03 - Pritil Market - Electrical - Phase 2 (2) - 1755771664
03 - Pritil Market - Electrical - Phase 2 (2) - 1755771664
RAXA
BAGO
CA
T.
A
UN
5TH S
PU
NL
LO
N
JUA
G
4TH
ST.
ST.
AHA
NDIN
1ST
G
3RD
ST.
TA
OLD
TOR
RES
TIOCO
FRAN
CO
ES
TER
OD
ELA
RE
INA
SITE TAYU
MAN
HER
B OSA
ERO
NA
A
OR
O
AM
C
CO
FRAN
SZ
UNA
GE
OLA
RO
NA
JUAN L
NIC
FRA
NCI
SCO
PRUDENCIA
ETH
ESG
U
THAN
ERR
LILIB
A
F PF V A
LEGENDS
POWER SERVICE ENTRANCE, 230V, 3-PHASE
MDP ELECTRICAL PANELBOARD
M KILOWATT-HOUR METER
LIGHTING FIXTURE (FOR SPECS, REFER TO LAYOUT)
S 2S 1-GANG SWITCH | 2-GANG SWITCH
3S S3W 3-GANG SWITCH | 1-GANG 3-WAY SWITCH
2S3W 3S3W 2-GANG 3-WAY SWITCH | 3-GANG 3-WAY SWITCH
2500AT
CT DUPLEX CONVENIENCE OUTLET: WEATHERPROOF
3 PHASE, 230V
CT DUPLEX CONVENIENCE OUTLET: WALL MOUNTED | COUNTER TOP NEMA-4X
CM CONVENIENCE OUTLET: CEILING MOUNTED | FLOOR MOUNTED ENCLOSURE
HD GFCI HAND DRYER | GROUND FAULT CIRCUIT INTERRUPTER W/ GROUNDING
EL EF EMERGENCY LIGHT | EXHAUST FAN (WALL MOUNTED) TERMINAL LUGS
EXHAUST FAN: CEILING MOUNTED (WEATHER PROOF)
EF
WF WALL FAN | CEILING FAN GROUND FLOOR
WP ACU, ACCU, FCU OUTLET/CIRCUIT BREAKER | WEATHER PROOF (OUTLET OR SWITCH)
B F FIRE ALARM BELL | FIRE ALARM SWITCH
FACP FIRE ALARM CONTROL PANEL
25mmØ C, 1#14mm2 BCW
CLOSED-CIRCUIT TELEVISION (CCTV) CAMERA CONNECT TO 20mmØ X 3.281m
REF/FR/
WM/D/RH
REFRIGERATOR| FREEZER | WASHING MACHINE | DRYER | RANGE HOOD GROUND ROD / ELECTRODE
MOTOR OR PULLBOX (SEE DESIGNS AND CALCULATIONS FOR SPECS)
PROJECT TITLE: ELECTRICAL DESIGN: ENGINEER : SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED: SHEET NO.
D NG M A DEPARTMENT OF ENGINEERING & PUBLIC WORKS
SO Y
G
NI
LA
ESTER
O DELA
REINA
3.0O METER
EASEMENT
ESTE
RO
3.0O METER EASEMENT DELA
4 REIN
A
3.0O METER
EASEMENT 5
STP PUMP WP UP
AERATION BLOWERS AERATION BLOWERS AERATION BLOWERS
13
ROOM
SLUDGE PUMP EFFLUENT PUMP EFFLUENT PUMP
08 09 10 11 12 PPA 14 08 09 STO.
