Application Guidelines (CS3) for Connection of Electricity Supply by Contestable consumers
(Rev: 27-Nov-2024)
FORM A – CS3 APPLICATION INFORMATION (To be completed by Tenant’s LEW / Elect. Contractor)
Instructions to applicant:
1. Form-A comprises of 5 parts (2-pages). Tenant / contractor LEW or electrical contractor shall fill up the required
information accordingly.
2. Write in a clear and legible manner when filling up the forms.
3. All boxes are required to be filled. Incomplete forms will be subjected to longer processing time. Where required
information is not applicable at all, write ‘N.A’.
4. Refer to Part-5 for the compulsory documents to be submitted together with Form-A and Form-B (CS3 Form).
5. All single-line diagrams that are to be submitted must be checked by Tenant / Contractor / Applicant’s LEW for
compliance to the SLD submission guidelines (refer to Appendix).
6. All documents shall be submitted in the form of softcopy format (PDF File).
Merge all documents and drawings into 1 single file. Arrange your
documents in the sequence as shown on the right.
7. Single line diagrams that are not endorsed by LEW / documents that are incomplete
or does not comply with the SLD submission guideline will be rejected or subjected
to longer application processing time.
8. Submit completed application forms together with all relevant
drawings to: (email) [email protected]
(Office) 6567-4032 - For enquiry
9. Processing will take approximately 3 working days.
---------------------------------------------------------------------------------------------------------------------------------------- -----------------
Part-1: TENANT’S INFORMATION:
Tenant Company Name: WORLEY PTE. LIMITED
Tenant Premise full address:
Block: 438B Unit No: # 04-05 TO 08 Building Name: ALEXANDRA TECHNOPARK B
(address of the new application) Street: ALEXANDRA ROAD Postal Code: 119968
Tenant Contact Person: Name: Doreen Toh Designation: Administrative Services Supervisor
Tenant Contact number: HP: 92478020 Office: Fax:
Part-2: BILLING INFORMATION:
Company Name
(For invoice of Inspection fees): AMPERE ENGINEERING PTE LTD
Full Address Block: 101 Unit No: # 04-05 Building Name: PEOPLE’S PARK CENTRE
(For invoice of Inspection fees): Street: CROSS STREET Postal Code: 058357
Part-3: SITE PERSONNEL CONTACT INFORMATION:
Tenant’s LEW Name and
Mobile No:
Name: TAN PENG CHUA HP: 90056821
Contractor Supervisor Name and
Name: ZAMES HP: 91462340
Mobile No:
This document contains material which is owned by or licensed to LC Engineering Services Pte Ltd. This material includes, but is not limited to, the design, layout, look, appearance and graphics. Any form of
reproduction (full or part of it) is considered copyright infringement under the Copyright Act. Unauthorized use of this material may give rise to a claim for damages and/or be a criminal offence.
Address: 1 Bukit Batok St 22, #04-01, Singapore 659592 | Tel: 65674032| Fax: 65697507
Email: [email protected] | Website: www.Lces.com.sg | GST Reg No. 201134302M Page 9 of 12
CONSULTANCY AND ENGINEERING
EMA ELECTRICAL LICENSING
TESTING, MAINTENANCE & PROJECT MANAGEMENT
Application Guidelines (CS3) for Connection of Electricity Supply by Contestable consumers
(Rev: 27-Nov-2024)
FORM A – CS3 APPLICATION INFORMATION (To be completed by Tenant’s LEW / Elect. Contractor)
Part-4: ARRANGEMENT FOR INSPECTION / TURN ON OF SUPPLY LINE
The following conditions shall be fulfilled before making a request for inspection / testing / energization of the
supply line:
• Revenue meter to be installed and tested by metering agent (only for new installation).
• Installation of electrical fixtures are completed.
• CS3 had been approved with payment for CS3 fees made.
Applicant may contact LC Engineering Services Pte Ltd via email ([email protected]) to provide their preferred
testing / inspection / energization appointment.
Subjected to the availability of the testing LEW from LC Engineering services Pte Ltd, the testing appointment
may be changed.
Refer to 5.d & 5.e (page-6 of the guidelines) for information of booking for testing appointments.
