QUOTATION
QUOTATION NO: ES2504006 QUOTATION DATE: 03.04.2025
To, MTEKPRO TECHNOLOGIES PVT. LTD.
28, Second Floor, Okhla Industrial Estate,
Uttar Pradesh Power Transmission Corporation Limited Phase-3, New Delhi-110020
Ghaziabad Quoted by: Mr. Taiyab Zia Ahmed
Founder & Director
Kind Attn: Mr. VIPIN KUMAR E:
[email protected] (Executive Engineer) M: +91 9810706882
Mob: +91-8130599629
Email:
[email protected] Sr. No. Description Qty Total Price in INR
Conducting following RLA test on 150 MVA ,220/132
01 kV Transformer at 220 kV Substation Loni.
Routine Test
Turns Ratio test
Megnetizing Current
1.1 Short Circuit Impendance measurement
Winding Resistance measurement
Insulation resistance measurment
Polarization index test
Magnetic Balance
Special Test
Tan delta and Capacitance & Measurement of 01 Rs. 1,95,000/-
Bushings
1.2 Tan delta and capacitance measurement of
winding.
Sweep frequency Response analysis
Frequency Responses Stray Loss Measurement
Oil Test
Routine test as per IS: 1866
1.3 Dissolve gas Analysis
FURAN test
DP Paper Test
Online Partial Discharge Measurement using acoustic
1.4 and HFCT
Sr.No. Description Qty Total Price in INR
Conducting following RLA test on 220 MVA , 132/33 kV
02 Transformer at 132 kV Substation Mohan Nagar
Routine Test
Turns Ration test
Megnetizing Current
Short Circuit Impendance measurement
2.1
Winding Resistance measurement
Insulation resistance measurment
Polarization index test
Magnetic Balance
Special Test
Tan delta and Capacitance & Measurement of 01 Rs. 1,75,000/-
Bushings
2.2 Tan delta and capacitance measurement of
winding.
Sweep frequency Response analysis
Oil Test
Routine test as per IS: 1866
2.3 Dissolve gas Analysis
FURAN test
DP Paper Test
2.4 Online Partial Discharge Measurement using acoustic
and HFCT
Total Rs. 3,70,000/-
GST Rs. 66,600/-
Grand Total Rs. 4,36,600/-
Commercial Terms and Conditions:
100% Advance Payment along with the Purchase order
Payment Terms
Mobilization charges Included
Lodging & Boarding for two Engineers To be arrange by UPPTCL
GST (extra) @ 18%
Offer Validity 30 Days from the date of quotation.
Note:
1. Single phase & Three Phase power supply to be arranged by UPPTCL at the point of testing free of cost.
2. Two technician for connection and disconnection of test cables to be arranged by UPPTCL free of cost.