06 10 14 18 22
PPA WET STALLS
PPA PPA PPA PPA WET STALLS PPA PPB PPB PPC PPC PPC PPC PPC
Trench drain Trench drain
REFRIGERATION MOTOR REFRIGERATION MOTOR
DRY STALLS DRY STALLS 10
11 12 PPE
REFRIGERATION MOTOR REFRIGERATION MOTOR 10 11 13 14
DRY PPB PPB PPD PPD PPD PPD
ICE STORAGE 07 11 15 19 23
STORAGE WP PPC PPC PPC PPC PPC
TOILETS
UP 11
PPE
DRY STALLS DRY STALLS
DRY STALLS
DRY STALLS
DRY STALLS
DRY STALLS
DRY STALLS
DRY STALLS
02 WET STALLS 15 16 WET STALLS 18 14 12 15 13 17 15 18 16
PPA PPB PPB PPD PPD
PPA Trench drain PPA
17 Trench drainPPA PPB PPB 08 12 16 20 24 PPD PPD
Trench drain
Trench drain
Trench drain
PPA PPC PPC PPC PPC PPC
T
S T R E E
MDP PPA PPB PPC PPD PPE 12
ELEC. DRY STALLS DRY STALLS PPE
01
PPA ROOM 18 16 19 17 21 19 22 20
F R A N C
LPA LPB PACU WET STALLS WET STALLS 19 20 WET STALLS 22 PPB PPB 09 13 17 21 25 PPD PPD
MOTORS Trench drain Trench drainPPA PPB PPB PPD PPD
03 PPA PPA PPC PPC PPC PPC PPC
PPA
BOOSTER PUMP DISTRIBUTION PUMP DISTRIBUTION PUMP WATER INTAKE PUMP WATER INTAKE PUMP
21
PPA
CISTERN AND
A
DRY STALLS DRY STALLS
PUMP ROOM
Z A M O R
OPEN ABOVE
04 26 OPEN ABOVE
O
JOCKEY FIRE PUMP SEWAGE PUMP SEWAGE PUMP MAIN FIRE PUMP
23 24 20 21 23 24
PPA PPA PPA PPA 22 23 25 26
PPB PPB PPB PPB PPD PPD PPD PPD 13
Trench drain 25 Trench drain
PPE
PPA
S T R E E
26 29 02 05 08
WP DRY STALLS PPC PPC PPD PPD PPD DRY STALLS
14
A S
05 30 26 24 27 25 29 27 01 28 PPE
PPAWET STALLS WET STALLS 27 28 29
WET STALLS PPB PPB PPD PPD
PPA Trench drain PPA PPA Trench drainPPA PPB PPB PPD PPE
T
N I C O L
27 30 03 06 09
PPC PPC PPD PPD PPD
DRY STALLS
DRY STALLS
DRY STALLS
DRY STALLS
DRY STALLS
DRY STALLS
DRY STALLS DRY STALLS
Trench drain
Trench drain
Trench drain
FF-04 FF-04 30 28 01 29 04 02 05 03
06
PPA Trench drain Trench drain PPB PPB PPC PPB PPE PPE PPE PPE
WET STALLS WET STALLS
RAMP DN
RAMP UP
28 01 04 07 10
UP
PPC PPD PPD PPD PPD 15
WP DRY STALLS DRY STALLS PPE
07
PPAWET STALLS 04 02 05 03 08 06 09 07
PPC PPC PPC PPC PPE PPE PPE PPE
H E R B O S A S T R E E T H E R B O S A S T R E E T
PROJECT TITLE: ELECTRICAL DESIGN: ENGINEER : SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED: SHEET NO.
D NG M A DEPARTMENT OF ENGINEERING & PUBLIC WORKS
SO Y
G
NI
LA
DN
MARKET
DRIVEWAY DRIVEWAY DRIVEWAY
MASTER
OFFICE
PANTRY
STORAGE
PARKING
17
PPE
WP WP
16
WP PPE
DRIVEWAY
DRIVEWAY
OPEN OPEN
RAMP DN
RAMP UP
18
MOTORCYCLE
PPE
WP WP
PARKING
WP
Tap to nearest
source
PARKING PARKING PARKING PARKING PARKING PARKING PARKING PARKING
MARKET VENDORS COOPERATIVE
ASSOCIATION OFFICE OFFICE
MALE
TOILET
PARKING PARKING PARKING PARKING PARKING PARKING PARKING PARKING PARKING
DN
PROJECT TITLE: ELECTRICAL DESIGN: ENGINEER : SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED: SHEET NO.
