DR Majid Albana 5 Floor Posttention Slab System Al Shaab 2025 Model

This document contains structural drawings and specifications for a commercial building, specifically a hypermarket, designed by Dr. Majid Albana. It outlines various construction details, including dimensions, materials, and design standards, emphasizing the use of reinforced concrete and adherence to specific codes. The document also includes guidelines for foundation design, construction joints, waterproofing, and load requirements.

Uploaded by

kkgigijim
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views26 pages

DR Majid Albana 5 Floor Posttention Slab System Al Shaab 2025 Model

This document contains structural drawings and specifications for a commercial building, specifically a hypermarket, designed by Dr. Majid Albana. It outlines various construction details, including dimensions, materials, and design standards, emphasizing the use of reinforced concrete and adherence to specific codes. The document also includes guidelines for foundation design, construction joints, waterproofing, and load requirements.

Uploaded by

kkgigijim
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 26

2.

25
‫الطابق الثالث‬

2.25 ‫الطابق الثاني‬

THE COPYRIGHTS OF THESE PLANS AND DRAWINGS ARE RESERVED 12.65

2.25
‫الطابق الاول‬

FOR 2.53
‫الطابق الارضي‬

DR-MAJID AL BANA
1.69 ‫السرداب‬

A B C D E F G

1.12

1.35
‫مصعد‬
3.35
2

3.29
3

3.34
4

Notes

THE BUILDING SYSTEM WILL BE


CONSIDER AS SHEAR WALL
BUILDING WITH COLUMNS AND THE
SLAB WILL BE AS FLAT SLAB WITH
M. BEAMS.THE SOFTWARE USED IN
DESIGN (CSI ETABS 2022, AND CSI
SAFE 2022&PROKON) IS THE
GENERAL PROGRAM USED IN THIS
DESIGN

job title

Commercial building -
hypermarket
Structural
Drawings

DESIGNED BY DR-Majid Albana


CHECKED BY

SCALE As Shown

DATE 4/2025

SHEET NO. Str. 1


ABBREVIATIONS :-
GENERAL :- REINFORCED CONCRETE :- ADD ADDITIONAL
ARCH ARCHITECTURAL
1. ALL DIMENSIONS TO TAKE PRECEDENCE OVER SCALE SHOWN ON PLANS, SECTIONS AND 1. COMPRESIVE STRENGTH OF CONCRETE SHOULD BE DETERMIND BY THE TABLE BELOW :- Walk Way B BEAM
B.R.C (no. 63)
DETAILS, (DO NOT SCALE FROM DRAWINGS). Out Door Yard BOTT BOTTOM
1 LAYER OF B.R.C(gage 63) 2Ø10 C1 COLUMN TYP C1
x
MINIMUM 28 DAYS Joint Every 25 m² B.R.C (no. 63)
2. ALL DIMENSIONS ARE IN MILLIMETRES AND ALL LEVELS IN METRES (UNO). LOCATIONS x CANT CANTILEVER
CUBE COMPRESSIVE x
CJ CONSTRUCTION JOIN
AGGREGATE X X X X X
3. THE STRUCTURAL DRAWINGS SHOULD BE USED IN CONJUNCTION WITH THE ARCHITECTURAL, STRENGTH (Fcu) X X X X X X X X X X X X Nylon Sheet CL CENTRE
MEMBER MAX. SIZE Ø10/200
MECHANICAL,CIVIL,PLUMBING AND ELECTRICAL DRAWINGS. C COULMN
TYPE ( MPa ) 2Ø12
150mmSub-base 90% CONC CONCRETE
4. ALL OPENINGS SIZE AND LOCATION SHOULD BE VERIFIED AND CHECKED WITH SERVICES DET DETAIL
SCREED 20 10 mm Nylon Sheet 150mmSub-base 90%
DRAWINGS,WHERE OPENINGS SIZES ARE NOT SHOWN ON THE STRUCTURAL DRAWINGS, DIM DIMENSION
SITE ENGINEER SHALL INTRODUCE SUCH OPENINGS WITH PROPER FRAMING INCLUDING BLINDING OR LEAN CONCRETE 20 20 mm DWG DRAWING
ANY REVISION TO THE SIZES SHOWN ON THE DRAWINGS. D DEPTH
SLABS 40 20 mm Typical Detail Of Out Door Yard Typical Sec. For Stair On Earth E.A EACH
5. DESIGN STANDARED & LOADS :-
PILES - 20-38 mm E.F EACH FACE
DESIGN & CONSTRUCTION OF REINFORCED CONCRETE STRUCTURES MEMBERS SHALL E.J EXPANSION JOINT
FOUNDATIONS 40 20 mm ELEV ELEVATION
IN ACCORDANCE WITH ACI-318-95 (ULTIMATE STRENGTH DESIGN METHOD).
COLUMNS AND SHEAR WALLS 45 20 mm E.W EACH WAY
ALL RETANING WALL STRUCTURE SHOULD BE AS BRITISH 8 97- 110 or ACI - 93 - 318. EXP EXPANSION
SUSPENDED SLAB, BEAMS F FOOTING
40 20 mm
MASONARY BRICK OR CONCRETE BLOCK ACCORDING TO B.S - 5628. AND WALLS F1 FOOTING TYPE-1
WATER RETAINING STRUCTURES - 20 mm FDN FOUNDATION
6. LOADING :- F.F.L FINISH FLOOR LEVEL
PLAIN CONCRETE 25 20 mm GEN GENERAL
MINIMUM DESIGN LOAD (LIVE LOAD) ACCORDING TO IBC-09. B.R.C No.63 x x GL GRID LINE
x
SEISMIC LOAD ACCORDING TO IRAQI SEISMIC CODE 1997. x LL LIVE LOAD
100mm plain conc. x MAX MAXIMIM
WIND LOAD ACCORDING TO ASCE-05. 2. SULPHATE RESISTANT CEMENT TYPE 5 SHOULD BE USED IN ALL CONCERET WORK IN x

