PLOTTING KERJA PT.
TRI KARYA CEMERLANG
MANDIRI INHEALTH TOWER
HARI/TANGGAL : Senin, 16 Juni 2025
NO AREA SHIFT WANITA PRIA JAM ISTIRAHAT P3C/EXTRA JOB
1 LOBBY ADE
2 BASEMENT DIDIK
3 EXTERNAL ISKANDAR
4 GF TOILET
SADIYAH 1. Iskandar :
LANTAI 2 - Swepping Sampah External Ring Luar dan Dalam
SURYADI
LANTAI 3 - Stripping Sampah All Floor 29-GF
5
- Dusting Rambu- Rambu
LANTAI 5 2. Didik :
- General Cleaning Pupm Room
LANTAI 6 - General Cleaning Ruang Valve P4
NUR
- General Ceaning Ruang Mesin lift lt 3,29,30
LANTAI 7
3. Ade :
6 LANTAI 8 ALFINESA - Polishing Planter Pot
4. Suryadi dan Sadiyah :
LANTAI 9 - ROC Ceilling (Exhaust fan, AC Grill, Speaker & Kap lampu) Toilet Lantai GF-05
LANTAI 10 - Brushing Manual Nat-nat Lantai Toilet Lantai GF-05
YUNI - Wall Cleaning Dinding Koridor Lantai GF - 05
LANTAI 11 5. Alfinesa, Nur dan Yuni :
- ROC Ceilling (Exhaust fan, AC Grill, Speaker & Kap lampu) Toilet Lantai 06-10
LANTAI 12 1 12:00 - 13:00
- Brushing Manual Nat-nat Lantai Toilet Lantai 06-10
LANTAI 15 YUDI - Wall Cleaning Dinding Koridor Lantai 06-10
6. Yudi Dan Revita:
LANTAI 16 - ROC Ceilling (Exhaust fan, AC Grill, Speaker & Kap lampu) Toilet Lantai 11-17
7 REVITA
LANTAI 17 - Brushing Manual Nat-nat Lantai Toilet Lantai 11-17
- Wall Cleaning Dinding Koridor Lantai 11-17
LANTAI 18 7. Rizal dan Rizka :
- ROC Ceilling (Exhaust fan, AC Grill, Speaker & Kap lampu) Toilet Lantai 18-23
LANTAI 19
- Brushing Manual Nat-nat Lantai Toilet Lantai 18-23
LANTAI 20 RAHMAT - Wall Cleaning Dinding Koridor Lantai 18-23
8. Dandi Dan Poppy :
LANTAI 21 RIZKA - ROC Ceilling (Exhaust fan, AC Grill, Speaker & Kap lampu) Toilet Lantai 25-29
- Brushing Manual Nat-nat Lantai Toilet Lantai 25-29
LANTAI 22
- Wall Cleaning Dinding Koridor Lantai 25-29
LANTAI 23 - General Cleaning Unit Kosong Lantai 28 B, C
LANTAI 25
8 LANTAI 26
DANDI
LANTAI 27 POPY
LANTAI 28
LANTAI 29
1. Handi 1. On Air PH 2 sisi Utara
9 GONDOLA 1 12:00 - 13:00
2. Rifki 2. General Cleaning Canopy Pos 1
10 ADMIN 1 Renie Mustika 11:00 - 12:00
11 TEAM LEADER 1 Sarwinah 12:00 - 13:00
All Area
12 SITE MANAGER 1 Dede Setiawan 12:00 - 13:00
TOTAL KEHADIRAN
KONTRAK SHIFT
REALISASI SHIFT KETERANGAN
SHIFT 1 SHIFT 2
SITE MANAGER 1 - 1
TEAM LEADER 1 2 3
ADMIN 1 - 1
GONDOLA 2 - 2
CSO 14 16 30
19 18
TOTAL
37
DIBUAT OLEH, DISETUJUI OLEH,
DEDE SETIAWAN NANING
SITE MANAGER - PT. TRI KARYA CEMERLANG