Introduction
This report summarises common open pit mining methods used to extract phosphate deposits, with emphasis on
drilling & blasting, mechanical excavation (shovels & trucks), ripping, and surface mining using specialised
continuous machines. The aim is to provide clear technical descriptions, typical operating conditions,
advantages and disadvantages, and schematic illustrations usable for training and presentations.
Phosphate deposits include both sedimentary (soft) and hard rock (igneous/metamorphic) types. The chosen
extraction method depends on geotechnical parameters (UCS, abrasivity), deposit geometry, environmental
constraints, production rate, and downstream processing requirements.
Drilling & Blasting
Used for hard to medium hard rock where fragmentation by blasting is the most efficient way to produce
loader sized material. Typical sequence: drilling pattern design charging controlled blast load & haul
primary crushing if required.
Mechanical Excavation (Shovel & Truck)
Common where material is free digging or sufficiently fragmented. Excavators or electric rope shovels load
trucks; suitable for layered deposits and high production rates. Requires haul roads and fleet management.
Ripping (Dozer/Ripper + Loader)
Used when material is cohesive but not excessively hard. Ripping reduces need for blasting. Effective for
weathered rock, calcrete, or interbedded soft layers.
Surface Miner (Continuous Mechanical Mining)
Large cutting machines (e.g., Wirtgen SM series) remove rock in a continuous process. Best for soft to
medium hard rocks where reducing fines, avoiding blasts, and selective mining are priorities. Reduces
secondary crushing requirements and vibration/noise from blasting.
Methods Comparison: Pros & Cons
Method Pros Cons Typical Conditions / Notes
Drilling & Blasting High productivity; suitable for hard rock;
Vibration,
established
flyrock,technology
noise; produces fines;
Usedregulatory
when UCSconstraints
is high andon
blastin
blas
Mechanical Excavation Flexible, well understood; high production
Requires
withgood
suitable
haulage
fleetinfrastructure;
Common
inefficient
in softer
in verytohard
medium
rock rock
with
Ripping Reduces need for blasting; lower fines
Notthan
effective
blasting
in very hard rock; slower
Best
than
forblasting
weathered, cohesive mate
Surface Miner No blasting; low fines; selective mining;
Highreduced
CAPEX; crushing
limited on very hard rock;
Sweet
specialized
spot: softmaintenance
to medium rock, e
Drilling & Blasting Bench Diagram
Bench 6
Bench 5
Bench 4
Bench 3
Bench 2
Drill pattern and boreholes - then blasting to fragment benches
Bench 1
Mechanical Excavation Loader & Truck
Bench 6
Bench 5
Bench 4
Loader Dump Truck
Bench 3
Bench 2
Excavation by shovel/loader and haulage by trucks
Bench 1
Surface Miner Continuous Cutting Schematic
Bench 6
Bench 5
Surface
Bench 4 Miner
Cutting direction
(and conveyor extraction)
Bench 3
Bench 2
Continuous mechanical cutting of bench face - no blasting
Bench 1
Case Studies (Selected Examples)
Khouribga (Morocco): Large sedimentary phosphate with bench mining; mix of mechanical excavation and selective
blasting in harder benches. Surface miners have been trialed in some operations.
Bone Valley (Florida, USA): Sedimentary deposits with mechanical excavation and hydrological management;
minimal blasting.
Ma'aden (Saudi Arabia): Large open pit operations with conventional benching and blasting in hard zones;
continuous improvement to reduce fines.
Conclusion & Recommendations
Method selection should be based on site characterisation: UCS, moisture, abrasion, deposit continuity, and
the sensitivity of downstream processes to fines. Environmental and community constraints (noise, vibration)
can strongly favour non blasting approaches such as Surface Miners.
Pilot tests and economic models (CAPEX/OPEX, availability, productivity) are recommended prior to committing
to a full scale change in mining method.
Appendix: Quick Selection Checklist
1. Obtain geotechnical parameters (UCS, abrasivity, moisture).
2. Determine production target (t/h or Mt/year).
3. Assess downstream process sensitivity to fines.
4. Evaluate environmental & regulatory constraints (blasting permissions).
5. Run a short pilot using rental or contractor machines (Surface Miner trial if non blasting is desired).