15
B.R.C No.63 MECH MECHANICAL
CONTACT WITH EARTH OR BELOW D.P.C LEVEL. Nylon Sheet

0
x
Nylon Sheet
7. FOR TYP. SECTIONS & DETAILS SEE ST-G2. x MIN MINIMUM
x
3. REINFORCMENT STEEL CONFORM TO ASTM A615 & A616 OR A617 BARS SHOULD BE GRADE x 2Ø10 x
mm MILLIMETRES
x
400 FY=410N/mm (60000psi). x SEC SECTION
FOUNDATION AND EARTH WORK :- 150mmSub-base 90%
150mmSub-base 90%
4. PLACING OF REINFORCEMENT SHOULD BE ACCORDING TO ACI-315 DETAILING MANUAL. Ø10/200
1. FOUNDATION DESIGN BASED ACCORDING TO THE SOIL REPORT PREPARED BY THE 2Ø10
& RESEARCH ( ( ) 2023 \ \ \ ). 5. MINIMUM BARS COVER :-
CONSTRUCTION OF PARTITION
2. BEARING CAPACITY ACCORDING TO THE SOIL REPORT IS (70/ m²) AT DEPTH OF (-2.50m) ON GROUND SLAB
BELOW THE EXISTING N.G.L. MEMBER (mm) Typical Sec. Of Ramp
provid construction joint for max.(5mx5m)
3. A WELL COMPACTED SUB-BASE LAYERS OF A TOTAL THICK AS INDICATED IN THE DWG. SLABS 25
SHOULD BE USED UNDER FOOTING WITH FOLLOWING SPECIFICATIONS :- BEAMS & GIRDERS 40
2Ø16
THE DIMENSION OF THE SUB-BASE LAYERS SHOULD BE LARGER THAN THE DIMENSIONS OF Ø10 @ 200
COLUMNS 40 Ø10 @ 200
THE FOUNDATION FROM ALL SIDES BY 0.25m.
INTERIOR WALLS 25
THE VALUE OF CALIFORNIA BEARING RATIO (C.B.R) SHALL NOT BE LESS THAN (35% ASTM D) 2Ø16
1883 AT 95% OF THE MAXIMUM DRY DENSITY ESTABLISHED ACCORDING TO (ASTM D)1557. EXTERIOR FACE OF WALL 40
FORMED FOUNDATION 50 Arround all windos for loovers
LIQUID LIMIT ≤ 25%.
NON-FORMED FOUNDATION 75
PLASTICITY INDEX ≤ 6%. 3-Ø16(typ.)
ORGANIC MATERIAL ≤ 2%. T&B
6. MINIMUM BARS SPACING :-
SO3 ≤ 5%. 2-Ø16
CLEAR SPACING BETWEEN PARA LLEL BARS SHALL NOT BE LESS THAN BAR DIAMETER Ø16@200
OR 4/3 OF MAXIMUM AGGREGATE SIZE BUT NOT LESS THAN 25mm.
TOTAL SOLUBLE SALTS ≤ 5%.
CLEAR SPACING BETWEEN LAYERS OF BARS TO BE NOT LESS THAN 25mm AND THE
GYPSUM CONTENT ≤ 10.75%.
UPPER BARS SHOULD BE OVER THE LOWER BARS .
RELATIVE COMPACTION 95% ( MODIFIED PROCTOR).
IN COLUMNS CLEAR DISTANCE BETWEEN LONGITUDINAL BARS SHOULD BE NOT LESS TYPICAL REINF. AROUND TYPICAL UP STAND DETAIL
4. SULPHATE RESISTANT CEMENT TYPE 5 SHOULD BE USED IN ALL CONCERET WORK IN THAN 1.5 BAR DIAMETER NOR LESS THAN 40mm.
CONTACT WITH EARTH OR BELOW D.P.C. LEVEL.
OPENNINGS UP TO 600 ROOF OPENNINGS
7. MINIMUM LAP LENGTH (UNLESS NOTED ON DRAWINGS) SHOULD BE AS TABLE BELWO :-
5. BACKFILL AROUND FOOTINGS AND UTILITY TRENCH WITHIN THE BUILDING AREA SHOULD
BE DONE WITH APPROVED SELECTED CLASSIFIED MATERIAL FREE OF CLAY AND SHOULD
BE MECHANICALLY COMPACTED IN LAYERS , NOT EXCEEDING 250mm LOOSE THICKNESS BAR DIA.(mm) 10 12 16 18 20 22 25
TO 90% OF MAXIMUM PROCTOR DENSITY. LAP LENGTH (mm) IN 400 500 600 650 700 800 900
COLUMNS
LAP LENGTH (mm) IN PROVID 2-Ø6 PLATE (300 * 250 * 3 )
400 600 700 800 900 1000 1250
ELSE WHERE AT EVERY 5TH COURSE OF BRICK AT EVERY 5TH COURSE OF BRICK
CONSTRUCTION JOINT AND WATERPROOFING :-
1. CONSTRUCTION JOINT :- LAP LOCATION IN SLABS AND BEAMS :-

