0% found this document useful (0 votes)
3 views3 pages

Progress Quantity 2022-09-20

qty

Uploaded by

Renante
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3 views3 pages

Progress Quantity 2022-09-20

qty

Uploaded by

Renante
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Date 2022-09-13 Company Total Done Balance Prog.

DEMOLISHED ITEM
Quantity
Discipline NO DESCRIPTION Unit Required Qty. Demolished Qty Remaining Prog. %

1 Dike Wall Surface Removal m2 1,148.00 1,112.22 35.78 96.88%


2 Dike Wall Demolition m3 242.00 104.00 138.00 42.98% NSH 66.19 10.24 55.95 15%
3 Concrete Pavement m3 547.37 415.40 131.97 75.89% NSH 88.19 80.89 7.3 92%
4 Wall Paint (Control Room) m2 940.00 940.00 0.00 100.00%
Civil 5 Stair and Handrail m2 15.00 15.00 0.00 100.00%
6 Asphalt paving m2 9,537.58 1,337.58 8,200.00 14.02% NSH 1,635.49 1,635.49 0.00 100%
7 Steel Structure No. 19.00 19.00 0.00 100.00%
8 Parking Shed m2 78.00 78.00 0.00 100.00%
9 Roofing m2 865.80 865.80 0.00 100.00%
10 Process Pipes Lm 1,138.25 1,051.00 87.25 92.33% NSH 440.85 440.85 0 100%
Piping 11 Fire water pipes Lm 9,045.96 8,262.96 783.00 91.34% NSH 2909 2909 0 100%
12 Valves No 166.00 116.00 50.00 69.88% NSH 173 159.00 14.00 92%
13 E&I Cable Lm 110,257 110,257 0.00 100.00%
14 E&I Cable Tray Lm 203.00 203.00 0.00 100.00%
15 E&I Conduit Lm 12,367.00 12,367.00 0.00 100.00%
Electrical and 16 Instruments Nos. 72.00 72.00 0.00 100.00%
Instrumentation 17 Junction Box Nos. 34.00 34.00 0.00 100.00%
18 CP Rectifier Panel Nos. 5.00 5.00 0.00 100.00%
18 Lighting fixture Nos. 75.00 75.00 0.00 100.00%
18 High Mast and Light Pole Nos. 10.00 10.00 0.00 100.00%
19 Shell Removal Phase 1 T-105 Ton 94.39 94.39 0.00 100.00%
20 Tank Roof (T-103)- 4,214 m2 m2 4,242.00 4,242.00 0.00 100.00%
21 Rafter Nos. 312.00 312.00 0.00 100.00%
Girder and Column Removal T-
Mechanical 22 Nos. 97.00 97.00 0.00 100.00%
103
23 Tank Grit Blasting (T-108) m2 4,587.00 4,587.00 0.00 100.00%
24 Base Plate Removal m2 4,242.00 0.00 4,242.00 0.00%
25 Shell Removal T-103 m2 1,123.61 612.00 511.61 54.47%
RESTORATION ITEM
Discipline NO DESCRIPTION Unit Required Qty. Restored Qty. Remaining Prog. %
1 Wall Paint (Control Room) m2 940.00 940.00 0.00 100.00%
Stair and Handrail (Control
2 m2 15.00 15.00 0.00 100.00%
Room)
3 Parking Shed (Control Room) m2 78.00 78.00 0.00 100.00%

4 Dike Concrete Wall Restoration m3 414.18 0.00 414.18 0.00% NSH 152.8 119 33.8 78%

5 Pavement Restoration m3 547.37 161.96 385.41 29.59% NSH 307.52 238.19 69.33 77%
CIVIL
6 Dike Wall Painting m2 2,116.00 0.00 2,116.00 0.00%
7 Steel Structure No. 14.00 14.00 0.00 100.00% NSH 14 14 0.00 100%
8 Roofing m2 865.80 865.80 0.00 100.00%
9 Tank Grit Blasting (T-108) m2 4,587.00 4,587.00 0.00 100.00%
10 Tank Coating (T-108) m2 4,587.00 3,669.00 918.00 79.99%
11 Asphalt paving m2 9,537.58 0.00 9,537.58 0.00% NSH 1635.49 0 1,635.49 0%
12 Process Pipes Jump Over Lm 381.00 381.00 0.00 100.00% NSH 381 381 0.00 100%

13 Process Pipes (Other Areas) Lm 810.80 80.53 730.27 9.93% NSH 682.38 455.149 227.23 67%
PIPING 14 Fire water pipes Lm 146.00 0.43 145.57 0.29% NSH 149.5 58.43 91.07 39.08%
15 Fire Fighting Pipe Coating Lm 1,280.35 1,134.45 145.90 88.60%
16 Valves No 284.00 85.00 199.00 29.93% NSH 280 127 153.00 45%
17 Panels (Control Room) No 12.00 12.00 0.00 100.00%
18 Instrumentation Cable Lm 49,750.00 49,750.00 0.00 100.00%
19 Instruments Nos. 84.00 29.00 55.00 34.52%
ELECTRICAL & INSTRUMENTTAION

20 Instrumentation Conduits Lm 3,050.00 3,050.00 0.00 100.00%


21 Instrument Junction Box Nos. 31.00 31.00 0.00 100.00%
22 Instrumentation cable Tray Lm 130.00 130.00 130.00 100.00%
23 Electrical cable Lm 66,310.00 66,310.00 0.00 100.00%
24 Electrical Cable Tray Lm 143.00 143.00 0.00 100.00%
25 Electrical Conduit Lm 5,717.00 5,717.00 0.00 100.00%
26 Electrical Junction Box Nos. 3.00 0.00 3.00 0.00% NA
27 Lighting fixture Nos. 82.00 82.00 0.00 100.00%
28 High Mast Nos. 4.00 4.00 0.00 100.00%
ELECTRICAL 29 Light Pole Nos. 7.00 7.00 0.00 100.00%
30 CP Rectifier Panel Nos. 5.00 0.00 5.00 0.00%
31 Tank Roof (T-103)- 4,214 m2 m2 4,242.00 0.00 4,242.00 0.00%
32 Rafter Ton 41.00 0.00 41.00 0.00%
MECHANICAL 33 Girder and Column T-103 Nos. 49.00 0.00 49.00 0.00%
34 Shell Restoration T-103 m2 1,123.61 0.00 1,123.61 0.00%
35 Base Plate m2 4,242.00 0.00 4,242.00 0.00%