1.0.Important ...................................................................3
1.1.Preamble ...........................................................4
NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009
1.0. IMPORTANT !
Authorised personnel only, who is familiar with the operating and maintenance
instructions and the appropriate instructions with regard to safety at work and accident
prevention, is allowed to use, maintain and repair the machine.
The manufacturer NA-CE MACHINERY Co. herewith declares, that the new belt
conveyor as described in the following is in compliance with the regulations of the Machinery
Safety 05/06/2002-official gazette : 24776 and thus complies also with the Machinery
Directive 98/37/EEC in its applicable version.
NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009
1.1. PREAMBLE
NA-CE Machinery Industry Co. thanks you for the confidence that you have
placed in NA-CE with the purchase of this equipment.
The information given to you with these operating and maintenance instructions
shall direct the user’s attention to design, construction and functioning of the GBV Belt
Conveyor and impart all knowledge necessary for a successful application, use, trouble-free
operation, expert maintenance and correct purchase of spare parts.
The present “Operating and Maintenance Instructions” shall not cancel the current
national laws and accident prevention regulations.
GBV Belt Conveyor shall be used by expert and authorised personnel only and
exclusively for the purpose it had been designed and made for.(i.e. for feeding and
conveying of materials-)
The conveyor shall be operated and maintained by authorised persons only, who
have been registered in the equipment check list and are therefore familiar with the conveyor
and know the risks and hazards very well.
Any other use of the belt conveyor shall not be covered by the above-mentioned
instructions. The manufacturer of the conveyor shall neither be made liable for defects nor
consequential defects and damage resulting from such use, nor shall he take over any
liability with regard to the Product Liability Act.
NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009
10 Commandments of Safety
1. Support all efforts to keep the place of work safe and healthy.
2. Act and do everything with responsibility and utmost care if your safety and the
safety of others is at stake.
3. Regularly check all protection devices and tools for completeness and safe
functioning.
4. Inform yourself and others about the risks involved with the job so that such
risks can be prevented in the most effective way.
5. To avoid injuries and mechanical defects inform yourself about hazards and
safety measures if you feel not having enough knowledge on this subject.
6. Always bear dangers of injuries and accidents in mind before you begin with a
new work. Prepare well thought out safety precautions to protect yourself and
others. Revise such measures regularly and introduce necessary improvements.
7. Warn others of possible risks and defects if you see that they are working in a
very dangerous way or are about to cause dangerous situations.
8. Pay attention to changes in working conditions and working processes and act
accordingly.
10. Keep your place of work/area of work tidy. Tools and auxiliary means must be
collected after use and kept in a place especially provided for this purpose.
NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009
Let the operating personnel attend a First Aid Course if they do not have such
knowledge.
Take off rings, bracelets, wristwatches, necklaces etc. before you start working at
the conveyor.
For lifting heavy loads (above 25 kg) always use appropriate lifting devices.
Never stand under lifted loads and check all load raising devices for damage and
sufficient load-bearing capacities before each use.
Protect hair with a hairnet and avoid loose clothing when working at the machine
to avoid getting caught by rotating parts.
Crushing material and operating conditions may create dusty environments, which
necessitate the use of protection masks.
NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009
Do not change or remove installations that ensure safety and avoid accidents.
Always keep them in a safe-to-operate condition.
Prior to each start-up the belt conveyor personnel must make sure that no
unauthorised persons are within the dangerous areas of the conveyor.
Service and maintenance work are only allowed - and that without any exception -
when the unit is switched off and protected against unintended start-up (lock main switch).
In case of defects, which reduce the safety of conveyor, stop the conveyor at once
resp. switch it off and inform the managers.
Conveying
Expert and skilled persons only with adequate training, who are familiar with the
operating instructions and dispose of sufficient experiences to operate the conveyor are
authorised to do so.
For switching on the belt conveyor wait until the material throughput shows no
NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009
obstructions and all operating personnel is well away from the plant.
Always wear suitable protection clothing (safety gloves, safety shoes etc.) to avoid
injuries.