CONSTRUCTION JOINT IN FLOORS SHOULD BE LOCATED WITHIN THE MIDDLE THIRD OF * AT SUPPORT FOR BOTTOM BARS.
SPANS OF SLABS ,BEAMS & GIRDERS,JOINT IN GIRDER SHOULD BE OFFSET A MINIMUM
DISTANCE OF TWO TIMES THE WIDTH OF INTERSECTING BEAMS. * AT MID SPAN FOR TOP BARS.

AT CONSTRUCTION JOINTS SURFACES SHOULD BE ROUGHENED BY BROOMING OUT LAP LOCATION IN FOUNDATION :-
MORTAR, EXPOSING 12mm OF COARSE AGGREGATE TWO HOURS AFTER PLACING
* AT SUPPORT FOR TOP BARS.
CONCRETE.
* AT MID SPAN FOR BOTTOM BARS.
CONSTRUCTION JOINTS FOR STRUCTURAL SLAB / FOUNDATION / WALLS ETC . AND
VOLUME OF CASTING IN A POUR SHOULD BE APPROVED BY THE ENGINEER. CONECTION BETWEEN BRICK WALL CONECTION BETWEEN BRICK WALL
8. VERTICAL REINFORCEMENT IN COLUMN :-
AND R.C. COLUMN AND R.C. COLUMN
CONSTRUCTION JOINTS SHOULD BE DOWELED, KEYED AND THOROUGHLY CLEANED , ALL
CONSTRUCTION JOINTS SHOULD BE CONSTRUCTED IN ACCORDANCE WITH THE TYPICAL
WHERE COLUMN FACE ARE OFFSET 75mm OR MORE SPLICE OF VERTICAL BARS proposel 1 proposel 2
TO THE OFFSET FACE SHOULD BE MADE BY SEPARAT E DOWELS OVER LAP AS SPECIFIED
CONSTRUCTION JOINT DETAILS SHOWN ON THE STRUCTURAL DRAWINGS, CONTRACTOR ABOVE.
HAVE TO PREPARE ANY MISSING DETAILS NOT COVERED IN THE STRUCTURAL DRAWINGS
AND SUBMIT FOR ENGINEER'S APPROVAL. WHERE A LONGITUDINAL BARS ARE OFFSET AT SPLICE THE SLOPE OF INCLINED ADJACENT
PORTION SHALL NOT EXCEED 1:6 (HORIZANTAL:VERTICAL). no. date initials revision
2. WATERPROOFING :-
CHANGING OF REINFORCEMENT BETWEEN FLOORS WHERE SUCH SITUATION OCCURS
WATER STOPS SHOULD BE USED AT ALL CONSTRUCTION ,CONTRACTION & EXPANSION THE REINFORCEMENT OFF SHOULD BE CUT OFF AT DISTANCE 75mm BELOW FLOOR
JOINTS,WHERE WATERPROOFING SYSTEM IS APPLIED ALL INTERSECTION PIECES OF LEVEL SPACED 100mm AND PLACED BEFOR THE POINT OF BEND. A
WATER STOPS SHOULD BE FACTORY MOLDED.
a job title
WHERE LONGITUDINAL BARS OFFSET,PROVIDE 4TIES. A
ALL CONCRETE WORKS IN CONTACT WITH SOIL FOR NORMAL STRUCTURE SHOULD BE Ø10@200
COATED WITH PROTECTIVE LAYER. 9. HOT & COLD WETHERING SHOULD BE ACCORDING TO ACI-305R-99. B

h
(A)
10. ALL REINFORCING BAR BENDS TO BE MADE COLD. 250 250 drawing title
a B
11. IN ONE-WAY SLAB, SHRINKAGE & TEMPERATURE REINF. STEEL EXTENDING IN THE LONG
. all dim. from ARCH D.W.G. DIRECTION SHALL BE PLACED IN THE PLACE OF, AND TIED TO THE MAIN REINF.
EXTENDING IN THE SHORT DIRECTION.
L<2000, h=200 , A=B=2-Ø12
SEC. ( a - a )
designed
GENERAL NOTES
project manager
L<5000, h=400 , A=2-Ø12 , B=2-Ø16 ENG : DR-Majid Albana
checked scale date
12. MIXING & PLACING CONCRETE SHOULD BE DONE ACCORDING TO ACI - 318M - 95 (CHAPTER 5)
CONDUIT OR PIPE SIZE SHALL NOT EXCEED 30% OF SLAB THICKNESS UNLESS SPECIFICALLY LINTEL REINFORCEMENT job no. sheet no.

