0% found this document useful (0 votes)
4 views24 pages

Belt Conveyors

Uploaded by

jaber.excav
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views24 pages

Belt Conveyors

Uploaded by

jaber.excav
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 24

SBV Tarih : 27/04/2009

BELT CONVEYOR Sayfa No: 1/24

SBV BELT CONVEYOR


OPERATING AND MAINTENANCE
MANUAL

PRODUCER
NA-CE MACHINERY INDUSTRY CO.
PHONE: 0 312 267 00 39
FAX: 0312 267 18 44
ANKARA/TURKEY

EDITION: 2009

NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009

BELT CONVEYOR Sayfa No: 2/24

TABLE OF CONTENTS
1.0.Important ...................................................................3

1.1.Preamble ...........................................................4

1.2.Machine Specific Safety Instructions ....................7

1.3.Warning Paint, Lettering and Warning Signs ........ 9

2.0.SBV Belt Conveyor ...................................................... 10

2.1.Technical Description .........................................10

2.2.Adjustment and Maintenance .............................. 13

2.3.Belt Conveyor Trouble Shooting ..........................19

2.4.Spare Parts …………………………………………………….22

NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009

BELT CONVEYOR Sayfa No: 3/24

1.0. IMPORTANT !

These Operating and Maintenance Instructions and Safety Regulations shall be


read and observed carefully prior to transport, installation, commissioning, maintenance
and servicing of the machine!

Authorised personnel only, who is familiar with the operating and maintenance
instructions and the appropriate instructions with regard to safety at work and accident
prevention, is allowed to use, maintain and repair the machine.

The manufacturer NA-CE MACHINERY Co. herewith declares, that the new belt
conveyor as described in the following is in compliance with the regulations of the Machinery
Safety 05/06/2002-official gazette : 24776 and thus complies also with the Machinery
Directive 98/37/EEC in its applicable version.

NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009

BELT CONVEYOR Sayfa No: 4/24

1.1. PREAMBLE
NA-CE Machinery Industry Co. thanks you for the confidence that you have
placed in NA-CE with the purchase of this equipment.

The information given to you with these operating and maintenance instructions
shall direct the user’s attention to design, construction and functioning of the GBV Belt
Conveyor and impart all knowledge necessary for a successful application, use, trouble-free
operation, expert maintenance and correct purchase of spare parts.

The present “Operating and Maintenance Instructions” shall not cancel the current
national laws and accident prevention regulations.

GBV Belt Conveyor shall be used by expert and authorised personnel only and
exclusively for the purpose it had been designed and made for.(i.e. for feeding and
conveying of materials-)

Additionally, start-up, operating and maintenance conditions (in accordance with


the operating and maintenance instructions) as specified by the manufacturer of the
conveyor shall be strictly observed.

Furthermore, foreseeable wrong behaviour of personnel and the directions of the


relevant local safety regulations and laws shall be well considered too.

The conveyor shall be operated and maintained by authorised persons only, who
have been registered in the equipment check list and are therefore familiar with the conveyor
and know the risks and hazards very well.
Any other use of the belt conveyor shall not be covered by the above-mentioned
instructions. The manufacturer of the conveyor shall neither be made liable for defects nor
consequential defects and damage resulting from such use, nor shall he take over any
liability with regard to the Product Liability Act.

NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009

BELT CONVEYOR Sayfa No: 5/24

10 Commandments of Safety

1. Support all efforts to keep the place of work safe and healthy.

2. Act and do everything with responsibility and utmost care if your safety and the
safety of others is at stake.

3. Regularly check all protection devices and tools for completeness and safe
functioning.

4. Inform yourself and others about the risks involved with the job so that such
risks can be prevented in the most effective way.

5. To avoid injuries and mechanical defects inform yourself about hazards and
safety measures if you feel not having enough knowledge on this subject.

6. Always bear dangers of injuries and accidents in mind before you begin with a
new work. Prepare well thought out safety precautions to protect yourself and
others. Revise such measures regularly and introduce necessary improvements.

7. Warn others of possible risks and defects if you see that they are working in a
very dangerous way or are about to cause dangerous situations.

