Revised Procurement Manual Final 18 Sept 2019
Revised Procurement Manual Final 18 Sept 2019
Document Control
31st May 2014 Work Flows & Forms are replaced with the new
formats as per newly implemented Stores,
Procurement & Payable System
Page 1 of 58
Procurement Manual
Table of Contents
Introduction, Objective 5
Guiding Principles 6
Work Matrix 7
Definitions 8-9
Evaluation of Vendor 19
Emergent Demand 24
Projects 25
Page 2 of 58
Procurement Manual
Requisition 58
Page 3 of 58
Procurement Manual
Abbreviations
Abbreviation Description
Dy MP Deputy Manager Procurement
AMP Assistant Manager Procurement
CapEx Capital Expenditures
CE Chief Executive
CFO Chief Financial Officer
COO Chief Operating Officer
GM General Manager
GRN Goods Receipts Note
OpEx Operating Expenditures
PO Purchase Order
WO Work Order
Q. Call Quotation Call
QC Quality Control
SIHS Shalamar Institute of Health Sciences
SV Service Voucher
SMDC Shalamar Medical & Dental College
SNC Shalamar Nursing College
SSAHS Shalamar School of Allied Health Sciences
SH Shalamar Hospital
Page 4 of 58
Procurement Manual
INTRODUCTION
The “Procurement Manual” provides the essential information and brief step-by-
step procedures for procurement of goods, works and services. This document is
intended to guide the procurement officials directly involved in the procurement
activities. It also intends to help in understanding the procurement processes and
to achieve uniformity in procurement processes. Efforts have been made to
outline procedure to exercise economy, avoid pilferage, increase efficiency and
enforce fairness.
The purpose of this manual is to establish the policies and procedures of SIHS
concerning the acquisition of goods and services. The procurement policies and
procedures are designed to ensure timely, efficient, and economic procurement,
within the guidelines of good business practices. Unless stated otherwise, these
policies and procedures will apply to all procurement actions of SIHS irrespective
of funding source and payment method. All purchases and procurements shall be
reasonable and necessary (i.e., no unnecessary items shall be purchased.
Objective
To maximize value for money in the acquisition of goods and services through
fair, open and transparent purchasing practices which comply with all applicable
legislations and trade agreements, resulting in the highest quality of service
delivery.
Page 5 of 58
Procurement Manual
Guiding Principles
To procure quality goods and services in the appropriate quantity and time
to fully satisfy the requisitioning departments requirements
2. Vendor Analysis
To encourage meaningful participation of suppliers in a competitive
process prior to the establishment of a business relationship or contract
award.
3. Procurement Process
To solicit, using the highest standards of professionalism and ethical
conduct, bids or proposals from which to make a choice for award of a
purchase order or contract. The form of competitive bidding, solicitation
and contract will be auditable, open, without favoritism and the most
appropriate for the related requirement.
4. Risk Management
To reduce the risk and potential for internal and external conflicts of
interest through the application of specific and transparent policies. To
ensure patient and staff safety are considered in all purchasing decisions.
5. Efficient Purchase
To maximize value for money in all acquisitions, applying leading practices
when making purchasing decisions.
7. Exceptions
Any exceptions to the laid down procedures require written justification
and the approval in accordance with approved SOPs mentioned in this
manual.
Page 6 of 58
Procurement Manual
Work Matrix
Page 7 of 58
Procurement Manual
Definitions
Page 8 of 58
Procurement Manual
11. “Contract” means the agreement entered into between the Purchaser
and the Contractor, as recorded in the Contract Form signed by the
parties, including all Schedules and Attachments thereto and all
documents incorporated by reference therein.
12. “Contract Price” means the price payable to the Contractor under the
Purchase Order/Contract for the full and proper performance of its
contractual obligations.