2
drawn
DETAILED,OTHERWISE CONCENTRATIONS OF CONDUITS OR PIPES SHOULD BE AVOIDED EXCEPT
WHERE DETAILED OPENINGS ARE PROVIDED, ALL SUBJECTED TO ENGINEER'S APPROVAL. approved
NEW SLAB TO BE POURED FREE END SLAB
(CANTILEVER SLAB)

EXCAVATION, BACK FILLING & FOUNDATION THE DESIGN LOADS


100% SUPPORTING

1) SUPER IMPOSED DEAD LOAD (SDL) :


FREE END SLAB
(CANTILEVER SLAB)

OLD SLAB
50% SUPPORTING

FREE END SLAB


(CANTILEVER SLAB)

OLD SLAB

2) LIVE LOADS: COLUMN COLUMN


25% SUPPORTING

FREE END SLAB


(CANTILEVER SLAB)

DETAIL FOR SLAB SUPPORTING COLUMN COLUMN

(BACK PROPPING)

3) WIND LOADS:

Frameworks removal time :

Type of framework Min. period before striking formworks

Vertical framework of the column 24 hrs

Vertical framework of the shear walls 2-3 days

framework of the slab and beam


a. span up to 6 m 14 days
a. span from 6-8 m 20 days

4) SEISMIC LOADS:

* Seismic Load assumed also According to the Iraqi Code 2016.


* Load Pattern assumed for Seismic (EX,-EX,+EX,EY,-EY,+EY)
* SS=0.30
6) CONSTRUCTION JOINTS AND CONTROL JOINTS: * S1=0.1
* Soil Profile Type =E
* Occupancy Importance =1
* Response Modification R =5.00
* System Overstrength Omega =2.50
* Deflection Amplification Cd=4.5
* Soil Profile Type =E

drawing title

THE DESIGN LOADS


designed project manager
ENG :DR- Majid Albana
checked scale date
1-100 4/2025
drawn job no. sheet no.

approved
3 ST/D/03
A B C D E F G

2.00

‫مصعد‬
2.40
6.30

Ø20@200 T. MESH
2
6.55

Ø20@150 B . MESH

3
6.30

CONCRETE COVERS

4 -SLABS = 25 mm

-BEAMS = 40 mm

-COLUMNS = 40 mm

-WALLS = 25 mm

-SLAB ON GRADE = 50 mm
5
-RAFT FOUNDATION = 75 mm

-THE BUILDING IS DESIGNED FOR BASEMENT + GROUND


FLOOR + 3 FLOORS + PENT-HOUSE

ADDITIONAL
Ø25@150mm
BOTTOM L=3m

no. date initials revision

3.0
MINIMUM LAP LENGTH (UNLESS NOTED ON DRAWINGS) SHOULD BE AS TABLE BELWO :-
job title

3.0

BAR DIA.(mm) 10 12 16 18 20 22 25 (A)


drawing title
LAP LENGTH (mm) IN 400 500 600 650 700 800 900
Foundation Plan
PLAN OF FOUNDATION
COLUMNS REINFORCEMENT&SEC.
LAP LENGTH (mm) IN 400 600 700 800 900 1000 1250 designed
ENG : DR-Majid Albana
project manager

ELSE WHERE checked scale date

THICK. = 800 mm . all dim. from ARCH D.W.G. drawn


1-100
job no.
4 /2025
sheet no.

approved 4 ST/D/04
A B C D E F G

1
A

B
2.00

2.40
B
5.95

2
B

800 cm Reinf. conc. Raft


foundation 40 Mpa min.
5.85

5 cm plain concrete
W1
A

A
A

A
2 layers Bitumen 1 cm thick. min
with bitumen felts between them
(1:2:4) 10cm Blinding Ø16@15 cm C/C
w/c = 0.45 , coarse agg. 5-19 mm
3 25cm Sub base 95% comp. Ø12@20 cm C/C
25cm Bolder
Sub grade ( stiff & stable ) Protection Wall
5.95

Ø16@20
cm C/C

4
1.00

A
0.05

0.10

5
0.25

0.25

SECTION IN RAFT FOUNDATION


BASEMENT WALL W2

Typical Section (A-A) of raft foundation

no. date initials revision

job title

(A)
drawing title

Foundation Plan PLAN OF FOUNDATION


REINFORCEMENT&SEC.
designed
ENG : DR-Majid Albana
project manager

scale date
checked

THICK. = 800 mm . all dim. from ARCH D.W.G. drawn


1-100
job no.
4 /2025
sheet no.

