0% found this document useful (0 votes)
140 views1 page

155mm M107 Production Equipment

155mm M107 Production Equipment

Uploaded by

nanocardoso
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
140 views1 page

155mm M107 Production Equipment

155mm M107 Production Equipment

Uploaded by

nanocardoso
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

155mm M107 Production Equipment about:reader?url=https%3A%2F%2F2.zoppoz.workers.dev%3A443%2Fhttps%2Fammoterra.com%2Fproduct%2...

ammoterra.com

155mm M107 Production Equipment


~2 minutos

Full production line of equipment to establish ammunition


production plant for 155mm M107 and other larger calibers such as
the 152mm in acceptable country. Offer includes forging, narrowing,
cooling, quality control, testing and full technical transfer. Plant is
capable of producing at least 20,000 plus artillery pieces per month
based on an3 shifts system. Total time for installation 15 months.
All building and technical requirements will be provided. Top OEM
with over 100 years of experience and production. Place order now
for delivery in 2025. No other firm has this capacity in the world. We
can also assist in sourcing components on a separate contract. At
least 2 plants available contact [email protected] to place order.

the plant requires at least 100,000 square feet and must also have
areas for warehousing, storage of complete, shipping and logistics.
Operating at its capacity the plant can produce over 20,000 shells
per month. With the current shortage and very high demand this
plant will recoup its initial cost within one year of operations.

We can also supply at least 20,000 155mm M107 Rounds per


month on an ongoing basis. All buyers must supply Proof of Funds
(POF), End User Certificate (EUC), permissions and supporting
documentation for both the plant and artillery shells. Contract must
be signed, purchase order, invoice and deposit made prior to
fulfillment of order.

1 of 1 07/08/2025, 10:06

You might also like