer Standard $145.93
New Century Engineer Graduate $104.24
Anglo Gold Ashanti Engineer Undergraduate $83.39
Newmont Australia Draftsperson Principal $224.11
Teck Draftsperson Lead $0.00
Mining Plus- Canada Draftsperson Senior $171.99
Mining Plus - USA Draftsperson Standard $145.93
Nevada Copper INC. Draftsperson Cadet $78.18
Eng Support Standard $145.93
Procurement Senior $198.05
Procurement Standard $140.72
Project Director $349.20
Project Manager Senior $333.57
Project Manager Standard $260.60
Senior Project Engineer $208.48
Project Engineer $145.93
Commissioning Manager Standard $0.00
Construction Manager Standard $333.57
HSE Manager $0.00
HSE Senior $213.69
HSE Standard $182.42
Supervisor $265.81
Cost Controller Manager $265.81
Project Controls Senior $187.63
Project Controls Standard $156.36
Planner Principal $229.33
Planner Senior $224.11
Planner Standard $0.00
Estimator Senior $234.54
Estimator Standard $213.69
Innovation Manager $0.00
Innovation Senior $0.00
Innovation Standard $0.00
Innovation Graduate $0.00
Contracts Admin Senior $0.00
Contracts Admin Standard $0.00
Environmental Manager $0.00
Environmental Principal Consultant $0.00
Environmental Senior Consultant $0.00
Environmental Consultant $0.00
Spare Category 13 $0.00
Spare Category 14 $0.00
Spare Category 10 $0.00
Spare Category 11 $0.00
Spare Category 12 $0.00
Spare Category 13 $0.00
Spare Category 14 $0.00
Spare Category 10 $0.00
Spare Category 11 $0.00
Revision: 0 - 08/12/2025
924553805.xlsx/Lookups Page 43 of 59
Project Name: RMI Tailings
Payment Claim: December
Purchase Order Number: LEG_010101-CO-0079_0005_1
Description Budget Hours for Budget Charge for Actual Hours Charge for Previous Actual Hours for Charge for Current Cumulative Hours Cumulative Charge
Project Project Previous Period Period Current Period Period To Date To Date
Engineering Resource
Revision: 0 - 08/12/2025
924553805.xlsx/Progress Claim 1 Page 44 of 59
Project Name: RMI Tailings
Payment Claim: January
Purchase Order Number: LEG_010101-CO-0079_0005_1
Description Budget Hours for Budget Charge for Actual Hours Charge for Previous Actual Hours for Charge for Current Cumulative Hours Cumulative Charge
Project Project Previous Period Period Current Period Period To Date To Date
Engineering Resource
Revision: 0 - 08/12/2025
924553805.xlsx/Progress Claim 2 Page 45 of 59
Date from: 1/27/2025 JDE Allocated Period 3 Allocation to Invoice Deferred
Date to: 2/23/2025 LEG_010101-CO-0079_0005_1
SAP WBS Role Classification Cost Rate Charge Rate Actual Hours Cost Charge Invoiced Hours Charge Defered Hours Deferred Charge Reason for Deferral
n/a Administration Senior $ - $ 109.45 - $ - $ - - $ - $ -
n/a Administration Standard $ 51.00 $ 83.39 - $ - $ - - $ - $ -
n/a Document Control Manager $ - - $ - - $ - $ -
n/a Document Control Senior $ 113.04 $ 145.93 - $ - $ - - $ - $ -
n/a Document Control Standard $ 97.44 $ 109.45 6.00 $ 584.64 $ 656.70 6.00 $ 656.70 $ -
n/a General Manager Standard $ 401.32 - $ - - $ - $ -
