This specification outlines the requirements for structural steelwork, including fabrication, materials, welding, and erection processes, in accordance with various British Standards. The contractor is responsible for supplying, fabricating, and erecting steelwork as per the drawings and specifications, ensuring all materials meet the specified standards and are properly tested. Additionally, the document emphasizes the need for inspections, approvals, and adherence to safety and quality standards throughout the construction process.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0 ratings0% found this document useful (0 votes)
48 views12 pages
Specification - Steel Structural
This specification outlines the requirements for structural steelwork, including fabrication, materials, welding, and erection processes, in accordance with various British Standards. The contractor is responsible for supplying, fabricating, and erecting steelwork as per the drawings and specifications, ensuring all materials meet the specified standards and are properly tested. Additionally, the document emphasizes the need for inspections, approvals, and adherence to safety and quality standards throughout the construction process.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 12
‘SPECIFICATION
STFFI AND TRONWORKER
S/58
TTEM
No
HEADING
DESCRIPTION
ot
02
Generally
Standard And
Codes OF
Practive
STRUCTURAL STEELWORK
This Specification is to be read in conjunction with the Conditions
Of Contract, the General Specification and all others Specification
and Drawings.
The Contractor shall supply, fabricate and erect all steelwork
shawn on the drawings or specified herein, in accordance with the
specification.
The Contractor shall allow for all necessary operations, including
hoisting and fixing in position and shall supply all tools, machinery
and appliances, including drift pins and fitting-up bolts, necessary
for the expeditious handling of the work. The suitability and
capacity of all plant and equipment used for erection shall be
subjected to approval of the Engineer.
Unless otherwise specified herein, all structural steelwork and testing
shall comply with the relevant clauses of the following British Standards
anid Codes of Praclive nal aie current at the date of the tender :-
BS4 Structural Steel Sections
Part | Hot Rolled Sections
BS 5950 The Structural Use of Steel Work in Building
Bs 639 Covered Electrodes for the Manual Metal-Arc Welding
of Carbon and Carbon Manganese Steels
Bs 648 Schedule of Weighs of Building Materials
BS 1775 Steel Tubes for Mechanical, Structural and General
Engineering Purposes
Bs 2984 Cold Rolled Steel Sections
BS 3083, Hot Dipped Galvanized Corrugated Stee! Sheers for
General Purposes
BS 3294 The use of High Strength Friction Grip Bolts in
Structural Steelwork
Refi fea‘SPECIFICATION
STEEL AND IRONWORKER
s/59
ITEM | HEADING DESCRIPTION
NO
STRUCTURAL STEELWORK
01 | Standard And «BS 3692 ISO Metric Precision Hexagon Bolt, Screws and Nuts
Codes OF
Practice (Cont'd) 8S 4190 ISO Metric Black Bolt, Screws and Nuts
Bs 4320 ‘Metal Washer for General Engineering purposes
Bs 4360 Weldable Structural Steels
BS 4395 High Strength Friction Grip Bolts
BS 4232 Surface Finish of Blast-Cleaned Steel for painting
Bs 4604 The use of High Strenath Friction Grip Bolts in
Structural Steetwork
Bs 4848 Hot Rolled Structural Steel Sections
Part 2 Hollow Sections
Part 3 Equal and Unequal Angles
BS 4870 ‘Approval testing of welding Procedures Part 1
Fusion welding of steels
Bs 4871 Approval Testing of Welders working to Approved
Welding procedures Part | Fusion Welding to Stee!
Bs 4872 Approval Testing of Welders when welding procedure
Approval is not required
Part | Fusion Welding to Steel
BS 5135 Metal-Arc Welding of Carbon and Carbon Manganese
Steels
AWS D1.1 Manual of Stee! Construction
AISC Manual of Steel Construction
Ref: fot‘SPECIFICATION
STEEL AND IRONWORKER,
S/60
TIEN | HEADING DESCRIPTION
2
01 | Materials Structural Stee!
Generally
() Structural steel shall conform to BS 4360 unless specifically
mentioned otherwise. The Contractor shall submit to the
Engineer, copies of all mill test certificates for materials to be
used in the work. Each piece of steel shall be identified by the
manufacturer's name or trademark and batch number
showing direct correlation to the mill test certificates.
(i) The stee! shall be new and wall and cleanly rolled to the
dimensions, sections and weights specified’ It shall be free
trom cracks, surtace tlaws, laminations and other detects
Bolts
@ High otrongth friction grip bolts shall conform to DS 4995 part
1 General Grade, All high strength friction grip bolts shall be fined
with load indicating washers.