8. Pay attention to changes in working conditions and working processes and act
accordingly.

9. Hazardous and risky behaviour, dangerous conditions and processes, which


could have caused accidents, must be reported to the management without
delay. Do not assume that somebody else will do this. Do not take drugs, pills
etc. and never drink alcohol when operating or maintaining the machine, or
prohibit consumption of drugs and alcohol during working hours.

10. Keep your place of work/area of work tidy. Tools and auxiliary means must be
collected after use and kept in a place especially provided for this purpose.

NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009

BELT CONVEYOR Sayfa No: 6/24

Additional Safety Regulations


Inform operating personnel of the emergency numbers. The emergency numbers
must be made clearly visible close to the telephone.

Let the operating personnel attend a First Aid Course if they do not have such
knowledge.

In case of injuries to a person call for a doctor or other ambulance personnel at


once and take care of the injured person without delay.

All accident must be reported at once to the management.

Take off rings, bracelets, wristwatches, necklaces etc. before you start working at
the conveyor.

For lifting heavy loads (above 25 kg) always use appropriate lifting devices.

Lift loads only out of the legs with stretched back.

Never stand under lifted loads and check all load raising devices for damage and
sufficient load-bearing capacities before each use.

Protect hair with a hairnet and avoid loose clothing when working at the machine
to avoid getting caught by rotating parts.

Always wear helmets for your own safety.

Crushing material and operating conditions may create dusty environments, which
necessitate the use of protection masks.

Protect your eyes with safety glasses to avoid injuries


caused by dust and flying particles.

Always USE safety work-shoes and gloves to avoid injuries.

Unauthorised stay of persons within dangerous areas of the conveyor is strictly


forbidden.

NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009

BELT CONVEYOR Sayfa No: 7/24

Do not change or remove installations that ensure safety and avoid accidents.
Always keep them in a safe-to-operate condition.

Prior to each start-up the belt conveyor personnel must make sure that no
unauthorised persons are within the dangerous areas of the conveyor.

Visually verify that all personnel and objects are clear of


equipment prior to operation.

Service and maintenance work are only allowed - and that without any exception -
when the unit is switched off and protected against unintended start-up (lock main switch).

In case of defects, which reduce the safety of conveyor, stop the conveyor at once
resp. switch it off and inform the managers.

Careful and detailed instruction and training of the operating,


maintenance and repair personnel only as well as observation
and keeping of the safety regulations and working prescriptions
of the operating instructions ensure high availability of the
equipment with regard to trouble-free operation and economical
application.
Supplement the safety regulations of this operating instruction with
internal operating instructions based on national prescriptions, local
and national environmental laws, national accident prevention
regulations etc.

In this connection reference is made to the EC-Directive (89/655/EEC).

1.2. MACHINE-SPECIFIC SAFETY INSTRUCTIONS

Conveying
Expert and skilled persons only with adequate training, who are familiar with the
operating instructions and dispose of sufficient experiences to operate the conveyor are
authorised to do so.

All safety installations must be correctly mounted and be in a ready-to-operate


condition. The belt conveyor itself must be free from material to ease starting the conveyor
drive.

For switching on the belt conveyor wait until the material throughput shows no

NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009

BELT CONVEYOR Sayfa No: 8/24

obstructions and all operating personnel is well away from the plant.

Never start the belt conveyor before all above-mentioned


conditions have been fulfilled.

Always wear suitable protection clothing (safety gloves, safety shoes etc.) to avoid
injuries.

Dangers in case of material flow irregularities

Elimination of irregularities in the material flow and in particular will often lead to
risky situations. Please refer to causes and remedies page.

Having eliminated the malfunction re-mount all safety installations and check them
again for proper functioning and operation reliability.

Electrical Equipment
NA-CE-authorised personnel only are allowed to perform repair work at
the electrical equipment.

Expert personnel of a licensed company only are allowed to work on the


electrical equipment of the belt conveyor.

Carefully check whether the conveyor has been earthed in accordance


with the local provisions.

Electrical details and drawings are given as separate document.

Welding repairs at the belt conveyor without adequate safety precautions will
damage the electrical equipment.

Emergency-Off
The belt conveyor may only be operated with an emergency off device.
Never use the EMERGENCY-OFFS for a normal stop of the belt conveyor. Check
these EMERGENCY-OFFS regularly for proper functioning.

Maintenance and Servicing


lndicated lubrication and oil changing intervals must be kept.

NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009

BELT CONVEYOR Sayfa No: 9/24

Maintenance and servicing jobs at the conveyor must only be carried out during
standstill of all drives.

Make sure to prevent unintended starting of the conveyor unit (e.g. blocking the
main switch).

Never use any other lubricants than those recommended by NA-CE.

Never mix up lubricants based on different substances (e.g. lithium-soaped grease


with calcium-soaped grease) because otherwise this could considerably damage bearings
circumstances.
After completion of maintenance and repair work re-mount all
available safety installation and check them again for proper
functioning and operation reliability.

Hazardous Material Disposal


Waste oil, waste grease, cleansing liquids, remnants of paints etc. must be
disposed of in an expert way and in accordance with the relevant national environmental
laws that are generally applicable.

Welding repairs
Welding repairs on NA-CE – BELT CONVEYORS must only be done after
consultation of NA-CE MACHINERY Co.!!

1.3. WARNING PAINT, LETTERING AND WARNING SIGNS

Nameplates and warning signs must never be removed or painted over.


Illegible and defective nameplates and warning signs must be
replaced at once by identical new ones. Nameplates may be
obtained from NA-CE Machinery Industry/TURKIYE.

NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009

BELT CONVEYOR Sayfa No: 10/24

2.0. SBV BELT CONVEYOR


Belt conveyor is used for transportation of various granular size materials upward
or downward or horizontally.

Belt is the main element and installed between exciting and tensioning drums. A
motor coupled with a reducer box, between two drums, excites belt conveyor. There are
troughing idlers which trough and carry the loaded belt and they are equally spaced. Also
there are guiding idlers placed vertically to prevent belt moving on its plane and maintain the
belt upon a straight course.

There are two belt scrapers; one at the head section and at the front.

2.1-TECHNICAL DESCRIPTION:
Belt conveyor basically consists of following items.

1.Chassis

2.Drive mechanism

3. Take-up unit

4.Impact and troughing idlers.

5.Infinite belt.

6.Tail and head drums

7.Discharging Chute

8.Feeding Chute

NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009

BELT CONVEYOR Sayfa No: 11/24

NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009

BELT CONVEYOR Sayfa No: 12/24

MAIN DIMENSIONS

TİPİ TYPE L A B C D E F TİPİ TYPE L A B C D E F


600 10-20 M 710 1500
600 21-30 M 710 1540
10-20 M
750 860 1650 21-30 M
750 860 1690
10-22 M
800 400 910 1700 89 1000 116 23-30 M
800 500 910 1740 89 1000 116
10-22 M
1000 1110 1900 23-30 M
1000 1110 1940
10-12 M
1200 1310 2100 13-30 M
1200 1310 2140

TECHNICAL SPECIFICATIONS

BELT LENGHT L
(m) 10_12 13-20 21-30 10 11_15 16-30 10_12 13-15 16-28 29-30 10_12 13-22 23-30 10_12 13-18 19-24 25-30
BELT WIDTH
(mm) 600 750 800 1000 1200
MOTOR-RED.
(KW) 4 5.5 7.5 5.5 7.5 11 5.5 7.5 11 15 7.5 11 15 11 15 18.5 22
ANGLE 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18
SPEED (m/s) 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5

NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009

BELT CONVEYOR Sayfa No: 13/24

2.2-ADJUSTMENT AND MAINTENANCE:


If the belt tension is not sufficient during operation then friction forces decreases
and a slippage occurs. Slippages decrease the belt life and worsen functionality. To prevent
such occurrences, following adjustments should be verified.

a) BELT TENSIONING (TAKE-UP UNIT):

Correct belt tensioning is important for life of the belt. Hence a tensioning
adjustment should be controlled weekly or a working period of minimum 40 hours. When belt
adjustment is required, each tensioning screw should be equally adjusted. Over tensioning is
as dangerous as slackness. Belt tension must be such a value sufficient to prevent skidding
of belt in loaded position.

Hand-operated adjustable screws operating on the middle of the conveyor provide


adjustment to the tensioning of the conveyor belt.

Never attempt to adjust belt tensioning of the loaded conveyor belt!

b) STARTING UP:

Before actual start-up of a conveyor system, electrical controls should be checked


to insure that entire system can be quickly stopped in case of an emergency. During initial
start-up, the conveyor should be jogged on and off until the belt has made several complete
revolutions. During this period make through check of all equipment to determine proper
adjustment and function.