n/a Project Development Manager $ 300.54 $ 349.20 - $ - $ - - $ - $ -
n/a BD Manager Senior $ - - $ - - $ - $ -
n/a BD Manager Standard $ - - $ - - $ - $ -
n/a Group Manager Standard $ 317.93 - $ - - $ - $ -
n/a Study Manager Senior $ 271.02 - $ - - $ - $ -
n/a Study Manager Standard $ 208.48 - $ - - $ - $ -
n/a Design Manager Senior $ 229.01 $ 234.54 117.80 $ 26,977.38 $ 27,628.81 117.80 $ 27,628.81 $ -
n/a Design Manager Standard $ 179.98 $ 218.90 - $ - $ - - $ - $ -
n/a Discipline Manager $ 236.35 $ 281.45 - $ - $ - - $ - $ -
n/a Engineer Consultant $ 315.88 $ 375.26 - $ - $ - - $ - $ -
n/a Engineer Principal $ 223.73 $ 265.81 67.90 $ 15,191.27 $ 18,048.50 67.90 $ 18,048.50 $ -
n/a Engineer Senior $ 161.09 $ 208.48 194.40 $ 31,315.90 $ 40,528.51 194.40 $ 40,528.51 $ -
n/a Engineer Intermediate $ - - $ - - $ - $ -
n/a Engineer Standard $ 115.42 $ 145.93 80.30 $ 9,268.23 $ 11,718.18 80.30 $ 11,718.18 $ -
n/a Engineer Graduate $ 89.42 $ 104.24 - $ - $ - - $ - $ -
n/a Engineer Undergraduate $ 51.96 $ 83.39 32.70 $ 1,699.09 $ 2,726.85 32.70 $ 2,726.85 $ -
n/a Draftsperson Principal $ 224.11 - $ - - $ - $ -
n/a Draftsperson Lead $ - - $ - - $ - $ -
n/a Draftsperson Senior $ 148.20 $ 171.99 181.70 $ 26,927.94 $ 31,250.58 181.70 $ 31,250.58 $ -
n/a Draftsperson Standard $ 109.02 $ 145.93 65.20 $ 7,108.10 $ 9,514.64 65.20 $ 9,514.64 $ -
n/a Draftsperson Cadet $ 78.18 - $ - - $ - $ -
n/a Eng Support Standard $ 145.93 - $ - - $ - $ -
n/a Procurement Senior $ 186.08 $ 198.05 122.00 $ 22,701.76 $ 24,162.10 122.00 $ 24,162.10 $ -
n/a Procurement Standard $ 140.72 - $ - - $ - $ -
n/a Project Director $ 349.20 - $ - - $ - $ -
n/a Project Manager Senior $ 333.57 - $ - - $ - $ -
n/a Project Manager Standard $ 200.04 $ 260.60 - $ - $ - - $ - $ -
n/a Senior Project Engineer $ 200.04 $ 208.48 - $ - $ - - $ - $ -
n/a Project Engineer $ 128.01 $ 145.93 4.00 $ 512.04 $ 583.72 4.00 $ 583.72 $ -
n/a Commissioning Manager Standard $ - - $ - - $ - $ -
n/a Construction Manager Standard $ 293.09 $ 333.57 - $ - $ - - $ - $ -
n/a HSE Manager $ - - $ - - $ - $ -
n/a HSE Senior $ 203.15 $ 213.69 - $ - $ - - $ - $ -
n/a HSE Standard $ 182.42 - $ - - $ - $ -
n/a Supervisor $ 265.81 - $ - - $ - $ -
n/a Cost Controller Manager $ 265.81 - $ - - $ - $ -
n/a Project Controls Senior $ 187.63 - $ - - $ - $ -
n/a Project Controls Standard $ 156.36 - $ - - $ - $ -
n/a Planner Principal $ - $ 229.33 - $ - $ - - $ - $ -
n/a Planner Senior $ 159.60 $ 224.11 25.80 $ 4,117.68 $ 5,782.04 25.80 $ 5,782.04 $ -
n/a Planner Standard $ - - $ - - $ - $ -
n/a Estimator Senior $ 207.30 $ 234.54 1.00 $ 207.30 $ 234.54 1.00 $ 234.54 $ -
n/a Estimator Standard $ 213.69 - $ - - $ - $ -
n/a Innovation Manager $ - - $ - - $ - $ -
n/a Innovation Senior $ - - $ - - $ - $ -
Subtotal Manhours 898.80 $ 146,611.32 $ 172,835.17 898.80 $ 172,835.17 - $ -
PO Value $ 1,557,297.88
Invoiced to Date
Available $ 1,557,297.88
Remaining Incl Inv $ 1,381,795.46
Invoice No.