approved 5 ST/D/05
Reinf. conc. Raft
foundation 40 Mpa min.
5 cm plain concrete
2 layers Bitumen 1 cm thick. min
with bitumen felts between them
(1:2:4) 10cm Blinding
w/c = 0.45 , coarse agg. 5-19 mm
25cm Sub base 95% comp.
25cm Bolder
Sub grade ( stiff & stable )

B
0.80

0.05

0.10

0.25

0.25

SECTION IN RAFT FOUNDATION


BASEMENT WALL W2

250 250

Ø12@200V

Ø12@200H
60 BAR DIA METER

4-Ø16 5Ø16

500 500
4Ø16
1.0

5-Ø16

Ø12@200

ties Ø12@200

Blinding 1:4:8 10cm

4-Ø16 Diagonal
Well Compacted Sub-base >95% 2 Layers Each 25cm

A
Ø12@200 1.20

Well Compacted Sub-grade


TIE Ø12@200

2.20
5-Ø16

no. date initials revision

SECTION A-A

F4/ SPANDREL BEAM DETAILS


1 SCALE
job title

(A)
drawing title

designed project manager


ENG : Majid Albana
checked scale date
ENG : Majid Albana 1-100 4/2025
drawn job no. sheet no.

6
ENG : Majid Albana
approved ST/D/06
B' A'

12 No. Ø12
0
15
6@
Ø1
0
20
2@
0.500
Ø1

SECTION A'-A' (between Foundation &


landing )
5Ø16mm Ø16mm@200

Slab Reinf.

Ø12@150
0 Slab Reinf.
15
6@
Ø1
Ø12@200 0 Slab Reinf.
20
2@ 0
Ø1 20
2@
Ø1
Ø12@200
200

Slab Reinf.
2T16

CONCRETE COVERS
SECTION A'-A' (between slab & landing )
200mm

-SLABS = 25 mm

-BEAMS = 40 mm
no. date initials revision
-COLUMNS = 40 mm

-WALLS = 25 mm

-SLAB ON GRADE = 50 mm
job title

-RAFT FOUNDATION = 75 mm
(A)
drawing title

Stairs detail
. all dim. from ARCH D.W.G. -THE BUILDING IS DESIGNED FOR
BASEMENT + GROUND FLOOR + 6
designed
ENG : DR-Majid Albana
checked
project manager

scale date
FLOORS + PENT-HOUSE 1-100 4/2025
drawn job no. sheet no.

approved
7 ST/D/07
A B C D E F G

W2 W2 W2 W2 W2 W2
1
C1 C1 C1 C1 C1 C1 C1
2.00

W1

2.40
5.95

W2 SCHEDULE OF COLUMNS AND WALLS


W2 SIZE
W1 COLUMNS
C1 2 OR WALLS LENGTH WIDTH REMARK
C2 C2 C2 C2 C2 C1
ID (mm) (mm)
W2 C1 1000 300 just in basement
5.70

W2 C2 600 600

C1 3
C2 C2 C2 C2 C2 C1
W1 250 2500 lift
W2 300 just in basement
W2
5.95

W2 Notes

-Fcu = 50 N/mm2
4 -Fy = 420 N/mm2.
C1 C2 C2 C2 CONCRETE COVERS
C1 -SLABS = 25 mm
W2 C1 W2 -BEAMS = 40 mm

W2 C1 -COLUMNS = 40 mm
W2 -WALLS = 25 mm
W2 C1
C1 -SLAB ON GRADE = 50 mm
W2 W2 5 -RAFT FOUNDATION= 75 mm

no. date initials revision

job title

(A)
drawing title

COLUMNS & WALL KEY PLAN


COLUMNS & WALL KEY PLAN designed
ENG : DR-Majid Albana
checked
project manager

scale date

. all dim. from ARCH D.W.G. drawn


1-100
job no.
4 /2025
sheet no.

approved 8 ST/D/08
24- Ø20 20- Ø25 20- Ø20

Ø12@200 Ø12@200 Ø12@200


3Ties/Set 3Ties/Set 3Ties/Set
Main Bar Roof Floor

Column Reinf.
Ties

Rest See
C 45 1000 800 800

Section

300 300 300

4rth Floor

Main Bar 3 rd Floor 24- Ø20 20- Ø25 25- Ø20

Ties Ø12@200 Ø12@200 Ø12@200


3Ties/Set 3Ties/Set 3Ties/Set

Rest See Column Reinf.


C 45 Ø12@200 V
1000 800 800

Section

Ground Level Ø12@200 H


foundation
level 300 300 300

24 - Ø25 20- Ø25 20- Ø20


Dowels
C1 C2 C3 W1

Rest See Column Reinf.


no. date initials revision

job title

(A)
drawing title

SCHEDULE OF COLUMN
Typ. Sec. For Column
designed project manager
ENG : DR-Majid Albana
TYPICAL INTERNAL COLUMN TO BEAM DETAIL TYPICAL EDGE COLUMN TO BEAM DETAIL checked scale date
1-100 4 /2025
drawn job no. sheet no.