Correct rotation of the motor and gearbox must be checked; if incorrectly wired,
wiring must be changed.

Never start the belt conveyor before all safety instructions have

been fulfilled.

c) BELT ALLIGNMENT (BELT TRAINING):

The conveyor is run in unloaded position for a short time and observed if the belt
alignment is true. If not; the belt running on to the tail drum is observed and the appropriate
return idlers are adjusted.(Belt training)

Belt training is a process of adjusting idlers and loading conditions in a manner


which will correct any tendency of the belt to run off.

NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009

BELT CONVEYOR Sayfa No: 14/24

DO NOT ATEMPT to train the belt by unequal adjustment off screw take-ups.

Bear in mind that a misaligned conveyor installation will cause the belt to run to
one side, always toward the side of the idler it first touches. Start by aligning the return side
first. Starting at the head end, adjust the forth or fifth idler, before the run-out point, and
each succeeding idler up to the run-out point.

It is better to adjust a number of idlers a small amount than adjusting than one or
two idlers a great deal. To adjust the idlers, loosen the mounting bolts and using a soft
hammer tap the bracket on the side of the belt is running off.

After moving the bracket slightly forward, in the direction of the belt travel to
reposition the roll, retighten the bolts. Repeat this procedure at each point where the belt
runs off until the return side is running true.

Then start on the carrying side, at the tail end, working in the direction of belt
travel using the same method as for the return side.

It may be necessary to repeat these adjustments more than once until the belt
runs true.

Belt can be “steered” to improve training by slight shifting of idlers relative to line
of belt travel. Tilting of idlers is another technique for improving training of conveyor belt. A tilt
of 2° is the maximum that should be used to keep excessive wear on the rolls to a minimum.
This can be done by placing washers under rear feet of the mounting pads.

d) BELT SLIPPAGE:

Once the belt has been properly trained while running empty, the belt must be
checked when carrying a full load. Ideally, a properly trained belt will run true under loaded
conditions. In most cases off center running of the belt, when loaded, is caused by off-
centered loading. Chutes should distribute the load evenly and centered on to the belt.

If the belt slip to any direction at loaded position, it must be adjusted firstly by tail
drum and then by top idlers. Top idlers are adjusted as follows:

The slipping side of the belt is moved to forward and the other side to backward
direction when observed to the moving direction of the belt. Supports of the top idlers are
overly drilled. Required side of the support can be moved to forward and the other side to
backward by loosening the connection bolts must be tightened after that operation. This
adjustment is valid also for bottom idlers.

If the belt is slipping to any direction even if all these adjustments balance
condition of the belt should be controlled with a water level.

NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009

BELT CONVEYOR Sayfa No: 15/24

Loading:

Start with a light load and gradually work up the load that the conveyor was
designed to handle. Check chutes to see that the material is being directed onto the center of
the belt. The loading point of a belt conveyor is the critical point. Here the conveyor receives
its major abrasion and practically all of its impact. The ideal condition is to have the material
pass from chute to belt at the same speed and direction of travel as the belt, with a minimum
amount of impact, and to load the belt on center.

The skirts must be adjusted to prevent side spillage of material and to keep the
load central on the belt. The skirt lengths were designed to stop side spillage. The material
should also be at rest on the belt before it reaches the end of the skirt. If material is still
tumbling as it passes the skirt end, the skirts should be lengthened.

Periodic Controls Every Day:

General Cleaning

Materials around the drums should be removed.

Check oil level the reducer box, if necessary add oil given below;

Replace the oil completely at the end of 2.000 working hours.

NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009

BELT CONVEYOR Sayfa No: 16/24

OIL VISCOSITY (Cst/40°) PRODUCER

INDUSTRIAL GEAR OIL


M150 150 PETROL
INDUSTRIAL GEAR OIL 220 OFISI
M220

OMALA 150 150


SHELL
OMALA 220 220

MOBIL GEAR 628 150


MOBIL
MOBIL GEAR 629 220

ALPHA SP 150 150


CASTROL
ALPHA SP 220 220

ENERGOL GR-XP 150 150


BP
ENERGOL GR-XP 220 220

OIL CAPACITY (max.) -

NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009

BELT CONVEYOR Sayfa No: 17/24

Periodic Controls Every 40 Hours or a week:

Driving unit bearings are greased by Bearing Grease No: 3

Take-up screws are supplied by a grease.