Revision: 0 - 08/12/2025
924553805.xlsx/Invoice 3 Page 46 of 59
Project Name: RMI Tailings
Payment Claim: February (27 Jan to 23 Feb)
Purchase Order Number: LEG_010101-CO-0079_0005_1
Description Budget Hours for Budget Charge for Actual Hours Charge for Previous Actual Hours for Charge for Current Cumulative Hours Cumulative Charge
Project Project Previous Period Period Current Period Period To Date To Date
Engineering Resource
Revision: 0 - 08/12/2025
924553805.xlsx/Progress Claim 3 Page 47 of 59
Date from: 2/24/2025 JDE Allocated Period 4 Allocation to Invoice Deferred
Date to: 3/23/2025 LEG_010101-CO-0079_0005_1
SAP WBS Role Classification Cost Rate Charge Rate Actual Hours Cost Charge Invoiced Hours Charge Defered Hours Deferred Charge Reason for Deferral
n/a Administration Senior $ - $ 109.45 - $ - $ - - $ - $ -
n/a Administration Standard $ 51.00 $ 83.39 - $ - $ - - $ - $ -
n/a Document Control Manager $ - - $ - - $ - $ -
n/a Document Control Senior $ 113.04 $ 145.93 - $ - $ - - $ - $ -
n/a Document Control Standard $ 97.44 $ 109.45 6.48 $ 631.41 $ 709.24 6.48 $ 709.24 $ -
n/a General Manager Standard $ 401.32 - $ - - $ - $ -
n/a Project Development Manager $ 300.54 $ 349.20 - $ - $ - - $ - $ -
n/a BD Manager Senior $ - - $ - - $ - $ -
n/a BD Manager Standard $ - - $ - - $ - $ -
n/a Group Manager Standard $ 317.93 - $ - - $ - $ -
n/a Study Manager Senior $ 271.02 - $ - - $ - $ -
n/a Study Manager Standard $ 208.48 - $ - - $ - $ -
n/a Design Manager Senior $ 229.01 $ 234.54 99.10 $ 22,694.89 $ 23,242.91 99.10 $ 23,242.91 $ -
n/a Design Manager Standard $ 179.98 $ 218.90 0.50 $ 89.99 $ 109.45 0.50 $ 109.45 $ -
n/a Discipline Manager $ 236.35 $ 281.45 2.00 $ 472.70 $ 562.90 2.00 $ 562.90 $ -
n/a Engineer Consultant $ 315.88 $ 375.26 - $ - $ - - $ - $ -
n/a Engineer Principal $ 223.73 $ 265.81 95.70 $ 21,410.96 $ 25,438.02 95.70 $ 25,438.02 $ -
n/a Engineer Senior $ 161.09 $ 208.48 325.50 $ 52,434.80 $ 67,860.24 325.50 $ 67,860.24 $ -
n/a Engineer Intermediate $ - - $ - - $ - $ -
n/a Engineer Standard $ 115.42 $ 145.93 22.40 $ 2,585.41 $ 3,268.83 22.40 $ 3,268.83 $ -
n/a Engineer Graduate $ 89.42 $ 104.24 56.40 $ 5,043.29 $ 5,879.14 56.40 $ 5,879.14 $ -
n/a Engineer Undergraduate $ 51.96 $ 83.39 - $ - $ - - $ - $ -
n/a Draftsperson Principal $ 224.11 - $ - - $ - $ -
n/a Draftsperson Lead $ - - $ - - $ - $ -
n/a Draftsperson Senior $ 148.20 $ 171.99 218.60 $ 32,396.52 $ 37,597.01 218.60 $ 37,597.01 $ -
n/a Draftsperson Standard $ 109.02 $ 145.93 23.40 $ 2,551.07 $ 3,414.76 23.40 $ 3,414.76 $ -
n/a Draftsperson Cadet $ 78.18 - $ - - $ - $ -
n/a Eng Support Standard $ 145.93 - $ - - $ - $ -
n/a Procurement Senior $ 186.08 $ 198.05 136.40 $ 25,381.31 $ 27,014.02 136.40 $ 27,014.02 $ -
n/a Procurement Standard $ 140.72 - $ - - $ - $ -
n/a Project Director $ 349.20 - $ - - $ - $ -
n/a Project Manager Senior $ 333.57 - $ - - $ - $ -
n/a Project Manager Standard $ 200.04 $ 260.60 4.00 $ 800.16 $ 1,042.40 4.00 $ 1,042.40 $ -
n/a Senior Project Engineer $ 200.04 $ 208.48 6.00 $ 1,200.24 $ 1,250.88 6.00 $ 1,250.88 $ -
n/a Project Engineer $ 128.01 $ 145.93 3.00 $ 384.03 $ 437.79 3.00 $ 437.79 $ -
n/a Commissioning Manager Standard $ - - $ - - $ - $ -
n/a Construction Manager Standard $ 293.09 $ 333.57 - $ - $ - - $ - $ -
n/a HSE Manager $ - - $ - - $ - $ -
n/a HSE Senior $ 203.15 $ 213.69 - $ - $ - - $ - $ -
n/a HSE Standard $ 182.42 - $ - - $ - $ -
n/a Supervisor $ 265.81 - $ - - $ - $ -
n/a Cost Controller Manager $ 265.81 - $ - - $ - $ -