. all dim. from ARCH D.W.G. approved 9


Reinf. conc. Raft Ø16@15cm C/C
foundation .
5 cm plain concrete Ø12@20cm C/C
2 layers Bitumen 1 cm thick. min
with bitumen felts between them
(1:2:4) 10cm Blinding
w/c = 0.45 , coarse agg. 5-19 mm
25cm Sub base 95% comp.
300 mm 25cm Bolder
COMPACTED Sub grade ( stiff & stable )
SUBBASE
100 mm -2.70 -2.70
LEAN CONC. 16@150
16@150
RAFT REINF.
400

8
1

SECTION IN RAFT FOUNDATION &


SEC. J-J STAIR NECK

16@150 16@150
0.3

0.3
Reinf. conc. Raft
foundation .
5 cm plain concrete

0.3
W2
2 layers Bitumen 1 cm thick. min
with bitumen felts between them
(1:2:4) 10cm Blinding
w/c = 0.45 , coarse agg. 5-19 mm
VAR.

25cm Sub base 95% comp.


25cm Bolder
Sub grade ( stiff & stable ) Protection Wall
-2.70

Ø16@20
cm C/C

0.3 3.50 0.3


0.28

0.10

no. date initials revision

0.25
0.11

0.25
job title

SEC. K-K SECTION IN RAFT FOUNDATION


(A)
drawing title
BASEMENT WALL W1 RAMP
REINFORCEMENT&SEC.
designed project manager
ENG : DR-Majid Albana
checked scale date
1-100 4 /2025
drawn job no. sheet no.

approved
10 ST/D/10
3⌀16mm

0.20
0.50
Ø10mm @ 170mm c/c
Ø12@150 B. MESH Ø12@150 B. MESH Stirrups Notes

2⌀20mm
CONCRETE COVERS

0.20
-SLABS = 25 mm

-BEAMS = 40 mm

-COLUMNS = 40 mm

B3 Detail -WALLS

-SLAB ON GRADE
= 25 mm

= 50 mm

-RAFT FOUNDATION = 75 mm

no. date initials revision

job title

(A)
drawing title

BEAM KEY PLAN


BEAM KEY PLAN designed
ENG : DR-Majid Albana
checked
project manager

scale date

. all dim. from ARCH D.W.G. drawn


1-100
job no.
4/2025
sheet no.

approved
11 ST/D/08
NEW SLAB TO BE POURED FREE END SLAB
(CANTILEVER SLAB)

100% SUPPORTING Notes

FREE END SLAB


(CANTILEVER SLAB)

OLD SLAB
50% SUPPORTING

CONCRETE COVERS
FREE END SLAB
(CANTILEVER SLAB)
25 mm
camber -SLABS = 25 mm
OLD SLAB
-BEAMS = 40 mm
25% SUPPORTING
COLUMN COLUMN

-COLUMNS = 40 mm
FREE END SLAB
(CANTILEVER SLAB)

-WALLS = 25 mm

-SLAB ON GRADE = 50 mm
DETAIL FOR SLAB SUPPORTING COLUMN COLUMN

(BACK PROPPING)
-RAFT FOUNDATION = 75 mm

Ø12@150 T&B. MESH

25 mm
camber

Ø12@150 . MESH

220
370
150
2000
Ø12@150 B. MESH
6.08m

ADDITIONAL
Ø12@200 mm
TOP L=4m
no. date initials revision

SLAB REINFORCEMENT (BASEMENT FLOOR)


SLAB THICKNESS = 220 mm job title

MINIMUM LAP LENGTH (UNLESS NOTED ON DRAWINGS) SHOULD BE AS TABLE BELWO :- (A)
BAR DIA.(mm) 10 12 16 18 20 22 25 drawing title
LAP LENGTH (mm) IN COLUMNS 400 500 600 650 700 800 900 PLAN OF SLAB
LAP LENGTH (mm) IN SLAB & BEAMS 400 600 700 800 900 1000 1250 REINFORCEMENT&SEC.
designed project manager
ENG : DR-Majid Albana
checked scale date
2.0 1-100 4 /2025
. all dim. from ARCH D.W.G. drawn job no. sheet no.
4.0

approved
12 ST/D/08
..\..\‫\كرادة ارخيتة‬card ‫استشاري‬.bmp

A B C D E F G

2.00

W1

2.40
5.95

Notes

W1
2 CONCRETE COVERS

-SLABS = 25 mm

-BEAMS = 40 mm

-COLUMNS = 40 mm
5.85

-WALLS = 25 mm

-SLAB ON GRADE = 50 mm

-RAFT FOUNDATION = 75 mm

3
Ø12@150 B&T. MESH
5.95

Ø12@150 . MESH

NEW SLAB TO BE POURED FREE END SLAB


(CANTILEVER SLAB)
200
350
150
100% SUPPORTING

2000
FREE END SLAB
(CANTILEVER SLAB) Ø12@150 B. MESH

OLD SLAB
50% SUPPORTING

FREE END SLAB


(CANTILEVER SLAB)