Belt scrapers should be checked; if wearing occurs re-adjustment will be


necessary.

Periodic Controls Every 750 Hours ( 100 Working Day ) :

Bearings of HEAD and TAIL drums are dismounted and cleaned by gasoline then
gressed.

Discharge the oil of the reducer box. Clean all gears by gasoline. Then oil SAE 30
should be supplied.

Direction of the belt is reversed.

Check bearings and change worn out ones.

MOUNTING AND DISMOUNTING OF THE BELT:

Firstly belt is laid on the floor. Such that upper and lower parts are placed side by
side. The chassis, mounted at another place, except front part placed on to the lower part of
belt. Then front part of the chassis placed and tensioning process are verified. Finally all the
supports are placed and bolted. Dismounting is in reverse order.

NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009

BELT CONVEYOR Sayfa No: 18/24

NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009

BELT CONVEYOR Sayfa No: 19/24

2.3. BELT CONVEYOR TROUBLE-SHOOTING


Any belt conveyor installation can be subject to a wide variety of difficulties, which
may become costly in terms of replacement and plant downtime unless the problem is
quickly diagnosed and corrected. This guide is intended to point out the majority of belt con-
veyor problems and to set forth their probable causes and remedies.

Locate your specific problem in the "complaint" table below and note the numbers
to the right. They represent the most likely causes for the problem, in order of probable
occurrence, and how to correct them. The list at the bottom of the page details the causes
and remedies by number. The remedies will correct the majority of belt conveyor troubles.
However, some remedies require lengthy procedures, which should be referred to NA-CE
representative.

COMMON BELT CONVEYOR COMPLAINTS

CAUSE CAUSE
COMPLAINT COMPLAINT
In Order of Probable In Order of Probable
Occurrence Occurrence

Belt runs off at tail pulley. Excessive wear,


7 15 14 17 21 including rips, gouges 12 24 17 21 8 5
and tears.
Entire belt runs off at all 25 17 15 21 4 16 Excessive bottom cover 21 14 5 19 20
points of the line. wear.
One belt section runs off 2 11 1 Excessive edge wear, 25 4 17 8 1 21
at all points of the line. broken edges.
Belt runs off at head 15 21 16 Cover swells in spots or 8
pulley. streaks.
Belt runs to one side 15 16 21 Belt hardens or cracks. 8 22 18
through-out, entire length
at
Beltspecific
slip. idlers. Covers become checked
19 7 21 14 8 18
or brittle.
Belt slip on starting. 19 7 10 Longitudinal grooving or 26 14 21 12
Cracking of top cover.
Excessive belt stretch. Longitudinal grooving or
13 10 21 6 9 8 14 21
Cracking of bottom
cover.
Belt breaks at or behind Fabric decay, carcass
fasteners; fasteners tear 2 22 13 20 10 cracks, ruptures, gouges 12 20 5 10 8 23
loose. (soft spots in belt).
Vulcanised splice Ply separation.
separation. 13 22 10 20 2 9 13 22 11 8 3 27

NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009

BELT CONVEYOR Sayfa No: 20/24

CAUSES and REMEDIES

1.Belt bowed: Avoid telescoping belt rolls or storing them in damp locations. A
new belt should straighten out when "broken in" or it must _ replaced.

2.Belt improperly spliced or wrong fasteners - Use correct fasteners. Re-


tighten after running for a short while. If improperly spliced, remove belt splice and make
new splice.'" Set up regular inspection schedule.

3.Belt speed too fast - Reduce belt speed.

4.Belt strained on one side - Allow time for new belt to "break in." If belt does
not break in properly or is not new, remove strained section and splice in a new piece.

5.Breaker strip missing or inadequate- When service is lost, install belt with
proper breaker strip.

6.Damage by abrasives, acid, chemicals, heat, mildew, oil - Use belt


designed for specific condition. For abrasive materials working into cuts and between plies,
make spot repairs with cold patch or with Permanent Repair Patch. Seal metal fasteners or
replace with vulcanised step splice. Enclose belt line for protection against rain, snow or sun.
Don't over-lubricate idlers.