Page 9 of 58
Procurement Manual
a. The pre-qualification tenure will be for two (2) years, subsequently at the
end of tenure the pre-qualification period may be extended to another term
with the approval of COO SH.
c. The request for among all the pre-qualified Vendors, Quotations (RFQs)
shall be called to all prequalified firms for the specific procurement of
goods and services.
d. All potential bidders must indicate their intention for selection, for single or
multiple categories i.e. the potential bidder may participate in more than
one category, as per the “Pre-qualification Form”, (Annex-A).
Page 10 of 58
Procurement Manual
j. SIHS reserves the right to accept / reject wholly or partially any response or
cancel the pre-qualification process altogether at any stage of the pre-
qualification process without assigning any reason.
k. Responses are liable to be rejected if; they are not conforming to the terms,
conditions and specifications stipulated in the pre-qualification document.
o. An affidavit on legal stamp paper worth Rs.100/- to the effect that the firm
has not been blacklisted by any Government / semi Government
organization, and there is no litigation against the firm.
q. The purchaser will not be responsible for any costs or expenses incurred by
Firms/Contractors in connection with the preparation or delivery of
proposals.
r. Manufacturers, Super Stores and sole distributors shall be pre-qualified
on production of Registration/ Certificate.
Page 11 of 58
Procurement Manual
g. The Purchaser will inspect any goods when received and Repair &
Maintenance work at designated offices by Authorized Officials as
per Purchase / work order issued to the Firm.
Page 12 of 58
Procurement Manual
k. All items must meet in all respects with the description details and
conditions of the Purchase Order, and must be in good condition on
receipt, otherwise they will be liable to rejection.
l. The supplier will deliver the goods ordered to the Manager Stores
department who will sign on each delivery note, otherwise the
Purchaser will not be held responsible for the goods delivered
contrary, to this instruction.
Page 13 of 58
Procurement Manual
o. Blacklisting
(1) If the Supplier fails / delays in performance of any of the
obligations, under the Purchase Order/Work Order/Contract
and violates any of the provisions, breach of any of the terms
and conditions of the Purchase Order / Contract, a
committee headed by Unit Head and representatives from
Finance & Procurement Department as its members, may at
any time, without prejudice to any other right of action /
remedy it may have, blacklist the Supplier, either indefinitely
or for a stated period.
Page 14 of 58
Procurement Manual
a. Pre-qualification of vendor.
b. Approval / preparation of list of pre-qualified vendors by following
Committee:-
(1) Head of Committee COO-SH
(2) Members CFO
GM SMDC
HOD Bio Medical Department
Manager Administration SH
(3) Secretary HOD Procurement Department
Page 15 of 58
Procurement Manual
Pre-Qualification of Vendors
The vendor selection and evaluation shall be carried out for all types of
transactions including supplies, services of high value equipment. Application
shall be sought by HOD Procurement for pre-qualifying of vendors for supply of
goods/material and services through an advertisement in country vide
newspapers. Specimen advertisement is attached at Annex-C.
Vendor Selection
Page 16 of 58
Procurement Manual
Page 17 of 58
Procurement Manual
Page 18 of 58
Procurement Manual
Evaluation of Vendors
Page 19 of 58
Procurement Manual
The HOD Procurement shall finalize category wise list of items for calling
quotations from pre-qualified vendors.
Request for quotation (RFQ) is a process with a purpose to invite suppliers into a
bidding process to bid on specific products or services.
Page 20 of 58
Procurement Manual
4. The finalized and approved rate list shall be signed by above Committee,
and shall be communicated to all vendors who have submitted quotations for the
category of good / services. The approved vendor shall be offered a letter
communicating that his offered rates are approved.
5. The Procurement Department shall sign a contract with the vendor for
supply of goods / services as per the approved rate list. The term of contract can
be left at the discretion of the committee. The Head of Committee shall negotiate
the rate and terms/condition of the contact with the vendor and make
recommendation before the above committee for consideration and approval.
6. For specific items in which a vendor has expertise & repute or sole
dealership / agency, no other quotations are called and procurement of such item
is negotiated with that particular vendor only.