(i) High strength bolts shall conform to BS 3692 Grade 8.8
amy Black botts shall conform to BS 4190 Grade 4.6
Electrodes
(2) Welding electrodes for manual shielded metal-are welding
shall conform to BS 639. Type of electrodes used shall be
compatible with the grade of steel to be welcied,
Impact Test
@ For tension members of parts of build-up members
which predominantly intensions, the maximum thickness
for mild steel shall be zumm.
Surface Inspection
() The Contractor chall arrange and provide all necessary
inspection, when required by the Engineer to ensure
that steel containing laminations, or other defects, is not
incorporated in the work. The cost of such inspectivn
shall be included in the rates.‘SPECIFICATION
STEEL AND IRONWORKER
S/6t
TTEM | HEADING DESCRIPTION
NO.
01 | Fabrication Generally
Reh fa
The specialist firm fabricating the steelwork shall be subject to
prior approval by the Engineer, As much of the fabrication of
steelwork as is reasonably practical shall be completed in the
fabricator’s workshop.
Rolled material. before being laid off or worked should be straight
within the tolerance allowed by the relevant code and shall be free
from twist If straightening or flattening is necessary it shall be
done by a process and in a manner that will not injure the material
and to the satisfaction of the Engineer, Finished members shall be
true to line and free from twists, bends and open joints.
‘Component parts shall not be forcibly fitted together,
Fabrication shall be in accordance with BS 5950 with the following
amplifications and amendments :-
(@ Machining of Place Edge
Edges of all plates shall be accurately machined, and there
shall be no gaps between the edges of web or flange plates
and the edges or surface of adjacent parts. Machining of
plate edges shall be such as to remove 3mm from edges
previously seared.
(i) Flame Cuttin
Machine flame cutting of mild steel, by an approved
procedure on approved machines, is acceptable as an
alternative to shearing and planning. Machine flame cutting
of high yield steel is acceptable as an alternative to
shearing and planning provided that :~
1) The flame cut edges is subsequently incorporated in
a weld;
2) A controlled procedure approved by the Engineer is
used, 50 as fo prevent undue hardening of the cut
surface, and the use of flame cutting is limited to
parts of the work approved for flame cutting by the
Engineer and the flame cutting is followed by hand
buffings to remove surface scale and round off the
edges.‘SPECIFICATION
STEEL AND IRONWORKER
s/62
TTEM | HEADING DESCRIPTION
NO
01 | Fabrication (ii) Ending of Members
(Cont'd)
The flame cut edces is subsequently incornorated in a weld:
Unless otherwise specified or approved, all joints not formed
by welding shall be closely butted with surfaces machined to
the correct plane after fabrication
(iv) Bolt Holes
Holes for black and grip bolts shall be drilled 1.8mm larger
than the nominal diameter of the bolt.
(v) Bolts, Nuts and Washers
Grip bolts, nuts and washers shall be of an approved type
in which the bolt tension is indicated by the compression of
protrusions formed on the washers, In other respects the
dimensions of grip bolts, nuts and waslie's slicll wumply with
B.S. 3139 Part 1.
(vi) Thiel Assernibly of Structure
To check the accuracy of fabrication, one complete truss
and Lattice Girder shall pe erected at the works for
inspection hy the Engineer and the cost shall be included in
the rates.
The Contractor shall rectify inaccuracies found during this
inspection, all at his own expense until such time as the
Engineer is satisfied that the erected span fully meets the
requirements of the specifications and relevant diawinys
and thet corrections made to members in the erected span
have also been applied to the remaining steelwork.
(vii) Inspection and Testing
The Engineer or his representative may arrange tor the
inspection and testing of all materials and workmanchip to
ensure that they meet the standards required by this
specification. Although he may also carry out dimensional
checks during fabrication, it chould be noted that this will
net normally be done until the fabrication of an individual
members is complete.
Notwithstanding any approval given or implied during
inspection the Contractor shall be entirely responsible for
the accuracy of fabrication and the quality of all materials
and workmanship,
Reh fend‘SPECIFICATION
STEEL AND IRONWORKER
Ref fo-4
$/83
TEM | HEADING DESCRIPTION
NO
01 | Construction Construction generally shall comply with BS 5950 with the
following amplifications and amendments :~
(i) Setting out of structure
The shop lengths of steel members shall be such that it
assembled in the unstressed condition, the configuration of
the structure and the levels of the finished surfaces would
correspond with those given on the drawings.
(ii) Steelwork Drawinas
The Contractor shall, at his own expense prepare working
drawings as required of all parts of the steel structures and
shall submit @ copy of each to the Engineer for approval,
amendment or correction. If required by the Engineer, he
shall submit further corrected or amended copies until
finally approved. No part of the steelwork fabrication shall
be put in hand until the relevant drawings have been
approved.