----------------------------------------------------------------------------------------------------------------------------- ----------------------------
Part-5: DOCUMENT SUBMISSION CHECKLIST:
The following documents are attached together with this application:
No. of No. of
Document Document
copies copies
Overcurrent & Earth Fault Relay Operation
Electrical Single-Line Diagram *#+ 1
Test Report +
Electrical Layout Diagram # + Electrical Installation Test Report +
(power / lighting / e-light / DB) (insulation resistance test)
Certificate of Compliance *#+ 1 Other Equipment Test Reports (if any)
Note:
* Documents required to be submitted for review / approval of temporary CS3 application
# Documents required to be submitted for review / approval of permanent CS3 application
+
Documents (updated, if any) required to be submitted for review and record keeping during energization
This document contains material which is owned by or licensed to LC Engineering Services Pte Ltd. This material includes, but is not limited to, the design, layout, look, appearance and graphics. Any form of
reproduction (full or part of it) is considered copyright infringement under the Copyright Act. Unauthorized use of this material may give rise to a claim for damages and/or be a criminal offence.
Address: 1 Bukit Batok St 22, #04-01, Singapore 659592 | Tel: 65674032| Fax: 65697507
Email: [email protected] | Website: www.Lces.com.sg | GST Reg No. 201134302M Page 10 of 12
CONSULTANCY AND ENGINEERING
EMA ELECTRICAL LICENSING
TESTING, MAINTENANCE & PROJECT MANAGEMENT
Application Guidelines (CS3) for Connection of Electricity Supply by Contestable consumers
(Rev: 27-Nov-2024)
FORM B – CS3 Form: Request for Electricity Supply by Tenants
PART 1 – TENANT (Details to be completed by Tenant’s appointed Licensed Electrical Worker)
Send Building LEW - 1 Bukit Batok, #04-01, S(659592)
Application to: 65674032 (Office) | 65697507 (Fax) |
[email protected] (email)
Full Address of Block: 438B Unit No: # 04-05 TO 08 Building Name: ALEXANDRA TECHNOPARK B
Installation Street: ALEXANDRA ROAD Postal Code: 058357
Name of
Company WORLEY PTE. LIMITED
Circuit
Total Approved Amps at: Total Floor Power Density
63 Breaker
Load (A) [1] 230V / 400V Area (m2) (W/m2) [1]
Rating (A)
(✓ Tick to select the type of application)
☐ New Connection[1,2] ☐ Upgrading of Supply[1,2] ☐ Temporary Supply[3,4] (Event / Decoration) ☐ Temporary supply[3,4] (Construction)
☐ Rewiring work ☐ Addition / Alteration[1,2] ☐ Reinstatement[5]
Note:
[1] Applicant’s installation design load shall comply with Landlord’s agreement for the approved load, limited to the approved allocated power density.
[2] Private utility meter installed shall complied with Landlord’s requirement.
[3] Temporary supply for renovation, fit-out work / temporary installations for events site set-up shall comply with SS:650 (Formerly CP-88).
[4] An Kwh utility meter shall be installed for recording of power consumption during the period of temporary supply connection.
Kwh meter is not required if landlord deems as not necessary and charges for usage of electricity is based on daily rate.
[5] SP Services revenue meter shall be returned to SP Services. Revenue meters from private energy retailers shall be returned accordingly by either the
reinstatement contractor or the outgoing tenant.
PART 2 – BUILDING LICENSED ELECTRICAL WORKER
1. I have checked the loading of the electrical installation of the above-mentioned building / complex and hereby confirm that the
above-mentioned load requirement can be catered for from the rising / horizontal mains system / main switchboard of the building
/ complex and the total approved load to the entire building / complex will not be exceeded.
2. I have no objection for the above-mentioned load to be connected to the rising / horizontal mains system / main switchboard of
the building / complex.
3. I will check to ensure that the above-mentioned installation is compatible with the electrical installation of the building / complex.
______________________
Signature of Building’s LEW Date:
PART 3 – CONSENT FROM LANDLORD
To: Tenant of above-mentioned address:
• I hereby give consent for the above-mentioned tenant to tap electricity supply of the capacity indicated above from the rising /
horizontal mains system / main switchboard of the building /complex.
• Please ask your tenant’s LEW to liaise with our building’s LEW for the inspection of your electrical installations.
____ _____________________
Name / Signature of Authorised Personnel Date:
This document contains material which is owned by or licensed to LC Engineering Services Pte Ltd. This material includes, but is not limited to, the design, layout, look, appearance and graphics. Any form of
reproduction (full or part of it) is considered copyright infringement under the Copyright Act. Unauthorized use of this material may give rise to a claim for damages and/or be a criminal offence.
Address: 1 Bukit Batok St 22, #04-01, Singapore 659592 | Tel: 65674032| Fax: 65697507
Email: [email protected] | Website: www.Lces.com.sg | GST Reg No. 201134302M Page 11 of 12