Finding R2
Finding R2
Welding machine
3 Daily 2 Jun 2024 inspection due date Ground Floor
pending
Observed poor
18 Daily 9 Jun 2024 housekeeping at P&M PH2
hoist 2.
Observed poor
housekeeping, not
23 Daily 12 Jun 2024 Project Road
protection of sand &
scattered plastic scraps
Found accumulation of
concrete debris pieces at North side PH
24 Daily 12 Jun 2024 chajja chance of fall & area( 1-7
may lead to personal Grid)
injury
Observed fire
extinguisher not available
30 Daily 15 Jun 2024 at electrical DB and 33th Floor
plastic bag above the DB.
Observed rubber mat and
fire extinguisher not
31 Daily 16 Jun 2024 Ground Floor
available at electrical DB.
And poor HK.
Observed substandard
35 Daily 18 Jun 2024 hard barricade and MS 22th Floor
stool at the floor edge.
Inform to Supervisor to
provide to provide fire 2/6/2024 Closed NA ACCIPL
extinguisher
Inform to electrician to
4/6/2024 Closed NA ACCIPL
change DB door
Inform to electrician to
5/6/2024 Closed NA ACCIPL
provide proper joint of cable
All electrical connection
6/6/2024 Closed NA ACCIPL
must be tight and insulated
Inform to electrician to
provide proper 6/6/2024 Closed NA ACCIPL
housekeeping
Inform to contractor
supervisor to provide new 8/6/2024 Closed NA ACCIPL
safety harness
Inform to electrician to
16/6/2024 Closed NA ACCIPL
provide proper joint of cable
Inform to contractor
supervisor to provide new 17/6/2024 Closed NA ACCIPL
safety jacket
19/06/24 NA NA ACCIPL
Compliance Severity
GP/O/NC Hazard/Risk Sub-Category of Hazard/Risk
Responsibility GP/H/M/L
Mr.BibekaNanda
H O Legaldivition
Biswas
Mr.BibekaNanda
M O LegalDeviation Other
Biswas
Mr.Bibekananda
M O Electrocution Other
Biswas
Mr.Bibekananda
H O Electrocution Other
Biswas
Mr.Bibekananda
L O Fire Others
Biswas
Mr.Bibekananda
H O Electrocution Other
Biswas
Mr.Bibekananda
H O Electrocution Damaged cable
Biswas
Mr.Bibekananda
H O Electrocution Damaged cable
Biswas
Mr.Bibekananda
M O SlipTripFallAtSameLevel Blocked access
Biswas
Mr.Soumyakanti
H O FallFromHeightPerson Damaged life line
Bhunia
Mr.Bibekananda
H O LegalDeviation Other
Biswas
Mr.Bibekananda
L O SlipTripFallAtSameLevel Blocked access
Biswas
ContactWithSharpObje
Mr .Rahul H O Others
ct
MrAbhijit
L O SlipTripFallAtSameLevel Others
Sengupta
Unsecured working
Mr.Soumyadip M O FallFromHeightPerson
planks
Mr.Bibekananda
H O Electrocution Other
Biswas
Mr.Bibekananda
L O LegalDeviation Other
Biswas
Deviation to
Mr.Bibekananda
L O ProcedureDeviation Road/driving safety
Biswas
management
Mr.Bibekananda
L O LegalDeviation Other
Biswas
Mr.Bibekananda
L O Electrocution Other
Biswas
Mr.Bibekananda Loose/Unprotected
H O Electrocution
Biswas connection/joints
Unsecured working
Mr.Rudrak Roy H O FallFromHeightPerson
planks
Mr.Bibekananda
L O LegalDeviation Other
Biswas
Cause 6: 10 to 11
Improper
UA R Process Non Tag updated NA
compliance
Supervision hrs
Cause 5:
Awareness Hand Gloves
UA NR Awareness NA 9 to 10 hrs
Deficiency provided