The Contractor shall supply to the Engineer a further copy
of each of his approved drawing. He shall maintain a
complete set of such approved drawings at the site
throughout the period of the works.
Among the drawings prepared by the Contractor and
supplied as aforesaid to the Engineer and the site, shall be
a full and clear set of marking plans and all necessary
erection drawings.
Notwithstanding any approval given or implied by the
Engineer, the Contractor shall be entirely responsible for
the accuracy of his own drawings and for the fabrication
thereto.‘SPECIFICATION
STEEL AND IRONWORKER.
8/64
TIEM | HEADING DESCRIPTION
NO
o1 | Welding All welding shall be carried out by the qualified welder in
(Cont'd) accordance with the requirements of BS 5135 and AWS D1.1 and
to the approval of the Engineer,
@
ai)
(iii)
General
Special care shall be taken to remove slag trom welds, and
weld splatter from surrounding surfaces, after the welds
have been completed and before final surface treatment,
The welding plant shall be of modern design, either A.C. or
D.C, and of adequate capacity to provide the required
current to each welding point without appreciable
fluctuation.
Electrodes shall be stored in accordance with the
iignuratturer’s recommendations. The coating shall be dry
when each electrode is put inta use, and all un-used
electrodes shall be returned to a heated store each evening.
Adequate means of unidentification by a method to be
agreed with the Engineer shall be approved to enable all
Welds to be traced to the welding operator by whom they
were made.
All butt welds shall be continuously complete penetration
butt welds made from both sides of the joint, unless
otherwise shown on the drawings.
In the fabrivativ of built-up members, all transverse putt
welds in which component is welded to other parts of the
members.
Welding Procedures
Ine welding procedure for making each joint shall be
approved by the Engineer before the work is started and
the Contractor shall make such trial welds may be required
to demonstrate the soundness of the proposed methods
and the competence of his workmen. Trial welds sliall Le
made with the parts fitted together with the same
clearances, coupled with the maximum limits of fit, lowest
Precheat and wurst cuinbinalions of electrode conditions
allowed by this Specification, or by the Contractor's
proposed procedure,oN
‘SPECIFICATION
STEEL AND IRONWORKER,
S/65
TTEM
NO
HEADING
DESCRIPTION
o1
02
Welding
(Cont'd)
Erection
oo)
Erection generally shall comply with 8S 5950 with the following
amplifications and amendments :~
@
dil)
Welding
After assembly and before general welding is commenced,
the individual parts are to be securely welded together in
the line of the seams, The tack welds are to be sufficiently
strong to prevent relative movement of the parts to be
Joined, but small enough to be incorporated, In the main
weld. ‘Any tack welds, or temporary connections not so
incorporated, shall be removed and the surface ground
flush with no undercutting.
Every effort shall be made during fabrication to minimise
the effects of distortion due to welding, and in particular
suitable allowance for contraction must be made in the
lengths of the steel parts before welding, so that the
finished lengths are correct within normally accepted limits.
Erection Procedure
The Contractor shall be deemed to have satisfied himself,
before tendering, of the safety and suitability of his
Proposed methods of site erection. The erection procedure
(including any temporary or permanent fastenings) shall at
all stages be to the approval of Engineer. The Contractor
shall submit for approval such detailed descriptions and
drawings of his proposed procedure, together with
supporting calculations, as the Engineer may require.
High Strenath Friction Grip Bolts
Connections by grip bolts shall be made as specified in B.S.
3294, Part 1 and addition:~
a) All bolts shall be provided with suitable hardened
washers under both the head and nut.HEADING
“SPECIFICATION
STEEL AND IRONWORKER
S/66
DESCRIPTION
a2
Refi fo
Erection
(Cont'd)
Surface
Treatment
before Delivery
to Site
a)
(iii)
High Strenath Friction Grip Bolts (Cont'd)
b) These washers shall be suitably bevelled where the
angle between the bolts axis and a steel bearing face Is
outside the limit of 90 % + 1%.
¢) Where the induced bolt tension is indicated by
protrusions on washers, such washers may replace a flat
washer under the boit head, but in cases where It Is
necessary to place the indicating washer under the nut,
then an additional facing washer shall be supplied
suitably heat treated to the same hardness as the bolt.
d) All the grip bolts of one group shall be tightened
sufficiently to bring all the parts firmly together, and to
the satisfaction of the Engineer, before any bolt of the
group is finally tightened. After final tightening the gap
under the washer shall be as determined by the
Engineer, and within the tolerance recommended by the
manufacturer.