Elimination of irregularities in the material flow and in particular will often lead to
risky situations. Please refer to causes and remedies page.
Having eliminated the malfunction re-mount all safety installations and check them
again for proper functioning and operation reliability.
Electrical Equipment
NA-CE-authorised personnel only are allowed to perform repair work at
the electrical equipment.
Welding repairs at the belt conveyor without adequate safety precautions will
damage the electrical equipment.
Emergency-Off
The belt conveyor may only be operated with an emergency off device.
Never use the EMERGENCY-OFFS for a normal stop of the belt conveyor. Check
these EMERGENCY-OFFS regularly for proper functioning.
NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009
Maintenance and servicing jobs at the conveyor must only be carried out during
standstill of all drives.
Make sure to prevent unintended starting of the conveyor unit (e.g. blocking the
main switch).
Welding repairs
Welding repairs on NA-CE – BELT CONVEYORS must only be done after
consultation of NA-CE MACHINERY Co.!!
NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009
Belt is the main element and installed between exciting and tensioning drums. A
motor coupled with a reducer box, between two drums, excites belt conveyor. There are
troughing idlers which trough and carry the loaded belt and they are equally spaced. Also
there are guiding idlers placed vertically to prevent belt moving on its plane and maintain the
belt upon a straight course.
There are two belt scrapers; one at the head section and at the front.
2.1-TECHNICAL DESCRIPTION:
Belt conveyor basically consists of following items.
1.Chassis
2.Drive mechanism
3. Take-up unit
5.Infinite belt.
7.Discharging Chute
8.Feeding Chute
NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009
NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009
MAIN DIMENSIONS
TECHNICAL SPECIFICATIONS
BELT LENGHT L
(m) 10_12 13-20 21-30 10 11_15 16-30 10_12 13-15 16-28 29-30 10_12 13-22 23-30 10_12 13-18 19-24 25-30
BELT WIDTH
(mm) 600 750 800 1000 1200
MOTOR-RED.
(KW) 4 5.5 7.5 5.5 7.5 11 5.5 7.5 11 15 7.5 11 15 11 15 18.5 22
ANGLE 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18
SPEED (m/s) 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5
NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009
Correct belt tensioning is important for life of the belt. Hence a tensioning
adjustment should be controlled weekly or a working period of minimum 40 hours. When belt
adjustment is required, each tensioning screw should be equally adjusted. Over tensioning is
as dangerous as slackness. Belt tension must be such a value sufficient to prevent skidding
of belt in loaded position.
b) STARTING UP:
Correct rotation of the motor and gearbox must be checked; if incorrectly wired,
wiring must be changed.
Never start the belt conveyor before all safety instructions have
been fulfilled.
The conveyor is run in unloaded position for a short time and observed if the belt
alignment is true. If not; the belt running on to the tail drum is observed and the appropriate
return idlers are adjusted.(Belt training)
NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009
DO NOT ATEMPT to train the belt by unequal adjustment off screw take-ups.
Bear in mind that a misaligned conveyor installation will cause the belt to run to
one side, always toward the side of the idler it first touches. Start by aligning the return side
first. Starting at the head end, adjust the forth or fifth idler, before the run-out point, and
each succeeding idler up to the run-out point.
It is better to adjust a number of idlers a small amount than adjusting than one or
two idlers a great deal. To adjust the idlers, loosen the mounting bolts and using a soft
hammer tap the bracket on the side of the belt is running off.
After moving the bracket slightly forward, in the direction of the belt travel to
reposition the roll, retighten the bolts. Repeat this procedure at each point where the belt
runs off until the return side is running true.
Then start on the carrying side, at the tail end, working in the direction of belt
travel using the same method as for the return side.
It may be necessary to repeat these adjustments more than once until the belt
runs true.
Belt can be “steered” to improve training by slight shifting of idlers relative to line
of belt travel. Tilting of idlers is another technique for improving training of conveyor belt. A tilt
of 2° is the maximum that should be used to keep excessive wear on the rolls to a minimum.