n/a Project Controls Senior $ 187.63 - $ - - $ - $ -
n/a Project Controls Standard $ 156.36 - $ - - $ - $ -
n/a Planner Principal $ - $ 229.33 - $ - $ - - $ - $ -
n/a Planner Senior $ 159.60 $ 224.11 56.60 $ 9,033.36 $ 12,684.63 56.60 $ 12,684.63 $ -
n/a Planner Standard $ - - $ - - $ - $ -
n/a Estimator Senior $ 207.30 $ 234.54 - $ - $ - - $ - $ -
n/a Estimator Standard $ 213.69 - $ - - $ - $ -
n/a Innovation Manager $ - - $ - - $ - $ -
n/a Innovation Senior $ - - $ - - $ - $ -
Subtotal Manhours 1,056.08 $ 177,110.13 $ 210,512.22 1,056.08 $ 210,512.22 - $ -
PO Value $ 1,557,297.88
Invoiced to Date
Available $ 1,557,297.88
Remaining Incl Inv $ 1,346,463.03
Invoice No.
Revision: 0 - 08/12/2025
924553805.xlsx/Invoice 4 Page 48 of 59
Project Name: RMI Tailings
Payment Claim: March (24 Feb to 23 Mar)
Purchase Order Number: LEG_010101-CO-0079_0005_1
Description Budget Hours for Budget Charge for Actual Hours Charge for Previous Actual Hours for Charge for Current Cumulative Hours Cumulative Charge
Project Project Previous Period Period Current Period Period To Date To Date
Engineering Resource
Revision: 0 - 08/12/2025
924553805.xlsx/Progress Claim 4 Page 49 of 59
Project Name: RMI Tailings
Monthly Progress Claim
Purchase Order Number: LEG_010101-CO-0079_0005_1
Description Actual Hours Charge for Previous Actual Hours for Charge for Current Cumulative Hours Cumulative Charge
Previous Period Period Current Period Period To Date To Date
Engineering Resource
Administration Senior - $ - - $ -
Administration Standard 6.08 $ 507.01 6.08 $ 507.01
Document Control Manager - $ - - $ -
Document Control Senior - $ - - $ -
Document Control Standard - $ - - $ -
General Manager Standard - $ - - $ -
Project Development Manager 1.00 $ 349.20 - $ -
BD Manager Senior - $ - - $ -
BD Manager Standard - $ - - $ -
Group Manager Standard - $ - - $ -
Study Manager Senior - $ - - $ -
Study Manager Standard - $ - - $ -
Design Manager Senior 28.10 $ 6,590.57 49.60 $ 11,633.18
Design Manager Standard - $ - 43.00 $ 9,412.70
Discipline Manager - $ - 3.00 $ 844.35
Engineer Consultant - $ - 1.00 $ 375.26
Engineer Principal 21.00 $ 5,582.01 76.90 $ 20,440.79
Engineer Senior 37.20 $ 7,755.46 76.00 $ 15,844.48
Engineer Intermediate - $ - - $ -
Engineer Standard - $ - 38.90 $ 5,676.68
Engineer Graduate - $ - - $ -
Engineer Undergraduate - $ - 38.90 $ 3,243.87
Draftsperson Principal - $ - - $ -
Draftsperson Lead - $ - - $ -
Draftsperson Senior 1.50 $ 257.99 13.60 $ 2,339.06
Draftsperson Standard - $ - - $ -
Draftsperson Cadet - $ - - $ -
Eng Support Standard - $ - - $ -
Procurement Senior 4.60 $ 911.03 38.00 $ 7,525.90
Procurement Standard - $ - - $ -
Project Director - $ - - $ -
Project Manager Senior - $ - - $ -
Project Manager Standard - $ - - $ -
Senior Project Engineer - $ - - $ -
Project Engineer - $ - - $ -
Commissioning Manager Standard - $ - - $ -
Construction Manager Standard - $ - - $ -
HSE Manager - $ - - $ -
HSE Senior - $ - - $ -
HSE Standard - $ - - $ -
Supervisor - $ - - $ -
Cost Controller Manager - $ - - $ -
Project Controls Senior - $ - - $ -
Project Controls Standard - $ - - $ -
Planner Principal - $ - - $ -
Planner Senior 7.60 $ 1,703.24 22.80 $ 5,109.71
Planner Standard - $ - - $ -
Estimator Senior - $ - - $ -
Estimator Standard - $ - - $ -
Innovation Manager - $ - - $ -
Innovation Senior - $ - - $ -
Engineering Resource Total 107.08 $23,656.50 407.78 $82,952.99 - $0.00
Expenses
Monthly Expenses $ - $ -
Revision: 0 - 08/12/2025