Deficiency
Cause 6:
Improper 11 to 12
UC NR Process Non Tag updated NA
Supervision hrs
compliance
Cause 6:
Improper Fire extinguisher 11 to 12
UC NR Process Non NA
Supervision provided hrs
compliance
Cause 6: 10 to 11
Improper
UC NR Process Non Material Removed NA
compliance
Supervision hrs
Cause 5: 11 to 12
Improper LED lamp shifted
UC NR Awareness NA
Deficiency
Supervision safe place hrs
Cause 6: 10 to 11
Improper
UC NR Process Non Door changed NA
compliance
Supervision hrs
Cause 6: 10 to 11
Improper 3 core cable
UC NR Process Non NA
compliance
Supervision provided hrs
Cause 6: 10 to 11
Improper New cable
UC NR Process Non NA
compliance
Supervision provided hrs
Cause 6: 10 to 11
Improper New cable
UC NR Process Non NA
compliance
Supervision provided hrs
Cause 6: 10 to 11
Improper Housekeeping
UC NR Process Non NA
compliance
Supervision done hrs
Cause 5:
Improper 10 to 11
UA NR Awareness Gloves provided NA
Supervision hrs
Deficiency
Cause 5: 10 to 11
Improper
UA NR Awareness Gloves provided NA
Deficiency
Supervision hrs
Cause 5: 11 to 12
Improper New harness
UC NR Awareness NA
Deficiency
Supervision provided hrs
Cause 5:
Improper 11 to 12
UA NR Awareness Goggles provided NA
Supervision hrs
Deficiency
Cause 6: 10 to 11
Improper
UC NR Process Non Tag updated NA
compliance
Supervision hrs
Cause 6: 10 to 11
Improper Housekeeping
UC NR Process Non NA
compliance
Supervision done hrs
Cause 5:
Awareness Dust mask and
UA NR Awareness NA 9 to 10 hrs
Deficiency goggles provided
Deficiency
Cause 5:
Improper Wheel guard
UA NR Awareness NA 8 to 9 hrs
Supervision provided
Deficiency
Cause 6: 9 to 10
Improper
UC NR Process Non NA
compliance
Supervision hrs
Cause 6:
Improper Safe working 10 to 11
UC NR Process Non NA
Supervision platform provided hrs
compliance
Cause 6: 10 to 11
Improper
UC NR Process Non NA
compliance
Supervision hrs
Cause 6: 10 to 11
Improper
UC NR Process Non NA
compliance
Supervision hrs
Cause 6: 10 to 11
Improper Fire extinguisher
UC NR Process Non NA
compliance
Supervision provided hrs
Cause 6: 10 to 11
Improper Fire extinguisher
UC NR Process Non NA
compliance
Supervision provided hrs
Housekeeping
Cause 6: 10 to 11
Improper done and fire
UC NR Process Non NA
compliance
Supervision extinguisher hrs
provided
Housekeeping
Cause 6: done and rubber 10 to 11
Improper
UC NR Process Non mat and fire NA
compliance
Supervision
extinguisher hrs
provided
Cause 6: 10 to 11
Improper New cable
UC NR Process Non NA
compliance
Supervision provided hrs
Cause 6: 10 to 11
Improper Safe working
UC NR Process Non NA
compliance
Supervision platform provided hrs
Cause 6: 10 to 11
Improper
UC NR Process Non Jacket provided NA
compliance
Supervision hrs
Cause 6: 10 to 11
Improper Safe working
UC NR Process Non NA
compliance
Supervision platform provided hrs
Cause 6: 10 to 11
Improper
UC NR Process Non SLD displayed NA
compliance
Supervision hrs
Cause 6: 10 to 11
Improper New cable
UC NR Process Non NA
compliance