Page 21 of 58
Procurement Manual
Purchase requisitions shall be initiated by the end-user both for OPEX & CAPEX
items based on budget estimates. It must, at a minimum, contain the following:-
a. Accounting codes.
b. Quantity required and unit of measure (i.e. case or each).
c. A complete description of the goods and/or services required
including complete technical specifications (as appropriate to the
complexity of the sourcing event). The requisition form should be
comprehensive and should have all mandatory fields.
d. Required Delivery date.
Approvals
Store issue requisitions shall be checked by concerned HOD and final approvals
shall be made as per the following protocols:
a. Shalamar Hospital:
(1) All medical related Store supplies the Store Issue requests shall be
approved by Deputy Medical Director as per approved financial
powers, and shall refer to Chief Operating Officer for approval
amount exceeding his/her financial powers.
Page 22 of 58
Procurement Manual
b. SMDC
(2) All fixed asset items shall be approved by Principal SMDC / BHT
Procurement Committee.
c. SSAHS. The Principal SSAHS shall approve all opex demands being the
unit head, however fixed assets capex shall be approved by Principal
SSAHS/BHT Procurement Committee.
d. SNC. The Principal SNC shall approve all opex demands being the unit
head, however fixed assets / capex shall be approved by Principal
SNC/BHT Procurement Committee.
(2) All Store supplies Issue requests for items to be utilized for
internal consumption of the department shall be approved by
Secretary SIHS as per approved financial powers and shall obtain
approval from CE-SIHS for amount exceeding his financial powers.
Page 23 of 58
Procurement Manual
f. Catering:
g. Power Management :
Procurement Requisitions
a. In case the items requested are not available in the Stores the
Store Incharge shall forward a Purchase Demand based on the
demand received.
b. The store Incharge shall maintain the ordering levels of store items
based on the available consumption history and departmental
requirements. The Store in charge shall raise a Purchase demand
to ensure maintaining of levels and forwarded to Purchase
department.
Emergent Demands
Page 24 of 58
Procurement Manual
Projects
Page 25 of 58
Procurement Manual
Imports are products imported directly into a country and / or through the
manufacturer’s authorized agent / distributor.
b. Procurement Department
Page 26 of 58
Procurement Manual
Page 27 of 58
Procurement Manual
c. Finance Department.
Page 28 of 58
Procurement Manual
(5) Shall call the Insurance Surveyor and coordinate the time
with all concerned to open the cartons.
(5) Will keep Service Manuals and monitor the warranty period /
after sale services as per purchase contract.
Page 29 of 58
Procurement Manual
e. Stores Department
f. Opening of Cartons
(1) On arrival of goods, the Supplier shall open the seal of the
package/carton in presence of the Insurance Agent and
Quality Assurance Committee. (It should be noted that
original seals of shipments are torn by Custom Authorities
for checking on air / dry port).
Page 30 of 58
Procurement Manual
Page 31 of 58
Procurement Manual
Page 32 of 58
Procurement Manual
All contracts are processed, evaluated, finalized and approved through the
Procurement Department. Legal vetting wherever required shall be sought by the
concerned department. After the contract has been finalized and approved by the
respective unit head, the contract documents shall be handled and distributed as
follows:-
Page 33 of 58
Procurement Manual
a. Payment terms
b. Delivery dates
c. Item identification
d. Quantitates
e. Terms and all other obligations and conditions.
4. Purchase order could be given to the vendor by mail service and/or by fax.
Vendor can also collect purchase order from Procurement Department.
a. Original - To Vendor
b. 2nd copy - To Procurement Department
Page 34 of 58
Procurement Manual
In case certain goods are to be received which will become part of inventory
system then regular purchase orders should be created and must follow the
approved SOP. The Work Order may be prepared as follows:-
Page 35 of 58
Procurement Manual
Page 36 of 58
Procurement Manual
2. Security Office be directed not to allow any Vendor Vehicle access after
1415 hours from the main barrier unless personally requested by the Store
Incharge.