Service bolts
The use of permanent bolts as service bolts during the
erection will be permitted where such use is not liable to
cause damage to the protective treated treatment provided
to the bolt. Any bolt so damaged shall be replaced at the
Contractor's expense.
Before fabrication, except as noted below all surfaces shall be :~
«i
)
Properly cleaned by wire brushing or other approved
methods to the complete satisfaction and approval of the
Engineer.
Painted with an approved pre-fabrication primer as soon as
possible, and not more than four hours after blasting to an
average dry film thickness of 0.5 mm.
After fabrication, except as noted below, all surfaces shall :-
o
Have damaged areas of primer cleaned to the entire
satisfaction of the Engineer and recoated.‘SPECIFICATION
STEEL AND IRONWORKER
S/67
TTeM | HEADING DESCRIPTION
NO
01 | Blast Cleaning — Blast-Cleaning where specified shall be carried out in
accordance with Bs 4232, but to give a surface finish Sa 2.5 to
Swedish Standard SIS 05 59 00. The maximum grade of abrasive
shail be as specified in Table 2 of BS 4232. The abrasive shall be
free from contamination, and recovered material shall be
cleaned to the satisfaction of the Engineer before re-use. Non
metallic (containing Silica) abrasives shall not be used. The
blast cleaner surface shall have a surface profile height between
50 and 100 microns.
Blast-cleaned steelwork shall be free from dust, mill scale and
adherent parcticles. The first coat primer shall be applied by an
approved airless spray process with the least possible delay, and
in any case within 2 hours of blast-cleaning. The successive coats
shall_be applied within the time periods specified by the
manufacturer. Suitable masks shall be provided at friction grip
bolted connections to ensure that the friction surfaces are kept
free of primer and paint, Before masking, areas to be brought into
contract shall have received one coat of zinc metal spray paint.
Refi 4‘SPECIFICATION
STEEL AND IRONWORKER
S/68
TTEM
NO.
HEADING
DESCRIPTION
on
02
Surface
Treatment
before Delivery
to Site (Cont'd)
Bolted Joint
(i) It should be noted that cleaning and repairing immediately
after machining, drilling, welding, etc. is preferable and
may obviate the possibility of substantial cleaning and
repriming later.
(il) After thorough cleaning to the satisfaction of the Engineer,
be painted as described in the Schedule of Rates.
‘Secondary Material
Secondary material, e.g. small members, loose packing shall be
treated in accordance with the relevant clauses of this specification
except that blast cleaning and priming may take place after
fabrication at the option of the Contractor and with the approval of
the Engineer.
Joints and Connections
Contract surfaces, including areas under heads and washers of all
bolts and nuts shall be treated in accordance with sub-clause as
described abave where applicable.
(All contact surfaces shall be cleaned of all foreign matter
immediately prior to being brought together, special care
being taken to remove all oll, grease, etc., trom surtaces to
be jointed by grip bolts.
(ii) After tightening, bolt heads, nuts and washers shall be
cleaned, and externally exposed surfaces painted with each
primer.
Following which, they and the surrounding area shall receive two
coats of paints as described in the Bills of Quantities carefully
tapped to the adjacent treatment after cleaning to the satisfa
of the Engineer.‘SPECIFICATION
STEEL AND IRONWORKER,
s/69
TTEM | HEADING DESCRIPTION
NO
01 | Application of Painting shall only be done under favorable condition, which will be
Paint determined by specification.
Steel surface should be 3°C above dew point,
The relative humidity of the air should not exceed 85%.
Surface to be painted shall he free fram moisture, grease, dirt and
other surface contamination.
No solvent is used for cleaning / degreasing. However, if item is
contaminated than recommended, manufacturer's thinner cleaner to
be used.
All paints to be used shall be properly mixed and applied as per
manufacturer's recommendation.
After every coat, paint shall be inspected for it’s general visual quality
and thickness.
The recommended minimum and maximum over coating thickness will
be followed.
02 | Paint Coating The paint coating system specified will provide @ minimum corrosion
system protaction to the structural eteal worl
‘Surface preparation : Blast cleaning to ISO 8501-1 : 1988, Sa 2.5,
Unless otherwise stated, the paint coating system shall be in
accordance with the following
() 1% coat / primer
wat : Two component Inorganic Zinc silicate
= 75 microns
(i) 2" coat High Solid Epoxy ~ 125 microns
(iii) 3" coat High Solid Epoxy - 125 microns
(iv) 4M coat Aliphatic Poly Urethane coatina ~ 50 microns
03 | Rates Rates for structural steelwork shall include for:
(i) All shop and site holes, notches, ete. for bolts, etc,
(ii) Surface treatment before delivery to site as described.
Ren er