This can be done by placing washers under rear feet of the mounting pads.
d) BELT SLIPPAGE:
Once the belt has been properly trained while running empty, the belt must be
checked when carrying a full load. Ideally, a properly trained belt will run true under loaded
conditions. In most cases off center running of the belt, when loaded, is caused by off-
centered loading. Chutes should distribute the load evenly and centered on to the belt.
If the belt slip to any direction at loaded position, it must be adjusted firstly by tail
drum and then by top idlers. Top idlers are adjusted as follows:
The slipping side of the belt is moved to forward and the other side to backward
direction when observed to the moving direction of the belt. Supports of the top idlers are
overly drilled. Required side of the support can be moved to forward and the other side to
backward by loosening the connection bolts must be tightened after that operation. This
adjustment is valid also for bottom idlers.
If the belt is slipping to any direction even if all these adjustments balance
condition of the belt should be controlled with a water level.
NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009
Loading:
Start with a light load and gradually work up the load that the conveyor was
designed to handle. Check chutes to see that the material is being directed onto the center of
the belt. The loading point of a belt conveyor is the critical point. Here the conveyor receives
its major abrasion and practically all of its impact. The ideal condition is to have the material
pass from chute to belt at the same speed and direction of travel as the belt, with a minimum
amount of impact, and to load the belt on center.
The skirts must be adjusted to prevent side spillage of material and to keep the
load central on the belt. The skirt lengths were designed to stop side spillage. The material
should also be at rest on the belt before it reaches the end of the skirt. If material is still
tumbling as it passes the skirt end, the skirts should be lengthened.
General Cleaning
Check oil level the reducer box, if necessary add oil given below;
NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009
NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009
Bearings of HEAD and TAIL drums are dismounted and cleaned by gasoline then
gressed.
Discharge the oil of the reducer box. Clean all gears by gasoline. Then oil SAE 30
should be supplied.
Firstly belt is laid on the floor. Such that upper and lower parts are placed side by
side. The chassis, mounted at another place, except front part placed on to the lower part of
belt. Then front part of the chassis placed and tensioning process are verified. Finally all the
supports are placed and bolted. Dismounting is in reverse order.
NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009
NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009
Locate your specific problem in the "complaint" table below and note the numbers
to the right. They represent the most likely causes for the problem, in order of probable
occurrence, and how to correct them. The list at the bottom of the page details the causes
and remedies by number. The remedies will correct the majority of belt conveyor troubles.
However, some remedies require lengthy procedures, which should be referred to NA-CE
representative.
CAUSE CAUSE
COMPLAINT COMPLAINT
In Order of Probable In Order of Probable
Occurrence Occurrence
NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009
1.Belt bowed: Avoid telescoping belt rolls or storing them in damp locations. A
new belt should straighten out when "broken in" or it must _ replaced.
4.Belt strained on one side - Allow time for new belt to "break in." If belt does
not break in properly or is not new, remove strained section and splice in a new piece.
5.Breaker strip missing or inadequate- When service is lost, install belt with
proper breaker strip.
9.Edge worn or broken - Repair belt edge. Remove badly worn or out-of-square
section and splice in a new piece.
NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009
17.Insufficient traction between belt and pulley - Increase wrap with snub
pulleys. In wet conditions, use vulcanised pulleys. Install correct cleaning devices on belt.
Install centrifugal switch for safety.
18.Material between belt and pulley- Use skirt boards properly. Remove
accumulation. Improve maintenance.
22.Relative loading velocity too high or - too low - Adjust chutes or correct
belt speed. Consider use of impact idlers.
24.Skirts improperly placed – Install skirt boards so that they do not rub
against belt.
NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009
2.4.SPARE PARTS:
Damaged PARTS should be renewed immediately if not repairable. Repairable parts should
be repaired. For parts, damaged, inform us with the name and the number associated with.
NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009
NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009
Please use the form when giving orders for your machine.
FORM NO: FYD.01 12/02/1999-03 DISTRIBUTION : 1.Copy Purchasıng 2.Copy Inventory 3.Copy Back to spare parts manager
NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.