3. The Stores Department shall not accept any delivery from the vendor in
the absence of following documents:-
Page 37 of 58
Procurement Manual
9. Manager Store will generate Goods Return Transfer (GRT) on the basis
of intimation of rejected items, after approval by HOD Procurement
Department.
11. Decision to return, replace and /or disposal of the rejected materials is
the sole responsibility of Procurement Department.
QUALITY CONTROL
2. For specific items when quality check by the end user is necessary, the
Manager Store shall arrange its inspection by the end user in the presence of the
supplier and representatives of bio medical and procurement department.
Page 38 of 58
Procurement Manual
Page 39 of 58
Procurement Manual
Page 40 of 58
Procurement Manual
Annex-A
6. Business Nature:
a. Manufacture/Fabricators b. Agents to foreign principals
c. Importer d. Stockiest/Whole Seller
e. Retailer
7. Monthly Production / Supply Capacity:
__________________________________________________________
Page 41 of 58
Procurement Manual
12. Provide warranty claim history / certificates from end users/ customers (at least one)
13. Establishment Date of the Company/Enterprises
_____________________________________
14. Name of sole proprietor / CE :
__________________________________________________________________
15. Mobile Number:
__________________________________________________________________
16. Telephone Number (Office):
__________________________________________________________________
17. Official Website:
__________________________________________________________________
18. Fax Number:
__________________________________________________________________
19. E-mail address:
__________________________________________________________________
20. No. of years in business:
__________________________________________________________________
21. No. of employees:
__________________________________________________________________
22. Can you accept purchase orders by e-mail YES/NO
23. Category for which pre-qualification is being submitted:
Page 42 of 58
Procurement Manual
Particulars
Name
Position
Email Address
Financial Information
1) Company’s annual turnover ___________________________________________________
2) NTN number: ___________________________________________________
3) Bankers Name & Address: ___________________________________________________
___________________________________________________
Page 43 of 58
Procurement Manual
2. This registration will be valid from the date of issue for a period of two years.
3. BHT reserves the right to modify or cancel the registration at any time without assigning
any reason.
4. Generally our inquiries for purchase of material are notified trough Procurement
Department. Your timely response is expected according to the requirements.
5. In case any information given in this form is found incorrect at any later stage after
registration, the registration of the applicant will be canceled and the applicant shall be
blacklisted for entire SIHS units.
Declaration
I/We declare that the details given in this document are correct and accurate.
Completed by:
_______________ _______________
_______________ _______________
Page 44 of 58
Procurement Manual
Annex-B
VENDOR POST EVALUATION FORM
Department: __________________
Vendor ID__________________
Category: ____________________________________
Vendor Name: ________________________________ Contact Designation: ____________
Address: _________________________________________________________________
Re-evaluation Year:
Evaluation Factors MKs Date:
Marks Obtained
1- Product Quality 20
2- Product Safety (*) 10
3- Delivery ( complete, time) 10
4- After Sale Service 5
5- Response of queries 10
6- Emergency Response 5
TOTAL 100
NOTE:
1- Product parameter under which the vendors will be evaluated.