Supervision provided hrs
Cause 7:
GP NR NA
Other
by For
Designation/Roll Remark
Agency Agency
Other
Contractor>=5
(mentioned in Contractor>=5Cr ACCEHS
Cr
remark column)
Other
Contractor>=5
(mentioned in Contractor>=5Cr ACCEHS
Cr
remark column)
Other
Contractor>=5
(mentioned in Contractor>=5Cr ACCEHS
Cr
remark column)
Other
Contractor>=5
(mentioned in Contractor>=5Cr ACCEHS
Cr
remark column)
Other
Contractor>=5
(mentioned in Contractor>=5Cr ACCEHS
Cr
remark column)
Other
Contractor>=5
(mentioned in Contractor>=5Cr ACCEHS
Cr
remark column)
Other
Contractor>=5
(mentioned in Contractor>=5Cr ACCEHS
Cr
remark column)
Other
Contractor>=5
(mentioned in Contractor>=5Cr ACCEHS
Cr
remark column)
Other
Contractor>=5
(mentioned in Contractor>=5Cr ACCEHS
Cr
remark column)
Other
Contractor>=5
(mentioned in Contractor>=5Cr ACCEHS
Cr
remark column)
Other
Contractor>=5
(mentioned in Contractor>=5Cr ACCEHS
Cr
remark column)
Other
Contractor>=5
(mentioned in Contractor>=5Cr ACCEHS
Cr
remark column)
Other
Contractor>=5
(mentioned in Contractor>=5Cr ACCEHS
Cr
remark column)
Other
Contractor>=5
(mentioned in Contractor>=5Cr ACCEHS
Cr
remark column)
Other
Contractor>=5
(mentioned in Contractor>=5Cr ACCEHS
Cr
remark column)
Other
Contractor>=5
(mentioned in Contractor>=5Cr ACCEHS
Cr
remark column)
Other
Contractor>=5
(mentioned in Contractor>=5Cr ACCEHS
Cr
remark column)
Other
Contractor>=5
(mentioned in Contractor>=5Cr ACCEHS
Cr
remark column)
Other
Contractor>=5
(mentioned in Contractor>=5Cr ACCEHS
Cr
remark column)
Other
Contractor>=5
(mentioned in Contractor>=5Cr ACCEHS
Cr
remark column)
Other
Contractor>=5
(mentioned in Contractor>=5Cr ACCEHS
Cr
remark column)
Other
Contractor>=5
(mentioned in Contractor>=5Cr ACCEHS
Cr
remark column)
Other
Contractor>=5
(mentioned in Contractor>=5Cr ACCEHS
Cr
remark column)
Other
Contractor>=5
(mentioned in Contractor>=5Cr ACCEHS
Cr
remark column)
Other
Contractor>=5
(mentioned in Contractor>=5Cr ACCEHS
Cr
remark column)
Other
Contractor>=5
(mentioned in Contractor>=5Cr ACCEHS
Cr
remark column)
Other
Contractor>=5
(mentioned in Contractor>=5Cr ACCEHS
Cr
remark column)
Other
Contractor>=5
(mentioned in Contractor>=5Cr ACCEHS
Cr
remark column)
Other
Contractor>=5
(mentioned in Contractor>=5Cr ACCEHS
Cr
remark column)
Other
Contractor>=5
(mentioned in Contractor>=5Cr ACCEHS
Cr
remark column)
Other
Contractor>=5
(mentioned in Contractor>=5Cr ACCEHS
Cr
remark column)
Other
Contractor>=5
(mentioned in Contractor>=5Cr ACCEHS
Cr
remark column)
Other
Contractor>=5
(mentioned in Contractor>=5Cr ACCEHS
Cr
remark column)
Other
Contractor>=5
(mentioned in Contractor>=5Cr ACCEHS
Cr
remark column)
Other
Contractor>=5
(mentioned in Contractor>=5Cr ACCEHS
Cr
remark column)
Other
Contractor>=5
(mentioned in Contractor>=5Cr ACCEHS
Cr
remark column)
Other
Contractor>=5
(mentioned in Contractor>=5Cr ACCEHS
Cr
remark column)
Other
Contractor>=5
(mentioned in Contractor>=5Cr ACCEHS
Cr
remark column)