D NG M A DEPARTMENT OF ENGINEERING & PUBLIC WORKS
SO Y
G
NI
LA
L2 L2 L2 L2
S L2 L2 L2 L2
04
LPA UP
EL
L2 L2 L2
L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L2 L2 L2 S
06 09 LPA 14
L6 L6 L6 L6
L2
L6 L6
LPA LPA
TAP TO SWITCH BANK
LPA
TAP TO SWITCH BANK
L6 L6 S L6 L6 L2 L2 L2 L2 L1 L1 L1 L1 L1 L1 L1
L1 L1 L1 L1 L1 L1 L1 L1
L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1
L1
S L6 L6 L6
S L6
L2 L2 L2 L2
S
L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1
L1 L1
UP L2 L2 L2 L2
S EL
L2
03 S S L1 L1 L1 L1 L1 L1 L1 L1
LPA L1 L1 L1 L1 L1 L1 L1
L4
L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1
L1 L1 L1
S L1 L1 LPA L1
02 L1 L1 L1 L1
L1 L1 L1
LPA L2 L2 L2 L2 L2
L1
WASTE FACILITY
TAP TO SWITCH BANK
SWITCH BANK
L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1
STORAGE
L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1
L1 L1 L1 L1
L1 L1
L1 L1 L1 L1 L1 L1 L1 L1
L1
L1
S
L4
L1 L1 L1
L1 L1
L2 L2 STP PUMP
L2 L2 L2
L1
ROOM L4 L4 L4 L4 L4 L4 L4 L4
L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1
L4 L4 L4 L4 L4 L4 L4 L4
13
TAP TO SWITCH BANK
LPA
L1
L1 L1
10 STO. 15
LPA
TAP TO SWITCH BANK 12 TAP TO SWITCH BANK
L1 L1
LPA
TAP TO SWITCH BANK L1 L4
L1
L1
L1 L1 L1
TOILETS L1 L1 L1
L1 L1 L1
L1 L1 L1
LPA L1 L1 L1
L1
L4
L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1
S LE
L1 L1 L1 L1 L1 L1 L1
L2 UP
01 L1 L1 L1 L1 L1 L1 L1 L1 L1
LPA
L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1
L1 L1
L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1
L1 L1 L1 L1 L1 L1 L1 L1 L1
ELEC. ROOM L1 L1 L1 L1 L1 L1 L1
L2
CISTERN AND L4
PUMP ROOM S
EL
05 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1
S
L2 L2 L2
LPA UP
STO.
NI
LA
UP
16 19 20 23
LPB LPB LPB LPB
02 03 S S S S S
01 S S S S S S LPB S S S S S S LPB S S L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3
L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6
S S S S S S S S S S S S S S
LPB L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6
L3 L3 L3 L3 L3 L3 L3 L3 L3 L3
S S S S S
S S S S S S S S S S S S S S
L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6
S S S S S S
L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6
S S S S S S S S S S S S S S L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3
L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6
S S S S S S S S S S S S S S S S
L3 L3 L3 L3 L3 L3 L3 L3 S S S S S L3 L3 L3 L3 L3 L3 L3 L3 S
L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6
UP S S S S S S
S S S S S S S S S S S S S S
L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6
L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3
L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6
S S S S S S S L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 S S S S S S S L3 L3
S S S S S S
08 S S S S S S
LPB
04 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3
S S S S S S S S S S S S S S S S
LPB S
L6 L6
S
L6 L6
S
L6 L6 L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S S
L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S S S S S S
L3 L3 L3 L3 L3 L3 L3 L3 S S S S S L3 L3 L3 L3 L3 L3 L3 L3 S
S S S S S S S S S S S S S S S S S S S S S
L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3
L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3
S S S S S S S S S S S S S S
L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 S S S S S S
S S S S S S
17 24
09 LPB L3 L3 L3 L3 L3 L3 L3 L3 L3 L3
LPB L3 L3
LPB S S S S S S
05 S S S S S S S S S S S S S S S S S S S S S S
LPB S
L6 L6
S
L6 L6
S
L6 L6 L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S S
L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3
L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3
S S S S S S S S S S S S S S S S S S S L3 L3 L3 L3 L3 L3 L3 L3 S S S S S L3 L3 L3 L3 L3 L3 L3 L3 S
S S S S S S S S S S S S S S
L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6
10
LPB 21 22
06 LPB LPB
LPB S
L6 L6
S
L6 L6
S
L6 L6 L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S S