924553805.xlsx/SS_Progress Claim 2 Page 50 of 59
Updated from Revision 14 (21 Jun 2023) of Proposal Estimating Template
Discipline Resource Code Resource Title Allocated Role
Administration ADMSEN Senior Business Unit Administrator Administration Senior
ADMSEN Business Unit Administrator Administration Standard
ADMSTD Administration Trainee Administration Standard
ADMSEN Senior Submissions Coordinator Administration Senior
PRPCST Submissions Coordinator Administration Standard
DOCCSN Senior Document Controller Document Control Senior
DOCCST Document Controller Document Control Standard
Management - Business GMRSTD General Manager General Manager Standard
GRMSTD Group Manager Group Manager Standard
PRDVST Manager Business & Project Development Project Development Manager
MGTEST Manager, Engineering Group Manager Standard
PROCPR Manager Process Solutions Engineer Consultant
Management - Job STYMSN Senior Study Manager Study Manager Senior
STYMST Study Manager Study Manager Standard
DMGSNR Senior Design Manager Design Manager Senior
DMGSTD Design Manager Design Manager Standard
Discipline - Civil CIVEMN Manager Civil Discipline Manager
CIVPR Principal Civil Engineer Engineer Principal
CIVESE Senior Civil Engineer Engineer Senior
CIVEST Civil Engineer Engineer Standard
CIVEGR Graduate Civil Engineer Engineer Graduate
UGRENG Undergraduate Civil Engineer Engineer Undergraduate
CIVDSN Senior Civil Draftsperson Draftsperson Senior
CIVDST Civil Draftsperson Draftsperson Standard
Discipline - Controls CTLMGR Manager Controls Discipline Manager
CTLEPR Principal Controls Engineer Engineer Principal
CTLESN Senior Controls Engineer Engineer Senior
CTLEST Controls Engineer Engineer Standard
CTLEGR Graduate Controls Engineer Engineer Graduate
Discipline - Electrical ELEEMG Manager E&I Discipline Manager
ELEEPR Principal Electrical Engineer Engineer Principal
ELEESN Senior Electrical Engineer Engineer Senior
ELEEST Electrical Engineer Engineer Standard
ELEEGR Graduate Electrical Engineer Engineer Graduate
UGRENG Undergraduate Electrical Engineer Engineer Undergraduate
ELEDSE Senior Electrical & Controls Draftsper. Draftsperson Senior
ELEDST Electrical Draftsperson Draftsperson Standard
Discipline - Mechanical MECEMG Manager Materials Handling Discipline Manager
MECEPR Principal Materials Handling Engineer Engineer Principal
MECESN Senior Materials Handling Engineer Engineer Senior
MECEST Mechanical Engineer Engineer Standard
MECEGR Graduate Mechanical Engineer Engineer Graduate
UGRENG Undergraduate Mechanical Engineer Engineer Undergraduate
MECDPR Principal Draftsperson Draftsperson Principal
MECDSN Senior Materials Handling Draftsperson Draftsperson Senior
MECDST Standard Materials Handling Draftsperson Draftsperson Standard
Discipline - Process PROEMG Manager Process Discipline Manager
PROCPR Principal Consultant Engineer Consultant
PROCPR Principal Coal Quality Consultant Engineer Consultant
PROEPR Principal Process Engineer Engineer Principal
PROEPR Process Integration Specialist Engineer Principal
PROEPR Senior Metallurgist Engineer Principal
PROESN Process Discipline Specialist Engineer Senior
PROESN Senior Process Engineer Engineer Senior
PROEST Process Engineer Engineer Standard
PROEGR Graduate Process Engineer Engineer Graduate
PRODPR Principal Draftsperson Draftsperson Principal
PRODSN Senior Process Draftsperson Draftsperson Senior
PRODST Process Draftsperson Draftsperson Standard
Discipline - Structural STREMG Manager Structures Discipline Manager