OLD SLAB

25% SUPPORTING
COLUMN COLUMN

FREE END SLAB

ADDITIONAL (CANTILEVER SLAB)

Ø12@150 mm
TOP L=3m DETAIL FOR SLAB SUPPORTING
(BACK PROPPING)
COLUMN COLUMN

no. date initials revision

SLAB REINFORCEMENT (BASEMENT,GR,1ST,2ND,3RD FLOOR )


job title
SLAB THICKNESS = 200 mm
MINIMUM LAP LENGTH (UNLESS NOTED ON DRAWINGS) SHOULD BE AS TABLE BELWO :- (A)
BAR DIA.(mm) 10 12 16 18 20 22 25 drawing title
LAP LENGTH (mm) IN COLUMNS 400 500 600 650 700 800 900 PLAN OF SLAB
LAP LENGTH (mm) IN SLAB & BEAMS 400 600 700 800 900 1000 1250 REINFORCEMENT&SEC.
designed project manager
ENG : DR-Majid Albana
checked scale date
2.0 1-100 4/2025
. all dim. from ARCH D.W.G. drawn job no. sheet no.
4.0

approved
13 ST/D/08
A B C D E F G

2.00

W1

2.40
5.95

W1
2 Notes
5.85

CONCRETE COVERS

-SLABS = 25 mm

-BEAMS = 40 mm

-COLUMNS = 40 mm
3 -WALLS = 25 mm

-SLAB ON GRADE = 50 mm

-RAFT FOUNDATION = 75 mm
5.95

Ø12mm @ 150 mm Ø12mm @ 150 mm


Top Top
Additional Additional

Ø12mm @ 150 mm Ø12mm @ 150 mm


Top
Additional
Top
Additional
Ø12mm @ 150 mm
Top
5
Additional

Ø12@150 . MESH

200
350
150
2000
Ø12@150 B. MESH

Top Additional dir y


ADDITIONAL
Ø12@150 mm
TOP L=3m
no. date initials revision

SLAB REINFORCEMENT (BASEMENT,GR,1ST,2ND,3RD FLOOR )


job title
SLAB THICKNESS = 200 mm
MINIMUM LAP LENGTH (UNLESS NOTED ON DRAWINGS) SHOULD BE AS TABLE BELWO :- (A)
BAR DIA.(mm) 10 12 16 18 20 22 25 drawing title
LAP LENGTH (mm) IN COLUMNS 400 500 600 650 700 800 900 PLAN OF SLAB
LAP LENGTH (mm) IN SLAB & BEAMS 400 600 700 800 900 1000 1250 REINFORCEMENT&SEC.
designed project manager
ENG : DR-Majid Albana
checked scale date
2.0 1-100 4 /2025
. all dim. from ARCH D.W.G. drawn job no. sheet no.
4.0

approved
14 ST/D/08
A B C D E F G

2.00

W1

2.40
5.95

W1 Ø12mm @ 150 mm
2 Top Notes
Additional
5.85

CONCRETE COVERS

-SLABS = 25 mm

-BEAMS = 40 mm

-COLUMNS = 40 mm
3 Ø12mm @ 150 mm
Top -WALLS = 25 mm
Additional
-SLAB ON GRADE = 50 mm

-RAFT FOUNDATION = 75 mm
5.95

4 Ø12mm @ 150 mm
Top
Additional

B3

NEW SLAB TO BE POURED FREE END SLAB


(CANTILEVER SLAB)

100% SUPPORTING

FREE END SLAB


(CANTILEVER SLAB)

Ø12@150 . MESH
OLD SLAB
50% SUPPORTING

FREE END SLAB


(CANTILEVER SLAB) 200
350
OLD SLAB 150
25% SUPPORTING
COLUMN COLUMN
2000
FREE END SLAB
(CANTILEVER SLAB)
Ø12@150 B. MESH

DETAIL FOR SLAB SUPPORTING COLUMN COLUMN

(BACK PROPPING)

no. date initials revision

Top Additional dir x


job title

MINIMUM LAP LENGTH (UNLESS NOTED ON DRAWINGS) SHOULD BE AS TABLE BELWO :- (A)
BAR DIA.(mm) 10 12 16 18 20 22 25 drawing title

SLAB REINFORCEMENT (BASEMENT,GR,1ST,2ND,3RD FLOOR ) LAP LENGTH (mm) IN COLUMNS

LAP LENGTH (mm) IN SLAB & BEAMS


400 500 600
400 600 700
650
800
700 800 900
900 1000 1250
PLAN OF SLAB
REINFORCEMENT&SEC.
designed project manager
SLAB THICKNESS = 200 mm ENG : DR-Majid Albana
checked scale date
1-100 4 /2025
. all dim. from ARCH D.W.G. drawn job no. sheet no.

approved
15 ST/D/08
1 2 3
L/3 L/3 L/3

1 2 3
Ø10mm @ 130mm c/c Ø10mm @ 130mm c/c
Ø10mm @ 170mm c/c
Stirrups Stirrups
Stirrups