2- Scoring Criteria
A (Excellent) = 90 % and above B (Good) = ≥ 80 % and < 90 %
C (Satisfactory) = ≥ 70 % and < 80 % D (Poor) = Less than 70%
Page 45 of 58
Procurement Manual
Annex-C
Page 46 of 58
Procurement Manual
Annex-D
Description
Business Information 35
1 Legal Status 10
Public Ltd 10
Pvt Ltd 8
Partnership 6
Sole Proprietor 4
2 Years in Business 5
Above 10 Years 5
6-10 Years 3
2-5 years 1
3 Financial Capacity 10
Bank Certificate 2
Annual turnover Certificate 2
No of employees 2
Operational Region(No of Cities) 2
No of Branches (>=2) 2
4 Product List 5
Multi Products (%) 5
5 Production/Supply Capacity 5
Unlimited 5
Limited 3
On Order 1
Financial Review 45
1 Business Form 15
Manufacturer/Fabricator 15
Agents to Foreign Principal 12
Importers 9
Stockiest/Whole Seller 7
Retailer 4
2 Source of Supply/Freight 4
Within City 4
Page 47 of 58
Procurement Manual
Outside City 2
3 After Sale Services/Technical Support 5
4 Warranty Period 10
More Than 3 Years 10
25 months to 36 months 8
13 months to 24 months 6
1 month to 12 months 4
5 Warranty Type 5
Replacement 5
Spares & Services 4
Services 2
6 Warranty Claims History/Certificate 3
7 Ordering Level 3
Order as per Demand 3
Minimum Order Volume 0
Certification 10
1 International Certification 10
2 Local Certification 5
Quality of Samples (if required)
Reputation & Stability 10
1 Business References 5
2 Client List 5
Total Score 65
Page 48 of 58
Procurement Manual
ANNEX- E
TERM OF REFERENCE
BUSINESSMEN HOSPITAL TRUST PROCUREMENT COMMITTEE
Introduction
Businessmen Hospital Trust (BHT) is a not for profit charitable trust and runs four
units namely Shalamar Hospital, Shalamar Medical & Dental College, Shalamar
Nursing College and Shalamar School of Allied Health Sciences. These four
organizations of the BHT work under the administrative umbrella of Shalamar
Institute of Health Sciences (SIHS).
These TORs shall set the policies and procedures to ensure efficient and
economic procurement, within the guidelines of good business practices and
applicable laws and shall be applicable to all the existing as well as future units of
BHT.
Mission Statement
To maximize value for money n the acquisition of Assets through fair, open and
transparent purchasing practices which comply with all applicable legislations
and trade agreements, resulting in the highest quality of asset procured.
Page 49 of 58
Procurement Manual
Organization
The committee which shall oversee the procurement process shall be called
“BHT Procurement Committee (BPC)”. It shall consist of following members:-
Tenure of Trustees
The Board of Trustees shall appoint two Trustees along with Chairman of
Committee for tenure of five years.
Quorum of Meeting
The Quorum for a meeting shall be three members consisting of any one trustee
and two other members.
Page 50 of 58
Procurement Manual
but this period can be reduced in the case of emergent meetings. The notice
period can also be dispenses with, with the mutual consent of the trustees based
on their availability. In case any member is unable to attend a meeting, he can be
consulted through a conference call in which case he will be deemed to have
been present in the meeting. No casual approval by circulation shall be sought or
given and all approvals must be sought in a properly convened meeting of the
committee.
Scope of Meeting
These TORs shall cover the procurement of Equipment related assets in all the
units of BHT. The Equipment to be procured shall be approved by the following
authorities:-
Page 51 of 58
Procurement Manual
Complete details shall be submitted for each asset to be procured to BPC for
their review and approval. The BPC shall approve the procurement keeping in
view the following factors:-
In carrying out this assignment, the committee shall consider the following:-
d. Call upon any external advisors in this respect and can appoint or
take help and advice from external sources.
e. While presenting its purchase proposal, the Management has to
ensure that:
The Secretary of the committee shall report on the activities of the Procurement
Department in establishing the various internal controls and SOP’s and get them
approved from the Committee. Any changes or amendments made in the internal
controls and SOP’s shall be presented before the Committee for its approval.
The committee shall report on its activities to the BOT periodically through the
minutes of the meetings as well as personally by the chairman of the committee,
if called for, in the BOT meetings. The committee, being a Board Committee is
answerable to and accountable to the BOT only.
Page 53 of 58
Procurement Manual
HOD Procurement and the indentee should not improperly disclose any
information, confidential or otherwise, obtained during the course of their work.
Page 54 of 58
Procurement Manual
Page 55 of 58
Procurement Manual
Page 56 of 58
Procurement Manual
Page 57 of 58
Procurement Manual
Page 58 of 58