STREPR Principal Structural Engineer Engineer Principal
STRESN Senior Structural Engineer Engineer Senior
STREST Structural Engineer Engineer Standard
STREGR Graduate Structural Engineer Engineer Graduate
UGRENG Undergraduate Structural Engineer Engineer Undergraduate
STRDSN Senior Structural Draftsperson Draftsperson Senior
STRDST Structural Draftsperson Draftsperson Standard
Discipline - General and Support BIMSTD BIM Coordinator Eng Support Standard
CADSTD CAD Support Officer Eng Support Standard
CDTDST Cadet Draftsperson Draftsperson Cadet
CHESTD Pipe Checker Draftsperson Standard
CHESTD Checker Draftsperson Standard
EAPCST Engineering Applications Coordinator Eng Support Standard
ENGCST Engineering Coordinator Eng Support Standard
Procurement Support GRMSTD Group Manager, Procurement Group Manager Standard
PRCASN Senior Procurement Advisor Procurement Senior
PRCASN Procurement Advisor Procurement Standard
PRCASN Senior Fabrication Advisor Procurement Senior
PRCAST Fabrication Advisor Procurement Standard
PRCOST Procurement Expeditor Procurement Standard
COADSN Senior Contracts Administrator Procurement Senior
COADST Contracts Administrator Procurement Standard
ADMSEN Procurement Administrator Administration Senior
Project Support PMGSEN Project Director Project Director
PMGSEN Senior Project Manager Project Manager Senior
PMGSTD Project Manager Project Manager Standard
PRJESN Senior Project Engineer Senior Project Engineer
PRJEST Project Engineer Project Engineer
CONMST Construction Manager Construction Manager Standard
COPMGR Completions Manager Group Manager Standard
HSESNR Senior HSE Advisor HSE Senior
HSESTD HSE Advisor HSE Standard
ADMSEN Senior Project Administrator Administration Senior
ADMSTD Project Administrator Administration Standard
SUPVST Supervisor Supervisor
Project Services COSMGR Cost Controls Manager Cost Controller Manager
PCOESN Senior Project Control Engineer Project Controls Senior
PCOESD Project Controls Engineer Project Controls Standard
PLANPR Planning Manager Planner Principal
PLANSN Senior Planner Planner Senior
ESTSEN Senior Estimator Estimator Senior
ESTSTD Estimator Estimator Standard
Spare ATYTYP1 Estimator Standard Estimator Standard
ATYTYP2 Spare Category 1 Spare Category 1
ATYTYP3 Spare Category 2 Spare Category 2
ATYTYP4 Spare Category 3 Spare Category 3
ATYTYP5 Spare Category 4 Spare Category 4
ATYTYP6 Spare Category 5 Spare Category 5
ATYTYP7 Spare Category 6 Spare Category 6
ATYTYP8 Spare Category 7 Spare Category 7
ATYTYP9 Spare Category 8 Spare Category 8
ATYTYP6 Spare Category 9 Spare Category 9
ATYTYP7 Spare Category 10 Spare Category 10
ATYTYP8 Spare Category 11 Spare Category 11
ATYTYP9 Spare Category 12 Spare Category 12
ATYTYP10 Spare Category 13 Spare Category 13
ATYTYP5 Spare Category 14 Spare Category 14
ATYTYP6 Spare Category 15 Spare Category 15
ATYTYP7 Spare Category 16 Spare Category 16
ATYTYP8 Spare Category 17 Spare Category 17
ATYTYP9 Spare Category 18 Spare Category 18
ATYTYP10 Spare Category 19 Spare Category 19
Revision: 0 - 08/12/2025
924553805.xlsx/Proposal Est Roles Page 51 of 59
Discipline Resource Title
Study Management
Administration Senior Business Unit Administrator
Administration
Estim rev, R&O Group Manager
" + commercials, client liason Manager Business & Project Development
Engineering Delivery
Construction Manager
Senior HSE Advisor
Planning Manager
Senior Planner
Planner
CAPEX Senior Estimator
Total (calculated)
Total (check)
Allocated Role Cost Rate Charge Rate