7.Differential speed wrong on dual pulleys - Make necessary adjustment.

8.Drive under-belted - Recalculate maximum belt tensions and select correct


belt. If line is over-extended, consider using two-flight system with transfer point. If carcass
is not rigid enough for load, install belt with proper flexibility when service is lost. Refer to
NACE.

9.Edge worn or broken - Repair belt edge. Remove badly worn or out-of-square
section and splice in a new piece.

10.Excessive impact of material on belt or fasteners - Use correctly


designed chutes and baffles. Make vulcanised splices. Load fines first. Where material is
trapped under skirts, adjust skirt boards to minimum clearance or install cushioning idlers to
hold belt against skirts. Refer to NACE.

11.Excessive tension - Recalculate and adjust tension. Use vulcanised splice


within recommended limits.

12.Frozen idlers - Free idlers. Lubricate. Improve maintenance. (Don't over


lubricate!)

13.Idlers or pulleys out-of-square with centerline of conveyor - Realign.


Install limit switches for greater safety.

NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009

BELT CONVEYOR Sayfa No: 21/24

14.Idlers improperly placed – Relocate idlers or insert additional idlers spaced


to support belt. Refer to NACE.

15.Improper loading, spillage - Feed should be in direction of belt travel and at


belt speed, centered on the belt. Control flow with feeders, chutes and skirt boards.

16.Improper storage or handling – Store belts under cover in cool dry


conditions. Store belts in an upright position, if possible on a spindle through the centre of
the roll.

17.Insufficient traction between belt and pulley - Increase wrap with snub
pulleys. In wet conditions, use vulcanised pulleys. Install correct cleaning devices on belt.
Install centrifugal switch for safety.

18.Material between belt and pulley- Use skirt boards properly. Remove
accumulation. Improve maintenance.

19.Material build-up - Remove accumulation. Install cleaning devices, scrapers.

20.Pulleys too small - Use larger-diameter pulleys.

21.Radius of convex vertical curve too small - Increase radius by vertical


realignment of idlers to prevent excessive edge tension.

22.Relative loading velocity too high or - too low - Adjust chutes or correct
belt speed. Consider use of impact idlers.

23.Side loading - Load in direction of belt travel, in center of conveyor.

24.Skirts improperly placed – Install skirt boards so that they do not rub
against belt.

25.Low quality belt rubber- Replace conveyor belt. Refer to NACE

NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009

BELT CONVEYOR Sayfa No: 22/24

2.4.SPARE PARTS:
Damaged PARTS should be renewed immediately if not repairable. Repairable parts should
be repaired. For parts, damaged, inform us with the name and the number associated with.

SPARE PART LIST FOR SBV BELT CONVEYORS

TAIL AND DISCHARGE


MIDLLE
TAKE-UP TAIL FRAME HEAD FRAME
FRAME CHUTE
SCREW
SBV.100.(10-20) SBV.200.(10-20) SBV.300.(10-20) SBV.400.00 SBV.500.(10-20-30-40)
FLAT
IMPACT
FLAT IDLER INFERIOR BACK BELT
IDLER
GROUP IDLER SCRAPER
GROUP
GROUP
SB1.900.00 SB1.900.00 SB1.400.00-A SB1.014.00

SBV BELT CONVEYOR DRIVE UNIT

NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009

BELT CONVEYOR Sayfa No: 23/24

IDLERS OF THE SBV BELT CONVEYORS

BACK BELT SCRAPER

NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.
SBV Tarih : 27/04/2009

BELT CONVEYOR Sayfa No: 24/24

SPARE PART ORDER FORM

Please use the form when giving orders for your machine.

SPARE PART ORDER FORM ORDER NO :

NAME OF FIRM : ORDER DATE :


ADDRESS : DELIVERY DATE :
CONTACT PERSON:
DRAWING NO PART NAME QUANTITY PRICE TOTAL PRICE

CUSTOMER APPROVAL NA-CE SPARE PART MANAGER DISTRIBUTE

FORM NO: FYD.01 12/02/1999-03 DISTRIBUTION : 1.Copy Purchasıng 2.Copy Inventory 3.Copy Back to spare parts manager

NOT: NA-CE Yukarıdaki bilgilerde teknolojik gerekçelerle değişiklik yapmak hakkına sahiptir.

You might also like