L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S S S S S S S S S S S S S S S S
S S S S S S
L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3
S S S S S S S S S S S S S S S S S S S
L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3
L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L3 L3 L3 L3 L3 L3 L3 L3 S S S S S L3 L3 L3 L3 L3 L3 L3 L3 S
S S S S S S S S S S S S S S
S S S S S S
11 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3
LPB S S S S S S
07 S S S S S S
S S S S S S S S S S S S S S S S
LPB S
L6 L6
S
L6 L6
S
L6 L6 L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S S
L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
S
L6 L6
L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3
L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3
S S S S S S S S S S S S S S S S S S S S S S S S S S S
L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3
S S S S S S
S S S S S S S S S S S S S S
L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6
18 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 25 L3 L3
14 15 LPB S S S S S LPB S
12 LPB LPB S S S S S S
LPB L6 L6 L6 L6 L6 L6 13 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6
S S S S S S S S S S S S S S S S
S S S LPB L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6
L3 L3 L3 L3 L3 L3 L3 L3
L3 L3 L3 L3 L3 L3 L3 L3 L3 L3
L3 L3 L3 L3 L3 L3 L3 L3
L3 L3
S S S S S S S S S S S S S S
UP S S S S S S
S S S L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 S S S S S S
L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3
L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 S S S S S S S S S S S S S S
L6 L6 L6 L6 L6 L6
S S S S S S S S S S S S S S
L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3
L6
S S L6 L6
S S L6 L6
S S L6 L6
S S L6 L6
S S L6 L6
S S L6 L6
S S L6 S S S S S S
S S S S S
L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6 L6
L6 L6 L6 L6 L6 L6
S S S
L6
S S L6 L6
S S L6 L6
S S L6 L6
S S L6 L6
S S L6 L6
S S L6 L6
S S L6 S S S S S S S S S S S S S S S S
L3 L3 L3 L3 L3 L3 L3 L3 L3 L3
L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3 L3
S S S S S
UP
2 1
NI
LA
L6 L6
EL
L2 L2 L2
L6 L6 DN
S
S L9 L9
L9 L9 L9 L9 L9
L5 L5 L5 L5 L5 L5 L5 L5 L5 L5
L2
28
LPA
L2 L2
17 TAP TO SWITCH BANK
L9
LPA 22 23 LPA
S
DN L2 L2
L6 L6
AC S EL
LPA LPA
AC S EL AC
L2 S L8 L8 L8
AC
EL
L6S L6 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L9
L7
S S L7
L8 L8 L8
L2 L2 L6 L6
08
L8 L8 L8 L8 L8 L8 L8 L8 L8
SWITCH BANK
S PACU EL
AC
L2 L2
L7
17 L2
L8 L8 L8 L7
L5 PACU AC
L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 S
L9
L8 L8
L8 L8 L8
S L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8
L8 L8
L7 L7
L2 L2
L9
L8 L8 L8
L8 L8
L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8
L2 L2
19 L9 L9 L9 L9 L9 L9 L9 L9 L9 L9 L9 L9 L9 L9
AC S EL AC
S
EL AC
LPA L9
20
L7
L7 L7
04 L7 L7
05 L7 L7 L7
06 L7 L7
L7
L5
21
L9 L9 L9 L9
LPA
L2 L2 09 10 13 14
TAP TO SWITCH BANK
PACU L7 L7 L7 L7
PACU L7
PACU L7 L7 L7 L7
PACU
L7
AC 26 EL AC AC S LE
27 AC
L7
L9
L2 L2
L9 L9 L9 L9 L9 L9 L9 L9 L9 L9 L9 L9 L9 L9
LPA
S
LPA
L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8
L9
L7 L7
L2 L2
L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8
L5
L9
L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8
L7 L7
L10
L2 L2 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8
L7 L7
LE
L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L8 L9
DN L2 EL
S AC AC AC AC
EL
L2 L2 L2
L7 L7
11 L7 L7 L7
12 L7 L7 15 L7 L7 L7
16 L7 L9
PACU PACU PACU PACU
L2 L2 L2
L2
L2 L2 L2
L2 L5 L5 L5 L5 L5 L5 L5 L5 L5 L5
L9 L9
S L9 L9 L9 L9 L9
S
DN
L6 L6
L10
EL
L2 L2 L2
L6 L6
L9 L9 L9 L9 L9 L9 L9 L9 L9 L9 L9 L9 L9 L9 L9 L9 L9 L9
NI
LA
PROJECT TITLE: ELECTRICAL DESIGN: ENGINEER : SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED: SHEET NO.
D NG M A DEPARTMENT OF ENGINEERING & PUBLIC WORKS
SO Y
G
NI
LA
PROJECT TITLE: ELECTRICAL DESIGN: ENGINEER : SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED: SHEET NO.
D NG M A DEPARTMENT OF ENGINEERING & PUBLIC WORKS
SO Y
G
NI
LA