Beam1 - Longitudinal
Section
2⌀20mm
3⌀20mm 5⌀20mm
0.20

0.20

0.20
0.50

0.50

0.50
Ø10mm @ 170mm c/c Ø10mm @ 130mm c/c Ø10mm @ 130mm c/c
Stirrups Stirrups Stirrups

3⌀20mm 2⌀20mm 2⌀20mm

0.30 0.30 0.30


25 mm

B2 Detail - at mid span B2 Detail - at supports B2 Detail - at cantliver

1 2 3
L/3 L/3 L/3

1 2 3
Ø10mm @ 130mm c/c Ø10mm @ 130mm c/c
Ø10mm @ 170mm c/c
Stirrups Stirrups
Stirrups

Beam1 - Longitudinal
Section
6⌀25mm L=9m
0.20

no. date initials revision

job title
0.50

Ø10mm @ 130mm c/c (A)


Stirrups
drawing title

3⌀20mm
BEAM REINFORCEMENT&SEC.
designed project manager
ENG : DR-Majid Albana
0.30 checked scale date
1-100 4 /2024
drawn job no. sheet no.
B1 Detail - at supports
approved
16
250

2Ø10 E.F.
Ø10/250

400
see slab reinf.

200
A B C D E F G

300
Ø10/200
3Ø12T&B

250

1 sec. b-b roof


NEW SLAB TO BE POURED FREE END SLAB
(CANTILEVER SLAB)

Ø12@150 B&T. MESH 100% SUPPORTING

25 mm FREE END SLAB


(CANTILEVER SLAB)
camber

OLD SLAB
50% SUPPORTING

2 FREE END SLAB


(CANTILEVER SLAB)

OLD SLAB

25% SUPPORTING
COLUMN COLUMN

FREE END SLAB


(CANTILEVER SLAB)

DETAIL FOR SLAB SUPPORTING COLUMN COLUMN

(BACK PROPPING)

3
Ø12@150

4
None Bearing Wall
Brick Wall 24cm

Ø12@150

Ø12@200 H
Ø12@200 V Beam
Ø12@200 V
Ø12@200 H

PENT HOUSE no. date initials revision

SLAB REINFORCEMENT (3rd floor)

job title

(A)
TOP REINFORCEMENT
Slab Reinf.
drawing title
PLAN OF SLAB
SLAB THICKNESS = 200 mm REINFORCEMENT&SEC.
BOTTOM REINFORCEMENT
designed project manager
ENG : DR-Majid Albana
checked scale date
. all dim. from ARCH D.W.G. drawn
1-100
job no.
4/2025
sheet no.

approved
17 ST/D/12
BOTTOM MESH BOTH DIRECTIONS
∅10@30 cm BOTTOM ADD BARS
∅16@20 cm ADD TOP BARS
∅12@20 cm ADD TOP BARS
∅16@20 cm ADD TOP BARS
∅12@20 cm ADD TOP BARS
MAX 20mm
CLEARCOVER

1 TYPICAL ANCHOR DETAIL AT LIVE END 5 TYPICAL ANCHOR DETAIL AT DEAD END 9 TRIM BARS AT UN SUPPORTED SLAB EDGES 13 TYPICAL SECTION THROUGH TENDON COVER

2 TYPICAL SLAB DETAIL AT CORE WALL CORNERS 6 PUNCHING SHEAR REINFORCEMENT -- SECTION 10 ADDED REBAR AT INTERIOR SHEAR WALLS 14 TRIM BARS FOR OPENINGS AT SLAB EDGE

3 REBAR AT RE-ENTRANT CORNERS 7 PUNCHING SHEAR REINFORCEMENT -- SECTION 11 ADDED REBAR AT EXTERIOR SHEAR WALLS 15 TRIM BARS FOR INTERIOR OPENINGS IN SLAB

4 REINFORCEMENT AT CANTILEVER SLAB EDGE 8 PUNCHING SHEAR REINFORCEMENT -- SECTION 12 TYPICAL SECTION THROUGH SLAB AND RAMP/STAIRCONNECTION
16 PLAN OF STRESSING SINGLE POCKET 20 PROFILE FOR REVERSED PARABOLA DISTRIBUTED TENDONS 24 RC DETAIL - PLAN 28 PLAN OF MINIMUM REINFORCEMENT AT EDGE OF SHEARWALL

SLAB

17 PLAN OF STRESSING DOUBLE POCKET 21 PROFILE FOR PARTIAL PARABOLA BANDED TENDONS 25 RC DETAIL SECTION WITH SHEAR WALL 29 ADDED REBAR AT SMALL DROPS IN SLAB SOFFIT

FOR MIDD SPAN

FOR END SLAB

18 POCKET SECTIONS 22 TYPICAL COLUMN SECTION DROP CAP AT BELOW 26 RC DETAIL - SECTION 30 ADDED REBAR AT CONSTRUCTION JOINT

19 SECTION A-A 23 TYPICAL SECTION AT SLAB COLUMN CONNECTION 27 TYPICAL ARRANGEMENT OF THE REINFORCEMENT IN BEAM